-
1
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
A. Allahverdi, J.N.D. Gupta and T. Aldowaisan, A review of scheduling research involving setup considerations, Omega 27 (1999) 219-239.
-
(1999)
Omega
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
2
-
-
0000612586
-
Complexity of task sequencing with deadlines, set-up times and changeover costs
-
J. Bruno and P. Downey, Complexity of task sequencing with deadlines, set-up times and changeover costs, SIAM Journal of Computing 7 (1978) 393-404.
-
(1978)
SIAM Journal of Computing
, vol.7
, pp. 393-404
-
-
Bruno, J.1
Downey, P.2
-
4
-
-
0031493530
-
Single machine scheduling to minimize batch delivery and job earliness penalties
-
T.C.E. Cheng, M.Y. Kovalyov and B.M.T. Lin, Single machine scheduling to minimize batch delivery and job earliness penalties, SIAM Journal on Optimization 7 (1997) 547-559.
-
(1997)
SIAM Journal on Optimization
, vol.7
, pp. 547-559
-
-
Cheng, T.C.E.1
Kovalyov, M.Y.2
Lin, B.M.T.3
-
6
-
-
0023817926
-
A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem
-
A. Gascon and R.C. Leachman, A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem, Operations Research 36 (1988) 50-56.
-
(1988)
Operations Research
, vol.36
, pp. 50-56
-
-
Gascon, A.1
Leachman, R.C.2
-
7
-
-
0000949843
-
Minimum change-over scheduling of several products on one machine
-
C.R. Glassey, Minimum change-over scheduling of several products on one machine, Operations Research 16 (1968) 342-352.
-
(1968)
Operations Research
, vol.16
, pp. 342-352
-
-
Glassey, C.R.1
-
9
-
-
0003666178
-
-
Research Report 43, Management Science Research Project, University of California, Los Angeles
-
J.R. Jackson, Scheduling a production line to minimize maximum tardiness, Research Report 43, Management Science Research Project, University of California, Los Angeles (1955).
-
(1955)
Scheduling a Production Line to Minimize Maximum Tardiness
-
-
Jackson, J.R.1
-
11
-
-
84974861854
-
Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
-
C.N. Potts and L.N. Van Wassenhove, Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity, Journal of the Operational Research Society 43 (1992) 395-406.
-
(1992)
Journal of the Operational Research Society
, vol.43
, pp. 395-406
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
13
-
-
0029338650
-
Scheduling groups of jobs on a single machine
-
S. Webster and K.R. Baker, Scheduling groups of jobs on a single machine, Operations Research 43 (1995) 692-703.
-
(1995)
Operations Research
, vol.43
, pp. 692-703
-
-
Webster, S.1
Baker, K.R.2
-
14
-
-
84873015292
-
Scheduling with generalized batch delivery dates and earliness penalties
-
to appear
-
X. Yang, Scheduling with generalized batch delivery dates and earliness penalties, IIE Transactions (2001) to appear.
-
(2001)
IIE Transactions
-
-
Yang, X.1
|