1
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." J. Constr. Eng. Manage., 124(1), 11-17.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
2
-
-
13944256682
-
Integrated production scheduler for construction look-ahead planning
-
Construction Engineering and Management Program, Univ. of California, Berkeley, Calif.
-
Chua, D. K. H., Shen, L. J., and Bok, S. H. (1999). "Integrated production scheduler for construction look-ahead planning." Proc., 7th Annual Conf. on Lean Construction, Construction Engineering and Management Program, Univ. of California, Berkeley, Calif., 287-298.
-
(1999)
Proc., 7th Annual Conf. on Lean Construction
, pp. 287-298
-
-
Chua, D.K.H.1
Shen, L.J.2
Bok, S.H.3
-
3
-
-
0035155610
-
The production performance benefits from JIT implementation
-
Fullerton, R. R., and McWatters, C. S. (2001). "The production performance benefits from JIT implementation." J. Operations Manage., 19(1), 81-96.
-
(2001)
J. Operations Manage.
, vol.19
, Issue.1
, pp. 81-96
-
-
Fullerton, R.R.1
McWatters, C.S.2
-
4
-
-
0023984547
-
Computerized shop floor scheduling
-
Goldratt, E. M. (1988). "Computerized shop floor scheduling." Int. J. Prod. Res., 26(4), 443-455.
-
(1988)
Int. J. Prod. Res.
, vol.26
, Issue.4
, pp. 443-455
-
-
Goldratt, E.M.1
-
6
-
-
84993056296
-
Information technology decision support and business process change in the USA
-
Hansen, K. L., Gann, D. M., and Groak, S. (1998). "Information technology decision support and business process change in the USA." J. of Engrg., Constr. and Arch. Mgmt., 5(2), 115-126.
-
(1998)
J. of Engrg., Constr. and Arch. Mgmt.
, vol.5
, Issue.2
, pp. 115-126
-
-
Hansen, K.L.1
Gann, D.M.2
Groak, S.3
-
7
-
-
0040318385
-
Quantifying buffers for project schedules
-
Hoel, K., and Taylor, S. G. (1999). "Quantifying buffers for project schedules." Prod. and Inv. Mgmt. J., 40(2), 43-47.
-
(1999)
Prod. and Inv. Mgmt. J.
, vol.40
, Issue.2
, pp. 43-47
-
-
Hoel, K.1
Taylor, S.G.2
-
8
-
-
0006086683
-
-
Wrox Press, Arden House, Birmingham, U.K.
-
Horton, I. (1999). Beginning Java 2, Wrox Press, Arden House, Birmingham, U.K.
-
(1999)
Beginning Java 2
-
-
Horton, I.1
-
9
-
-
77956820331
-
Can project control do its job?
-
School of Civil Engineering, Univ. of Birmingham, Birmingham, U.K.
-
Howell, G., and Ballard, G. (1996). "Can project control do its job?" Proc., 4th Annual Int. Conf. on Lean Construction, School of Civil Engineering, Univ. of Birmingham, Birmingham, U.K.
-
(1996)
Proc., 4th Annual Int. Conf. on Lean Construction
-
-
Howell, G.1
Ballard, G.2
-
10
-
-
84860087429
-
Write high-performance RMI servers and swing clients
-
Itworld.com, Inc.
-
Krumel, A. (1999). "Write high-performance RMI servers and swing clients." JavaWorld, Itworld.com, Inc. (available at http://www.javaworld. com/javaworld/jw-04-1999/jw-04-enterprise.html).
-
(1999)
JavaWorld
-
-
Krumel, A.1
-
11
-
-
0003656231
-
Application of the new production philosophy to construction
-
Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
Koskela, L. (1992). "Application of the new production philosophy to construction." Tech. Rep. No. 72, Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
(1992)
Tech. Rep. No. 72
, vol.72
-
-
Koskela, L.1
-
12
-
-
5044246367
-
-
Wrox Press, Arden House, Birmingham, U.K.
-
Myers, T., and Nakhimovsky, A. (1999). Professional Java XML programming with servlets and JSP, Wrox Press, Arden House, Birmingham, U.K.
-
(1999)
Professional Java XML Programming with Servlets and JSP
-
-
Myers, T.1
Nakhimovsky, A.2
-
13
-
-
0032114853
-
A quantitative approach to estimate the size of the time buffer in the theory of constraints
-
Radovilsky, Z. D. (1998). "A quantitative approach to estimate the size of the time buffer in the theory of constraints." Int. J. of Prod. Econ., 55(2), 113-119.
-
(1998)
Int. J. of Prod. Econ.
, vol.55
, Issue.2
, pp. 113-119
-
-
Radovilsky, Z.D.1
-
14
-
-
0032376210
-
Theory of constraints. A review of the philosophy and its applications
-
Rahman, S. (1998). "Theory of constraints. A review of the philosophy and its applications." Int. J. Operat. Product. Manage., 18(4), 336-355.
-
(1998)
Int. J. Operat. Product. Manage.
, vol.18
, Issue.4
, pp. 336-355
-
-
Rahman, S.1
-
15
-
-
0142009401
-
Distributed scheduling with integrated production scheduler
-
Programme on Innovation in the Built Environment SPRU, Univ. of Sussex, Brighton, U.K.
-
Shen, L. J., Chua, D. K. H., and Bok, S. H. (2000). "Distributed scheduling with integrated production scheduler." Proc., 8th Annual Conf. on Lean Construction, Programme on Innovation in the Built Environment SPRU, Univ. of Sussex, Brighton, U.K. (available at http://www.sussex.ac.uk/spru/ imichair/iglc8).
-
(2000)
Proc., 8th Annual Conf. on Lean Construction
-
-
Shen, L.J.1
Chua, D.K.H.2
Bok, S.H.3
-
16
-
-
13944264416
-
Look-ahead planning: Screening and pulling
-
Civil and Environmental Engineering Dept., Univ. of California, Berkeley, Calif.
-
Tommelein, I. D., and Ballard, G. (1997). "Look-ahead planning: Screening and pulling." Tech. Rep. No. 97-9, Civil and Environmental Engineering Dept., Univ. of California, Berkeley, Calif.
-
(1997)
Tech. Rep. No. 97
, vol.97
, Issue.9
-
-
Tommelein, I.D.1
Ballard, G.2
-
17
-
-
0032048282
-
Constraint time buffer determination model
-
Tu, Y.-M., and Li, R.-K. (1998). "Constraint time buffer determination model." Int. J. Prod. Res., 36(4), 1091-1103.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.4
, pp. 1091-1103
-
-
Tu, Y.-M.1
Li, R.-K.2
|