메뉴 건너뛰기




Volumn 107, Issue 1-4, 2001, Pages 51-63

Single Supplier Scheduling for Multiple Deliveries

Author keywords

Batching; Delivery; Scheduling; Supply chain

Indexed keywords


EID: 0035561146     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/A:1014938712999     Document Type: Article
Times cited : (19)

References (14)
  • 1
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • A. Allahverdi, J.N.D. Gupta and T. Aldowaisan, A review of scheduling research involving setup considerations, Omega 27 (1999) 219-239.
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 2
    • 0000612586 scopus 로고
    • Complexity of task sequencing with deadlines, set-up times and changeover costs
    • J. Bruno and P. Downey, Complexity of task sequencing with deadlines, set-up times and changeover costs, SIAM Journal of Computing 7 (1978) 393-404.
    • (1978) SIAM Journal of Computing , vol.7 , pp. 393-404
    • Bruno, J.1    Downey, P.2
  • 4
    • 0031493530 scopus 로고    scopus 로고
    • Single machine scheduling to minimize batch delivery and job earliness penalties
    • T.C.E. Cheng, M.Y. Kovalyov and B.M.T. Lin, Single machine scheduling to minimize batch delivery and job earliness penalties, SIAM Journal on Optimization 7 (1997) 547-559.
    • (1997) SIAM Journal on Optimization , vol.7 , pp. 547-559
    • Cheng, T.C.E.1    Kovalyov, M.Y.2    Lin, B.M.T.3
  • 6
    • 0023817926 scopus 로고
    • A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem
    • A. Gascon and R.C. Leachman, A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem, Operations Research 36 (1988) 50-56.
    • (1988) Operations Research , vol.36 , pp. 50-56
    • Gascon, A.1    Leachman, R.C.2
  • 7
    • 0000949843 scopus 로고
    • Minimum change-over scheduling of several products on one machine
    • C.R. Glassey, Minimum change-over scheduling of several products on one machine, Operations Research 16 (1968) 342-352.
    • (1968) Operations Research , vol.16 , pp. 342-352
    • Glassey, C.R.1
  • 9
    • 0003666178 scopus 로고
    • Research Report 43, Management Science Research Project, University of California, Los Angeles
    • J.R. Jackson, Scheduling a production line to minimize maximum tardiness, Research Report 43, Management Science Research Project, University of California, Los Angeles (1955).
    • (1955) Scheduling a Production Line to Minimize Maximum Tardiness
    • Jackson, J.R.1
  • 11
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • C.N. Potts and L.N. Van Wassenhove, Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity, Journal of the Operational Research Society 43 (1992) 395-406.
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 13
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • S. Webster and K.R. Baker, Scheduling groups of jobs on a single machine, Operations Research 43 (1995) 692-703.
    • (1995) Operations Research , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.R.2
  • 14
    • 84873015292 scopus 로고    scopus 로고
    • Scheduling with generalized batch delivery dates and earliness penalties
    • to appear
    • X. Yang, Scheduling with generalized batch delivery dates and earliness penalties, IIE Transactions (2001) to appear.
    • (2001) IIE Transactions
    • Yang, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.