-
1
-
-
0031206984
-
Total quality management in the construction process
-
Arditi, D., and Gunaydin, H. (1997). "Total quality management in the construction process." Int. J. Proj. Manage., 15(4), 235-243.
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.4
, pp. 235-243
-
-
Arditi, D.1
Gunaydin, H.2
-
2
-
-
0004011301
-
-
Ph.D. thesis, Univ. of Birmingham, U.K., (5/15/04)
-
Ballard, G. (2000a). "The last planner system of production control." Ph.D. thesis, Univ. of Birmingham, U.K., 〈http://www. leanconstruction.org/〉 (5/15/04).
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, G.1
-
3
-
-
69949101125
-
Lean project delivery system
-
Construction Institute, (5/15/04)
-
Ballard, G. (2000b). "Lean project delivery system." LCI White Paper-8. Lean, Construction Institute, 〈http://www.leanconstruction. org〉 (5/15/04).
-
(2000)
LCI White Paper-8. Lean
-
-
Ballard, G.1
-
4
-
-
12444343674
-
Implementing lean construction: Improving downstream performance
-
Balkema, Rotterdam, Netherlands
-
Ballard, G., and Howell, G. (1997). "Implementing lean construction: Improving downstream performance." Lean construction, Balkema, Rotterdam, Netherlands, 111-125.
-
(1997)
Lean Construction
, pp. 111-125
-
-
Ballard, G.1
Howell, G.2
-
5
-
-
67349244749
-
An update on last planner
-
IGLC, Blacksburg, Va., (May 15, 2004)
-
Ballard, G., and Howell, G. (2003). "An update on last planner." Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11), IGLC, Blacksburg, Va., 11-23, 〈http://strobos.cee.vt.edu/ IGLC11〉 (May 15, 2004).
-
(2003)
Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11)
, pp. 11-23
-
-
Ballard, G.1
Howell, G.2
-
6
-
-
17744367592
-
Construction productivity improvement
-
Associated Schools of Construction, San Luis Obispo, Calif
-
Banik, G. (1999). "Construction productivity improvement." Proc., 35th Annual Conf., Associated Schools of Construction, San Luis Obispo, Calif, 165-178.
-
(1999)
Proc., 35th Annual Conf.
, pp. 165-178
-
-
Banik, G.1
-
7
-
-
0033481622
-
The evolution of production models: Is a new paradigm emerging?
-
Bartezzaghi, E. (1999). "The evolution of production models: Is a new paradigm emerging?" Int. J. Operat. Product. Manage., 19(2), 229-250.
-
(1999)
Int. J. Operat. Product. Manage.
, vol.19
, Issue.2
, pp. 229-250
-
-
Bartezzaghi, E.1
-
8
-
-
17744386882
-
Construction as a complex system
-
IGLC, Blacksburg, Va., (May 15, 2004)
-
Berteisen, S. (2003). "Construction as a complex system." Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11), IGLC, Blacksburg, Va., 11-23. 〈http://strobos.cee.vt.edu/IGLC11〉 (May 15, 2004).
-
(2003)
Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11)
, pp. 11-23
-
-
Berteisen, S.1
-
9
-
-
0032360014
-
The lean service: In defense of a production line approach
-
Bowen, D., and Youngdahl, W. (1998). "The lean service: In defense of a production line approach." Int. J. Service Industry Management, 9(3), 207-225.
-
(1998)
Int. J. Service Industry Management
, vol.9
, Issue.3
, pp. 207-225
-
-
Bowen, D.1
Youngdahl, W.2
-
10
-
-
0034288465
-
The extended kanban control system for production coordination of assembly manufacturing systems
-
Chaoiya, C., Liberopoulos, G., and Dallery, Y. (2000). "The extended kanban control system for production coordination of assembly manufacturing systems." IIE Trans., 32, 999-1012.
-
(2000)
IIE Trans.
, vol.32
, pp. 999-1012
-
-
Chaoiya, C.1
Liberopoulos, G.2
Dallery, Y.3
-
12
-
-
84856643278
-
Principle of transparency applied in construction
-
IGLC, Guarujá, Brazil
-
Dos Santos, A., Powell, J., Sharp, J., and Formoso, C. (1998). "Principle of transparency applied in construction." Proc., 6th Annual Conf. of the Int. Group for Lean Construction (IGLC-6), IGLC, Guarujá, Brazil, 16-23.
-
(1998)
Proc., 6th Annual Conf. of the Int. Group for Lean Construction (IGLC-6)
, pp. 16-23
-
-
Dos Santos, A.1
Powell, J.2
Sharp, J.3
Formoso, C.4
-
13
-
-
0003202623
-
What we can learn from Japanese management
-
Drucker, P. (1971). "What we can learn from Japanese management." Harvard Bus. Rev., March-April, 110-122.
-
(1971)
Harvard Bus. Rev.
, vol.MARCH-APRIL
, pp. 110-122
-
-
Drucker, P.1
-
15
-
-
0009591698
-
Evolution of manufacturing systems and ex-post dynamic capabilities: A case of Toyota's final assembly operations
-
Oxford Univ. Press, New York
-
Fujimoto, T. (2000). "Evolution of manufacturing systems and ex-post dynamic capabilities: A case of Toyota's final assembly operations." Nature and dynamics of organizational capabilities, Oxford Univ. Press, New York, 244-250.
-
(2000)
Nature and Dynamics of Organizational Capabilities
, pp. 244-250
-
-
Fujimoto, T.1
-
16
-
-
0028715393
-
Developing a TQM excellence model
-
Ho, S., and Fung, C. (1994). "Developing a TQM excellence model." TQM Magazine, 6(6), 24-30.
-
(1994)
TQM Magazine
, vol.6
, Issue.6
, pp. 24-30
-
-
Ho, S.1
Fung, C.2
-
17
-
-
0001247217
-
What is lean construction?
-
IGLC, Berkeley, Calif.
-
Howell, G. (1999). "What is lean construction?" Proc., Int. Group for Lean Construction 7th Annual Conf. (IGLC-7), IGLC, Berkeley, Calif., 1-10.
-
(1999)
Proc., Int. Group for Lean Construction 7th Annual Conf. (IGLC-7)
, pp. 1-10
-
-
Howell, G.1
-
18
-
-
0030556322
-
Lean production in a changing competitive world: A Japanese perspective
-
Katayama, H. (1996). "Lean production in a changing competitive world: A Japanese perspective." Int. J. Operat. Product. Manage., 16(2), 8-23.
-
(1996)
Int. J. Operat. Product. Manage.
, vol.16
, Issue.2
, pp. 8-23
-
-
Katayama, H.1
-
19
-
-
0002303124
-
Triumph of the lean production system
-
Krafcik, J. (1988). 'Triumph of the lean production system." Sloan Manage. Rev., 30(1), 41-52.
-
(1988)
Sloan Manage. Rev.
, vol.30
, Issue.1
, pp. 41-52
-
-
Krafcik, J.1
-
20
-
-
12244286007
-
The theory of project management: Explanation to novel methods
-
IGLC, Gramado, Brazil, (May 15, 2004)
-
Koskela, L. (2002). "The theory of project management: Explanation to novel methods." Proc., Int. Group for Lean Construction 10th Annual Conf. (IGLC-10), IGLC, Gramado, Brazil, 〈http://www.cpgec.ufrgs.br/norie/ iglc10/papers/index.htm〉 (May 15, 2004).
-
(2002)
Proc., Int. Group for Lean Construction 10th Annual Conf. (IGLC-10)
-
-
Koskela, L.1
-
21
-
-
17744391728
-
Quality management tools for lean production: From enforcement to empowerment
-
IGLC, Gramado, Brazil, (May 15, 2004)
-
Marosszeky, M., Thomas, R., Karim, K., Davis, S., and McGeorge, D. (2002). "Quality management tools for lean production: From enforcement to empowerment." Proc., Int. Group for Lean Construction 10th Annual Conf. (IGLC-10), IGLC, Gramado, Brazil, 〈http://www.cpgec.ufrgs.br/norie/iglc10/ papers/index.htm〉 (May 15, 2004).
-
(2002)
Proc., Int. Group for Lean Construction 10th Annual Conf. (IGLC-10)
-
-
Marosszeky, M.1
Thomas, R.2
Karim, K.3
Davis, S.4
McGeorge, D.5
-
22
-
-
27644434543
-
The challenge: The impetus for change to lean project delivery
-
IGLC, Blacksburg, Va., (May 15, 2004)
-
Mastroianni, R., and Abdelhamid, T. (2003). "The challenge: The impetus for change to lean project delivery." Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11), IGLC, Blacksburg, Va., 〈http://strobos.cee.vt.edu/IGLC11〉 (May 15, 2004).
-
(2003)
Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11)
-
-
Mastroianni, R.1
Abdelhamid, T.2
-
23
-
-
8644220585
-
Quality relationships: Partnering in the construction supply chain
-
Matthews, J., Pellew, L., Phua, F., and Rowlinson, S. (2000). "Quality relationships: Partnering in the construction supply chain." Int. J. Qual. Reliab. Manage., 7(4/5), 493-510.
-
(2000)
Int. J. Qual. Reliab. Manage.
, vol.7
, Issue.4-5
, pp. 493-510
-
-
Matthews, J.1
Pellew, L.2
Phua, F.3
Rowlinson, S.4
-
24
-
-
2342420277
-
Role of tolerances and process capability data in product and process design integration
-
ASCE, Honolulu, Hawaii, (May 15, 2004)
-
Milberg, C., and Tommelein, I. (2003). "Role of tolerances and process capability data in product and process design integration." Proc., Construction Research Congress, ASCE, Honolulu, Hawaii, 〈http://www.ce. berkeley.edu/~tommelein/tommelein_pub.html〉 (May 15, 2004).
-
(2003)
Proc., Construction Research Congress
-
-
Milberg, C.1
Tommelein, I.2
-
25
-
-
0036538669
-
Balancing and scheduling mixed-model U-shaped production lines
-
Miltenburg, J. (2002). "Balancing and scheduling mixed-model U-shaped production lines." Int. J. Flexible Manufacturing Systems, 14, 119-151.
-
(2002)
Int. J. Flexible Manufacturing Systems
, vol.14
, pp. 119-151
-
-
Miltenburg, J.1
-
29
-
-
84983410132
-
Exploring the role of visual controls on mobile cell manufacturing: A case study on drywall technology
-
IGLC, Blacksburg, Va., (Feb. 1, 2004)
-
Moser, L., and dos Santos, A. (2003). "Exploring the role of visual controls on mobile cell manufacturing: A case study on drywall technology." Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11), IGLC, Blacksburg, Va., 11-23, 〈http://strobos.cee.vt.edu/IGLC11〉 (Feb. 1, 2004).
-
(2003)
Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11)
, pp. 11-23
-
-
Moser, L.1
Dos Santos, A.2
-
31
-
-
0039756649
-
Work design issues in lean production from a sociotechnical systems perspective: Neo-Taylorism or the next step in sociotechnical design?
-
Niepce, W., and Molleman, E. (1998). "Work design issues in lean production from a sociotechnical systems perspective: Neo-Taylorism or the next step in sociotechnical design?" Hum. Relat., 51(3), 259-287.
-
(1998)
Hum. Relat.
, vol.51
, Issue.3
, pp. 259-287
-
-
Niepce, W.1
Molleman, E.2
-
32
-
-
0004220333
-
-
Productivity, Cambridge, Ma.
-
Ohno, T. (1988). Toyota production system, Productivity, Cambridge, Ma., 1-44.
-
(1988)
Toyota Production System
, pp. 1-44
-
-
Ohno, T.1
-
33
-
-
3843065481
-
Lean indicators and manufacturing strategies
-
Sánchez, A., and Pérez, M. (2001). "Lean indicators and manufacturing strategies." Int. J. Operat. Product. Manage., 21(11), 1433-1451.
-
(2001)
Int. J. Operat. Product. Manage.
, vol.21
, Issue.11
, pp. 1433-1451
-
-
Sánchez, A.1
Pérez, M.2
-
34
-
-
17744390331
-
Safety and production: An integrated planning and control model
-
IGLC, Gramado, Brazil, (May 15, 2004)
-
Saurin, T., Formoso, C., Guimarães, L., and Soares, A. (2002). "Safety and production: An integrated planning and control model." Proc., Int. Group for Lean Construction 10th Annual Conf. (IGLC-10), IGLC, Gramado, Brazil, 〈http://www.cpgec.ufrgs.br/norie/iglc10/papers/index. htm〉 (May 15, 2004).
-
(2002)
Proc., Int. Group for Lean Construction 10th Annual Conf. (IGLC-10)
-
-
Saurin, T.1
Formoso, C.2
Guimarães, L.3
Soares, A.4
-
39
-
-
0036190151
-
A model for evaluating the degree of leanness of manufacturing firms
-
Soriano-Meier, H., and Forrester, P. (2002). "A model for evaluating the degree of leanness of manufacturing firms." Integr. Manuf. Syst., 13(2), 104-109.
-
(2002)
Integr. Manuf. Syst.
, vol.13
, Issue.2
, pp. 104-109
-
-
Soriano-Meier, H.1
Forrester, P.2
-
40
-
-
33748790312
-
Building a high-performing project team
-
Van Nostrand Reinhold, New York
-
West, J. (1998). "Building a high-performing project team." Field guide to project management, Van Nostrand Reinhold, New York, 239-254.
-
(1998)
Field Guide to Project Management
, pp. 239-254
-
-
West, J.1
-
41
-
-
0003986421
-
-
Simon & Schuster, New York
-
Womack, J., and Jones, D. (1996). Lean thinking, Simon & Schuster, New York, 29-92.
-
(1996)
Lean Thinking
, pp. 29-92
-
-
Womack, J.1
Jones, D.2
-
42
-
-
0003463029
-
-
Macmillan, New York
-
Womack, J., Jones, D., and Roos, D. (1990). The machine that changed the world, Macmillan, New York, 3-15.
-
(1990)
The Machine That Changed the World
, pp. 3-15
-
-
Womack, J.1
Jones, D.2
Roos, D.3
-
43
-
-
0032122942
-
Flexible machine layout design for dynamic and uncertain production environments
-
Yang, T., and Peters, B. (1998). "Flexible machine layout design for dynamic and uncertain production environments," Eur. J. Oper. Res., 108, 49-64.
-
(1998)
Eur. J. Oper. Res.
, vol.108
, pp. 49-64
-
-
Yang, T.1
Peters, B.2
|