메뉴 건너뛰기




Volumn 35, Issue 6, 2011, Pages 1038-1063

Time representations and mathematical models for process scheduling problems

Author keywords

Batch scheduling; Crude oil scheduling; Mixed integer linear programming; Time representations

Indexed keywords

BATCH-SCHEDULING; COMPUTATIONAL RESULTS; CONTINUOUS-TIME REPRESENTATION; CRUDE-OIL SCHEDULING; GLOBAL OPTIMALITY; GRAPH STRUCTURES; MAXIMUM CLIQUE; MIXED INTEGER LINEAR PROGRAMMING; MODEL SIZE; MODELING APPROACH; MULTI-OPERATION; MULTI-STAGE; NEAR-OPTIMAL SOLUTIONS; OIL OPERATIONS; PROCESS OPERATION; PROCESS-SCHEDULING PROBLEM; SINGLE STAGE; STOPPING CRITERIA; SYMMETRY-BREAKING; THREE SOLUTIONS; TIME REPRESENTATIONS;

EID: 79955485197     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2010.07.007     Document Type: Article
Times cited : (75)

References (25)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams J., Balas E., Zawack D. The shifting bottleneck procedure for job shop scheduling. Management Science 1988, 34(3):391-401.
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 33646183471 scopus 로고    scopus 로고
    • An efficient milp model for the short-term scheduling of single stage batch plants
    • Castro P.M., Grossmann I.E. An efficient milp model for the short-term scheduling of single stage batch plants. Computers and Chemical Engineering 2006, 30(6-7):1003-1018.
    • (2006) Computers and Chemical Engineering , vol.30 , Issue.6-7 , pp. 1003-1018
    • Castro, P.M.1    Grossmann, I.E.2
  • 3
    • 33748805201 scopus 로고    scopus 로고
    • Two new continuous-time models for the scheduling of multistage batch plants with sequence dependent changeovers
    • Castro P.M., Grossmann I.E. Two new continuous-time models for the scheduling of multistage batch plants with sequence dependent changeovers. Industrial and Engineering Chemistry Research 2006, 45(18):6210-6226.
    • (2006) Industrial and Engineering Chemistry Research , vol.45 , Issue.18 , pp. 6210-6226
    • Castro, P.M.1    Grossmann, I.E.2
  • 4
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • Floudas C.A., Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers and Chemical Engineering 2004, 28:2109-2129.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 5
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Industrial and Engineering Chemistry Research 1998, 37(11):4341-4359.
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , Issue.11 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 6
    • 2442436591 scopus 로고    scopus 로고
    • Enhance continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
    • Janak S.L., Lin X., Floudas C.A. Enhance continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies. Industrial and Engineering Chemistry Research 2004, 43(10):2516-2533.
    • (2004) Industrial and Engineering Chemistry Research , vol.43 , Issue.10 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 7
    • 0442264226 scopus 로고    scopus 로고
    • Planning and scheduling in the process industry
    • Kallrath J. Planning and scheduling in the process industry. OR Spectrum 2002, 24(3):219-250.
    • (2002) OR Spectrum , vol.24 , Issue.3 , pp. 219-250
    • Kallrath, J.1
  • 8
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations. I: MILP formulation
    • Kondili E., Pantelides C.C., Sargent R.W.H. A general algorithm for short-term scheduling of batch operations. I: MILP formulation. Computers and Chemical Engineering 1993, 17(2):211-227.
    • (1993) Computers and Chemical Engineering , vol.17 , Issue.2 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 9
    • 0030151372 scopus 로고    scopus 로고
    • Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management
    • Lee H., Pinto J.M., Grossmann I.E., Park S. Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management. Industrial and Engineering Chemistry Research 1996, 35(5):1630-1641.
    • (1996) Industrial and Engineering Chemistry Research , vol.35 , Issue.5 , pp. 1630-1641
    • Lee, H.1    Pinto, J.M.2    Grossmann, I.E.3    Park, S.4
  • 10
    • 33846785064 scopus 로고    scopus 로고
    • Scheduling multistage, multiproduct batch plants with nonidentical parallel unitsandunlimitedintermediatestorage
    • Liu Y., Karimi I.A. Scheduling multistage, multiproduct batch plants with nonidentical parallel unitsandunlimitedintermediatestorage. Chemical Engineering Science 2007, 62(6):1549-1566.
    • (2007) Chemical Engineering Science , vol.62 , Issue.6 , pp. 1549-1566
    • Liu, Y.1    Karimi, I.A.2
  • 11
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias C.T., Grossmann I.E. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Industrial and Engineering Chemistry Research 2003, 42(13):3056-3074.
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , Issue.13 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 12
    • 32444438914 scopus 로고    scopus 로고
    • On the relation of continuous- and discrete-time state-task network formulations
    • Maravelias C.T., Grossmann I.E. On the relation of continuous- and discrete-time state-task network formulations. AIChE Journal 2006, 52(2):843-849.
    • (2006) AIChE Journal , vol.52 , Issue.2 , pp. 843-849
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 13
    • 0042807254 scopus 로고    scopus 로고
    • Dynamic scheduling in multiproduct batch plants
    • Méndez C.A., Cerdá J. Dynamic scheduling in multiproduct batch plants. Computers and Chemical Engineering 2003, 27(8-9):1247-1259.
    • (2003) Computers and Chemical Engineering , vol.27 , Issue.8-9 , pp. 1247-1259
    • Méndez, C.A.1    Cerdá, J.2
  • 15
    • 0035339828 scopus 로고    scopus 로고
    • An milp continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • Méndez C.A., Henning G.P., Cerdá J. An milp continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Computers and Chemical Engineering 2001, 25:701-711.
    • (2001) Computers and Chemical Engineering , vol.25 , pp. 701-711
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 16
    • 70349306845 scopus 로고    scopus 로고
    • A novel priority-slot based continuous-time formulation for crude-oil scheduling problems
    • Mouret S., Grossmann I.E., Pestiaux P. A novel priority-slot based continuous-time formulation for crude-oil scheduling problems. Industrial and Engineering Chemistry Research 2009, 48(18):8515-8528.
    • (2009) Industrial and Engineering Chemistry Research , vol.48 , Issue.18 , pp. 8515-8528
    • Mouret, S.1    Grossmann, I.E.2    Pestiaux, P.3
  • 19
    • 0001690679 scopus 로고
    • A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
    • Pinto J.M., Grossmann I.E. A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research 1995, 34(9):3037-3051.
    • (1995) Industrial and Engineering Chemistry Research , vol.34 , Issue.9 , pp. 3037-3051
    • Pinto, J.M.1    Grossmann, I.E.2
  • 20
    • 33748706709 scopus 로고    scopus 로고
    • Elsevier, F. Rossi, P. van Beek, T. Walsh (Eds.)
    • Handbook of constraint programming 2006, Elsevier. F. Rossi, P. van Beek, T. Walsh (Eds.).
    • (2006) Handbook of constraint programming
  • 21
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G., Pantelides C.C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Computers and Chemical Engineering 1996, 20(Suppl. 2):S1221-S1226.
    • (1996) Computers and Chemical Engineering , vol.20 , Issue.SUPPL. 2
    • Schilling, G.1    Pantelides, C.C.2
  • 22
    • 0029701808 scopus 로고    scopus 로고
    • Mathematical programming techniques for crude oil scheduling
    • Shah N. Mathematical programming techniques for crude oil scheduling. Computers and Chemical Engineering 1996, 20:1227-1232.
    • (1996) Computers and Chemical Engineering , vol.20 , pp. 1227-1232
    • Shah, N.1
  • 23
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations. 2. Computational issues
    • Shah N., Pantelides C.C., Sargent R.W.H. A general algorithm for short-term scheduling of batch operations. 2. Computational issues. Computers and Chemical Engineering 1993, 17(2):229-244.
    • (1993) Computers and Chemical Engineering , vol.17 , Issue.2 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 24
    • 21244468469 scopus 로고    scopus 로고
    • The relation of time indexed formulations of single machine scheduling problems to the node packing problem
    • Waterer H., Johnson E.L., Nobili P., Savelsbergh M.W.P. The relation of time indexed formulations of single machine scheduling problems to the node packing problem. Mathematical Programming 2002, 93(3):477-494.
    • (2002) Mathematical Programming , vol.93 , Issue.3 , pp. 477-494
    • Waterer, H.1    Johnson, E.L.2    Nobili, P.3    Savelsbergh, M.W.P.4
  • 25
    • 0030174820 scopus 로고    scopus 로고
    • The optimal operation of mixed production facilities: A general formulation and some approaches for the solution
    • Zhang X., Sargent R.W.H. The optimal operation of mixed production facilities: A general formulation and some approaches for the solution. Computers and Chemical Engineering 1996, 20(6-7):897-904.
    • (1996) Computers and Chemical Engineering , vol.20 , Issue.6-7 , pp. 897-904
    • Zhang, X.1    Sargent, R.W.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.