-
3
-
-
33744976139
-
A review of the use of compensated gross tonnes for shipbuilding performance measurement
-
Bruce, G. J. (2006). A review of the use of compensated gross tonnes for shipbuilding performance measurement. Journal of ship production, 22(2), 99-104.
-
(2006)
Journal of Ship Production
, vol.22
, Issue.2
, pp. 99-104
-
-
Bruce, G.J.1
-
4
-
-
79952744273
-
Ship complexity assessment at the concept design stage
-
Caprace, J. D., & Rigo, P. (2011). Ship complexity assessment at the concept design stage. Journal of marine science and technology, 16(1), 68-75.
-
(2011)
Journal of Marine Science and Technology
, vol.16
, Issue.1
, pp. 68-75
-
-
Caprace, J.D.1
Rigo, P.2
-
5
-
-
84879261859
-
Evaluating sustainable advantages in productivity with a systematic procedure
-
Chen, T., & Wang, Y. C. (2016). Evaluating sustainable advantages in productivity with a systematic procedure. The International Journal of Advanced Manufacturing Technology, 87(5-8), 1435-1442.
-
(2016)
The International Journal of Advanced Manufacturing Technology
, vol.87
, Issue.5-8
, pp. 1435-1442
-
-
Chen, T.1
Wang, Y.C.2
-
6
-
-
73249143958
-
Benchmarking shipbuilders' turnover of main assets
-
Colin, E. C., & Pinto, M. M. (2009). Benchmarking Shipbuilders' Turnover of Main Assets. Journal of Ship Production, 25(4), 175-181.
-
(2009)
Journal of Ship Production
, vol.25
, Issue.4
, pp. 175-181
-
-
Colin, E.C.1
Pinto, M.M.2
-
7
-
-
53749083311
-
-
(Organisation for Economic Co-operation and Development (OECD) Working Paper)
-
Council Working Party on Shipbuilding. (2007). Compensated Gross Ton (CGT) System. (Organisation for Economic Co-operation and Development (OECD) Working Paper).
-
(2007)
Compensated Gross Ton (CGT) System
-
-
-
8
-
-
3843144950
-
Naval compensated gross tonnage coefficients and shipyard learning
-
Craggs, J., Bloor, D., Tanner, B., & Bullen, H. (2004). Naval compensated gross tonnage coefficients and shipyard learning. Journal of ship production, 20(2), 107-113.
-
(2004)
Journal of Ship Production
, vol.20
, Issue.2
, pp. 107-113
-
-
Craggs, J.1
Bloor, D.2
Tanner, B.3
Bullen, H.4
-
9
-
-
85026437606
-
A computer simulation approach to improving tugboat shipbuilding design and development productivity
-
Das, B., & Tejpal, N. (2008). A computer simulation approach to improving tugboat shipbuilding design and development productivity. Journal of Ship Production, 24(4), 221-227.
-
(2008)
Journal of Ship Production
, vol.24
, Issue.4
, pp. 221-227
-
-
Das, B.1
Tejpal, N.2
-
11
-
-
84992960790
-
Delays and cost overruns in the construction projects in the Gaza strip
-
Enshassi, A., Al-Najjar, J., & Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), 126-151.
-
(2009)
Journal of Financial Management of Property and Construction
, vol.14
, Issue.2
, pp. 126-151
-
-
Enshassi, A.1
Al-Najjar, J.2
Kumaraswamy, M.3
-
12
-
-
33751295266
-
Significant factors causing delay in the UAE construction industry
-
Faridi, A. S., & El-Sayegh, S. M. (2006). Significant factors causing delay in the UAE construction industry. Construction Management and Economics,24(11), 1167-1176.
-
(2006)
Construction Management and Economics
, vol.24
, Issue.11
, pp. 1167-1176
-
-
Faridi, A.S.1
El-Sayegh, S.M.2
-
15
-
-
82355193693
-
Delays in building construction projects in Ghana
-
Fugar, F. D., & Agyakwah-Baah, A. B. (2010). Delays in Building Construction Projects in Ghana. Construction Economics and Building, 10(1/2), 103-116.
-
(2010)
Construction Economics and Building
, vol.10
, Issue.1-2
, pp. 103-116
-
-
Fugar, F.D.1
Agyakwah-Baah, A.B.2
-
16
-
-
0347537738
-
Productivity improvement at the SENESCO shipyard
-
Gebhardt, L. P., & Jarvis, R. G. (2003). Productivity improvement at the SENESCO shipyard. Journal of ship production, 19(3), 187-193.
-
(2003)
Journal of Ship Production
, vol.19
, Issue.3
, pp. 187-193
-
-
Gebhardt, L.P.1
Jarvis, R.G.2
-
17
-
-
3042769430
-
What is a case study and what is it good for?
-
Gerring, J. (2004). What is a case study and what is it good for?. American Political Science Review. 98(2), 341-354.
-
(2004)
American Political Science Review
, vol.98
, Issue.2
, pp. 341-354
-
-
Gerring, J.1
-
19
-
-
78649503341
-
Performance of major us shipyards in 20th/21st century
-
Gray, W. O. (2008). Performance of major us shipyards in 20th/21st century. Journal of Ship Production, 24(4), 202-213.
-
(2008)
Journal of Ship Production
, vol.24
, Issue.4
, pp. 202-213
-
-
Gray, W.O.1
-
20
-
-
84875014117
-
Quantification of delay factors using the relative importance index method for construction projects in Turkey
-
Gündüz, M., Nielsen, Y., & Özdemir, M. (2012). Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of Management in Engineering, 29(2), 133-139.
-
(2012)
Journal of Management in Engineering
, vol.29
, Issue.2
, pp. 133-139
-
-
Gündüz, M.1
Nielsen, Y.2
Özdemir, M.3
-
21
-
-
84868094213
-
Assessing the cost competitiveness of China's shipbuilding industry
-
Jiang, L., & Strandenes, S. P. (2012). Assessing the cost competitiveness of China's shipbuilding industry. Maritime Economics & Logistics, 14(4), 480-497.
-
(2012)
Maritime Economics & Logistics
, vol.14
, Issue.4
, pp. 480-497
-
-
Jiang, L.1
Strandenes, S.P.2
-
26
-
-
33745008654
-
Simulation-based performance improvement for shipbuilding processes
-
Lamb, T, Chung, H., Spicknall, M., Shin, J. G., Woo, J. H., & Koenig, P. (2006). Simulation-based performance improvement for shipbuilding processes. Journal of ship production, 22(2), 49-65.
-
(2006)
Journal of Ship Production
, vol.22
, Issue.2
, pp. 49-65
-
-
Lamb, T.1
Chung, H.2
Spicknall, M.3
Shin, J.G.4
Woo, J.H.5
Koenig, P.6
-
27
-
-
0036577018
-
A shipbuilding productivity predictor
-
Lamb, T., & Hellesoy, A. (2002). A shipbuilding productivity predictor. Journal of ship production, 18(2), 79-85.
-
(2002)
Journal of Ship Production
, vol.18
, Issue.2
, pp. 79-85
-
-
Lamb, T.1
Hellesoy, A.2
-
28
-
-
84899785132
-
Simulation-based work plan verification in shipyards
-
Lee, D. K., Shin, J. G., Kim, Y., & Jeong, Y. K. (2014). Simulation-Based Work Plan Verification in Shipyards. Journal of Ship Production and Design, 30(2), 49-57.
-
(2014)
Journal of Ship Production and Design
, vol.30
, Issue.2
, pp. 49-57
-
-
Lee, D.K.1
Shin, J.G.2
Kim, Y.3
Jeong, Y.K.4
-
29
-
-
84866361428
-
Sustainable manufacturing in the US shipbuilding industry through outsourcing
-
Lee, W., & Sarder, M. D. (2011). Sustainable Manufacturing in the US Shipbuilding Industry through Outsourcing. International Journal of Engineering & Industries, 2(4).
-
(2011)
International Journal of Engineering & Industries
, vol.2
, Issue.4
-
-
Lee, W.1
Sarder, M.D.2
-
30
-
-
0032667962
-
Inventory reduction and productivity growth: Linkages in the Japanese automotive industry
-
Lieberman, M. B., & Demeester, L. (1999). Inventory reduction and productivity growth: linkages in the Japanese automotive industry. Management science,45(4), 466-485.
-
(1999)
Management Science
, vol.45
, Issue.4
, pp. 466-485
-
-
Lieberman, M.B.1
Demeester, L.2
-
31
-
-
0027654507
-
Conducting case study research in operations management
-
McCutcheon, D. M., & Meredith, J. R. (1993). Conducting case study research in operations management. Journal of Operations Management, 11(3), 239-256.
-
(1993)
Journal of Operations Management
, vol.11
, Issue.3
, pp. 239-256
-
-
McCutcheon, D.M.1
Meredith, J.R.2
-
33
-
-
24344485381
-
Factors affecting ship design and construction lead time and cost
-
Moyst, H., & Das, B. (2005). Factors affecting ship design and construction lead time and cost. Journal of ship production, 21(3), 186-194.
-
(2005)
Journal of Ship Production
, vol.21
, Issue.3
, pp. 186-194
-
-
Moyst, H.1
Das, B.2
-
34
-
-
0036132474
-
Causes of construction delay: Traditional contracts
-
Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: traditional contracts. International journal of project management, 20(1), 67-73.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.1
, pp. 67-73
-
-
Odeh, A.M.1
Battaineh, H.T.2
-
35
-
-
66749144683
-
Output, input and productivity measures at the industry level: The eu klems database
-
O'Mahony, M., & Timmer, M. P. (2009). Output, input and productivity measures at the industry level: The eu klems database∗. The Economic Journal, 119(538), F374-F403.
-
(2009)
The Economic Journal
, vol.119
, Issue.538
, pp. F374-F403
-
-
O'Mahony, M.1
Timmer, M.P.2
-
36
-
-
64249102539
-
Shipbuilding performance benchmarking
-
Pires Jr, F. C., Lamb, T., & Souza, C. (2009). Shipbuilding performance benchmarking. International Journal of Business Performance Management,11(3), 216-235.
-
(2009)
International Journal of Business Performance Management
, vol.11
, Issue.3
, pp. 216-235
-
-
Pires, F.C.1
Lamb, T.2
Souza, C.3
-
37
-
-
84987829923
-
Causes and effects of delay in iranian construction projects
-
Pourrostam, T., & Ismail, A. (2012). Causes and effects of delay in Iranian construction projects. International Journal of Engineering and Technology,4(5), 5-8.
-
(2012)
International Journal of Engineering and Technology
, vol.4
, Issue.5
, pp. 5-8
-
-
Pourrostam, T.1
Ismail, A.2
-
39
-
-
34248402903
-
Causes and effects of delays in Malaysian construction industry
-
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of project management,25(5), 517-526.
-
(2007)
International Journal of Project Management
, vol.25
, Issue.5
, pp. 517-526
-
-
Sambasivan, M.1
Soon, Y.W.2
-
40
-
-
51349140630
-
The OECD productivity manual: A guide to the measurement of industry-level and aggregate productivity
-
(Spring)
-
Schreyer, P. (2001). The OECD productivity manual: a guide to the measurement of industry-level and aggregate productivity. International Productivity Monitor, 2(Spring), 37-51.
-
(2001)
International Productivity Monitor
, vol.2
, pp. 37-51
-
-
Schreyer, P.1
-
41
-
-
0034135189
-
Simulation-based evaluation of productivity for the design of an automated fabrication workshop in shipbuilding
-
Shin, J. G., & Sohn, S. J. (2000). Simulation-based evaluation of productivity for the design of an automated fabrication workshop in shipbuilding. Journal of ship production, 16(1), 46-59.
-
(2000)
Journal of Ship Production
, vol.16
, Issue.1
, pp. 46-59
-
-
Shin, J.G.1
Sohn, S.J.2
-
42
-
-
69649102631
-
A concept and framework for a shipyard layout design based on simulation
-
Shin, J. G., Song, Y. J., Lee, D. K., & Woo, J. H. (2009). A concept and framework for a shipyard layout design based on simulation. Journal of Ship production, 25(3), 126-135.
-
(2009)
Journal of Ship Production
, vol.25
, Issue.3
, pp. 126-135
-
-
Shin, J.G.1
Song, Y.J.2
Lee, D.K.3
Woo, J.H.4
-
44
-
-
85026465408
-
Measuring productivity
-
Xhaferi, B. (2012). Measuring Productivity. European Scientific Journal. 8(12), 68-79
-
(2012)
European Scientific Journal
, vol.8
, Issue.12
, pp. 68-79
-
-
Xhaferi, B.1
-
46
-
-
77952901270
-
Causes of delay in the planning and design phases for construction projects
-
Yang, J. B., & Wei, P. R. (2010). Causes of delay in the planning and design phases for construction projects. Journal of Architectural Engineering, 16(2), 80-83.
-
(2010)
Journal of Architectural Engineering
, vol.16
, Issue.2
, pp. 80-83
-
-
Yang, J.B.1
Wei, P.R.2
-
47
-
-
85026479396
-
The role of innovation in productivity improvement in advanced manufacturing mode: An example of a shipyard
-
Yu, F. P., Xiao, H. J., & Jiang, Z. H. (2010). The Role of Innovation in Productivity Improvement in Advanced Manufacturing Mode: An Example of a Shipyard. Research on Financial and Economic Issues, 3, 007.
-
(2010)
Research on Financial and Economic Issues
, vol.3
, pp. 007
-
-
Yu, F.P.1
Xiao, H.J.2
Jiang, Z.H.3
-
48
-
-
85020138162
-
Celine dorathy green shipping - A plethora of business opportunities for ecopreneurs
-
Dr. M. Bina Celine Dorathy Green Shipping - A Plethora of Business Opportunities for Ecopreneurs. International Journal of Civil Engineering and Technology, 8(5), 2017, pp. 189-198
-
(2017)
International Journal of Civil Engineering and Technology
, vol.8
, Issue.5
, pp. 189-198
-
-
Bina, M.1
-
49
-
-
85018743094
-
Greener, safer-sustainable energy efficient shipping using solar power optimizer by MPPT
-
Cite this Article
-
Cite this Article: T. Subhashini, N. Kumar, V. Thanikachalam and P. Maheswari, Greener, Safer-Sustainable Energy Efficient Shipping using Solar Power Optimizer by MPPT. International Journal of Mechanical Engineering and Technology, 8(4), 2017, pp. 156-164
-
(2017)
International Journal of Mechanical Engineering and Technology
, vol.8
, Issue.4
, pp. 156-164
-
-
Subhashini, T.1
Kumar, N.2
Thanikachalam, V.3
Maheswari, P.4
|