메뉴 건너뛰기




Volumn 50, Issue 10, 2012, Pages 2624-2638

Multi-objective analysis of an integrated supply chain scheduling problem

Author keywords

Genetic algorithms; Heuristics; Math programming; Multi criteria decision making; Supply chain management

Indexed keywords


EID: 85008185108     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.578162     Document Type: Article
Times cited : (52)

References (37)
  • 1
    • 19944381224 scopus 로고    scopus 로고
    • Shipping multiple items by capacitated vehicles: An optimal dynamic programming approach
    • Anily, S. and Tzur, M., 2005. Shipping multiple items by capacitated vehicles: An optimal dynamic programming approach. Transportation Science, 39, 233-248.
    • (2005) Transportation Science , vol.39 , pp. 233-248
    • Anily, S.1    Tzur, M.2
  • 2
    • 13544262325 scopus 로고    scopus 로고
    • Genetic local search for multi-objective flowshop scheduling problems
    • Arroyo, J.E.C. and Armentano, V.A., 2005. Genetic local search for multi-objective flowshop scheduling problems. European Journal of Operational Research, 167, 717-738.
    • (2005) European Journal of Operational Research , vol.167 , pp. 717-738
    • Arroyo, J.E.C.1    Armentano, V.A.2
  • 3
  • 4
    • 40849113047 scopus 로고    scopus 로고
    • Logistics scheduling with batching and transportation
    • Chen, B. and Lee, C., 2008. Logistics scheduling with batching and transportation. European Journal of Operations Research, 189, 871-876.
    • (2008) European Journal of Operations Research , vol.189 , pp. 871-876
    • Chen, B.1    Lee, C.2
  • 5
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Chen, Z.L. and Vairaktarakis, G.L., 2005. Integrated scheduling of production and distribution operations. Management Science, 51 (4), 614-628.
    • (2005) Management Science , vol.51 , Issue.4 , pp. 614-628
    • Chen, Z.L.1    Vairaktarakis, G.L.2
  • 6
    • 33744826037 scopus 로고    scopus 로고
    • Order assignment and scheduling in a supply chain
    • Chen, Z.L. and Pundoor, G., 2006. Order assignment and scheduling in a supply chain. Operations Research, 54 (3), 555-572.
    • (2006) Operations Research , vol.54 , Issue.3 , pp. 555-572
    • Chen, Z.L.1    Pundoor, G.2
  • 7
    • 38549131389 scopus 로고    scopus 로고
    • Supply chain scheduling: Conflict and cooperation in assembly systems
    • Chen, Z.L. and Hall, N.G., 2007. Supply chain scheduling: Conflict and cooperation in assembly systems. Operations Research, 55, 1072-1089.
    • (2007) Operations Research , vol.55 , pp. 1072-1089
    • Chen, Z.L.1    Hall, N.G.2
  • 8
    • 77249147436 scopus 로고    scopus 로고
    • Integrated production and outbound distribution scheduling: Review and extensions
    • Chen, Z.L., 2010. Integrated production and outbound distribution scheduling: Review and extensions. Operations Research, 58, 130-148.
    • (2010) Operations Research , vol.58 , pp. 130-148
    • Chen, Z.L.1
  • 9
    • 0035561146 scopus 로고    scopus 로고
    • Single supplier scheduling for multiple deliveries
    • Cheng, T.C.E., 2001. Single supplier scheduling for multiple deliveries. Annals of Operations Research, 107, 51-63.
    • (2001) Annals of Operations Research , vol.107 , pp. 51-63
    • Cheng, T.C.E.1
  • 10
    • 0037410718 scopus 로고    scopus 로고
    • A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines
    • Cochran, J., Horng, S., and Fowler, J., 2003. A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers & Operations Research, 30, 1087-1102.
    • (2003) Computers & Operations Research , vol.30 , pp. 1087-1102
    • Cochran, J.1    Horng, S.2    Fowler, J.3
  • 11
    • 33746163149 scopus 로고    scopus 로고
    • Supply chain scheduling: Distribution systems
    • Dawande, M., et al., 2006. Supply chain scheduling: Distribution systems. Productions and Operations Management, 15, 243-261.
    • (2006) Productions and Operations Management , vol.15 , pp. 243-261
    • Dawande, M.1
  • 13
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multi-objective genetic algorithm: NSGA-II
    • Deb, K., et al., 2002. A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation, 6, 182-197.
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , pp. 182-197
    • Deb, K.1
  • 15
    • 61349164254 scopus 로고    scopus 로고
    • The integrated production and transportation scheduling problem for a product with a short lifespan
    • Geismar, H.N., et al., 2008. The integrated production and transportation scheduling problem for a product with a short lifespan. INFORMS Journal on Computing, 20, 21-33.
    • (2008) INFORMS Journal on Computing , vol.20 , pp. 21-33
    • Geismar, H.N.1
  • 16
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • Graham, R., et al., 1979. Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 237-287.
    • (1979) Annals of Discrete Mathematics , vol.5 , pp. 237-287
    • Graham, R.1
  • 17
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • Hall, N.G. and Potts, C.N., 2003. Supply chain scheduling: Batching and delivery. Operations Research, 51, 566-584.
    • (2003) Operations Research , vol.51 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 18
    • 24144473403 scopus 로고    scopus 로고
    • The coordination of scheduling and batch deliveries
    • Hall, N.G. and Potts, C.N., 2005. The coordination of scheduling and batch deliveries. Annals of Operations Research, 135, 41-64.
    • (2005) Annals of Operations Research , vol.135 , pp. 41-64
    • Hall, N.G.1    Potts, C.N.2
  • 20
    • 0037116765 scopus 로고    scopus 로고
    • Genetic local search for multi-objective combinatorial optimization
    • Jaszkiewicz, A., 2002. Genetic local search for multi-objective combinatorial optimization. European Journal of Operational Research, 137, 50-71.
    • (2002) European Journal of Operational Research , vol.137 , pp. 50-71
    • Jaszkiewicz, A.1
  • 21
    • 33749553996 scopus 로고    scopus 로고
    • Batch delivery scheduling with batch delivery cost on a single machine
    • Ji, M., He, Y., and Cheng, T.C.E., 2007. Batch delivery scheduling with batch delivery cost on a single machine. European Journal of Operational Research, 176, 745-755.
    • (2007) European Journal of Operational Research , vol.176 , pp. 745-755
    • Ji, M.1    He, Y.2    Cheng, T.C.E.3
  • 22
    • 77957077792 scopus 로고
    • A pseudopolynomial time algorithm for sequencing jobs to minimize total tardiness
    • Lawler, E., 1977. A pseudopolynomial time algorithm for sequencing jobs to minimize total tardiness. Annals of Discrete Mathematics, 1, 331-342.
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 331-342
    • Lawler, E.1
  • 23
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • Lee, C.Y. and Chen, Z.L., 2001. Machine scheduling with transportation considerations. Journal of Scheduling, 4, 3-24.
    • (2001) Journal of Scheduling , vol.4 , pp. 3-24
    • Lee, C.Y.1    Chen, Z.L.2
  • 24
    • 33748518397 scopus 로고    scopus 로고
    • On the integrated production, inventory, and distribution routing problem
    • Lei, L., et al., 2006. On the integrated production, inventory, and distribution routing problem. IIE Transactions, 38, 955-970.
    • (2006) IIE Transactions , vol.38 , pp. 955-970
    • Lei, L.1
  • 27
    • 27944436124 scopus 로고    scopus 로고
    • Synchronizing scheduling of assembly and multi-destination air-transportation in a customer electronics supply chain
    • Li, K.P., Ganesan, V.K., and Sivakumar, A.I., 2005. Synchronizing scheduling of assembly and multi-destination air-transportation in a customer electronics supply chain. International Journal of Production Research, 43 (13), 2671-2685.
    • (2005) International Journal of Production Research , vol.43 , Issue.13 , pp. 2671-2685
    • Li, K.P.1    Ganesan, V.K.2    Sivakumar, A.I.3
  • 28
    • 34249057143 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs
    • Mazdeh, M.M., Sarhadi, M., and Hindi, K.H., 2007. A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs. European Journal of Operational Research, 183, 74-86.
    • (2007) European Journal of Operational Research , vol.183 , pp. 74-86
    • Mazdeh, M.M.1    Sarhadi, M.2    Hindi, K.H.3
  • 29
    • 4544293356 scopus 로고    scopus 로고
    • Minimizing total weighted tardiness on a single batch process machine with incompatible job families
    • Perez, I.C., Fowler, J.W., and Carlyle, W.M., 2005. Minimizing total weighted tardiness on a single batch process machine with incompatible job families. Computers and Operations Research, 32, 327-341.
    • (2005) Computers and Operations Research , vol.32 , pp. 327-341
    • Perez, I.C.1    Fowler, J.W.2    Carlyle, W.M.3
  • 31
    • 26444509814 scopus 로고    scopus 로고
    • Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
    • Pundoor, G. and Chen, Z.L., 2005. Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost. Naval Research Logistics, 52, 571-589.
    • (2005) Naval Research Logistics , vol.52 , pp. 571-589
    • Pundoor, G.1    Chen, Z.L.2
  • 32
    • 18744400261 scopus 로고    scopus 로고
    • Logistics scheduling model: Inventory cost reduction by batching
    • Qi, X.A., 2005. Logistics scheduling model: Inventory cost reduction by batching. Naval Research Logistics, 52, 312-320.
    • (2005) Naval Research Logistics , vol.52 , pp. 312-320
    • Qi, X.A.1
  • 33
    • 33646094727 scopus 로고    scopus 로고
    • Batch scheduling in a two-level supply chain - a focus on the supplier
    • Selvarajah, E. and Steiner, G., 2006. Batch scheduling in a two-level supply chain - a focus on the supplier. European Journal of Operational Research, 173, 226-240.
    • (2006) European Journal of Operational Research , vol.173 , pp. 226-240
    • Selvarajah, E.1    Steiner, G.2
  • 34
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A. and Morton, T., 1987. Priority rules for job shops with weighted tardiness costs. Management Science, 33, 1035-1047.
    • (1987) Management Science , vol.33 , pp. 1035-1047
    • Vepsalainen, A.1    Morton, T.2
  • 36
    • 33846658252 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint and job delivery coordination
    • Wang, X. and Cheng, T.C.E., 2007. Machine scheduling with an availability constraint and job delivery coordination. Naval Research Logistics, 54, 11-20.
    • (2007) Naval Research Logistics , vol.54 , pp. 11-20
    • Wang, X.1    Cheng, T.C.E.2
  • 37
    • 34248222606 scopus 로고    scopus 로고
    • On the machine scheduling problem with job delivery coordination
    • Zhong, W., Dosa, G., and Tan, Z., 2007. On the machine scheduling problem with job delivery coordination. European Journal of Operational Research, 182, 1057-1072.
    • (2007) European Journal of Operational Research , vol.182 , pp. 1057-1072
    • Zhong, W.1    Dosa, G.2    Tan, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.