메뉴 건너뛰기




Volumn 54, Issue 1, 2007, Pages 11-20

Machine scheduling with an availability constraint and job delivery coordination

Author keywords

Availability; Heuristics; Scheduling; Supply chain management

Indexed keywords

ALGORITHMS; AVAILABILITY; MACHINE DESIGN; MARKETING; POLYNOMIALS; PREVENTIVE MAINTENANCE;

EID: 33846658252     PISSN: 0894069X     EISSN: 15206750     Source Type: Journal    
DOI: 10.1002/nav.20175     Document Type: Article
Times cited : (61)

References (17)
  • 1
    • 2642510666 scopus 로고    scopus 로고
    • Machine scheduling with job delivery coordination, Bur
    • Y.-C. Chang and C.-Y. Lee, Machine scheduling with job delivery coordination, Bur J Oper Res 158 (2004), 470-487.
    • (2004) J Oper Res , vol.158 , pp. 470-487
    • Chang, Y.-C.1    Lee, C.-Y.2
  • 2
    • 0032661559 scopus 로고    scopus 로고
    • Integrated production/distribution planning in supply chains
    • S.S. Erengüc, N.C. Simpson, and A.J. Vakharia, Integrated production/distribution planning in supply chains, Eur J Oper Res 115 (1999), 219-236.
    • (1999) Eur J Oper Res , vol.115 , pp. 219-236
    • Erengüc, S.S.1    Simpson, N.C.2    Vakharia, A.J.3
  • 3
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batch and delivery
    • N.G. Hall and C.N. Potts, Supply chain scheduling: Batch and delivery, Oper Res 51 (2003), 566-583.
    • (2003) Oper Res , vol.51 , pp. 566-583
    • Hall, N.G.1    Potts, C.N.2
  • 4
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • C.-Y. Lee, Machine scheduling with an availability constraint, J Glob Optim 9 (1996), 395-416.
    • (1996) J Glob Optim , vol.9 , pp. 395-416
    • Lee, C.-Y.1
  • 5
    • 33846697217 scopus 로고    scopus 로고
    • C.-Y. Lee, Machine scheduling with availability constraints, Handbook of Scheduling, J. Leung, Editor, CRC Press, 22.1-22.13.
    • C.-Y. Lee, Machine scheduling with availability constraints, Handbook of Scheduling, J. Leung, Editor, CRC Press, 22.1-22.13.
  • 6
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • C.-Y. Lee and Z.-L. Chen, Scheduling jobs and maintenance activities on parallel machines, Nav Res Logist 47 (2000), 145-165.
    • (2000) Nav Res Logist , vol.47 , pp. 145-165
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 7
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • C.-Y. Lee and Z.-L. Chen, Machine scheduling with transportation considerations, J Schedul 4 (2001), 3-24.
    • (2001) J Schedul , vol.4 , pp. 3-24
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 8
    • 0031492360 scopus 로고    scopus 로고
    • Current trends in deterministic scheduling
    • C.-Y. Lee, L. Lei, and M. Pinedo, Current trends in deterministic scheduling, Ann Oper Res 70 (1997), 1-41.
    • (1997) Ann Oper Res , vol.70 , pp. 1-41
    • Lee, C.-Y.1    Lei, L.2    Pinedo, M.3
  • 9
    • 38249005916 scopus 로고
    • Capacitated two-parallel machines scheduling to minimize sum of job completion times
    • C.-Y. Lee and S.D. Liman, Capacitated two-parallel machines scheduling to minimize sum of job completion times, Discr Appl Math 41 (1993), 211-222.
    • (1993) Discr Appl Math , vol.41 , pp. 211-222
    • Lee, C.-Y.1    Liman, S.D.2
  • 11
    • 10444261222 scopus 로고    scopus 로고
    • Machine scheduling with deliveries to multiple customer locations
    • C.-L. Li, G. Vairaktarakis, and C.-Y. Lee, Machine scheduling with deliveries to multiple customer locations, Eur J Oper Res 164 (2005), 39-51.
    • (2005) Eur J Oper Res , vol.164 , pp. 39-51
    • Li, C.-L.1    Vairaktarakis, G.2    Lee, C.-Y.3
  • 12
    • 4344570389 scopus 로고    scopus 로고
    • Makespan minimization for two parallel machines with an availability constraint
    • C.-T. Liao, D.-L. Shyur, and C.-H. Lin, Makespan minimization for two parallel machines with an availability constraint, Eur J Oper Res 160 (2005), 445-456.
    • (2005) Eur J Oper Res , vol.160 , pp. 445-456
    • Liao, C.-T.1    Shyur, D.-L.2    Lin, C.-H.3
  • 13
    • 0033895628 scopus 로고    scopus 로고
    • Scheduling with batching: A review
    • C.N. Potts and M.Y. Kovalyov, Scheduling with batching: A review, Eur J Oper Res 120 (2000), 228-249.
    • (2000) Eur J Oper Res , vol.120 , pp. 228-249
    • Potts, C.N.1    Kovalyov, M.Y.2
  • 14
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • C.N. Potts and L.N. Van Wassenhove, Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity, J Oper Res Soc 43 (1992), 395-406.
    • (1992) J Oper Res Soc , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 15
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • G. Schmidt, Scheduling with limited machine availability, Eur J Oper Res 121 (2000), 1-15.
    • (2000) Eur J Oper Res , vol.121 , pp. 1-15
    • Schmidt, G.1
  • 16
    • 0041760308 scopus 로고    scopus 로고
    • Coordinated supply chain management
    • D.T. Thomas and P.M. Griffin, Coordinated supply chain management, Eur J Oper Res 94 (1996), 1-15.
    • (1996) Eur J Oper Res , vol.94 , pp. 1-15
    • Thomas, D.T.1    Griffin, P.M.2
  • 17
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • S. Webster and K.B. Baker, Scheduling groups of jobs on a single machine, Oper Res 43 (1995), 692-703.
    • (1995) Oper Res , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.