-
1
-
-
36849082395
-
A survey of scheduling problems with setup times and costs
-
Allahverdi, Ali, C.T. Ng, T.C.E. Cheng, and Mikhail Y. Kovalyov. 2008. A survey of scheduling problems with setup times and costs. European Journal of Operational Research 187(3): 985–1032
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
2
-
-
84859925191
-
Multi-objective integrated production and distribution planning of perishable products
-
Amorim, Pedro, Hans-Otto Günther, and Bernardo Almada-Lobo. 2012. Multi-objective integrated production and distribution planning of perishable products. International Journal of Production Economics 138(1): 89–101
-
(2012)
International Journal of Production Economics
, vol.138
, Issue.1
, pp. 89-101
-
-
Amorim, P.1
Günther, H.-O.2
Almada-Lobo, B.3
-
3
-
-
77955714368
-
Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application
-
Bilgen, Bilge, and Hans-Otto Günther. 2010. Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application. OR Spectrum 32(4): 927–955
-
(2010)
OR Spectrum
, vol.32
, Issue.4
, pp. 927-955
-
-
Bilgen, B.1
Günther, H.-O.2
-
4
-
-
77349118693
-
Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
-
Buschkühl, Lisbeth, Florian Sahling, Stefan Helber, and Horst Tempelmeier. 2010. Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectrum 32(2): 231–261
-
(2010)
OR Spectrum
, vol.32
, Issue.2
, pp. 231-261
-
-
Buschkühl, L.1
Sahling, F.2
Helber, S.3
Tempelmeier, H.4
-
5
-
-
0002458023
-
Measure costs right: make the right decisions
-
Cooper, Robin, and Robert S. Kaplan. 1988. Measure costs right: make the right decisions. Harvard Business Review 66(5): 96–103
-
(1988)
Harvard Business Review
, vol.66
, Issue.5
, pp. 96-103
-
-
Cooper, R.1
Kaplan, R.S.2
-
6
-
-
33645210456
-
On alternative mixed integer programming formulations and LP-based heuristics for lot sizing with setup times
-
Denizel, Meltem, and Haldun Süral. 2006. On alternative mixed integer programming formulations and LP-based heuristics for lot sizing with setup times. Journal of the Operational Research Society 57(4): 389–399
-
(2006)
Journal of the Operational Research Society
, vol.57
, Issue.4
, pp. 389-399
-
-
Denizel, M.1
Süral, H.2
-
7
-
-
33749286452
-
A heuristic solution procedure for the multi-item, multi-level, limited capacity lot sizing problem
-
Dixon, Paul S., and Edward A. Silver. 1981. A heuristic solution procedure for the multi-item, multi-level, limited capacity lot sizing problem. Journal of Operations Management 2(1): 23–39
-
(1981)
Journal of Operations Management
, vol.2
, Issue.1
, pp. 23-39
-
-
Dixon, P.S.1
Silver, E.A.2
-
8
-
-
84859794755
-
Integrated production and distribution planning for perishable food products
-
Farahani, Poorya, Martin Grunow, and Hans-Otto Günther. 2012. Integrated production and distribution planning for perishable food products. Flexible Services and Manufacturing 24(1): 28–51
-
(2012)
Flexible Services and Manufacturing
, vol.24
, Issue.1
, pp. 28-51
-
-
Farahani, P.1
Grunow, M.2
Günther, H.-O.3
-
9
-
-
58149250389
-
Solution approaches for the soft drink integrated production lot sizing and scheduling problem
-
Ferreira, Deisemara, Reinaldo Morabito, and Soccoro Rangel. 2009. Solution approaches for the soft drink integrated production lot sizing and scheduling problem. European Journal of Operational Research 196(4): 697–706
-
(2009)
European Journal of Operational Research
, vol.196
, Issue.4
, pp. 697-706
-
-
Ferreira, D.1
Morabito, R.2
Rangel, S.3
-
10
-
-
84857456910
-
Single-stage formulations for synchronized two-stage lot sizing and scheduling in soft drink production
-
Ferreira, Deisemara, Alistair R. Clark, Bernardo Almada-Lobo, and Reinaldo Morabito. 2012. Single-stage formulations for synchronized two-stage lot sizing and scheduling in soft drink production. International Journal of Production Economics 136(2): 255–265
-
(2012)
International Journal of Production Economics
, vol.136
, Issue.2
, pp. 255-265
-
-
Ferreira, D.1
Clark, A.R.2
Almada-Lobo, B.3
Morabito, R.4
-
11
-
-
0008655177
-
The general lot sizing and scheduling problem
-
Fleischmann, Bernhard, and Herbert Meyr. 1997. The general lot sizing and scheduling problem. OR Spektrum 19(1): 11–21
-
(1997)
OR Spektrum
, vol.19
, Issue.1
, pp. 11-21
-
-
Fleischmann, B.1
Meyr, H.2
-
12
-
-
1342290327
-
Plant coordination in pharmaceutics supply networks
-
Grunow, Martin, Hans-Otto Günther, and Gang Yang. 2003. Plant coordination in pharmaceutics supply networks. OR Spectrum 25(1): 109–141
-
(2003)
OR Spectrum
, vol.25
, Issue.1
, pp. 109-141
-
-
Grunow, M.1
Günther, H.-O.2
Yang, G.3
-
13
-
-
0022109204
-
Planning lot sizes and capacity requirements in a single stage production system
-
Günther, Hans-Otto. 1987. Planning lot sizes and capacity requirements in a single stage production system. European Journal of Operational Research 31(2): 223–231
-
(1987)
European Journal of Operational Research
, vol.31
, Issue.2
, pp. 223-231
-
-
Günther, H.-O.1
-
14
-
-
33746821809
-
Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO©
-
Günther, Hans-Otto, Martin Grunow, and Ulf Neuhaus. 2006. Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO©. International Journal of Production Research 44(18–19): 3711–3726
-
(2006)
International Journal of Production Research
, vol.44
, Issue.18-19
, pp. 3711-3726
-
-
Günther, H.-O.1
Grunow, M.2
Neuhaus, U.3
-
15
-
-
77951252436
-
Operative transportation planning in consumer goods supply chains
-
Günther, Hans-Otto, and Thorben Seiler. 2009. Operative transportation planning in consumer goods supply chains. Flexible Services and Manufacturing 21(1): 51–74
-
(2009)
Flexible Services and Manufacturing
, vol.21
, Issue.1
, pp. 51-74
-
-
Günther, H.-O.1
Seiler, T.2
-
16
-
-
0000356787
-
How many parts to make at once
-
152 (reprinted 1990 in: Operations Research, 38 (6): 947–950
-
Harris, Ford W. 1913. How many parts to make at once. Factory, The Magazine of Management 10(2): 135–136. and 152 reprinted 1990 in: Operations Research, 38 (6): 947–950
-
(1913)
Factory, The Magazine of Management
, vol.10
, Issue.2
, pp. 135-136
-
-
Harris, F.W.1
-
18
-
-
0032069649
-
Discrete lotsizing and scheduling by batch sequencing
-
Jordan, Carsten, and Andreas Drexl. 1998. Discrete lotsizing and scheduling by batch sequencing. Management Science 44(5): 698–713
-
(1998)
Management Science
, vol.44
, Issue.5
, pp. 698-713
-
-
Jordan, C.1
Drexl, A.2
-
19
-
-
0041511823
-
The capacitated lot sizing problem: a review of models and algorithms
-
Karimi, B., S.M.T. Fatemi Ghomi, and J.M. Wilson. 2003. The capacitated lot sizing problem: a review of models and algorithms. Omega 31(5): 365–378
-
(2003)
Omega
, vol.31
, Issue.5
, pp. 365-378
-
-
Karimi, B.1
Fatemi Ghomi, S.M.T.2
Wilson, J.M.3
-
20
-
-
84868262354
-
A framework to engineer production control strategies and its application in electronics manufacturing
-
Karrer, Christoph, Knut Alicke, and Hans-Otto Günther. 2012. A framework to engineer production control strategies and its application in electronics manufacturing. International Journal of Production Research 50(22): 6595–6611
-
(2012)
International Journal of Production Research
, vol.50
, Issue.22
, pp. 6595-6611
-
-
Karrer, C.1
Alicke, K.2
Günther, H.-O.3
-
21
-
-
30844436140
-
Mixed integer linear programming approaches to shelf-life-integrated planning and scheduling in yoghurt production
-
Lütke Entrup, Matthias, Hans-Otto Günther, Paul van Beek, Martin Grunow, and Thorben Seiler. 2005. Mixed integer linear programming approaches to shelf-life-integrated planning and scheduling in yoghurt production. International Journal of Production Research 43(23): 5071–5100
-
(2005)
International Journal of Production Research
, vol.43
, Issue.23
, pp. 5071-5100
-
-
Lütke Entrup, M.1
Günther, H.-O.2
van Beek, P.3
Grunow, M.4
Seiler, T.5
-
22
-
-
84896389193
-
Integrated scheduling of continuous casters and hot strip mills in the steel industry: a block planning application
-
Mattik, Imke, Pedro Amorim, and Hans-Otto Günther. 2014. Integrated scheduling of continuous casters and hot strip mills in the steel industry: a block planning application. International Journal of Production Research 52(9): 2576–2591
-
(2014)
International Journal of Production Research
, vol.52
, Issue.9
, pp. 2576-2591
-
-
Mattik, I.1
Amorim, P.2
Günther, H.-O.3
-
23
-
-
79955485197
-
Time representations and mathematical models for process scheduling problems
-
Mouret, Sylvain, Ignacio E. Grossmann, and Pierre Pestiaux. 2011. Time representations and mathematical models for process scheduling problems. Computers and Chemical Engineering 35(6): 1038–1063
-
(2011)
Computers and Chemical Engineering
, vol.35
, Issue.6
, pp. 1038-1063
-
-
Mouret, S.1
Grossmann, I.E.2
Pestiaux, P.3
-
24
-
-
57149133539
-
The floating stock policy in fast moving consumer goods supply chains
-
Pourakbar, Morteza, Andrei Sleptchenko, and Rommert Dekker. 2009. The floating stock policy in fast moving consumer goods supply chains. Transportation Research Part E 45(1): 39–49
-
(2009)
Transportation Research Part E
, vol.45
, Issue.1
, pp. 39-49
-
-
Pourakbar, M.1
Sleptchenko, A.2
Dekker, R.3
-
25
-
-
39449098494
-
Capacitated lot-sizing with extensions: a review
-
Quadt, Daniel, and Kuhn Heinrich. 2008. Capacitated lot-sizing with extensions: a review. 4OR 6(1): 61–83
-
(2008)
4OR
, vol.6
, Issue.1
, pp. 61-83
-
-
Quadt, D.1
Heinrich, K.2
-
26
-
-
44949142877
-
Coordinated deterministic dynamic demand lot-sizing problem: a review of models and algorithms
-
Robinson, Powell, Narayanan Arunachalam, and Sahin Funda. 2009. Coordinated deterministic dynamic demand lot-sizing problem: a review of models and algorithms. Omega 37(1): 3–15
-
(2009)
Omega
, vol.37
, Issue.1
, pp. 3-15
-
-
Robinson, P.1
Arunachalam, N.2
Funda, S.3
-
27
-
-
79955056703
-
Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighbourhood search heuristic
-
Ross, J.W.James, and Bernardo Almada-Lobo. 2011. Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighbourhood search heuristic. Computers and Operations Research 38(12): 1816–1825
-
(2011)
Computers and Operations Research
, vol.38
, Issue.12
, pp. 1816-1825
-
-
Ross, J.W.J.1
Almada-Lobo, B.2
-
29
-
-
33748760882
-
Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study
-
Shaik, Munawar A., Stacy L. Janak, and Christodoulos Floudas. 2006. Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study. Industrial and Engineering Chemistry Research 45(18): 6190–6209
-
(2006)
Industrial and Engineering Chemistry Research
, vol.45
, Issue.18
, pp. 6190-6209
-
-
Shaik, M.A.1
Janak, S.L.2
Floudas, C.3
-
30
-
-
34249948810
-
Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: an illustrative case study
-
Soman, Chetan Anil, Dirk Pieter van Donk, and Gerald J.C.Gaalman. 2007. Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: an illustrative case study. International Journal of Production Economics 108(1–2): 191–199
-
(2007)
International Journal of Production Economics
, vol.108
, Issue.1-2
, pp. 191-199
-
-
Soman, C.A.1
Pieter van Donk, D.2
Gerald, J.C.G.3
-
32
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner, Harvey M., and Thomson M. Whitin. 1958. Dynamic version of the economic lot size model. Management Science 5(1): 89–96
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
33
-
-
33847059708
-
Development of group setup strategies for makespan minimization in PCB assembly
-
Yilmaz, Ihsan Onur, Martin Grunow, Hans-Otto Günther, and Can Yapan. 2007. Development of group setup strategies for makespan minimization in PCB assembly. International Journal of Production Research 45(4): 871–897
-
(2007)
International Journal of Production Research
, vol.45
, Issue.4
, pp. 871-897
-
-
Yilmaz, I.O.1
Grunow, M.2
Günther, H.-O.3
Yapan, C.4
-
34
-
-
33748492325
-
Scheduling and lot sizing with sequence-dependent setup: a literature review
-
Zhu, Xiaoyan, and Wilbert E. Wilhelm. 2006. Scheduling and lot sizing with sequence-dependent setup: a literature review. IIE Transactions 38(11): 987–1007
-
(2006)
IIE Transactions
, vol.38
, Issue.11
, pp. 987-1007
-
-
Zhu, X.1
Wilhelm, W.E.2
|