메뉴 건너뛰기




Volumn 260, Issue 2, 2017, Pages 739-750

Capacity planning with technology replacement by stochastic dynamic programming

Author keywords

Capacity planning; Investment analysis; Stochastic dynamic programming; Technology replacement

Indexed keywords

CUSTOMER SATISFACTION; DECISION MAKING; GENETIC ALGORITHMS; INTEGER PROGRAMMING; INVESTMENTS; RISK ASSESSMENT; STOCHASTIC SYSTEMS;

EID: 85012031492     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2016.12.046     Document Type: Article
Times cited : (25)

References (40)
  • 1
    • 0035351895 scopus 로고    scopus 로고
    • Demand heterogeneity and technology evolution: Implications for product and process innovation
    • Adner, R., Levinthal, D., Demand heterogeneity and technology evolution: Implications for product and process innovation. Management Science 47:5 (2001), 611–628.
    • (2001) Management Science , vol.47 , Issue.5 , pp. 611-628
    • Adner, R.1    Levinthal, D.2
  • 3
    • 84989692604 scopus 로고
    • A dynamic infinite horizon replacement economy decision model
    • Bean, J.C., Lohmann, J.R., Smith, R.L., A dynamic infinite horizon replacement economy decision model. Naval Research Logistics 41 (1994), 117–128.
    • (1994) Naval Research Logistics , vol.41 , pp. 117-128
    • Bean, J.C.1    Lohmann, J.R.2    Smith, R.L.3
  • 6
    • 84878879511 scopus 로고    scopus 로고
    • Coordinated capacity planning in two-stage thin-film-transistor liquid-crystal-display (TFT-LCD) production networks
    • Chen, T.L., Lin, J.T., Wu, C.H., Coordinated capacity planning in two-stage thin-film-transistor liquid-crystal-display (TFT-LCD) production networks. Omega 42:1 (2014), 141–156.
    • (2014) Omega , vol.42 , Issue.1 , pp. 141-156
    • Chen, T.L.1    Lin, J.T.2    Wu, C.H.3
  • 7
    • 0007687241 scopus 로고
    • A Delphi technology forecasting approach using a semi-Markov concept
    • Cho, Y.Y., Jeong, G.H., Kim, S.H., A Delphi technology forecasting approach using a semi-Markov concept. Technological Forecasting and Social Change 40:3 (1991), 273–287.
    • (1991) Technological Forecasting and Social Change , vol.40 , Issue.3 , pp. 273-287
    • Cho, Y.Y.1    Jeong, G.H.2    Kim, S.H.3
  • 8
    • 84968884472 scopus 로고    scopus 로고
    • The impact of demand uncertainty on consumer subsidies for green technology adoption
    • Cohen, M.C., Lobel, R., Perakis, G., The impact of demand uncertainty on consumer subsidies for green technology adoption. Management Science 62:5 (2015), 1235–1258.
    • (2015) Management Science , vol.62 , Issue.5 , pp. 1235-1258
    • Cohen, M.C.1    Lobel, R.2    Perakis, G.3
  • 9
    • 0011742547 scopus 로고
    • Optimal replacement and maintenance under Markovian deterioration with probability bounds on failure
    • Derman, C., Optimal replacement and maintenance under Markovian deterioration with probability bounds on failure. Management Science 9:3 (1963), 478–481.
    • (1963) Management Science , vol.9 , Issue.3 , pp. 478-481
    • Derman, C.1
  • 11
    • 0031160838 scopus 로고    scopus 로고
    • Comparing several genetic algorithm schemes for the calibration of conceptual rainfall-runoff models
    • Franchini, M., Galeati, G., Comparing several genetic algorithm schemes for the calibration of conceptual rainfall-runoff models. Hydrological Sciences-Journal-des Sciences Hydrologiques 42:3 (1997), 357–379.
    • (1997) Hydrological Sciences-Journal-des Sciences Hydrologiques , vol.42 , Issue.3 , pp. 357-379
    • Franchini, M.1    Galeati, G.2
  • 12
    • 84868483649 scopus 로고    scopus 로고
    • Flexible long-term capacity planning in closed-loop supply chains with remanufacturing
    • Georgiadis, P., Athanasiou, E., Flexible long-term capacity planning in closed-loop supply chains with remanufacturing. European Journal of Operational Research 225:1 (2013), 44–58.
    • (2013) European Journal of Operational Research , vol.225 , Issue.1 , pp. 44-58
    • Georgiadis, P.1    Athanasiou, E.2
  • 14
    • 84989675199 scopus 로고
    • A discounted machine-replacement model with an expected future technological breakthrough
    • Goldstein, T., Ladany, S.P., Mehrez, A., A discounted machine-replacement model with an expected future technological breakthrough. Naval Research Logistics 35 (1988), 209–220.
    • (1988) Naval Research Logistics , vol.35 , pp. 209-220
    • Goldstein, T.1    Ladany, S.P.2    Mehrez, A.3
  • 15
    • 33645142826 scopus 로고    scopus 로고
    • Dynamic programming approaches for equipment replacement problems with continuous and discontinuous technological change
    • Hartman, J.C., Rogers, J., Dynamic programming approaches for equipment replacement problems with continuous and discontinuous technological change. IMA Journal of Management Mathematics 17:2 (2006), 143–158.
    • (2006) IMA Journal of Management Mathematics , vol.17 , Issue.2 , pp. 143-158
    • Hartman, J.C.1    Rogers, J.2
  • 16
    • 0021505209 scopus 로고
    • On Markov maintenance problems
    • Hatoyama, Y., On Markov maintenance problems. IEEE Transactions on Reliability R-33:4 (1984), 280–283.
    • (1984) IEEE Transactions on Reliability , vol.R-33 , Issue.4 , pp. 280-283
    • Hatoyama, Y.1
  • 18
    • 84989715120 scopus 로고
    • Timing equipment replacement decisions due to discontinuous technological change
    • Hopp, W., Nair, S., Timing equipment replacement decisions due to discontinuous technological change. Naval Research Logistics 38 (1991), 203–220.
    • (1991) Naval Research Logistics , vol.38 , pp. 203-220
    • Hopp, W.1    Nair, S.2
  • 19
    • 0028548376 scopus 로고
    • Markovian deterioration and technological change
    • Hopp, W., Nair, S., Markovian deterioration and technological change. IIE Transactions 26:6 (1994), 74–82.
    • (1994) IIE Transactions , vol.26 , Issue.6 , pp. 74-82
    • Hopp, W.1    Nair, S.2
  • 20
    • 84928176964 scopus 로고    scopus 로고
    • Strategic capacity investment under uncertainty
    • Huisman, K.J., Kort, P.M., Strategic capacity investment under uncertainty. The RAND Journal of Economics 46:2 (2015), 376–408.
    • (2015) The RAND Journal of Economics , vol.46 , Issue.2 , pp. 376-408
    • Huisman, K.J.1    Kort, P.M.2
  • 21
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • Hung, Y.F., Leachman, R.C., A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing 9:2 (1996), 257–269.
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 23
    • 0003103020 scopus 로고
    • Technology choice with stochastic demands and dynamic capacity allocation: A two-product analysis
    • 7
    • Li, S., Tirupati, D., Technology choice with stochastic demands and dynamic capacity allocation: A two-product analysis. Journal of Operations Management 12:3–4 (1995), 239–258 7.
    • (1995) Journal of Operations Management , vol.12 , Issue.3-4 , pp. 239-258
    • Li, S.1    Tirupati, D.2
  • 24
    • 84890847961 scopus 로고    scopus 로고
    • A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty
    • Lin, J.T., Chen, T.L., Chu, H.C., A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty. International Journal of Production Economics 148 (2014), 21–36.
    • (2014) International Journal of Production Economics , vol.148 , pp. 21-36
    • Lin, J.T.1    Chen, T.L.2    Chu, H.C.3
  • 25
    • 84919643394 scopus 로고    scopus 로고
    • Simulation optimization approach for hybrid flow shop scheduling problem in semiconductor back-end manufacturing
    • Lin, J.T., Chen, C.M., Simulation optimization approach for hybrid flow shop scheduling problem in semiconductor back-end manufacturing. Simulation Modelling Practice and Theory 51 (2015), 100–114.
    • (2015) Simulation Modelling Practice and Theory , vol.51 , pp. 100-114
    • Lin, J.T.1    Chen, C.M.2
  • 26
    • 85014097275 scopus 로고    scopus 로고
    • Pattern Search Climbs Mount Washington
    • Retrieved 20 May, 2014, from.
    • MatWorks, (2016). Pattern Search Climbs Mount Washington, Retrieved 20 May, 2014, from http://www.mathworks.com/help/gads/examples/pattern-search-climbs-mount-washington.html.
    • (2016)
  • 27
    • 0026985333 scopus 로고
    • A model for equipment replacement due to technological obsolescence
    • Nair, S., Hopp, W., A model for equipment replacement due to technological obsolescence. European Journal of Operational Research 63:2 (1992), 207–221.
    • (1992) European Journal of Operational Research , vol.63 , Issue.2 , pp. 207-221
    • Nair, S.1    Hopp, W.2
  • 28
    • 0346829717 scopus 로고    scopus 로고
    • Optimal portfolio of reconfigurable and dedicated capacity under uncertainty
    • University of Michigan Working paper
    • Narongwanich, W., Duenyas, I., Birge, J.R., Optimal portfolio of reconfigurable and dedicated capacity under uncertainty. 2002, University of Michigan Working paper.
    • (2002)
    • Narongwanich, W.1    Duenyas, I.2    Birge, J.R.3
  • 29
    • 0018432317 scopus 로고
    • Planning horizon procedures for machine replacement models
    • Sethi, S., Chand, S., Planning horizon procedures for machine replacement models. Management Science 25:2 (1979), 140–151.
    • (1979) Management Science , vol.25 , Issue.2 , pp. 140-151
    • Sethi, S.1    Chand, S.2
  • 30
    • 0019546385 scopus 로고
    • Optimal maintenance models for systems subject to failure: A review
    • Sherif, Y.S., Smith, M.L., Optimal maintenance models for systems subject to failure: A review. Naval Research Logistics (NRL) 28:1 (1981), 47–74.
    • (1981) Naval Research Logistics (NRL) , vol.28 , Issue.1 , pp. 47-74
    • Sherif, Y.S.1    Smith, M.L.2
  • 31
    • 0033889013 scopus 로고    scopus 로고
    • Tool capacity planning for semiconductor fabrication facilities under demand uncertainty
    • Swaminathan, J.M., Tool capacity planning for semiconductor fabrication facilities under demand uncertainty. European Journal of Operational Research 120:3 (2000), 545–558.
    • (2000) European Journal of Operational Research , vol.120 , Issue.3 , pp. 545-558
    • Swaminathan, J.M.1
  • 32
    • 0004259561 scopus 로고
    • Principles of operations research
    • Prentice-Hall, Inc Englewood Cliffs, NJ
    • Wagner, H.M., Principles of operations research. 1975, Prentice-Hall, Inc, Englewood Cliffs, NJ.
    • (1975)
    • Wagner, H.M.1
  • 33
    • 0242269921 scopus 로고    scopus 로고
    • Modelling and resolving the joint problem of capacity expansion and allocation with multiple resources and a limited budget in the semiconductor testing industry
    • Wang, K.J., Hou, T.C., Modelling and resolving the joint problem of capacity expansion and allocation with multiple resources and a limited budget in the semiconductor testing industry. International Journal of Production Research 41:14 (2003), 3217–3235.
    • (2003) International Journal of Production Research , vol.41 , Issue.14 , pp. 3217-3235
    • Wang, K.J.1    Hou, T.C.2
  • 34
    • 33751396886 scopus 로고    scopus 로고
    • A resource portfolio model for equipment investment and allocation of semiconductor testing industry
    • Wang, K.J., Wang, S.M., Yang, S.J., A resource portfolio model for equipment investment and allocation of semiconductor testing industry. European Journal of Operational Research 179:2 (2007), 390–403.
    • (2007) European Journal of Operational Research , vol.179 , Issue.2 , pp. 390-403
    • Wang, K.J.1    Wang, S.M.2    Yang, S.J.3
  • 35
    • 34548452458 scopus 로고    scopus 로고
    • A resource portfolio planning model using sampling-based stochastic programming and genetic algorithm
    • Wang, K.J., Wang, S.M., Chen, J.C., A resource portfolio planning model using sampling-based stochastic programming and genetic algorithm. European Journal of Operational Research 184:1 (2008), 327–340.
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 327-340
    • Wang, K.J.1    Wang, S.M.2    Chen, J.C.3
  • 36
    • 56349096267 scopus 로고    scopus 로고
    • Cooperative capacity planning and resource allocation by mutual outsourcing using ant algorithm in a decentralized supply chain
    • Wang, K.-J., Chen, M.J., Cooperative capacity planning and resource allocation by mutual outsourcing using ant algorithm in a decentralized supply chain. Expert Systems with Applications 36:2, Part 2 (2009), 2831–2842.
    • (2009) Expert Systems with Applications , vol.36 , Issue.2 , pp. 2831-2842
    • Wang, K.-J.1    Chen, M.J.2
  • 37
    • 84878573646 scopus 로고    scopus 로고
    • Simultaneous resource portfolio planning under demand and technology uncertainty in the semiconductor testing industry
    • Wang, K.-J., Wang, S.-M., Simultaneous resource portfolio planning under demand and technology uncertainty in the semiconductor testing industry. Robotics and Computer-Integrated Manufacturing 29:5 (2013), 278–287.
    • (2013) Robotics and Computer-Integrated Manufacturing , vol.29 , Issue.5 , pp. 278-287
    • Wang, K.-J.1    Wang, S.-M.2
  • 38
    • 84884418905 scopus 로고    scopus 로고
    • Free pattern search for global optimization
    • Wen, L., Gao, L., Li, X., Zhang, L., Free pattern search for global optimization. Applied Soft Computing 13:9 (2013), 3853–3863.
    • (2013) Applied Soft Computing , vol.13 , Issue.9 , pp. 3853-3863
    • Wen, L.1    Gao, L.2    Li, X.3    Zhang, L.4
  • 39
    • 85014081215 scopus 로고    scopus 로고
    • Pattern search (optimization)
    • Retrieved 20 May, 2013, from.
    • Wikipedia, (2013). Pattern search (optimization), Retrieved 20 May, 2013, from http://en.wikipedia.org/wiki/Pattern_search_(optimization).
    • (2013)
  • 40
    • 78049467418 scopus 로고    scopus 로고
    • Examining the diffusion of electronic supply chain management with external antecedents and firm performance: A multi-stage analysis
    • Wu, I.-L., Chuang, C.-H., Examining the diffusion of electronic supply chain management with external antecedents and firm performance: A multi-stage analysis. Decision Support Systems 50:1 (2010), 103–115.
    • (2010) Decision Support Systems , vol.50 , Issue.1 , pp. 103-115
    • Wu, I.-L.1    Chuang, C.-H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.