-
1
-
-
33645957411
-
Earned value project management method and extensions
-
Anbari, F. (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 12–23.
-
(2003)
Project Management Journal
, vol.34
, Issue.4
, pp. 12-23
-
-
Anbari, F.1
-
3
-
-
84855863702
-
Correction note: “Earned schedule” and its possible unreliability as an indicator
-
Fall)
-
Book, S. (2006a, Fall). Correction note: “Earned schedule” and its possible unreliability as an indicator. The Measurable News, 22–24.
-
(2006)
The Measurable News
, pp. 22-24
-
-
Book, S.1
-
5
-
-
18544371010
-
The estimate at completion problem: A review of three studies
-
Christensen, D. (1993). The estimate at completion problem: A review of three studies. Project Management Journal, 24, 37–42.
-
(1993)
Project Management Journal
, vol.24
, pp. 37-42
-
-
Christensen, D.1
-
6
-
-
84953371546
-
Is the cumulative SCI-based EAC an upper bound to the final cost of post-A12 defense contracts
-
Winter)
-
Christensen, D. (2004, Winter). Is the cumulative SCI-based EAC an upper bound to the final cost of post-A12 defense contracts? Journal of Cost Analysis and Management, 6, 1–10.
-
(2004)
Journal of Cost Analysis and Management
, vol.6
, pp. 1-10
-
-
Christensen, D.1
-
7
-
-
18544373981
-
Spring). A review of estimate at completion (EAC) research
-
Christensen, D., Antolini, R., & McKinney, J. (1995, Spring). A review of estimate at completion (EAC) research. Journal of Cost Analysis and Management, 41–62.
-
(1995)
Journal of Cost Analysis and Management
, pp. 41-62
-
-
Christensen, D.1
Antolini, R.2
McKinney, J.3
-
9
-
-
46949097502
-
Cost performance index stability – Fact or fiction
-
Christensen, D., & Payne, K. (1992). Cost performance index stability – Fact or fiction? Journal of Parametrics, 10, 27–40.
-
(1992)
Journal of Parametrics
, vol.10
, pp. 27-40
-
-
Christensen, D.1
Payne, K.2
-
10
-
-
18544370867
-
Is the CPI-based EAC a lower bound to the final cost of post A-12 contracts
-
Winter)
-
Christensen, D., & Rees, D. (2002, Winter). Is the CPI-based EAC a lower bound to the final cost of post A-12 contracts? Journal of Cost Analysis and Management, 4, 55–65.
-
(2002)
Journal of Cost Analysis and Management
, vol.4
, pp. 55-65
-
-
Christensen, D.1
Rees, D.2
-
12
-
-
85162242853
-
-
Colin, J., & Vanhoucke, M. (2013a). A multivariate approach to statistical project control using earned value management. Working paper at Ghent University, currently under journal submission (Check www.projectmanagement.ugent.be for an update).
-
Colin, J., & Vanhoucke, M. (2013a). A multivariate approach to statistical project control using earned value management. Working paper at Ghent University, currently under journal submission (Check www.projectmanagement.ugent.be for an update).
-
-
-
-
13
-
-
85162271711
-
-
Colin, J., & Vanhoucke, M. (2013b). Setting tolerance limits for statistical project control using earned value management. Working paper at Ghent University, currently under journal submission (Check www.projectmanagement.ugent.be for an update).
-
Colin, J., & Vanhoucke, M. (2013b). Setting tolerance limits for statistical project control using earned value management. Working paper at Ghent University, currently under journal submission (Check www.projectmanagement.ugent.be for an update).
-
-
-
-
15
-
-
3543055794
-
Rangen: A random network generator for activity-on-the-node networks
-
Demeulemeester, E., Vanhoucke, M., & Herroelen, W. (2003). Rangen: A random network generator for activity-on-the-node networks. Journal of Scheduling, 6, 17–38.
-
(2003)
Journal of Scheduling
, vol.6
, pp. 17-38
-
-
Demeulemeester, E.1
Vanhoucke, M.2
Herroelen, W.3
-
16
-
-
84875117724
-
Impact of sensitivity information on the prediction of project’s duration using earned schedule method
-
Elshaer, R. (2013). Impact of sensitivity information on the prediction of project’s duration using earned schedule method. International Journal of Project Management, 31, 579–588.
-
(2013)
International Journal of Project Management
, vol.31
, pp. 579-588
-
-
Elshaer, R.1
-
18
-
-
77953872383
-
A survey of variants and extensions of the resource-constrained project scheduling problem
-
Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207, 1–15.
-
(2010)
European Journal of Operational Research
, vol.207
, pp. 1-15
-
-
Hartmann, S.1
Briskorn, D.2
-
19
-
-
46949097849
-
Does project performance stability exist? A re-examination of CPI and evaluation of SPI(t) stability? Crosstalk
-
Henderson, K., & Zwikael, O. (2008). Does project performance stability exist? A re-examination of CPI and evaluation of SPI(t) stability? Crosstalk – The Journal of Defense Software Engineering, 21, 7–13.
-
(2008)
The Journal of Defense Software Engineering
, vol.21
, pp. 7-13
-
-
Henderson, K.1
Zwikael, O.2
-
20
-
-
0013408112
-
Schedule risk analysis simplified
-
Hulett, D. (1996). Schedule risk analysis simplified. Project Management Network, 10, 23–30.
-
(1996)
Project Management Network
, vol.10
, pp. 23-30
-
-
Hulett, D.1
-
21
-
-
35448950734
-
Forecasting project schedule completion with earned value metrics
-
March
-
Jacob, D. (2003, March). Forecasting project schedule completion with earned value metrics. The Measurable News, 1, 7–9.
-
(2003)
The Measurable News
, vol.1
, pp. 7-9
-
-
Jacob, D.1
-
23
-
-
35448950734
-
Forecasting schedule completion using earned value metrics? Revisited
-
Summer)
-
Jacob, D., & Kane, M. (2004, Summer). Forecasting schedule completion using earned value metrics? Revisited. The Measurable News, 1, 11–17.
-
(2004)
The Measurable News
, vol.1
, pp. 11-17
-
-
Jacob, D.1
Kane, M.2
-
25
-
-
49749100423
-
Introduction to modeling and generating probabilistic input processes for simulation
-
S. Henderson, B. Biller, M. Hsieh, J. Shortle, J. Tew, & R. Barton (Eds.), Washington, DC
-
Kuhl, M. E., Lada, E. K., Steiger, N. M., Wagner, M. A., & Wilson, J. R. (2007). Introduction to modeling and generating probabilistic input processes for simulation. In S. Henderson, B. Biller, M. Hsieh, J. Shortle, J. Tew, & R. Barton (Eds.), Proceedings of the 2007 winter simulation conference, Washington, DC (pp. 63–76). New Jersey: Institute of Electrical and Electronics Engineers.
-
(2007)
Proceedings of the 2007 Winter Simulation Conference
, pp. 63-76
-
-
Kuhl, M.E.1
Lada, E.K.2
Steiger, N.M.3
Wagner, M.A.4
Wilson, J.R.5
-
27
-
-
35448998301
-
Connecting earned value to the schedule
-
Winter)
-
Lipke, W. (2004, Winter). Connecting earned value to the schedule. The Measurable News, 1, 6–16.
-
(2004)
The Measurable News
, vol.1
, pp. 6-16
-
-
Lipke, W.1
-
28
-
-
85162271579
-
Earned schedule
-
Lipke, W. (2012). Earned schedule. lulu.com.
-
(2012)
Lulu.Com
-
-
Lipke, W.1
-
29
-
-
64449085007
-
Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes
-
Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009). Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management, 27, 400–407.
-
(2009)
International Journal of Project Management
, vol.27
, pp. 400-407
-
-
Lipke, W.1
Zwikael, O.2
Henderson, K.3
Anbari, F.4
-
30
-
-
58049139009
-
-
3rd ed.). Newtown Square: Project Management Institute, Inc
-
PMBOK. (2004). A guide to the project management body of knowledge (3rd ed.). Newtown Square: Project Management Institute, Inc.
-
(2004)
A Guide to the Project Management Body of Knowledge
-
-
-
31
-
-
84859211119
-
Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation
-
Trietsch, D., Mazmanyan, L., Govergyan, L., & Baker, K. R. (2012). Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation. European Journal of Operational Research, 216, 386–396.
-
(2012)
European Journal of Operational Research
, vol.216
, pp. 386-396
-
-
Trietsch, D.1
Mazmanyan, L.2
Govergyan, L.3
Baker, K.R.4
-
32
-
-
33645967441
-
A comparison of different project duration forecasting methods using earned value metrics
-
Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24, 289–302.
-
(2006)
International Journal of Project Management
, vol.24
, pp. 289-302
-
-
Vandevoorde, S.1
Vanhoucke, M.2
-
34
-
-
84952004004
-
Static and dynamic determinants of earned value based time forecast accuracy
-
T. Kidd (Ed.), Hershey: Information Science Reference
-
Vanhoucke, M. (2009). Static and dynamic determinants of earned value based time forecast accuracy. In T. Kidd (Ed.), Handbook of research on technology project management, planning, and operations (pp. 361–374). Hershey: Information Science Reference.
-
(2009)
Handbook of Research on Technology Project Management, Planning, and Operations
, pp. 361-374
-
-
Vanhoucke, M.1
-
36
-
-
84995792078
-
Measuring time: An earned value performance management study
-
Vanhoucke, M. (2010b). Measuring time: An earned value performance management study. The Measurable News, 1, 10–14.
-
(2010)
The Measurable News
, vol.1
, pp. 10-14
-
-
Vanhoucke, M.1
-
37
-
-
77953177108
-
Using activity sensitivity and network topology information to monitor project time performance
-
Vanhoucke, M. (2010c). Using activity sensitivity and network topology information to monitor project time performance. Omega – The International Journal of Management Science, 38, 359–370.
-
(2010)
Omega – the International Journal of Management Science
, vol.38
, pp. 359-370
-
-
Vanhoucke, M.1
-
38
-
-
78649854792
-
On the dynamic use of project performance and schedule risk information during project tracking
-
Vanhoucke, M. (2011). On the dynamic use of project performance and schedule risk information during project tracking. Omega – The International Journal of Management Science, 39, 416–426.
-
(2011)
Omega – the International Journal of Management Science
, vol.39
, pp. 416-426
-
-
Vanhoucke, M.1
-
39
-
-
84940385113
-
Dynamic scheduling: Integrating schedule risk analysis with earned value management
-
Vanhoucke, M. (2012a). Dynamic scheduling: Integrating schedule risk analysis with earned value management. The Measurable News, 2, 11–13.
-
(2012)
The Measurable News
, vol.2
, pp. 11-13
-
-
Vanhoucke, M.1
-
40
-
-
84655167747
-
Measuring the efficiency of project control using fictitious and empirical project data
-
Vanhoucke, M. (2012b). Measuring the efficiency of project control using fictitious and empirical project data. International Journal of Project Management, 30, 252–263.
-
(2012)
International Journal of Project Management
, vol.30
, pp. 252-263
-
-
Vanhoucke, M.1
-
43
-
-
84940444593
-
The impact of project schedule adherence and rework on the duration forecast accuracy of earned value metrics
-
E. C. Hoffmann (Ed.), Hauppauge: NOVA Publishers
-
Vanhoucke, M. (2013b). The impact of project schedule adherence and rework on the duration forecast accuracy of earned value metrics. In E. C. Hoffmann (Ed.), Project management: Practices, challenges and developments. Hauppauge: NOVA Publishers.
-
(2013)
Project Management: Practices, Challenges and Developments
-
-
Vanhoucke, M.1
-
45
-
-
85162244866
-
An overview of recent research results and future research avenues using simulation studies in project management. ISRN Computational Mathematics
-
(d)
-
Vanhoucke, M. (2013d). An overview of recent research results and future research avenues using simulation studies in project management. ISRN Computational Mathematics, Article ID:513549, 1–19.
-
(2013)
Article ID
, vol.549
, pp. 1-19
-
-
Vanhoucke, M.1
-
46
-
-
84951827689
-
Project baseline scheduling: An overview of past experiences
-
Vanhoucke, M. (2013e). Project baseline scheduling: An overview of past experiences. Journal of Modern Project Management, 1(2), 18–27.
-
(2013)
Journal of Modern Project Management
, vol.1
, Issue.2
, pp. 18-27
-
-
Vanhoucke, M.1
-
47
-
-
84952045818
-
Project management using dynamic scheduling: Baseline scheduling, risk analysis and project control
-
Vanhoucke, M. (2013f). Project management using dynamic scheduling: Baseline scheduling, risk analysis and project control. The Measurable News, 2, 45–50.
-
(2013)
The Measurable News
, vol.2
, pp. 45-50
-
-
Vanhoucke, M.1
-
48
-
-
85162191536
-
-
Vanhoucke, M. (2013g). Welcome to OR&S! Where students, academics and professionals come together (pp. 1–15). Available online at www.or-as.be/books/research.
-
Vanhoucke, M. (2013g). Welcome to OR&S! Where students, academics and professionals come together (pp. 1–15). Available online at www.or-as.be/books/research.
-
-
-
-
49
-
-
36048990558
-
An evaluation of the adequacy of project network generators with systematically sampled networks
-
Vanhoucke, M., Coelho, J., Debels, D., Maenhout, B., & Tavares, L. (2008). An evaluation of the adequacy of project network generators with systematically sampled networks. European Journal of Operational Research, 187, 511–524.
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 511-524
-
-
Vanhoucke, M.1
Coelho, J.2
Debels, D.3
Maenhout, B.4
Tavares, L.5
-
50
-
-
84655168542
-
Adding value to earned value analysis
-
Vanhoucke, M., & Shtub, A. (2011). Adding value to earned value analysis. PM World Today, XIII(1).
-
(2011)
PM World Today
, vol.13
, Issue.1
-
-
Vanhoucke, M.1
Shtub, A.2
-
52
-
-
70449475514
-
Measuring the accuracy of earned value/earned schedule forecasting predictors
-
Winter)
-
Vanhoucke, M., & Vandevoorde, S. (2007a, Winter). Measuring the accuracy of earned value/earned schedule forecasting predictors. The Measurable News, 26–30.
-
(2007)
The Measurable News
, pp. 26-30
-
-
Vanhoucke, M.1
Vandevoorde, S.2
-
53
-
-
35448944883
-
A simulation and evaluation of earned value metrics to forecast the project duration
-
Vanhoucke, M., & Vandevoorde, S. (2007b). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58, 1361–1374.
-
(2007)
Journal of the Operational Research Society
, vol.58
, pp. 1361-1374
-
-
Vanhoucke, M.1
Vandevoorde, S.2
-
55
-
-
84866254968
-
Forecasting a project’s duration under various topological structures
-
Spring)
-
Vanhoucke, M., & Vandevoorde, S. (2009, Spring). Forecasting a project’s duration under various topological structures. The Measurable News, 26–30.
-
(2009)
The Measurable News
, pp. 26-30
-
-
Vanhoucke, M.1
Vandevoorde, S.2
|