메뉴 건너뛰기




Volumn 32, Issue 4, 1998, Pages 397-413

A capacitated hierarchical approach to make-to-order production

Author keywords

Hierarchical planning; Lot sizing; Make to order production; Project scheduling; Shop floor scheduling

Indexed keywords


EID: 2842577299     PISSN: 12696935     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (6)

References (20)
  • 1
    • 85017021690 scopus 로고    scopus 로고
    • Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The resource-levelling and minimum project-duration problems
    • BRINKMANN, K., Neumann, K. (1996), Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: the resource-levelling and minimum project-duration problems. J. Decision Systems 5, 129-155
    • (1996) J. Decision Systems , vol.5 , pp. 129-155
    • Brinkmann, K.1    Neumann, K.2
  • 2
    • 0001563910 scopus 로고
    • Hierarchical production planning in a make-to-order company: A case study
    • CARRAVILLA, M.A., de Sousa, J.P. (1995), Hierarchical production planning in a make-to-order company: a case study. EJOR 86, 43-56
    • (1995) EJOR , vol.86 , pp. 43-56
    • Carravilla, M.A.1    De Sousa, J.P.2
  • 4
    • 0040759792 scopus 로고    scopus 로고
    • Resource-constrained project scheduling with time windows
    • Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe
    • FRANCK, B., Neumann, K. (1997), Resource-constrained project scheduling with time windows. Report WIOR-492, Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe
    • (1997) Report WIOR-492
    • Franck, B.1    Neumann, K.2
  • 5
    • 0012712572 scopus 로고    scopus 로고
    • A capacity-oriented hierarchical approach to single-item and small-batch production planning using project scheduling methods
    • FRANCK, B., Neumann, K., Schwindt, C. (1997), A capacity-oriented hierarchical approach to single-item and small-batch production planning using project scheduling methods. Oper. Res. Spektrum 19, 77-85
    • (1997) Oper. Res. Spektrum , vol.19 , pp. 77-85
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 6
    • 0000131281 scopus 로고
    • Algorithms for solving production scheduling problems
    • GIFFLER, B., Thompson, G.L. (1960), Algorithms for solving production scheduling problems. Oper. Res. 8, 487-503
    • (1960) Oper. Res. , vol.8 , pp. 487-503
    • Giffler, B.1    Thompson, G.L.2
  • 7
    • 0017320423 scopus 로고
    • Hierarchical integration of production planning and scheduling
    • Geisler, M. (Ed.): Logistics, Elsevier, Amsterdam
    • HAX, A.C., Meal, H.C. (1975), Hierarchical integration of production planning and scheduling. In: Geisler, M. (Ed.): Logistics, TIMS Studies in Management Science, Vol. 1, Elsevier, Amsterdam, 53-69
    • (1975) TIMS Studies in Management Science , vol.1 , pp. 53-69
    • Hax, A.C.1    Meal, H.C.2
  • 10
    • 2842614201 scopus 로고
    • Production scheduling and sequencing for multi-stage prodction systems
    • LAMBRECHT, M.R., Vanderveken, H. (1979), Production scheduling and sequencing for multi-stage prodction systems. Oper. Res. Spektrum 1, 103-114
    • (1979) Oper. Res. Spektrum , vol.1 , pp. 103-114
    • Lambrecht, M.R.1    Vanderveken, H.2
  • 13
    • 0000497721 scopus 로고    scopus 로고
    • Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
    • NEUMANN, K., Schwindt, C. (1997), Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. Oper. Res. Spektrum 19, 205-217
    • (1997) Oper. Res. Spektrum , vol.19 , pp. 205-217
    • Neumann, K.1    Schwindt, C.2
  • 14
    • 2842577664 scopus 로고    scopus 로고
    • Resource levelling for projects with schedule-dependent time windows
    • Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe, submitted to EJOR
    • NEUMANN, K., Zimmermann, J. (1997), Resource levelling for projects with schedule-dependent time windows, Report WIOR-508, Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe, submitted to EJOR
    • (1997) Report WIOR-508
    • Neumann, K.1    Zimmermann, J.2
  • 15
    • 0003039463 scopus 로고
    • Hierarchical structures in organisations: A conceptual framework
    • SCHNEEWEISS, C. (1995), Hierarchical structures in organisations: a conceptual framework. EJOR 86, 4-31
    • (1995) EJOR , vol.86 , pp. 4-31
    • Schneeweiss, C.1
  • 17
    • 0028430131 scopus 로고
    • A decomposition approach for a resource constrained scheduling problem
    • SERAFINI, P., Speranza, M.G. (1994), A decomposition approach for a resource constrained scheduling problem. EJOR 75, 112-135
    • (1994) EJOR , vol.75 , pp. 112-135
    • Serafini, P.1    Speranza, M.G.2
  • 18
    • 2842558708 scopus 로고
    • Hierarchische Produktionsplanung
    • Heidelberg
    • STEVEN, M. (1994), Hierarchische Produktionsplanung. Physica, Heidelberg
    • (1994) Physica
    • Steven, M.1
  • 19
    • 0012489199 scopus 로고
    • Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen und genereller Erzeugnisstruktur
    • TEMPELMEIER, H., Derstroff, M. (1993), Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen und genereller Erzeugnisstruktur, Oper. Res. Spektrum 15, 63-73
    • (1993) Oper. Res. Spektrum , vol.15 , pp. 63-73
    • Tempelmeier, H.1    Derstroff, M.2
  • 20
    • 0000857408 scopus 로고    scopus 로고
    • A Lagrangean-based heuristic for dynamic multilevel multilevel constrained lotsizing with setup times
    • TEMPELMEIER, H., Derstroff, M. (1996), A Lagrangean-based heuristic for dynamic multilevel multilevel constrained lotsizing with setup times. Mgmt Sci. 42, 738-757
    • (1996) Mgmt Sci. , vol.42 , pp. 738-757
    • Tempelmeier, H.1    Derstroff, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.