Volumn 129, Issue 3, 2003, Pages 293-301

Constralnt-based planning with integrated production scheduler over internet

Author keywords

Constraints; Construction industry; Internet; Scheduling

Indexed keywords

CONSTRAINT MANAGEMENT; CONSTRAINT MODELING; CONSTRAINTS; INFORMATION FLOW;

EID: 13944281016     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2003)129:3(293)     Document Type: Article
Times cited : (36)

References (17)
  • 1
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." J. Constr. Eng. Manage., 124(1), 11-17.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 2
    • 13944256682 scopus 로고    scopus 로고
    • Integrated production scheduler for construction look-ahead planning
    • Construction Engineering and Management Program, Univ. of California, Berkeley, Calif.
    • Chua, D. K. H., Shen, L. J., and Bok, S. H. (1999). "Integrated production scheduler for construction look-ahead planning." Proc., 7th Annual Conf. on Lean Construction, Construction Engineering and Management Program, Univ. of California, Berkeley, Calif., 287-298.
    • (1999) Proc., 7th Annual Conf. on Lean Construction , pp. 287-298
    • Chua, D.K.H.1    Shen, L.J.2    Bok, S.H.3
  • 3
    • 0035155610 scopus 로고    scopus 로고
    • The production performance benefits from JIT implementation
    • Fullerton, R. R., and McWatters, C. S. (2001). "The production performance benefits from JIT implementation." J. Operations Manage., 19(1), 81-96.
    • (2001) J. Operations Manage. , vol.19 , Issue.1 , pp. 81-96
    • Fullerton, R.R.1    McWatters, C.S.2
  • 4
    • 0023984547 scopus 로고
    • Computerized shop floor scheduling
    • Goldratt, E. M. (1988). "Computerized shop floor scheduling." Int. J. Prod. Res., 26(4), 443-455.
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.4 , pp. 443-455
    • Goldratt, E.M.1
  • 6
    • 84993056296 scopus 로고    scopus 로고
    • Information technology decision support and business process change in the USA
    • Hansen, K. L., Gann, D. M., and Groak, S. (1998). "Information technology decision support and business process change in the USA." J. of Engrg., Constr. and Arch. Mgmt., 5(2), 115-126.
    • (1998) J. of Engrg., Constr. and Arch. Mgmt. , vol.5 , Issue.2 , pp. 115-126
    • Hansen, K.L.1    Gann, D.M.2    Groak, S.3
  • 7
    • 0040318385 scopus 로고    scopus 로고
    • Quantifying buffers for project schedules
    • Hoel, K., and Taylor, S. G. (1999). "Quantifying buffers for project schedules." Prod. and Inv. Mgmt. J., 40(2), 43-47.
    • (1999) Prod. and Inv. Mgmt. J. , vol.40 , Issue.2 , pp. 43-47
    • Hoel, K.1    Taylor, S.G.2
  • 8
    • 0006086683 scopus 로고    scopus 로고
    • Wrox Press, Arden House, Birmingham, U.K.
    • Horton, I. (1999). Beginning Java 2, Wrox Press, Arden House, Birmingham, U.K.
    • (1999) Beginning Java 2
    • Horton, I.1
  • 9
    • 77956820331 scopus 로고    scopus 로고
    • Can project control do its job?
    • School of Civil Engineering, Univ. of Birmingham, Birmingham, U.K.
    • Howell, G., and Ballard, G. (1996). "Can project control do its job?" Proc., 4th Annual Int. Conf. on Lean Construction, School of Civil Engineering, Univ. of Birmingham, Birmingham, U.K.
    • (1996) Proc., 4th Annual Int. Conf. on Lean Construction
    • Howell, G.1    Ballard, G.2
  • 10
    • 84860087429 scopus 로고    scopus 로고
    • Write high-performance RMI servers and swing clients
    • Itworld.com, Inc.
    • Krumel, A. (1999). "Write high-performance RMI servers and swing clients." JavaWorld, Itworld.com, Inc. (available at http://www.javaworld. com/javaworld/jw-04-1999/jw-04-enterprise.html).
    • (1999) JavaWorld
    • Krumel, A.1
  • 11
    • 0003656231 scopus 로고
    • Application of the new production philosophy to construction
    • Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
    • Koskela, L. (1992). "Application of the new production philosophy to construction." Tech. Rep. No. 72, Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
    • (1992) Tech. Rep. No. 72 , vol.72
    • Koskela, L.1
  • 13
    • 0032114853 scopus 로고    scopus 로고
    • A quantitative approach to estimate the size of the time buffer in the theory of constraints
    • Radovilsky, Z. D. (1998). "A quantitative approach to estimate the size of the time buffer in the theory of constraints." Int. J. of Prod. Econ., 55(2), 113-119.
    • (1998) Int. J. of Prod. Econ. , vol.55 , Issue.2 , pp. 113-119
    • Radovilsky, Z.D.1
  • 14
    • 0032376210 scopus 로고    scopus 로고
    • Theory of constraints. A review of the philosophy and its applications
    • Rahman, S. (1998). "Theory of constraints. A review of the philosophy and its applications." Int. J. Operat. Product. Manage., 18(4), 336-355.
    • (1998) Int. J. Operat. Product. Manage. , vol.18 , Issue.4 , pp. 336-355
    • Rahman, S.1
  • 15
    • 0142009401 scopus 로고    scopus 로고
    • Distributed scheduling with integrated production scheduler
    • Programme on Innovation in the Built Environment SPRU, Univ. of Sussex, Brighton, U.K.
    • Shen, L. J., Chua, D. K. H., and Bok, S. H. (2000). "Distributed scheduling with integrated production scheduler." Proc., 8th Annual Conf. on Lean Construction, Programme on Innovation in the Built Environment SPRU, Univ. of Sussex, Brighton, U.K. (available at http://www.sussex.ac.uk/spru/ imichair/iglc8).
    • (2000) Proc., 8th Annual Conf. on Lean Construction
    • Shen, L.J.1    Chua, D.K.H.2    Bok, S.H.3
  • 16
    • 13944264416 scopus 로고    scopus 로고
    • Look-ahead planning: Screening and pulling
    • Civil and Environmental Engineering Dept., Univ. of California, Berkeley, Calif.
    • Tommelein, I. D., and Ballard, G. (1997). "Look-ahead planning: Screening and pulling." Tech. Rep. No. 97-9, Civil and Environmental Engineering Dept., Univ. of California, Berkeley, Calif.
    • (1997) Tech. Rep. No. 97 , vol.97 , Issue.9
    • Tommelein, I.D.1    Ballard, G.2
  • 17
    • 0032048282 scopus 로고    scopus 로고
    • Constraint time buffer determination model
    • Tu, Y.-M., and Li, R.-K. (1998). "Constraint time buffer determination model." Int. J. Prod. Res., 36(4), 1091-1103.
    • (1998) Int. J. Prod. Res. , vol.36 , Issue.4 , pp. 1091-1103
    • Tu, Y.-M.1    Li, R.-K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.