메뉴 건너뛰기




Volumn , Issue , 2008, Pages 635-646

Improving construction work flow - The connective role of lookahead planning

Author keywords

Last planner system; Lean construction; Lookahead planning; Production control; Rationalizing production

Indexed keywords

CONSTRUCTION WORKS; LAST PLANNER; LEAN CONSTRUCTION; LONG TERM PLANNING; LOOK-AHEAD; PLANNING PROCESS;

EID: 69949104826     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (48)

References (18)
  • 1
    • 84856653029 scopus 로고    scopus 로고
    • Lookahead planning: The missing link in production control
    • July, Gold Coast, Australia
    • Ballard, G. (1997). "Lookahead Planning: The Missing Link in Production Control", Proc. 5th Annual Conf. Int'l. Group for Lean Constr., IGLC 5, July, Gold Coast, Australia. pp. 13-26.
    • (1997) Proc. 5th Annual Conf. Int'l. Group for Lean Constr., IGLC , vol.5 , pp. 13-26
    • Ballard, G.1
  • 2
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G. (1998). "Shielding Production: An Essential Step in Production Control", Journal of Construction Engineering and Management, ASCE, 124 (1), pp. 11-17. (Pubitemid 128586379)
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 3
    • 0004011301 scopus 로고    scopus 로고
    • Ph.D. Diss., Faculty of Engineering, School of Civil Engineering, The University of Birmingham, UK
    • Ballard, G. (2000). The Last Planner System of Production Control. Ph.D. Diss., Faculty of Engineering, School of Civil Engineering, The University of Birmingham, UK.
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 9
    • 13944256682 scopus 로고    scopus 로고
    • Integrated production scheduler for construction look-ahead planning
    • 26-28 July, Berkeley, CA, USA
    • Chua, D.K.H., Jun, S.L., and Hwee, B.S. (1999) "Integrated Production Scheduler for Construction Look-ahead Planning". Proc. 7th Ann. Conf. Int'l. Group for Lean Constr., IGLC 7, 26-28 July, Berkeley, CA, USA, pp. 287-298.
    • (1999) Proc. 7th Ann. Conf. Int'l. Group for Lean Constr., IGLC , vol.7 , pp. 287-298
    • Chua, D.K.H.1    Jun, S.L.2    Hwee, B.S.3
  • 11
    • 79952454313 scopus 로고    scopus 로고
    • Logistics centers to support project-based production in the construction industry
    • 18-20 July, East Lansing, Michigan, USA
    • Hamzeh, F.R., Tommelein, I.D., Ballard, G., and Kaminsky, P. (2007). "Logistics Centers to Support Project-Based Production in the Construction Industry", Proc. 15th Ann. Conf. Int'l. Group for Lean Constr., IGLC 15, 18-20 July, East Lansing, Michigan, USA, pp. 181-191.
    • (2007) Proc. 15th Ann. Conf. Int'l. Group for Lean Constr., IGLC , vol.15 , pp. 181-191
    • Hamzeh, F.R.1    Tommelein, I.D.2    Ballard, G.3    Kaminsky, P.4
  • 17
    • 13944264416 scopus 로고    scopus 로고
    • Look-ahead planning: Screening and pulling
    • Civil and Environmental Engineering Department, University of California, Berkeley, CA, USA
    • Tommelein, I.D. and Ballard, G. (1997). "Look-ahead Planning: Screening and Pulling." Technical Report No. 97-9, Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, CA, USA.
    • (1997) Technical Report No. 97-9, Construction Engineering and Management Program
    • Tommelein, I.D.1    Ballard, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.