메뉴 건너뛰기




Volumn 120, Issue 3, 2000, Pages 545-558

Tool capacity planning for semiconductor fabrication facilities under demand uncertainty

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; HEURISTIC METHODS; INVENTORY CONTROL; MATHEMATICAL MODELS; OPTIMIZATION; PROCESS ENGINEERING; SEMICONDUCTOR DEVICE MANUFACTURE; STRATEGIC PLANNING; UNCERTAIN SYSTEMS;

EID: 0033889013     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(98)00389-0     Document Type: Article
Times cited : (145)

References (12)
  • 2
    • 0008231551 scopus 로고    scopus 로고
    • Chip makers get break in new bill
    • September 17
    • Benson, M., 1997. Chip makers get break in new bill. Wall Street Journal, September 17, CA4.
    • (1997) Wall Street Journal
    • Benson, M.1
  • 3
    • 0001939662 scopus 로고
    • A dynamically generated rapid response capacity planning model for semiconductor fabrication facilities
    • Kluwer Publishing, Dordrecht
    • Fordyce, K., Sullivan, G., 1994. A dynamically generated rapid response capacity planning model for semiconductor fabrication facilities. Impact of Emerging Technologies on Computer Science and Operations Research. Kluwer Publishing, Dordrecht, pp. 103-127.
    • (1994) Impact of Emerging Technologies on Computer Science and Operations Research , pp. 103-127
    • Fordyce, K.1    Sullivan, G.2
  • 4
    • 0022712939 scopus 로고
    • A total framework for semiconductor production planning and scheduling
    • Golovin, J.J., 1986. A total framework for semiconductor production planning and scheduling. Solid State Technology, pp. 167-170.
    • (1986) Solid State Technology , pp. 167-170
    • Golovin, J.J.1
  • 5
    • 0022914444 scopus 로고
    • The future of automation for high-volume wafer fabrication and ASIC manufacturing
    • Hughes R.A., Shott J.D. The future of automation for high-volume wafer fabrication and ASIC manufacturing. Proceedings of the IEEE. 74(12):1986;1775-1793.
    • (1986) Proceedings of the IEEE , vol.74 , Issue.12 , pp. 1775-1793
    • Hughes, R.A.1    Shott, J.D.2
  • 6
    • 0002549571 scopus 로고
    • On capacity modeling for production planning with alternative machines
    • Leachman R.C., Carmon T.F. On capacity modeling for production planning with alternative machines. IIE Transactions. 24(4):1992;62-72.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 62-72
    • Leachman, R.C.1    Carmon, T.F.2
  • 7
    • 0001829813 scopus 로고
    • Modeling techniques for automated production planning in the semiconductor industry
    • In: Ciriani, T.A., Leachman, R.C. (Eds.), Wiley, Chichester
    • Leachman, R.C., 1993. Modeling techniques for automated production planning in the semiconductor industry. In: Ciriani, T.A., Leachman, R.C. (Eds.), Optimization in Industry, Wiley, Chichester, pp. 1-30.
    • (1993) Optimization in Industry , pp. 1-30
    • Leachman, R.C.1
  • 9
    • 3843084206 scopus 로고
    • Managing Broader Product Lines through Delayed Differentiation using Vanilla Boxes
    • Working Paper, GSIA, Carnegie Mellon University, Pittsburgh, PA, forthcoming in
    • Swaminathan, J.M., Tayur, S.R., 1995. Managing Broader Product Lines through Delayed Differentiation using Vanilla Boxes, Working Paper, GSIA, Carnegie Mellon University, Pittsburgh, PA, forthcoming in Management Science.
    • (1995) Management Science
    • Swaminathan, J.M.1    Tayur, S.R.2
  • 11
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part-I: System characteristics. Performance evaluation and production planning
    • Uzsoy R., Lee C., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry, Part-I: System characteristics. Performance evaluation and production planning. IIE transactions. 24(4):1992;47-61.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 47-61
    • Uzsoy, R.1    Lee, C.2    Martin-Vega, L.A.3
  • 12
    • 0028496979 scopus 로고
    • Martin-Vega LA. A review of production planning and scheduling models in the semiconductor industry, Part-II: Shop floor control
    • Uzsoy R., Lee C. Martin-Vega LA. A review of production planning and scheduling models in the semiconductor industry, Part-II: Shop floor control. IIE transactions. 26(4):1994;44-55.
    • (1994) IIE Transactions , vol.26 , Issue.4 , pp. 44-55
    • Uzsoy, R.1    Lee, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.