메뉴 건너뛰기




Volumn 41, Issue 14, 2003, Pages 3217-3235

Modelling and resolving the joint problem of capacity expansion and allocation with multiple resources and a limited budget in the semiconductor testing industry

Author keywords

[No Author keywords available]

Indexed keywords

BUDGET CONTROL; COMPUTATIONAL COMPLEXITY; GENETIC ALGORITHMS; MATHEMATICAL MODELS; OPERATIONS RESEARCH; OPTIMIZATION; RESOURCE ALLOCATION; SEMICONDUCTOR DEVICE TESTING;

EID: 0242269921     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/0020754031000109152     Document Type: Article
Times cited : (43)

References (13)
  • 1
    • 0033207649 scopus 로고    scopus 로고
    • An optimization approach to capacity expansion in semiconductor manufacturing facilities
    • BARD, J. F., SRINIVASAN, K. and TIRUPATI, D., 1999, An optimization approach to capacity expansion in semiconductor manufacturing facilities. International Journal of Production Research, 37, 3359-3382.
    • (1999) International Journal of Production Research , vol.37 , pp. 3359-3382
    • Bard, J.F.1    Srinivasan, K.2    Tirupati, D.3
  • 2
    • 0030289876 scopus 로고    scopus 로고
    • Competitive capacity expansion under demand uncertainty
    • BASHYAM, T. C. A., 1996, Competitive capacity expansion under demand uncertainty. European Journal of Operational Research, 95, 89-114.
    • (1996) European Journal of Operational Research , vol.95 , pp. 89-114
    • Bashyam, T.C.A.1
  • 3
    • 0028748055 scopus 로고
    • Job shop scheduling with multiple resources and an application to a semiconductor testing facility
    • Lake Buena Vista
    • CHEN, T. R. and HSIA, T. C., 1994, Job shop scheduling with multiple resources and an application to a semiconductor testing facility. In Proceedings of the 33rd Conference on Decision and Control, Lake Buena Vista, pp. 1564-1570.
    • (1994) Proceedings of the 33rd Conference on Decision and Control , pp. 1564-1570
    • Chen, T.R.1    Hsia, T.C.2
  • 6
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculations
    • HUNG, Y. F. and LEACHMAN, R. C., 1996, A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing, 9, 257-269.
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 7
    • 0031117073 scopus 로고    scopus 로고
    • A new formulation technique for alternative material planning - An approach for semiconductor bin allocation planning
    • HUNG, Y. F. and WANG, Q. Z., 1997, A new formulation technique for alternative material planning - an approach for semiconductor bin allocation planning. Computer and Industrial Engineering, 32, 281-297.
    • (1997) Computer and Industrial Engineering , vol.32 , pp. 281-297
    • Hung, Y.F.1    Wang, Q.Z.2
  • 8
    • 0002549571 scopus 로고
    • On capacity modeling for production planning with alternative machines
    • LEACHMAN, R. C. and CARMON, T., 1992, On capacity modeling for production planning with alternative machines. IIE Transactions, 24, 62-72.
    • (1992) IIE Transactions , vol.24 , pp. 62-72
    • Leachman, R.C.1    Carmon, T.2
  • 10
    • 0033889013 scopus 로고    scopus 로고
    • Tool capacity planning for semiconductor fabrication facilities under demand uncertainty
    • SWAMINATHAN, J. M., 2000, Tool capacity planning for semiconductor fabrication facilities under demand uncertainty. European Journal of Operational Research, 120, 545-558.
    • (2000) European Journal of Operational Research , vol.120 , pp. 545-558
    • Swaminathan, J.M.1
  • 11
    • 0029488357 scopus 로고
    • Using simulation-based finite capacity planning and scheduling software to improve cycle time in front end operations
    • THOMPSON, M., 1995, Using simulation-based finite capacity planning and scheduling software to improve cycle time in front end operations. In IEEE Advanced Semiconductor Manufacturing Conference and Workshop, pp. 131-135.
    • (1995) IEEE Advanced Semiconductor Manufacturing Conference and Workshop , pp. 131-135
    • Thompson, M.1
  • 12
    • 0034692672 scopus 로고    scopus 로고
    • Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach
    • TIWARI, M. K. and VIDYARTH, N. K., 2000, Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach. International Journal of Production Research, 38, 3357-3384.
    • (2000) International Journal of Production Research , vol.38 , pp. 3357-3384
    • Tiwari, M.K.1    Vidyarth, N.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.