메뉴 건너뛰기




Volumn 50, Issue 3, 2012, Pages 909-919

INCAP - Applying short-term flexibility to control inventories

Author keywords

capacity control; inventory management; make to stock

Indexed keywords

CAPACITY CONTROL; FINISHED GOODS; INVENTORY LEVELS; INVENTORY MANAGEMENT; LOWER LIMITS; MAKE-TO-STOCK; PRODUCTION OUTPUTS; SEMI-FINISHED GOODS; SERVICE LEVELS; SHORT TERM; SIMPLE METHOD; SIMULATION EXPERIMENTS; UPPER LIMITS; WORK HOURS;

EID: 84859971638     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.544336     Document Type: Article
Times cited : (8)

References (21)
  • 1
    • 38049077958 scopus 로고    scopus 로고
    • Tactical capacity management under capacity flexibility
    • Alp, O. and Tan, T., 2008. Tactical capacity management under capacity flexibility. IIE Transactions, 40, 221-237.
    • (2008) IIE Transactions , vol.40 , pp. 221-237
    • Alp, O.1    Tan, T.2
  • 8
    • 29644447444 scopus 로고    scopus 로고
    • Grundlagen, Beschreibung, Konfiguration. Berlin: Springer (in German)
    • Lödding, H., 2008. Verfahren der Fertigungssteuerung. Grundlagen, Beschreibung, Konfiguration. Berlin: Springer (in German).
    • (2008) Verfahren der Fertigungssteuerung
    • Lödding, H.1
  • 11
    • 70749115681 scopus 로고    scopus 로고
    • Workload-dependent capacity control in production-to-order systems
    • Mincsovics, G.Z. and Dellaert, N.P., 2009. Workload-dependent capacity control in production-to-order systems. IIE Transactions, 41 (10), 853-865.
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 853-865
    • Mincsovics, G.Z.1    Dellaert, N.P.2
  • 15
    • 0003749677 scopus 로고    scopus 로고
    • A companywide approach to reducing lead times. Portland, OR: Productivity Press
    • Suri, R., 1998. Quick response manufacturing. A companywide approach to reducing lead times. Portland, OR: Productivity Press.
    • (1998) Quick Response Manufacturing
    • Suri, R.1
  • 16
    • 34547406430 scopus 로고
    • Inventory control with two switch-over levels for a class of M/G/I queuing systems with variable arrival and service rate
    • Tijms, H.C. and van der Schouten, F.A., 1978. Inventory control with two switch-over levels for a class of M/G/I queuing systems with variable arrival and service rate. Stochastic Processes and Their Applications, 6, 213-222.
    • (1978) Stochastic Processes and Their Applications , vol.6 , pp. 213-222
    • Tijms, H.C.1    Van Der Schouten, F.A.2
  • 17
    • 0347694396 scopus 로고    scopus 로고
    • Capacity management, investment and hedging: Review and recent developments
    • Van Mieghem, J.A.V., 2003. Capacity management, investment and hedging: Review and recent developments. Manufacturing & Service Operations Management, 5 (4), 269-302.
    • (2003) Manufacturing & Service Operations Management , vol.5 , Issue.4 , pp. 269-302
    • Van Mieghem1    V, J.A.2
  • 20
    • 0033640850 scopus 로고    scopus 로고
    • Automatic production control applying control theory
    • DOI 10.1016/S0925-5273(98)00253-9
    • Wiendahl, H.-P. and Breithaupt, J.-W., 2000. Automatic production control applying control theory. International Journal of Production Economics, 63 (1), 33-46. (Pubitemid 32081710)
    • (2000) International Journal of Production Economics , vol.63 , Issue.1 , pp. 33-46
    • Wiendahl, H.-P.1    Breithaupt, J.-W.2
  • 21
    • 22444434389 scopus 로고    scopus 로고
    • Managing capacity in the high-tech industry: A review of literature
    • DOI 10.1080/00137910590949887
    • Wu, S.D., Erkoc, M., and Karabuk, S., 2005. Managing capacity in the high-tech industry: A review of literature. The Engineering Economist, 50, 125-158. (Pubitemid 41006014)
    • (2005) Engineering Economist , vol.50 , Issue.2 , pp. 125-158
    • Wu, S.D.1    Erkoc, M.2    Karabuk, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.