메뉴 건너뛰기




Volumn 8, Issue 7, 2017, Pages 961-975

Factors affecting shipbuilding productivity

Author keywords

Customer factor; Management; Production inputs; Productivity; Shipbuilding

Indexed keywords


EID: 85026465265     PISSN: 09766308     EISSN: 09766316     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (11)

References (49)
  • 3
    • 33744976139 scopus 로고    scopus 로고
    • A review of the use of compensated gross tonnes for shipbuilding performance measurement
    • Bruce, G. J. (2006). A review of the use of compensated gross tonnes for shipbuilding performance measurement. Journal of ship production, 22(2), 99-104.
    • (2006) Journal of Ship Production , vol.22 , Issue.2 , pp. 99-104
    • Bruce, G.J.1
  • 4
    • 79952744273 scopus 로고    scopus 로고
    • Ship complexity assessment at the concept design stage
    • Caprace, J. D., & Rigo, P. (2011). Ship complexity assessment at the concept design stage. Journal of marine science and technology, 16(1), 68-75.
    • (2011) Journal of Marine Science and Technology , vol.16 , Issue.1 , pp. 68-75
    • Caprace, J.D.1    Rigo, P.2
  • 5
    • 84879261859 scopus 로고    scopus 로고
    • Evaluating sustainable advantages in productivity with a systematic procedure
    • Chen, T., & Wang, Y. C. (2016). Evaluating sustainable advantages in productivity with a systematic procedure. The International Journal of Advanced Manufacturing Technology, 87(5-8), 1435-1442.
    • (2016) The International Journal of Advanced Manufacturing Technology , vol.87 , Issue.5-8 , pp. 1435-1442
    • Chen, T.1    Wang, Y.C.2
  • 6
    • 73249143958 scopus 로고    scopus 로고
    • Benchmarking shipbuilders' turnover of main assets
    • Colin, E. C., & Pinto, M. M. (2009). Benchmarking Shipbuilders' Turnover of Main Assets. Journal of Ship Production, 25(4), 175-181.
    • (2009) Journal of Ship Production , vol.25 , Issue.4 , pp. 175-181
    • Colin, E.C.1    Pinto, M.M.2
  • 7
    • 53749083311 scopus 로고    scopus 로고
    • (Organisation for Economic Co-operation and Development (OECD) Working Paper)
    • Council Working Party on Shipbuilding. (2007). Compensated Gross Ton (CGT) System. (Organisation for Economic Co-operation and Development (OECD) Working Paper).
    • (2007) Compensated Gross Ton (CGT) System
  • 8
    • 3843144950 scopus 로고    scopus 로고
    • Naval compensated gross tonnage coefficients and shipyard learning
    • Craggs, J., Bloor, D., Tanner, B., & Bullen, H. (2004). Naval compensated gross tonnage coefficients and shipyard learning. Journal of ship production, 20(2), 107-113.
    • (2004) Journal of Ship Production , vol.20 , Issue.2 , pp. 107-113
    • Craggs, J.1    Bloor, D.2    Tanner, B.3    Bullen, H.4
  • 9
    • 85026437606 scopus 로고    scopus 로고
    • A computer simulation approach to improving tugboat shipbuilding design and development productivity
    • Das, B., & Tejpal, N. (2008). A computer simulation approach to improving tugboat shipbuilding design and development productivity. Journal of Ship Production, 24(4), 221-227.
    • (2008) Journal of Ship Production , vol.24 , Issue.4 , pp. 221-227
    • Das, B.1    Tejpal, N.2
  • 12
    • 33751295266 scopus 로고    scopus 로고
    • Significant factors causing delay in the UAE construction industry
    • Faridi, A. S., & El-Sayegh, S. M. (2006). Significant factors causing delay in the UAE construction industry. Construction Management and Economics,24(11), 1167-1176.
    • (2006) Construction Management and Economics , vol.24 , Issue.11 , pp. 1167-1176
    • Faridi, A.S.1    El-Sayegh, S.M.2
  • 16
    • 0347537738 scopus 로고    scopus 로고
    • Productivity improvement at the SENESCO shipyard
    • Gebhardt, L. P., & Jarvis, R. G. (2003). Productivity improvement at the SENESCO shipyard. Journal of ship production, 19(3), 187-193.
    • (2003) Journal of Ship Production , vol.19 , Issue.3 , pp. 187-193
    • Gebhardt, L.P.1    Jarvis, R.G.2
  • 17
    • 3042769430 scopus 로고    scopus 로고
    • What is a case study and what is it good for?
    • Gerring, J. (2004). What is a case study and what is it good for?. American Political Science Review. 98(2), 341-354.
    • (2004) American Political Science Review , vol.98 , Issue.2 , pp. 341-354
    • Gerring, J.1
  • 19
    • 78649503341 scopus 로고    scopus 로고
    • Performance of major us shipyards in 20th/21st century
    • Gray, W. O. (2008). Performance of major us shipyards in 20th/21st century. Journal of Ship Production, 24(4), 202-213.
    • (2008) Journal of Ship Production , vol.24 , Issue.4 , pp. 202-213
    • Gray, W.O.1
  • 20
    • 84875014117 scopus 로고    scopus 로고
    • Quantification of delay factors using the relative importance index method for construction projects in Turkey
    • Gündüz, M., Nielsen, Y., & Özdemir, M. (2012). Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of Management in Engineering, 29(2), 133-139.
    • (2012) Journal of Management in Engineering , vol.29 , Issue.2 , pp. 133-139
    • Gündüz, M.1    Nielsen, Y.2    Özdemir, M.3
  • 21
    • 84868094213 scopus 로고    scopus 로고
    • Assessing the cost competitiveness of China's shipbuilding industry
    • Jiang, L., & Strandenes, S. P. (2012). Assessing the cost competitiveness of China's shipbuilding industry. Maritime Economics & Logistics, 14(4), 480-497.
    • (2012) Maritime Economics & Logistics , vol.14 , Issue.4 , pp. 480-497
    • Jiang, L.1    Strandenes, S.P.2
  • 27
    • 0036577018 scopus 로고    scopus 로고
    • A shipbuilding productivity predictor
    • Lamb, T., & Hellesoy, A. (2002). A shipbuilding productivity predictor. Journal of ship production, 18(2), 79-85.
    • (2002) Journal of Ship Production , vol.18 , Issue.2 , pp. 79-85
    • Lamb, T.1    Hellesoy, A.2
  • 29
    • 84866361428 scopus 로고    scopus 로고
    • Sustainable manufacturing in the US shipbuilding industry through outsourcing
    • Lee, W., & Sarder, M. D. (2011). Sustainable Manufacturing in the US Shipbuilding Industry through Outsourcing. International Journal of Engineering & Industries, 2(4).
    • (2011) International Journal of Engineering & Industries , vol.2 , Issue.4
    • Lee, W.1    Sarder, M.D.2
  • 30
    • 0032667962 scopus 로고    scopus 로고
    • Inventory reduction and productivity growth: Linkages in the Japanese automotive industry
    • Lieberman, M. B., & Demeester, L. (1999). Inventory reduction and productivity growth: linkages in the Japanese automotive industry. Management science,45(4), 466-485.
    • (1999) Management Science , vol.45 , Issue.4 , pp. 466-485
    • Lieberman, M.B.1    Demeester, L.2
  • 31
    • 0027654507 scopus 로고
    • Conducting case study research in operations management
    • McCutcheon, D. M., & Meredith, J. R. (1993). Conducting case study research in operations management. Journal of Operations Management, 11(3), 239-256.
    • (1993) Journal of Operations Management , vol.11 , Issue.3 , pp. 239-256
    • McCutcheon, D.M.1    Meredith, J.R.2
  • 33
    • 24344485381 scopus 로고    scopus 로고
    • Factors affecting ship design and construction lead time and cost
    • Moyst, H., & Das, B. (2005). Factors affecting ship design and construction lead time and cost. Journal of ship production, 21(3), 186-194.
    • (2005) Journal of Ship Production , vol.21 , Issue.3 , pp. 186-194
    • Moyst, H.1    Das, B.2
  • 35
    • 66749144683 scopus 로고    scopus 로고
    • Output, input and productivity measures at the industry level: The eu klems database
    • O'Mahony, M., & Timmer, M. P. (2009). Output, input and productivity measures at the industry level: The eu klems database∗. The Economic Journal, 119(538), F374-F403.
    • (2009) The Economic Journal , vol.119 , Issue.538 , pp. F374-F403
    • O'Mahony, M.1    Timmer, M.P.2
  • 39
    • 34248402903 scopus 로고    scopus 로고
    • Causes and effects of delays in Malaysian construction industry
    • Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of project management,25(5), 517-526.
    • (2007) International Journal of Project Management , vol.25 , Issue.5 , pp. 517-526
    • Sambasivan, M.1    Soon, Y.W.2
  • 40
    • 51349140630 scopus 로고    scopus 로고
    • The OECD productivity manual: A guide to the measurement of industry-level and aggregate productivity
    • (Spring)
    • Schreyer, P. (2001). The OECD productivity manual: a guide to the measurement of industry-level and aggregate productivity. International Productivity Monitor, 2(Spring), 37-51.
    • (2001) International Productivity Monitor , vol.2 , pp. 37-51
    • Schreyer, P.1
  • 41
    • 0034135189 scopus 로고    scopus 로고
    • Simulation-based evaluation of productivity for the design of an automated fabrication workshop in shipbuilding
    • Shin, J. G., & Sohn, S. J. (2000). Simulation-based evaluation of productivity for the design of an automated fabrication workshop in shipbuilding. Journal of ship production, 16(1), 46-59.
    • (2000) Journal of Ship Production , vol.16 , Issue.1 , pp. 46-59
    • Shin, J.G.1    Sohn, S.J.2
  • 42
    • 69649102631 scopus 로고    scopus 로고
    • A concept and framework for a shipyard layout design based on simulation
    • Shin, J. G., Song, Y. J., Lee, D. K., & Woo, J. H. (2009). A concept and framework for a shipyard layout design based on simulation. Journal of Ship production, 25(3), 126-135.
    • (2009) Journal of Ship Production , vol.25 , Issue.3 , pp. 126-135
    • Shin, J.G.1    Song, Y.J.2    Lee, D.K.3    Woo, J.H.4
  • 44
    • 85026465408 scopus 로고    scopus 로고
    • Measuring productivity
    • Xhaferi, B. (2012). Measuring Productivity. European Scientific Journal. 8(12), 68-79
    • (2012) European Scientific Journal , vol.8 , Issue.12 , pp. 68-79
    • Xhaferi, B.1
  • 46
    • 77952901270 scopus 로고    scopus 로고
    • Causes of delay in the planning and design phases for construction projects
    • Yang, J. B., & Wei, P. R. (2010). Causes of delay in the planning and design phases for construction projects. Journal of Architectural Engineering, 16(2), 80-83.
    • (2010) Journal of Architectural Engineering , vol.16 , Issue.2 , pp. 80-83
    • Yang, J.B.1    Wei, P.R.2
  • 47
    • 85026479396 scopus 로고    scopus 로고
    • The role of innovation in productivity improvement in advanced manufacturing mode: An example of a shipyard
    • Yu, F. P., Xiao, H. J., & Jiang, Z. H. (2010). The Role of Innovation in Productivity Improvement in Advanced Manufacturing Mode: An Example of a Shipyard. Research on Financial and Economic Issues, 3, 007.
    • (2010) Research on Financial and Economic Issues , vol.3 , pp. 007
    • Yu, F.P.1    Xiao, H.J.2    Jiang, Z.H.3
  • 48
    • 85020138162 scopus 로고    scopus 로고
    • Celine dorathy green shipping - A plethora of business opportunities for ecopreneurs
    • Dr. M. Bina Celine Dorathy Green Shipping - A Plethora of Business Opportunities for Ecopreneurs. International Journal of Civil Engineering and Technology, 8(5), 2017, pp. 189-198
    • (2017) International Journal of Civil Engineering and Technology , vol.8 , Issue.5 , pp. 189-198
    • Bina, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.