-
1
-
-
85017021690
-
Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The resource-levelling and minimum project-duration problems
-
BRINKMANN, K., Neumann, K. (1996), Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: the resource-levelling and minimum project-duration problems. J. Decision Systems 5, 129-155
-
(1996)
J. Decision Systems
, vol.5
, pp. 129-155
-
-
Brinkmann, K.1
Neumann, K.2
-
2
-
-
0001563910
-
Hierarchical production planning in a make-to-order company: A case study
-
CARRAVILLA, M.A., de Sousa, J.P. (1995), Hierarchical production planning in a make-to-order company: a case study. EJOR 86, 43-56
-
(1995)
EJOR
, vol.86
, pp. 43-56
-
-
Carravilla, M.A.1
De Sousa, J.P.2
-
3
-
-
0009996502
-
Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme
-
DREXL, A., Fleischmann, B., Günther, H.-O., Stadtler, H., Tempelmeier, H. (1994), Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme. ZfbF 46, 1022-1045
-
(1994)
ZfbF
, vol.46
, pp. 1022-1045
-
-
Drexl, A.1
Fleischmann, B.2
Günther, H.-O.3
Stadtler, H.4
Tempelmeier, H.5
-
4
-
-
0040759792
-
Resource-constrained project scheduling with time windows
-
Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe
-
FRANCK, B., Neumann, K. (1997), Resource-constrained project scheduling with time windows. Report WIOR-492, Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe
-
(1997)
Report WIOR-492
-
-
Franck, B.1
Neumann, K.2
-
5
-
-
0012712572
-
A capacity-oriented hierarchical approach to single-item and small-batch production planning using project scheduling methods
-
FRANCK, B., Neumann, K., Schwindt, C. (1997), A capacity-oriented hierarchical approach to single-item and small-batch production planning using project scheduling methods. Oper. Res. Spektrum 19, 77-85
-
(1997)
Oper. Res. Spektrum
, vol.19
, pp. 77-85
-
-
Franck, B.1
Neumann, K.2
Schwindt, C.3
-
6
-
-
0000131281
-
Algorithms for solving production scheduling problems
-
GIFFLER, B., Thompson, G.L. (1960), Algorithms for solving production scheduling problems. Oper. Res. 8, 487-503
-
(1960)
Oper. Res.
, vol.8
, pp. 487-503
-
-
Giffler, B.1
Thompson, G.L.2
-
7
-
-
0017320423
-
Hierarchical integration of production planning and scheduling
-
Geisler, M. (Ed.): Logistics, Elsevier, Amsterdam
-
HAX, A.C., Meal, H.C. (1975), Hierarchical integration of production planning and scheduling. In: Geisler, M. (Ed.): Logistics, TIMS Studies in Management Science, Vol. 1, Elsevier, Amsterdam, 53-69
-
(1975)
TIMS Studies in Management Science
, vol.1
, pp. 53-69
-
-
Hax, A.C.1
Meal, H.C.2
-
8
-
-
2842605295
-
Resourceconstrained project scheduling - A survey of recent developments
-
Invited Paper, Germany
-
HERROELEN, W., Demeulemeester, E., De Reyck, B. (1996), Resourceconstrained project scheduling - a survey of recent developments. Invited Paper at the Symposium on Operations Research at Braunschweig, Germany
-
(1996)
Symposium on Operations Research at Braunschweig
-
-
Herroelen, W.1
Demeulemeester, E.2
De Reyck, B.3
-
10
-
-
2842614201
-
Production scheduling and sequencing for multi-stage prodction systems
-
LAMBRECHT, M.R., Vanderveken, H. (1979), Production scheduling and sequencing for multi-stage prodction systems. Oper. Res. Spektrum 1, 103-114
-
(1979)
Oper. Res. Spektrum
, vol.1
, pp. 103-114
-
-
Lambrecht, M.R.1
Vanderveken, H.2
-
13
-
-
0000497721
-
Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
-
NEUMANN, K., Schwindt, C. (1997), Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. Oper. Res. Spektrum 19, 205-217
-
(1997)
Oper. Res. Spektrum
, vol.19
, pp. 205-217
-
-
Neumann, K.1
Schwindt, C.2
-
14
-
-
2842577664
-
Resource levelling for projects with schedule-dependent time windows
-
Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe, submitted to EJOR
-
NEUMANN, K., Zimmermann, J. (1997), Resource levelling for projects with schedule-dependent time windows, Report WIOR-508, Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe, submitted to EJOR
-
(1997)
Report WIOR-508
-
-
Neumann, K.1
Zimmermann, J.2
-
15
-
-
0003039463
-
Hierarchical structures in organisations: A conceptual framework
-
SCHNEEWEISS, C. (1995), Hierarchical structures in organisations: a conceptual framework. EJOR 86, 4-31
-
(1995)
EJOR
, vol.86
, pp. 4-31
-
-
Schneeweiss, C.1
-
17
-
-
0028430131
-
A decomposition approach for a resource constrained scheduling problem
-
SERAFINI, P., Speranza, M.G. (1994), A decomposition approach for a resource constrained scheduling problem. EJOR 75, 112-135
-
(1994)
EJOR
, vol.75
, pp. 112-135
-
-
Serafini, P.1
Speranza, M.G.2
-
18
-
-
2842558708
-
Hierarchische Produktionsplanung
-
Heidelberg
-
STEVEN, M. (1994), Hierarchische Produktionsplanung. Physica, Heidelberg
-
(1994)
Physica
-
-
Steven, M.1
-
19
-
-
0012489199
-
Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen und genereller Erzeugnisstruktur
-
TEMPELMEIER, H., Derstroff, M. (1993), Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen und genereller Erzeugnisstruktur, Oper. Res. Spektrum 15, 63-73
-
(1993)
Oper. Res. Spektrum
, vol.15
, pp. 63-73
-
-
Tempelmeier, H.1
Derstroff, M.2
-
20
-
-
0000857408
-
A Lagrangean-based heuristic for dynamic multilevel multilevel constrained lotsizing with setup times
-
TEMPELMEIER, H., Derstroff, M. (1996), A Lagrangean-based heuristic for dynamic multilevel multilevel constrained lotsizing with setup times. Mgmt Sci. 42, 738-757
-
(1996)
Mgmt Sci.
, vol.42
, pp. 738-757
-
-
Tempelmeier, H.1
Derstroff, M.2
|