메뉴 건너뛰기




Volumn 164, Issue 1, 2005, Pages 39-51

Machine scheduling with deliveries to multiple customer locations

Author keywords

Computational complexity; Dynamic programming; Scheduling

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; CUSTOMER SATISFACTION; DYNAMIC PROGRAMMING; MATHEMATICAL MODELS; OPTIMIZATION; PROBLEM SOLVING; WAREHOUSES;

EID: 10444261222     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2003.11.022     Document Type: Article
Times cited : (126)

References (17)
  • 3
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • in press
    • Z.-L. Chen, G.L. Vairaktarakis, Integrated scheduling of production and distribution operations, Management Science, in press.
    • Management Science
    • Chen, Z.-L.1    Vairaktarakis, G.L.2
  • 5
    • 0003162664 scopus 로고
    • Jackson's rule of single-machine scheduling: Making a good heuristic better
    • L.A. Hall, D.B. Shmoys, Jackson's rule of single-machine scheduling: Making a good heuristic better, Mathematics of Operations Research 17 (1992) 22-35.
    • (1992) Mathematics of Operations Research , vol.17 , pp. 22-35
    • Hall, L.A.1    Shmoys, D.B.2
  • 6
    • 0026124166 scopus 로고
    • Automated two-machine flowshop scheduling: A solvable case
    • H. Kise, T. Shioyama, T. Ibaraki, Automated two-machine flowshop scheduling: A solvable case, IIE Transactions 23 (1991) 10-16.
    • (1991) IIE Transactions , vol.23 , pp. 10-16
    • Kise, H.1    Shioyama, T.2    Ibaraki, T.3
  • 7
    • 0023379505 scopus 로고
    • Interstage transportation planning in the deterministic flow-shop environment
    • M.A. Langsten, Interstage transportation planning in the deterministic flow-shop environment, Operations Research 35 (1987) 556-564.
    • (1987) Operations Research , vol.35 , pp. 556-564
    • Langsten, M.A.1
  • 8
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • C.-Y. Lee, Z.-L. Chen, Machine scheduling with transportation considerations, Journal of Scheduling 4 (2001) 3-24.
    • (2001) Journal of Scheduling , vol.4 , pp. 3-24
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 9
    • 0041763613 scopus 로고
    • On 2 × n sequencing problem with transportation times of jobs
    • P.L. Maggu, G. Das, On 2 × n sequencing problem with transportation times of jobs, Pure and Applied Mathematika Sciences 12 (1980) 1-6.
    • (1980) Pure and Applied Mathematika Sciences , vol.12 , pp. 1-6
    • Maggu, P.L.1    Das, G.2
  • 10
    • 0041587599 scopus 로고
    • On equivalent-job for job-block in 2 × n sequencing problem with transportation-times
    • P.L. Maggu, G. Das, R. Kumar, On equivalent-job for job-block in 2 × n sequencing problem with transportation-times, Journal of the Operations Research Society of Japan 24 (1981) 136-146.
    • (1981) Journal of the Operations Research Society of Japan , vol.24 , pp. 136-146
    • Maggu, P.L.1    Das, G.2    Kumar, R.3
  • 11
    • 0026188481 scopus 로고
    • Scheduling of a two-machine flowshop with travel time between machines
    • S.S. Panwalkar, Scheduling of a two-machine flowshop with travel time between machines, Journal of the Operational Research Society 42 (1991) 609-613.
    • (1991) Journal of the Operational Research Society , vol.42 , pp. 609-613
    • Panwalkar, S.S.1
  • 12
    • 0001662666 scopus 로고
    • Analysis of a heuristic for one machine sequencing with release dates and delivery times
    • C.N. Potts, Analysis of a heuristic for one machine sequencing with release dates and delivery times, Operations Research 28 (1980) 1436-1441.
    • (1980) Operations Research , vol.28 , pp. 1436-1441
    • Potts, C.N.1
  • 14
    • 10444284431 scopus 로고    scopus 로고
    • The master-slave paradigm in parallel computer and industrial settings
    • S. Sahni, G. Vairaktarakis, The master-slave paradigm in parallel computer and industrial settings, Journal of Global Optimization 9 (1996) 357-377.
    • (1996) Journal of Global Optimization , vol.9 , pp. 357-377
    • Sahni, S.1    Vairaktarakis, G.2
  • 15
    • 84974857090 scopus 로고
    • Scheduling parts in a combined production-transportation work cell
    • H.I. Stern, G. Vitner, Scheduling parts in a combined production-transportation work cell, Journal of the Operational Research Society 41 (1990) 625-632.
    • (1990) Journal of the Operational Research Society , vol.41 , pp. 625-632
    • Stern, H.I.1    Vitner, G.2
  • 16
    • 0030790585 scopus 로고    scopus 로고
    • Scheduling a two-machine flowshop with travel times to minimize maximum lateness
    • J.W. Stevens, D.D. Germill, Scheduling a two-machine flowshop with travel times to minimize maximum lateness, International Journal of Production Research 35 (1997) 1-15.
    • (1997) International Journal of Production Research , vol.35 , pp. 1-15
    • Stevens, J.W.1    Germill, D.D.2
  • 17
    • 0031274815 scopus 로고    scopus 로고
    • Analysis of algorithms for master-slave systems
    • G. Vairaktarakis, Analysis of algorithms for master-slave systems, IIE Transactions 29 (1997) 939-949.
    • (1997) IIE Transactions , vol.29 , pp. 939-949
    • Vairaktarakis, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.