메뉴 건너뛰기




Volumn 22, Issue 4, 2006, Pages 168-175

Lean construction: From theory to implementation

Author keywords

Construction management; Lean construction; Theories

Indexed keywords

CONSTRUCTION ELEMENTS; CONSTRUCTION MANAGEMENT; LEAN CONSTRUCTION; LEAN IMPLEMENTATION;

EID: 33748795375     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(2006)22:4(168)     Document Type: Article
Times cited : (284)

References (43)
  • 1
    • 0031206984 scopus 로고    scopus 로고
    • Total quality management in the construction process
    • Arditi, D., and Gunaydin, H. (1997). "Total quality management in the construction process." Int. J. Proj. Manage., 15(4), 235-243.
    • (1997) Int. J. Proj. Manage. , vol.15 , Issue.4 , pp. 235-243
    • Arditi, D.1    Gunaydin, H.2
  • 2
    • 0004011301 scopus 로고    scopus 로고
    • Ph.D. thesis, Univ. of Birmingham, U.K., (5/15/04)
    • Ballard, G. (2000a). "The last planner system of production control." Ph.D. thesis, Univ. of Birmingham, U.K., 〈http://www. leanconstruction.org/〉 (5/15/04).
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 3
    • 69949101125 scopus 로고    scopus 로고
    • Lean project delivery system
    • Construction Institute, (5/15/04)
    • Ballard, G. (2000b). "Lean project delivery system." LCI White Paper-8. Lean, Construction Institute, 〈http://www.leanconstruction. org〉 (5/15/04).
    • (2000) LCI White Paper-8. Lean
    • Ballard, G.1
  • 4
    • 12444343674 scopus 로고    scopus 로고
    • Implementing lean construction: Improving downstream performance
    • Balkema, Rotterdam, Netherlands
    • Ballard, G., and Howell, G. (1997). "Implementing lean construction: Improving downstream performance." Lean construction, Balkema, Rotterdam, Netherlands, 111-125.
    • (1997) Lean Construction , pp. 111-125
    • Ballard, G.1    Howell, G.2
  • 6
    • 17744367592 scopus 로고    scopus 로고
    • Construction productivity improvement
    • Associated Schools of Construction, San Luis Obispo, Calif
    • Banik, G. (1999). "Construction productivity improvement." Proc., 35th Annual Conf., Associated Schools of Construction, San Luis Obispo, Calif, 165-178.
    • (1999) Proc., 35th Annual Conf. , pp. 165-178
    • Banik, G.1
  • 7
    • 0033481622 scopus 로고    scopus 로고
    • The evolution of production models: Is a new paradigm emerging?
    • Bartezzaghi, E. (1999). "The evolution of production models: Is a new paradigm emerging?" Int. J. Operat. Product. Manage., 19(2), 229-250.
    • (1999) Int. J. Operat. Product. Manage. , vol.19 , Issue.2 , pp. 229-250
    • Bartezzaghi, E.1
  • 9
    • 0032360014 scopus 로고    scopus 로고
    • The lean service: In defense of a production line approach
    • Bowen, D., and Youngdahl, W. (1998). "The lean service: In defense of a production line approach." Int. J. Service Industry Management, 9(3), 207-225.
    • (1998) Int. J. Service Industry Management , vol.9 , Issue.3 , pp. 207-225
    • Bowen, D.1    Youngdahl, W.2
  • 10
    • 0034288465 scopus 로고    scopus 로고
    • The extended kanban control system for production coordination of assembly manufacturing systems
    • Chaoiya, C., Liberopoulos, G., and Dallery, Y. (2000). "The extended kanban control system for production coordination of assembly manufacturing systems." IIE Trans., 32, 999-1012.
    • (2000) IIE Trans. , vol.32 , pp. 999-1012
    • Chaoiya, C.1    Liberopoulos, G.2    Dallery, Y.3
  • 13
    • 0003202623 scopus 로고
    • What we can learn from Japanese management
    • Drucker, P. (1971). "What we can learn from Japanese management." Harvard Bus. Rev., March-April, 110-122.
    • (1971) Harvard Bus. Rev. , vol.MARCH-APRIL , pp. 110-122
    • Drucker, P.1
  • 15
    • 0009591698 scopus 로고    scopus 로고
    • Evolution of manufacturing systems and ex-post dynamic capabilities: A case of Toyota's final assembly operations
    • Oxford Univ. Press, New York
    • Fujimoto, T. (2000). "Evolution of manufacturing systems and ex-post dynamic capabilities: A case of Toyota's final assembly operations." Nature and dynamics of organizational capabilities, Oxford Univ. Press, New York, 244-250.
    • (2000) Nature and Dynamics of Organizational Capabilities , pp. 244-250
    • Fujimoto, T.1
  • 16
    • 0028715393 scopus 로고
    • Developing a TQM excellence model
    • Ho, S., and Fung, C. (1994). "Developing a TQM excellence model." TQM Magazine, 6(6), 24-30.
    • (1994) TQM Magazine , vol.6 , Issue.6 , pp. 24-30
    • Ho, S.1    Fung, C.2
  • 18
    • 0030556322 scopus 로고    scopus 로고
    • Lean production in a changing competitive world: A Japanese perspective
    • Katayama, H. (1996). "Lean production in a changing competitive world: A Japanese perspective." Int. J. Operat. Product. Manage., 16(2), 8-23.
    • (1996) Int. J. Operat. Product. Manage. , vol.16 , Issue.2 , pp. 8-23
    • Katayama, H.1
  • 19
    • 0002303124 scopus 로고
    • Triumph of the lean production system
    • Krafcik, J. (1988). 'Triumph of the lean production system." Sloan Manage. Rev., 30(1), 41-52.
    • (1988) Sloan Manage. Rev. , vol.30 , Issue.1 , pp. 41-52
    • Krafcik, J.1
  • 20
    • 12244286007 scopus 로고    scopus 로고
    • The theory of project management: Explanation to novel methods
    • IGLC, Gramado, Brazil, (May 15, 2004)
    • Koskela, L. (2002). "The theory of project management: Explanation to novel methods." Proc., Int. Group for Lean Construction 10th Annual Conf. (IGLC-10), IGLC, Gramado, Brazil, 〈http://www.cpgec.ufrgs.br/norie/ iglc10/papers/index.htm〉 (May 15, 2004).
    • (2002) Proc., Int. Group for Lean Construction 10th Annual Conf. (IGLC-10)
    • Koskela, L.1
  • 23
    • 8644220585 scopus 로고    scopus 로고
    • Quality relationships: Partnering in the construction supply chain
    • Matthews, J., Pellew, L., Phua, F., and Rowlinson, S. (2000). "Quality relationships: Partnering in the construction supply chain." Int. J. Qual. Reliab. Manage., 7(4/5), 493-510.
    • (2000) Int. J. Qual. Reliab. Manage. , vol.7 , Issue.4-5 , pp. 493-510
    • Matthews, J.1    Pellew, L.2    Phua, F.3    Rowlinson, S.4
  • 24
    • 2342420277 scopus 로고    scopus 로고
    • Role of tolerances and process capability data in product and process design integration
    • ASCE, Honolulu, Hawaii, (May 15, 2004)
    • Milberg, C., and Tommelein, I. (2003). "Role of tolerances and process capability data in product and process design integration." Proc., Construction Research Congress, ASCE, Honolulu, Hawaii, 〈http://www.ce. berkeley.edu/~tommelein/tommelein_pub.html〉 (May 15, 2004).
    • (2003) Proc., Construction Research Congress
    • Milberg, C.1    Tommelein, I.2
  • 25
    • 0036538669 scopus 로고    scopus 로고
    • Balancing and scheduling mixed-model U-shaped production lines
    • Miltenburg, J. (2002). "Balancing and scheduling mixed-model U-shaped production lines." Int. J. Flexible Manufacturing Systems, 14, 119-151.
    • (2002) Int. J. Flexible Manufacturing Systems , vol.14 , pp. 119-151
    • Miltenburg, J.1
  • 29
    • 84983410132 scopus 로고    scopus 로고
    • Exploring the role of visual controls on mobile cell manufacturing: A case study on drywall technology
    • IGLC, Blacksburg, Va., (Feb. 1, 2004)
    • Moser, L., and dos Santos, A. (2003). "Exploring the role of visual controls on mobile cell manufacturing: A case study on drywall technology." Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11), IGLC, Blacksburg, Va., 11-23, 〈http://strobos.cee.vt.edu/IGLC11〉 (Feb. 1, 2004).
    • (2003) Proc., Int. Group for Lean Construction 11th Annual Conf. (IGLC-11) , pp. 11-23
    • Moser, L.1    Dos Santos, A.2
  • 31
    • 0039756649 scopus 로고    scopus 로고
    • Work design issues in lean production from a sociotechnical systems perspective: Neo-Taylorism or the next step in sociotechnical design?
    • Niepce, W., and Molleman, E. (1998). "Work design issues in lean production from a sociotechnical systems perspective: Neo-Taylorism or the next step in sociotechnical design?" Hum. Relat., 51(3), 259-287.
    • (1998) Hum. Relat. , vol.51 , Issue.3 , pp. 259-287
    • Niepce, W.1    Molleman, E.2
  • 32
    • 0004220333 scopus 로고
    • Productivity, Cambridge, Ma.
    • Ohno, T. (1988). Toyota production system, Productivity, Cambridge, Ma., 1-44.
    • (1988) Toyota Production System , pp. 1-44
    • Ohno, T.1
  • 33
    • 3843065481 scopus 로고    scopus 로고
    • Lean indicators and manufacturing strategies
    • Sánchez, A., and Pérez, M. (2001). "Lean indicators and manufacturing strategies." Int. J. Operat. Product. Manage., 21(11), 1433-1451.
    • (2001) Int. J. Operat. Product. Manage. , vol.21 , Issue.11 , pp. 1433-1451
    • Sánchez, A.1    Pérez, M.2
  • 39
    • 0036190151 scopus 로고    scopus 로고
    • A model for evaluating the degree of leanness of manufacturing firms
    • Soriano-Meier, H., and Forrester, P. (2002). "A model for evaluating the degree of leanness of manufacturing firms." Integr. Manuf. Syst., 13(2), 104-109.
    • (2002) Integr. Manuf. Syst. , vol.13 , Issue.2 , pp. 104-109
    • Soriano-Meier, H.1    Forrester, P.2
  • 40
    • 33748790312 scopus 로고    scopus 로고
    • Building a high-performing project team
    • Van Nostrand Reinhold, New York
    • West, J. (1998). "Building a high-performing project team." Field guide to project management, Van Nostrand Reinhold, New York, 239-254.
    • (1998) Field Guide to Project Management , pp. 239-254
    • West, J.1
  • 41
    • 0003986421 scopus 로고    scopus 로고
    • Simon & Schuster, New York
    • Womack, J., and Jones, D. (1996). Lean thinking, Simon & Schuster, New York, 29-92.
    • (1996) Lean Thinking , pp. 29-92
    • Womack, J.1    Jones, D.2
  • 43
    • 0032122942 scopus 로고    scopus 로고
    • Flexible machine layout design for dynamic and uncertain production environments
    • Yang, T., and Peters, B. (1998). "Flexible machine layout design for dynamic and uncertain production environments," Eur. J. Oper. Res., 108, 49-64.
    • (1998) Eur. J. Oper. Res. , vol.108 , pp. 49-64
    • Yang, T.1    Peters, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.