메뉴 건너뛰기




Volumn 7, Issue 1, 2014, Pages 51-76

The block planning approach for continuous time-based dynamic lot sizing and scheduling

Author keywords

Block planning; Lot sizing and scheduling; Mixed integer linear programming

Indexed keywords


EID: 85012283629     PISSN: 21983402     EISSN: 21982627     Source Type: Journal    
DOI: 10.1007/s40685-014-0003-y     Document Type: Article
Times cited : (18)

References (34)
  • 2
    • 84859925191 scopus 로고    scopus 로고
    • Multi-objective integrated production and distribution planning of perishable products
    • Amorim, Pedro, Hans-Otto Günther, and Bernardo Almada-Lobo. 2012. Multi-objective integrated production and distribution planning of perishable products. International Journal of Production Economics 138(1): 89–101
    • (2012) International Journal of Production Economics , vol.138 , Issue.1 , pp. 89-101
    • Amorim, P.1    Günther, H.-O.2    Almada-Lobo, B.3
  • 3
    • 77955714368 scopus 로고    scopus 로고
    • Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application
    • Bilgen, Bilge, and Hans-Otto Günther. 2010. Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application. OR Spectrum 32(4): 927–955
    • (2010) OR Spectrum , vol.32 , Issue.4 , pp. 927-955
    • Bilgen, B.1    Günther, H.-O.2
  • 4
    • 77349118693 scopus 로고    scopus 로고
    • Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
    • Buschkühl, Lisbeth, Florian Sahling, Stefan Helber, and Horst Tempelmeier. 2010. Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectrum 32(2): 231–261
    • (2010) OR Spectrum , vol.32 , Issue.2 , pp. 231-261
    • Buschkühl, L.1    Sahling, F.2    Helber, S.3    Tempelmeier, H.4
  • 5
    • 0002458023 scopus 로고
    • Measure costs right: make the right decisions
    • Cooper, Robin, and Robert S. Kaplan. 1988. Measure costs right: make the right decisions. Harvard Business Review 66(5): 96–103
    • (1988) Harvard Business Review , vol.66 , Issue.5 , pp. 96-103
    • Cooper, R.1    Kaplan, R.S.2
  • 6
    • 33645210456 scopus 로고    scopus 로고
    • On alternative mixed integer programming formulations and LP-based heuristics for lot sizing with setup times
    • Denizel, Meltem, and Haldun Süral. 2006. On alternative mixed integer programming formulations and LP-based heuristics for lot sizing with setup times. Journal of the Operational Research Society 57(4): 389–399
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.4 , pp. 389-399
    • Denizel, M.1    Süral, H.2
  • 7
    • 33749286452 scopus 로고
    • A heuristic solution procedure for the multi-item, multi-level, limited capacity lot sizing problem
    • Dixon, Paul S., and Edward A. Silver. 1981. A heuristic solution procedure for the multi-item, multi-level, limited capacity lot sizing problem. Journal of Operations Management 2(1): 23–39
    • (1981) Journal of Operations Management , vol.2 , Issue.1 , pp. 23-39
    • Dixon, P.S.1    Silver, E.A.2
  • 8
    • 84859794755 scopus 로고    scopus 로고
    • Integrated production and distribution planning for perishable food products
    • Farahani, Poorya, Martin Grunow, and Hans-Otto Günther. 2012. Integrated production and distribution planning for perishable food products. Flexible Services and Manufacturing 24(1): 28–51
    • (2012) Flexible Services and Manufacturing , vol.24 , Issue.1 , pp. 28-51
    • Farahani, P.1    Grunow, M.2    Günther, H.-O.3
  • 9
    • 58149250389 scopus 로고    scopus 로고
    • Solution approaches for the soft drink integrated production lot sizing and scheduling problem
    • Ferreira, Deisemara, Reinaldo Morabito, and Soccoro Rangel. 2009. Solution approaches for the soft drink integrated production lot sizing and scheduling problem. European Journal of Operational Research 196(4): 697–706
    • (2009) European Journal of Operational Research , vol.196 , Issue.4 , pp. 697-706
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 10
    • 84857456910 scopus 로고    scopus 로고
    • Single-stage formulations for synchronized two-stage lot sizing and scheduling in soft drink production
    • Ferreira, Deisemara, Alistair R. Clark, Bernardo Almada-Lobo, and Reinaldo Morabito. 2012. Single-stage formulations for synchronized two-stage lot sizing and scheduling in soft drink production. International Journal of Production Economics 136(2): 255–265
    • (2012) International Journal of Production Economics , vol.136 , Issue.2 , pp. 255-265
    • Ferreira, D.1    Clark, A.R.2    Almada-Lobo, B.3    Morabito, R.4
  • 11
    • 0008655177 scopus 로고    scopus 로고
    • The general lot sizing and scheduling problem
    • Fleischmann, Bernhard, and Herbert Meyr. 1997. The general lot sizing and scheduling problem. OR Spektrum 19(1): 11–21
    • (1997) OR Spektrum , vol.19 , Issue.1 , pp. 11-21
    • Fleischmann, B.1    Meyr, H.2
  • 12
    • 1342290327 scopus 로고    scopus 로고
    • Plant coordination in pharmaceutics supply networks
    • Grunow, Martin, Hans-Otto Günther, and Gang Yang. 2003. Plant coordination in pharmaceutics supply networks. OR Spectrum 25(1): 109–141
    • (2003) OR Spectrum , vol.25 , Issue.1 , pp. 109-141
    • Grunow, M.1    Günther, H.-O.2    Yang, G.3
  • 13
    • 0022109204 scopus 로고
    • Planning lot sizes and capacity requirements in a single stage production system
    • Günther, Hans-Otto. 1987. Planning lot sizes and capacity requirements in a single stage production system. European Journal of Operational Research 31(2): 223–231
    • (1987) European Journal of Operational Research , vol.31 , Issue.2 , pp. 223-231
    • Günther, H.-O.1
  • 14
    • 33746821809 scopus 로고    scopus 로고
    • Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO©
    • Günther, Hans-Otto, Martin Grunow, and Ulf Neuhaus. 2006. Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO©. International Journal of Production Research 44(18–19): 3711–3726
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3711-3726
    • Günther, H.-O.1    Grunow, M.2    Neuhaus, U.3
  • 15
    • 77951252436 scopus 로고    scopus 로고
    • Operative transportation planning in consumer goods supply chains
    • Günther, Hans-Otto, and Thorben Seiler. 2009. Operative transportation planning in consumer goods supply chains. Flexible Services and Manufacturing 21(1): 51–74
    • (2009) Flexible Services and Manufacturing , vol.21 , Issue.1 , pp. 51-74
    • Günther, H.-O.1    Seiler, T.2
  • 16
    • 0000356787 scopus 로고
    • How many parts to make at once
    • 152 (reprinted 1990 in: Operations Research, 38 (6): 947–950
    • Harris, Ford W. 1913. How many parts to make at once. Factory, The Magazine of Management 10(2): 135–136. and 152 reprinted 1990 in: Operations Research, 38 (6): 947–950
    • (1913) Factory, The Magazine of Management , vol.10 , Issue.2 , pp. 135-136
    • Harris, F.W.1
  • 17
  • 18
    • 0032069649 scopus 로고    scopus 로고
    • Discrete lotsizing and scheduling by batch sequencing
    • Jordan, Carsten, and Andreas Drexl. 1998. Discrete lotsizing and scheduling by batch sequencing. Management Science 44(5): 698–713
    • (1998) Management Science , vol.44 , Issue.5 , pp. 698-713
    • Jordan, C.1    Drexl, A.2
  • 19
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: a review of models and algorithms
    • Karimi, B., S.M.T. Fatemi Ghomi, and J.M. Wilson. 2003. The capacitated lot sizing problem: a review of models and algorithms. Omega 31(5): 365–378
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 20
    • 84868262354 scopus 로고    scopus 로고
    • A framework to engineer production control strategies and its application in electronics manufacturing
    • Karrer, Christoph, Knut Alicke, and Hans-Otto Günther. 2012. A framework to engineer production control strategies and its application in electronics manufacturing. International Journal of Production Research 50(22): 6595–6611
    • (2012) International Journal of Production Research , vol.50 , Issue.22 , pp. 6595-6611
    • Karrer, C.1    Alicke, K.2    Günther, H.-O.3
  • 21
    • 30844436140 scopus 로고    scopus 로고
    • Mixed integer linear programming approaches to shelf-life-integrated planning and scheduling in yoghurt production
    • Lütke Entrup, Matthias, Hans-Otto Günther, Paul van Beek, Martin Grunow, and Thorben Seiler. 2005. Mixed integer linear programming approaches to shelf-life-integrated planning and scheduling in yoghurt production. International Journal of Production Research 43(23): 5071–5100
    • (2005) International Journal of Production Research , vol.43 , Issue.23 , pp. 5071-5100
    • Lütke Entrup, M.1    Günther, H.-O.2    van Beek, P.3    Grunow, M.4    Seiler, T.5
  • 22
    • 84896389193 scopus 로고    scopus 로고
    • Integrated scheduling of continuous casters and hot strip mills in the steel industry: a block planning application
    • Mattik, Imke, Pedro Amorim, and Hans-Otto Günther. 2014. Integrated scheduling of continuous casters and hot strip mills in the steel industry: a block planning application. International Journal of Production Research 52(9): 2576–2591
    • (2014) International Journal of Production Research , vol.52 , Issue.9 , pp. 2576-2591
    • Mattik, I.1    Amorim, P.2    Günther, H.-O.3
  • 23
    • 79955485197 scopus 로고    scopus 로고
    • Time representations and mathematical models for process scheduling problems
    • Mouret, Sylvain, Ignacio E. Grossmann, and Pierre Pestiaux. 2011. Time representations and mathematical models for process scheduling problems. Computers and Chemical Engineering 35(6): 1038–1063
    • (2011) Computers and Chemical Engineering , vol.35 , Issue.6 , pp. 1038-1063
    • Mouret, S.1    Grossmann, I.E.2    Pestiaux, P.3
  • 24
    • 57149133539 scopus 로고    scopus 로고
    • The floating stock policy in fast moving consumer goods supply chains
    • Pourakbar, Morteza, Andrei Sleptchenko, and Rommert Dekker. 2009. The floating stock policy in fast moving consumer goods supply chains. Transportation Research Part E 45(1): 39–49
    • (2009) Transportation Research Part E , vol.45 , Issue.1 , pp. 39-49
    • Pourakbar, M.1    Sleptchenko, A.2    Dekker, R.3
  • 25
    • 39449098494 scopus 로고    scopus 로고
    • Capacitated lot-sizing with extensions: a review
    • Quadt, Daniel, and Kuhn Heinrich. 2008. Capacitated lot-sizing with extensions: a review. 4OR 6(1): 61–83
    • (2008) 4OR , vol.6 , Issue.1 , pp. 61-83
    • Quadt, D.1    Heinrich, K.2
  • 26
    • 44949142877 scopus 로고    scopus 로고
    • Coordinated deterministic dynamic demand lot-sizing problem: a review of models and algorithms
    • Robinson, Powell, Narayanan Arunachalam, and Sahin Funda. 2009. Coordinated deterministic dynamic demand lot-sizing problem: a review of models and algorithms. Omega 37(1): 3–15
    • (2009) Omega , vol.37 , Issue.1 , pp. 3-15
    • Robinson, P.1    Arunachalam, N.2    Funda, S.3
  • 27
    • 79955056703 scopus 로고    scopus 로고
    • Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighbourhood search heuristic
    • Ross, J.W.James, and Bernardo Almada-Lobo. 2011. Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighbourhood search heuristic. Computers and Operations Research 38(12): 1816–1825
    • (2011) Computers and Operations Research , vol.38 , Issue.12 , pp. 1816-1825
    • Ross, J.W.J.1    Almada-Lobo, B.2
  • 29
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study
    • Shaik, Munawar A., Stacy L. Janak, and Christodoulos Floudas. 2006. Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study. Industrial and Engineering Chemistry Research 45(18): 6190–6209
    • (2006) Industrial and Engineering Chemistry Research , vol.45 , Issue.18 , pp. 6190-6209
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.3
  • 30
    • 34249948810 scopus 로고    scopus 로고
    • Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: an illustrative case study
    • Soman, Chetan Anil, Dirk Pieter van Donk, and Gerald J.C.Gaalman. 2007. Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: an illustrative case study. International Journal of Production Economics 108(1–2): 191–199
    • (2007) International Journal of Production Economics , vol.108 , Issue.1-2 , pp. 191-199
    • Soman, C.A.1    Pieter van Donk, D.2    Gerald, J.C.G.3
  • 32
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, Harvey M., and Thomson M. Whitin. 1958. Dynamic version of the economic lot size model. Management Science 5(1): 89–96
    • (1958) Management Science , vol.5 , Issue.1 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 34
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: a literature review
    • Zhu, Xiaoyan, and Wilbert E. Wilhelm. 2006. Scheduling and lot sizing with sequence-dependent setup: a literature review. IIE Transactions 38(11): 987–1007
    • (2006) IIE Transactions , vol.38 , Issue.11 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.