-
1
-
-
0033871635
-
Scheduling no-wait robotic cell with two and three machines
-
Agnetis, A., "Scheduling No-wait Robotic Cell with Two and Three Machines," European Journal of Operational Research, Vol. 123, pp. 303-314 (2002).
-
(2000)
European Journal of Operational Research
, vol.123
, pp. 303-314
-
-
Agnetis, A.1
-
2
-
-
0034315580
-
Part sequencing in three-machine no-wait robotic cells
-
Agnetis, A. and Pacciarelli, D., "Part Sequencing in Three-Machine No-wait Robotic Cells," Operations Research Letters, Vol. 27, pp. 185-192 (2000).
-
(2000)
Operations Research Letters
, vol.27
, pp. 185-192
-
-
Agnetis, A.1
Pacciarelli, D.2
-
3
-
-
0028550722
-
Design for synchronized flow manufacturing
-
Ahmadi, R. H. and Wurgaft, H., "Design for Synchronized Flow Manufacturing," Management Science, Vol. 40, pp. 1469-1483 (1994).
-
(1994)
Management Science
, vol.40
, pp. 1469-1483
-
-
Ahmadi, R.H.1
Wurgaft, H.2
-
4
-
-
0004175712
-
-
John Wiley & Sons, New York
-
Baccelli, F. L., Cohen, G., Quadrat, J. P., and Olsder, G. J., Synchronization and Linearity, John Wiley & Sons, New York (1992).
-
(1992)
Synchronization and Linearity
-
-
Baccelli, F.L.1
Cohen, G.2
Quadrat, J.P.3
Olsder, G.J.4
-
6
-
-
0025623442
-
Cyclic job shop scheduling using reservation tables
-
Chaar, J. K. and Davidson, E. S., "Cyclic Job Shop Scheduling Using Reservation Tables," Proceedings of the 1990 IEEE International Conference on Robotics and Automation, Cincinnati, OH, pp. 2128-2135 (1990).
-
(1990)
Proceedings of the 1990 IEEE International Conference on Robotics and Automation, Cincinnati, OH
, pp. 2128-2135
-
-
Chaar, J.K.1
Davidson, E.S.2
-
7
-
-
0034367676
-
Cyclic scheduling of robotic flowshops
-
Crama, Y., Kats, V., van de Klundert, J., and Levner, E., "Cyclic Scheduling of Robotic Flowshops," Annals of Operations Research, Vol. 96, pp. 97-104 (2000).
-
(2000)
Annals of Operations Research
, vol.96
, pp. 97-104
-
-
Crama, Y.1
Kats, V.2
Van De Klundert, J.3
Levner, E.4
-
8
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Crama, Y. and van de Klundert, J., "Cyclic Scheduling of Identical Parts in a Robotic Cell," Operations Research, Vol. 45, No. 6, pp. 952-965 (1997).
-
(1997)
Operations Research
, vol.45
, Issue.6
, pp. 952-965
-
-
Crama, Y.1
Van De Klundert, J.2
-
10
-
-
4244003645
-
Theorie linéaire des systèmes dans les dioïdes
-
Thèse, École des Mines de Paris, Paris
-
Gaubert, S., Theorie Linéaire des Systèmes dans les Dioïdes, Thèse, École des Mines de Paris, Paris (1992).
-
(1992)
-
-
Gaubert, S.1
-
11
-
-
0002680234
-
Valeurs propres et vecteurs propres dans les dioïdes et leur interprétation en théorie des graphes
-
Gondran, M. and Minoux, M., "Valeurs Propres et Vecteurs Propres dans les Dioïdes et leur Interprétation en Théorie des Graphes," Bulletin de la Direction des Études et Recherches, Série C, Mathématiques Informatique, Vol. 2 pp. 25-41 (1977).
-
(1977)
Bulletin de la Direction des Études et Recherches, Série C, Mathématiques Informatique
, vol.2
, pp. 25-41
-
-
Gondran, M.1
Minoux, M.2
-
12
-
-
0000410538
-
Scheduling of re-entrant flow shops
-
Graves, S. C., Meal, H. C., Stefek, D., and Zeghmi, A. H., "Scheduling of Re-entrant Flow Shops," Journal of Operations Management, Vol. 3, pp. 197-207 (1983).
-
(1983)
Journal of Operations Management
, vol.3
, pp. 197-207
-
-
Graves, S.C.1
Meal, H.C.2
Stefek, D.3
Zeghmi, A.H.4
-
13
-
-
0012220631
-
Operations research techniques for robotics systems
-
S. Y. Nof (Ed.), John Wiley & Sons, New York
-
Hall, N. G., "Operations Research Techniques for Robotics Systems," Handbook of Industrial Robotics, S. Y. Nof (Ed.), John Wiley & Sons, New York (1999).
-
(1999)
Handbook of Industrial Robotics
-
-
Hall, N.G.1
-
14
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machines cells
-
Hall, N. G., Kamoun, H., and Sriskandarajah, C., "Scheduling in Robotic Cells: Classification, Two and Three Machines Cells," Operations Research, Vol. 45, No. 3, pp. 421-439 (1997).
-
(1997)
Operations Research
, vol.45
, Issue.3
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
15
-
-
0012220632
-
The complexity of cyclic shop scheduling problems
-
Hall, N. G., Lee, T. E., and Posner, M. E., "The Complexity of Cyclic Shop Scheduling Problems," Journal of Scheduling, Vol. 5, pp. 307-327 (2002).
-
(2002)
Journal of Scheduling
, vol.5
, pp. 307-327
-
-
Hall, N.G.1
Lee, T.E.2
Posner, M.E.3
-
16
-
-
0028766191
-
Study of a NP-hard cyclic scheduling problem: The recurrent job shop
-
Hanen, C., "Study of a NP-hard Cyclic Scheduling Problem: The Recurrent Job Shop," European Journal of Operational Research, Vol. 72, pp. 82-101 (1994).
-
(1994)
European Journal of Operational Research
, vol.72
, pp. 82-101
-
-
Hanen, C.1
-
17
-
-
0024479894
-
Performance evaluation of job-shop systems using timed event graphs
-
Hillion, H. P. and Proth, J.-M., "Performance Evaluation of Job-Shop Systems Using Timed Event Graphs," IEEE Transactions on Automatic Control, Vol. 34, No. 1, pp. 3-9 (1989).
-
(1989)
IEEE Transactions on Automatic Control
, vol.34
, Issue.1
, pp. 3-9
-
-
Hillion, H.P.1
Proth, J.-M.2
-
18
-
-
0012219716
-
Scheduling of flexible flow shops - II
-
Technical Report LIDS-R-1049, Laboratory for Information and Decision Systems, M.I.T., Cambridge, MA
-
Hitz, K. L., "Scheduling of Flexible Flow Shops - II," Technical Report LIDS-R-1049, Laboratory for Information and Decision Systems, M.I.T., Cambridge, MA (1980).
-
(1980)
-
-
Hitz, K.L.1
-
19
-
-
0027906646
-
The complexity of scheduling jobs in repetitive manufacturing systems
-
Kamoun, H. and Sriskandarajah, C., "The Complexity of Scheduling Jobs in Repetitive Manufacturing Systems," European Journal of Operational Research, Vol. 70, pp. 350-364 (1993).
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 350-364
-
-
Kamoun, H.1
Sriskandarajah, C.2
-
20
-
-
21844501690
-
The interface of buffer design and cyclic scheduling decisions in deterministic flow lines
-
Karabati, S. and Kouvelis, P., "The Interface of Buffer Design and Cyclic Scheduling Decisions in Deterministic Flow Lines," Annals of Operations Research, Vol. 50, pp. 295-317 (1994).
-
(1994)
Annals of Operations Research
, vol.50
, pp. 295-317
-
-
Karabati, S.1
Kouvelis, P.2
-
21
-
-
0012270859
-
Periodic job shop scheduling
-
Ph.D. Thesis, The Ohio State University, Columbus, OH
-
Lee, T. E., "Periodic Job Shop Scheduling," Ph.D. Thesis, The Ohio State University, Columbus, OH (1991).
-
(1991)
-
-
Lee, T.E.1
-
22
-
-
0033891784
-
Stable earliest starting schedules for cyclic job shops: A linear system approach
-
Lee, T. E., "Stable Earliest Starting Schedules for Cyclic Job Shops: A Linear System Approach," International Journal of Flexible Manufacturing Systems, Vol. 12, pp. 59-80 (2000).
-
(2000)
International Journal of Flexible Manufacturing Systems
, vol.12
, pp. 59-80
-
-
Lee, T.E.1
-
23
-
-
0030691565
-
Performance measures and schedules in periodic job shops
-
Lee, T. E. and Posner, M. E., "Performance Measures and Schedules in Periodic Job Shops," Operations Research, Vol. 45, No. 1, pp. 72-91 (1997).
-
(1997)
Operations Research
, vol.45
, Issue.1
, pp. 72-91
-
-
Lee, T.E.1
Posner, M.E.2
-
24
-
-
0000136120
-
A parametric critical path problem and an application for cyclic scheduling
-
Levner, E. and Kats, V., "A Parametric Critical Path Problem and an Application for Cyclic Scheduling," Discrete Applied Mathematics, Vol. 87, pp. 149-158 (1998).
-
(1998)
Discrete Applied Mathematics
, vol.87
, pp. 149-158
-
-
Levner, E.1
Kats, V.2
-
25
-
-
0031095268
-
An improved algorithm for a cyclic robotic scheduling problem
-
Levner, E., Kats, V. B., and Levit, V. E., "An Improved Algorithm for a Cyclic Robotic Scheduling Problem," European Journal of Operational Research, Vol. 97, pp. 500-508 (1997).
-
(1997)
European Journal of Operational Research
, vol.97
, pp. 500-508
-
-
Levner, E.1
Kats, V.B.2
Levit, V.E.3
-
26
-
-
0025498065
-
Cyclic sequencing problems in the two-machine permutation flow shop: Complexity, worst-case and average-case analysis
-
Matsuo H., "Cyclic Sequencing Problems in the Two-Machine Permutation Flow Shop: Complexity, Worst-case and Average-case Analysis," Naval Research Logistics, Vol. 37, pp. 679-694 (1990).
-
(1990)
Naval Research Logistics
, vol.37
, pp. 679-694
-
-
Matsuo, H.1
-
27
-
-
0024770469
-
Sequencing in an assembly line with blocking to minimize cycle time
-
McCormick, S. T., Pinedo, M. L., Shenker, S., and Wolf, B., "Sequencing in an Assembly Line with Blocking to Minimize Cycle Time," Operations Research, Vol. 37, No. 6, pp. 925-935 (1989).
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 925-935
-
-
McCormick, S.T.1
Pinedo, M.L.2
Shenker, S.3
Wolf, B.4
-
28
-
-
0024645936
-
Petri nets: Properties, analysis and application
-
Murata, T., "Petri Nets: Properties, Analysis and Application," Proceedings of the IEEE, Vol. 77, No. 4, pp. 541-580 (1989).
-
(1989)
Proceedings of the IEEE
, vol.77
, Issue.4
, pp. 541-580
-
-
Murata, T.1
-
29
-
-
0003418449
-
-
Prentice-Hall, Inc., Englewood Cliffs, NJ
-
Peterson, J. L., Petri Net Theory and the Modeling of Systems, Prentice-Hall, Inc., Englewood Cliffs, NJ (1981).
-
(1981)
Petri Net Theory and the Modeling of Systems
-
-
Peterson, J.L.1
-
30
-
-
0019058848
-
Performance evaluation of asynchronous concurrent systems using petri nets
-
Ramamoorthy, C. V. and Ho, G. S., "Performance Evaluation of Asynchronous Concurrent Systems Using Petri Nets," IEEE Transactions on Software Engineering, Vol. 6, No. 5, pp. 440-449 (1980).
-
(1980)
IEEE Transactions on Software Engineering
, vol.6
, Issue.5
, pp. 440-449
-
-
Ramamoorthy, C.V.1
Ho, G.S.2
-
31
-
-
0000885127
-
Cyclic schedules for job shops with identical jobs
-
Roundy, R., "Cyclic Schedules for Job Shops with Identical Jobs," Mathematics of Operations Research, Vol. 17, pp. 842-865 (1992).
-
(1992)
Mathematics of Operations Research
, vol.17
, pp. 842-865
-
-
Roundy, R.1
-
32
-
-
0000222016
-
Sequencing of parts and robot moves in a robot cell
-
Sethi, S. P., Sriskandarajah, C., Sorger, G., Blazewicz, J., and Kubiak, W., "Sequencing of Parts and Robot Moves in a Robot Cell," International Journal of Flexible Manufacturing Systems, Vol. 4, pp. 331-358 (1992).
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 331-358
-
-
Sethi, S.P.1
Sriskandarajah, C.2
Sorger, G.3
Blazewicz, J.4
Kubiak, W.5
-
33
-
-
0032042832
-
Petri net modeling and scheduling for cyclic job shops with blocking
-
Song, J. S. and Lee, T. E., "Petri Net Modeling and Scheduling for Cyclic Job Shops with Blocking," Computers and Industrial Engineering, Vol. 35, No. 2, pp. 281-295 (1998).
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.2
, pp. 281-295
-
-
Song, J.S.1
Lee, T.E.2
-
34
-
-
0032391968
-
Scheduling large robotic cells without buffers
-
Sriskandarajah, C., Hall, N. G., and Kamoun, H., "Scheduling Large Robotic Cells without Buffers," Annals of Operations Research, Vol. 76, pp. 287-321 (1998).
-
(1998)
Annals of Operations Research
, vol.76
, pp. 287-321
-
-
Sriskandarajah, C.1
Hall, N.G.2
Kamoun, H.3
|