메뉴 건너뛰기




Volumn 30, Issue 2, 2014, Pages 49-57

Simulation-based work plan verification in shipyards

Author keywords

Modeling simulation; Shipyard production planning; Shipyard work plan; Simulation based plan verification

Indexed keywords

COMPUTER SIMULATION; PLANNING; PRODUCTION CONTROL; PRODUCTION ENGINEERING; PRODUCTIVITY; SHIPYARDS;

EID: 84899785132     PISSN: 21582866     EISSN: 21582874     Source Type: Journal    
DOI: 10.5957/JSPD.30.2.130032     Document Type: Article
Times cited : (13)

References (9)
  • 1
    • 0032003235 scopus 로고    scopus 로고
    • The virtual shipyard: A simulation model of the shipbuilding process
    • ALFELD, L. E., PILLIOD, C. S., and WILKINS, J. R. 1998 The virtual shipyard: a simulation model of the shipbuilding process, Journal of Ship Production, 14, 1, 33-40.
    • (1998) Journal of Ship Production , vol.14 , Issue.1 , pp. 33-40
    • Alfeld, L.E.1    Pilliod, C.S.2    Wilkins, J.R.3
  • 3
    • 7544222084 scopus 로고    scopus 로고
    • Discrete event simulation: An efficient tool to assist shipyard investment and production planning
    • KRAUSE, M., ROLAND, F., STEINHAUER, D., and HEINEMANN, M. 2004 Discrete event simulation: an efficient tool to assist shipyard investment and production planning, Journal of Ship Production, 20, 3, 176-182.
    • (2004) Journal of Ship Production , vol.20 , Issue.3 , pp. 176-182
    • Krause, M.1    Roland, F.2    Steinhauer, D.3    Heinemann, M.4
  • 5
    • 70449334365 scopus 로고    scopus 로고
    • Development of simulationbased production execution system in a shipyard: A case study for a panel block assembly shop
    • LEE, K. K., SHIN, J. G., and RYU, C. 2009 Development of simulationbased production execution system in a shipyard: a case study for a panel block assembly shop, Production Planning & Control: The Management of Operations, 20, 8, 750-768.
    • (2009) Production Planning & Control: The Management of Operations , vol.20 , Issue.8 , pp. 750-768
    • Lee, K.K.1    Shin, J.G.2    Ryu, C.3
  • 7
    • 84930481497 scopus 로고    scopus 로고
    • Research on systematization and advancement of shipbuilding production management for flexible and agile response for high value offshore platform
    • SONG, Y. J., WOO, J. H., and SHIN, J. G. 2011 Research on systematization and advancement of shipbuilding production management for flexible and agile response for high value offshore platform, International Journal of Naval Architecture and Ocean Engineering, 3, 3, 181-192.
    • (2011) International Journal of Naval Architecture and Ocean Engineering , vol.3 , Issue.3 , pp. 181-192
    • Song, Y.J.1    Woo, J.H.2    Shin, J.G.3
  • 8
    • 78649556769 scopus 로고    scopus 로고
    • Development of the decision-making system for the ship block logistics based on the simulation
    • WOO, J. H., SONG, Y. J., KANG, Y. W., and SHIN, J. G. 2010 Development of the decision-making system for the ship block logistics based on the simulation, Journal of Ship Production and Design, 26, 4, 290-300.
    • (2010) Journal of Ship Production and Design , vol.26 , Issue.4 , pp. 290-300
    • Woo, J.H.1    Song, Y.J.2    Kang, Y.W.3    Shin, J.G.4
  • 9
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • WU, S. D. and WYSK, R. A. 1989 An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing, International Journal of Production Research, 27, 9, 1603-1623.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1603-1623
    • Wu, S.1    Wysk, R.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.