메뉴 건너뛰기




Volumn 42, Issue 1, 2014, Pages 141-156

Coordinated capacity planning in two-stage thin-film-transistor liquid-crystal-display (TFT-LCD) production networks

Author keywords

Capacity planning; Shadow price; TFT LCD production network

Indexed keywords

COSTS; EXPANSION; INTEGER PROGRAMMING; LIQUID CRYSTAL DISPLAYS; SENSITIVITY ANALYSIS; THIN FILM CIRCUITS; THIN FILM TRANSISTORS; THIN FILMS;

EID: 84878879511     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2013.05.004     Document Type: Article
Times cited : (28)

References (44)
  • 1
    • 40949165996 scopus 로고    scopus 로고
    • Semiconductor tool planning via multi-stage stochastic programming
    • In: Proceedings of the 2000 international conference on modeling and analysis of semiconductor manufacturing
    • Ahmed S. Semiconductor tool planning via multi-stage stochastic programming. In: Proceedings of the 2000 international conference on modeling and analysis of semiconductor manufacturing; 2002. p. 153-157.
    • (2002) , pp. 153-157
    • Ahmed, S.1
  • 3
    • 0033207649 scopus 로고    scopus 로고
    • An optimization approach to capacity expansion in semiconductor manufacturing facilities
    • Bard J.F., Srinivasan K., Tirupati D. An optimization approach to capacity expansion in semiconductor manufacturing facilities. International Journal of Production Research 1999, 37(15):3359-3382.
    • (1999) International Journal of Production Research , vol.37 , Issue.15 , pp. 3359-3382
    • Bard, J.F.1    Srinivasan, K.2    Tirupati, D.3
  • 4
    • 0040113087 scopus 로고    scopus 로고
    • Capacity optimization planning system
    • Bermon S., Hood S.J. Capacity optimization planning system. Interface 1999, 29(5):31-50.
    • (1999) Interface , vol.29 , Issue.5 , pp. 31-50
    • Bermon, S.1    Hood, S.J.2
  • 5
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • Bitran G.R., Yanasse H.H. Computational complexity of the capacitated lot size problem. Management Science 1982, 28(10):1174-1186.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1174-1186
    • Bitran, G.R.1    Yanasse, H.H.2
  • 6
    • 0031630113 scopus 로고    scopus 로고
    • Robust investment model for long-range capacity expansion of chemical processing networks under uncertain demand forecast scenarios
    • Bok J.K., Lee H., Park H. Robust investment model for long-range capacity expansion of chemical processing networks under uncertain demand forecast scenarios. Computers and Chemical Engineering 1998, 22(7/8):1037-1049.
    • (1998) Computers and Chemical Engineering , vol.22 , Issue.7-8 , pp. 1037-1049
    • Bok, J.K.1    Lee, H.2    Park, H.3
  • 8
    • 84861621321 scopus 로고    scopus 로고
    • System Life-Cycle Planning
    • In: Design of Flexible Production Systems, Springer-Verlag: Berlin, Heidelberg
    • Cantamessa M, Capello C, Cordella G. System Life-Cycle Planning. In: Design of Flexible Production Systems, Springer-Verlag: Berlin, Heidelberg; 2009. p. 191-218.
    • (2009) , pp. 191-218
    • Cantamessa, M.1    Capello, C.2    Cordella, G.3
  • 11
    • 0036468406 scopus 로고    scopus 로고
    • Semiconductor capacity planning: stochastic modeling and computational studies
    • Christie R.M.E., Wu S.D. Semiconductor capacity planning: stochastic modeling and computational studies. IIE Transactions 2002, 34:131-143.
    • (2002) IIE Transactions , vol.34 , pp. 131-143
    • Christie, R.M.E.1    Wu, S.D.2
  • 13
  • 14
    • 33745290235 scopus 로고    scopus 로고
    • Strategic planning of BMW's global production network
    • Fleischmann B., Ferber S., Henrich P. Strategic planning of BMW's global production network. Interfaces 2006, 36(3):194-208.
    • (2006) Interfaces , vol.36 , Issue.3 , pp. 194-208
    • Fleischmann, B.1    Ferber, S.2    Henrich, P.3
  • 17
    • 64449086683 scopus 로고    scopus 로고
    • Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity
    • Geng N., Jiang Z., Feng C. Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity. European Journal of Operational Research 2009, 198(3):899-908.
    • (2009) European Journal of Operational Research , vol.198 , Issue.3 , pp. 899-908
    • Geng, N.1    Jiang, Z.2    Feng, C.3
  • 18
    • 70449625134 scopus 로고    scopus 로고
    • A review on strategic capacity planning for the semiconductor manufacturing industry
    • Geng N., Jiang Z. A review on strategic capacity planning for the semiconductor manufacturing industry. International Journal of Production Research 2009, 47(13):3639-3655.
    • (2009) International Journal of Production Research , vol.47 , Issue.13 , pp. 3639-3655
    • Geng, N.1    Jiang, Z.2
  • 21
    • 84878890703 scopus 로고    scopus 로고
    • LCD demand, panels, substrates all move from large to larger
    • Hsieh D. LCD demand, panels, substrates all move from large to larger. Display Devices 2006, 42:29-34.
    • (2006) Display Devices , vol.42 , pp. 29-34
    • Hsieh, D.1
  • 22
    • 4344689081 scopus 로고    scopus 로고
    • Coordinating strategic capacity planning in the semiconductor industry
    • Karabuk S., Wu S.D. Coordinating strategic capacity planning in the semiconductor industry. Operations Research 2003, 51(6):839-849.
    • (2003) Operations Research , vol.51 , Issue.6 , pp. 839-849
    • Karabuk, S.1    Wu, S.D.2
  • 23
    • 84861584835 scopus 로고    scopus 로고
    • Integrated capacity planning over highly volatile horizons
    • Lanza G., Peters S. Integrated capacity planning over highly volatile horizons. CIRP Annals-Manufacturing Technology 2012, 61(1):395-398.
    • (2012) CIRP Annals-Manufacturing Technology , vol.61 , Issue.1 , pp. 395-398
    • Lanza, G.1    Peters, S.2
  • 24
    • 1842850974 scopus 로고    scopus 로고
    • A hierarchical solution approach for multi-site capacity planning under uncertainty in the pharmaceutical industry
    • Levis A.A., Papageorgiou L.G. A hierarchical solution approach for multi-site capacity planning under uncertainty in the pharmaceutical industry. Computer and Chemical Engineering 2004, 28:707-725.
    • (2004) Computer and Chemical Engineering , vol.28 , pp. 707-725
    • Levis, A.A.1    Papageorgiou, L.G.2
  • 25
    • 84866977552 scopus 로고    scopus 로고
    • Multiobjective optimisation of production, distribution and capacity planning of global supply chains in the process industry
    • Liu S., Papageorgiou L.G. Multiobjective optimisation of production, distribution and capacity planning of global supply chains in the process industry. Omega 2013, 41(2):369-382.
    • (2013) Omega , vol.41 , Issue.2 , pp. 369-382
    • Liu, S.1    Papageorgiou, L.G.2
  • 27
    • 80855156463 scopus 로고    scopus 로고
    • A multi-stage stochastic supply network design problem with financial decisions and risk management
    • Nickel S., Saldanha-da-Gama F., Ziegler H.P. A multi-stage stochastic supply network design problem with financial decisions and risk management. Omega 2012, 40(5):511-524.
    • (2012) Omega , vol.40 , Issue.5 , pp. 511-524
    • Nickel, S.1    Saldanha-da-Gama, F.2    Ziegler, H.P.3
  • 29
    • 77957822822 scopus 로고    scopus 로고
    • Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations
    • Rastogi A.P., Fowler J.W., Carlyle W.M., Araz O.M., Büke B. Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations. International Journal of Production Economics 2011, 134(2):322-332.
    • (2011) International Journal of Production Economics , vol.134 , Issue.2 , pp. 322-332
    • Rastogi, A.P.1    Fowler, J.W.2    Carlyle, W.M.3    Araz, O.M.4    Büke, B.5
  • 31
    • 0036578708 scopus 로고    scopus 로고
    • A Heuristic procedure for solving multi-plant, multi-item, multi-period capacitated lot sizing problem
    • Sambasivan M., Schmidt C. A Heuristic procedure for solving multi-plant, multi-item, multi-period capacitated lot sizing problem. Asia-Pacific Journal of Operational Research 2002, 19(1):87-105.
    • (2002) Asia-Pacific Journal of Operational Research , vol.19 , Issue.1 , pp. 87-105
    • Sambasivan, M.1    Schmidt, C.2
  • 32
    • 4744372709 scopus 로고    scopus 로고
    • A Lagrangean-based heuristic procedure for solving multi-plant, multi-item, multi-period capacitated lot-sizing problem with inter-plant transfers
    • Sambasivan M., Yahya S. A Lagrangean-based heuristic procedure for solving multi-plant, multi-item, multi-period capacitated lot-sizing problem with inter-plant transfers. Computers and Operations Research 2005, 32(3):537-555.
    • (2005) Computers and Operations Research , vol.32 , Issue.3 , pp. 537-555
    • Sambasivan, M.1    Yahya, S.2
  • 33
    • 0033889013 scopus 로고    scopus 로고
    • Tool capacity planning for semiconductor fabrication facilities under demand uncertainty
    • Swaminathan J.M. Tool capacity planning for semiconductor fabrication facilities under demand uncertainty. European Journal of Operation Research 2000, 120:545-558.
    • (2000) European Journal of Operation Research , vol.120 , pp. 545-558
    • Swaminathan, J.M.1
  • 34
    • 0036468753 scopus 로고    scopus 로고
    • Tool procurement planning for wafer fabrication facilities: a scenario-based approach
    • Swaninathan J.M. Tool procurement planning for wafer fabrication facilities: a scenario-based approach. IIE Transactions 2002, 34:145-155.
    • (2002) IIE Transactions , vol.34 , pp. 145-155
    • Swaninathan, J.M.1
  • 36
    • 0036658162 scopus 로고    scopus 로고
    • Capacity expansion and allocation for a semiconductor testing facility under constrained budget
    • Wang K.J., Lin S.H. Capacity expansion and allocation for a semiconductor testing facility under constrained budget. Production Planning & Control 2002, 13(5):429-437.
    • (2002) Production Planning & Control , vol.13 , Issue.5 , pp. 429-437
    • Wang, K.J.1    Lin, S.H.2
  • 37
    • 0242269921 scopus 로고    scopus 로고
    • Modeling and resolving the joint problem of capacity expansion and allocation with multiple resources and a limited budget in the semiconductor testing industry
    • Wang K.J., Hou T.C. Modeling and resolving the joint problem of capacity expansion and allocation with multiple resources and a limited budget in the semiconductor testing industry. International Journal of Production Research 2003, 41(14):3217-3235.
    • (2003) International Journal of Production Research , vol.41 , Issue.14 , pp. 3217-3235
    • Wang, K.J.1    Hou, T.C.2
  • 38
    • 33751396886 scopus 로고    scopus 로고
    • A resource portfolio model for equipment investment and allocation of semiconductor testing industry
    • Wang K.J., Wang S.M., Yang S.J. A resource portfolio model for equipment investment and allocation of semiconductor testing industry. European Journal of Operational Research 2007, 179:390-403.
    • (2007) European Journal of Operational Research , vol.179 , pp. 390-403
    • Wang, K.J.1    Wang, S.M.2    Yang, S.J.3
  • 39
    • 33748257797 scopus 로고    scopus 로고
    • Resource portfolio planning of make-to-stock products using a constraint programming-based genetic algorithm
    • Wang S.M., Chen J.C., Wang K.J. Resource portfolio planning of make-to-stock products using a constraint programming-based genetic algorithm. Omega 2007, 35(2):237-246.
    • (2007) Omega , vol.35 , Issue.2 , pp. 237-246
    • Wang, S.M.1    Chen, J.C.2    Wang, K.J.3
  • 42
    • 33751186711 scopus 로고    scopus 로고
    • Strategic level three-stage production distribution planning with capacity expansion
    • Yilmaz P., Catay B. Strategic level three-stage production distribution planning with capacity expansion. Computers and Industrial Engineering 2006, 51:609-620.
    • (2006) Computers and Industrial Engineering , vol.51 , pp. 609-620
    • Yilmaz, P.1    Catay, B.2
  • 43
    • 33744986037 scopus 로고    scopus 로고
    • Capacity planning with reconfigurable kits in semiconductor test manufacturing
    • Zhang Z., Zhang M.T., Niu S., Zheng L. Capacity planning with reconfigurable kits in semiconductor test manufacturing. International Journal of Production Research 2006, 44(13):2625-2644.
    • (2006) International Journal of Production Research , vol.44 , Issue.13 , pp. 2625-2644
    • Zhang, Z.1    Zhang, M.T.2    Niu, S.3    Zheng, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.