-
2
-
-
0043253368
-
Formalization and automation of time-space conflict analysis
-
DOI 10.1061/(ASCE)0887-3801(2002)16:2(124)
-
B. Akinci, M. Fischer, R. Levitt, and B. Carlson Formalization and automation of time-space conflict analysis J. Comput. Civil Eng. 16 2 2002 124 134 (Pubitemid 40475287)
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 124-134
-
-
Akinci, B.1
Fischen, M.2
Levitt, R.3
Carlson, R.4
-
6
-
-
84893787945
-
-
(accessed 11.14.12)
-
Statewide Compliance Campaign-Formwork, WHSQ, 2008. < http://www.deir.qld.gov.au/workplace/resources/pdfs/audit-reports/ audit-formwork-2007.pdf > (accessed 11.14.12).
-
(2008)
Statewide Compliance Campaign-Formwork, WHSQ
-
-
-
7
-
-
84893774799
-
-
(accessed 09.21.13).
-
Scaffolding compliance campaign 2009-2010, WHSQ, 2012. < http://www.deir.qld.gov.au/workplace/industry/construction/high-risk/ scaffolding/index.htm > (accessed 09.21.13).
-
(2012)
Scaffolding Compliance Campaign 2009-2010, WHSQ
-
-
-
11
-
-
0027806191
-
Spatial reasoning for the automatic recognition of machinable features in solid models
-
J. Vandenbrande, and A. Requincha Spatial reasoning for the automatic recognition of machinable features in solid models IEEE Trans. Pattern Anal. Mach. Intell. 15 12 1993 1269 1285
-
(1993)
IEEE Trans. Pattern Anal. Mach. Intell.
, vol.15
, Issue.12
, pp. 1269-1285
-
-
Vandenbrande, J.1
Requincha, A.2
-
13
-
-
84863006281
-
Automation of scheme preparation and BOQ calculation for L&T-aluform
-
R. Nagi, T. George, M. Ashwin, Automation of scheme preparation and BOQ calculation for L&T-aluform, in: 24th International Symposium on Automation & Robotics in, Construction, 2007, pp. 273-280.
-
(2007)
24th International Symposium on Automation & Robotics In, Construction
, pp. 273-280
-
-
Nagi, R.1
George, T.2
Ashwin, M.3
-
15
-
-
84893805770
-
-
(accessed 11.14.12).
-
Schuster Construction. < http://www.schusterconstruction.com/projects/ angelos-law-center.html > (accessed 11.14.12).
-
Schuster Construction
-
-
-
16
-
-
84893799402
-
-
(accessed 11.14.12).
-
In Practice: DPR Construction, Tekla. < http://www.tekla.com/us/ solutions/references/Pages/DPRConstruction.aspx > (accessed 11.14.12).
-
Practice: DPR Construction, Tekla
-
-
-
17
-
-
84893721758
-
-
(accessed 05.01.12).
-
Tokyo Sky Tree, Japan, Tekla. < http://www.tekla.com/international/ solutions/references/Pages/tokyo-sky-tree-japan.aspx > (accessed 05.01.12).
-
Tokyo Sky Tree, Japan, Tekla
-
-
-
18
-
-
38649094993
-
-
John Wiley & Sons Inc. New Jersey
-
C. Eastman, P. Teicholz, R. Sacks, and K. Liston BIM handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors 2008 John Wiley & Sons Inc. New Jersey
-
(2008)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
19
-
-
84878419205
-
4D-BIM for construction safety planning
-
K. Sulankivi, K. Kähkönen, T. Mäkelä, M. Kiviniemi, 4D-BIM for construction safety planning, in: Proceedings of W099-Special Track 18th CIB World Building Congress, 2010, pp. 117-128.
-
(2010)
Proceedings of W099-Special Track 18th CIB World Building Congress
, pp. 117-128
-
-
Sulankivi, K.1
Kähkönen, K.2
Mäkelä, T.3
Kiviniemi, M.4
-
20
-
-
84891335917
-
Formalization of the features of activities and classification of temporary structures to support an automated temporary structure planning
-
J. Kim, M. Fischer, Formalization of the features of activities and classification of temporary structures to support an automated temporary structure planning, in: Proceedings of the 2007 ASCE International Workshop on Computing in Civil Engineering, 2007, pp. 338-346.
-
(2007)
Proceedings of the 2007 ASCE International Workshop on Computing in Civil Engineering
, pp. 338-346
-
-
Kim, J.1
Fischer, M.2
-
21
-
-
84893765067
-
-
(accessed 11.10.12).
-
Smart Scaffolder, CADS. < http://www.smartscaffolder.com > (accessed 11.10.12).
-
Smart Scaffolder, CADS
-
-
-
23
-
-
84893731238
-
The development of automatic module for formwork layout using the BIM
-
C. Lee, S. Ham, G. Lee, The development of automatic module for formwork layout using the BIM, in: Proceedings of ICCEM/ICCPM, vol. 3, 2009, pp. 1266-1271.
-
(2009)
Proceedings of ICCEM/ICCPM
, vol.3
, pp. 1266-1271
-
-
Lee, C.1
Ham, S.2
Lee, G.3
-
24
-
-
41749088228
-
Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models
-
R. Jongeling, J. Kim, M. Fischer, C. Mourgues, and T. Olofsson Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models Autom. Constr. 17 6 2008 780 791
-
(2008)
Autom. Constr.
, vol.17
, Issue.6
, pp. 780-791
-
-
Jongeling, R.1
Kim, J.2
Fischer, M.3
Mourgues, C.4
Olofsson, T.5
-
25
-
-
77951518362
-
Developing a rule engine for automated feature recognition from CAD models
-
H. Zhang, C. Van der Velden, Y. Xinghuo, C. Bil, T. Jones, I. Fieldhouse, Developing a rule engine for automated feature recognition from CAD models, in: Proceedings of Industrial Electronics 2009 IECON 09 35th annual conference of IEEE, 2009, pp. 3925-3930.
-
(2009)
Proceedings of Industrial Electronics 2009 IECON 09 35th Annual Conference of IEEE
, pp. 3925-3930
-
-
Zhang, H.1
Velden Der C.Van2
Xinghuo, Y.3
Bil, C.4
Jones, T.5
Fieldhouse, I.6
-
26
-
-
39749194535
-
A review of automated feature recognition with rule-based pattern recognition
-
DOI 10.1016/j.compind.2007.09.001, PII S0166361507001327
-
B. Babic, N. Nesic, and Z. Miljkovic A review of automated feature recognition with rule-based pattern recognition Comput. Ind. 59 4 2008 321 337 (Pubitemid 351308126)
-
(2008)
Computers in Industry
, vol.59
, Issue.4
, pp. 321-337
-
-
Babic, B.1
Nesic, N.2
Miljkovic, Z.3
-
27
-
-
70349429622
-
Automated rule-based checking of building designs
-
C. Eastman, J. Lee, Y. Jeong, and J. Lee Automated rule-based checking of building designs Autom. Constr. 18 8 2009 1011 1033
-
(2009)
Autom. Constr.
, vol.18
, Issue.8
, pp. 1011-1033
-
-
Eastman, C.1
Lee, J.2
Jeong, Y.3
Lee, J.4
-
28
-
-
68549083438
-
Automated assessment of early concept designs
-
C. Eastman, J. Lee, H. Sheward, P. Sanguinetti, Y. Jeong, J. Lee, and S. Abdelmohsen Automated assessment of early concept designs Archit. Des. 79 2 2009 52 57
-
(2009)
Archit. Des.
, vol.79
, Issue.2
, pp. 52-57
-
-
Eastman, C.1
Lee, J.2
Sheward, H.3
Sanguinetti, P.4
Jeong, Y.5
Lee, J.6
Abdelmohsen, S.7
-
29
-
-
84869092675
-
Building Information Modeling (BIM) and safety: Automatic safety checking of construction models and schedules
-
S. Zhang, J. Teizer, J. Lee, C. Eastman, and M. Venugopal Building Information Modeling (BIM) and safety: automatic safety checking of construction models and schedules Autom. Constr. 29 2013 183 195
-
(2013)
Autom. Constr.
, vol.29
, pp. 183-195
-
-
Zhang, S.1
Teizer, J.2
Lee, J.3
Eastman, C.4
Venugopal, M.5
-
30
-
-
84884282759
-
Quantification and Visualization of U.S. and German fall protection standards using automated safety-rule checking in building information models (BIM)
-
Taylor & Francis, Special Issue on Occupational Health and Safety in the Construction Industry
-
J. Melzner, S. Zhang, J. Teizer, and H.-J. Bargstädt Quantification and Visualization of U.S. and German fall protection standards using automated safety-rule checking in building information models (BIM) Construct. Manage. Econom. 31 6 2013 661 674 Taylor & Francis, Special Issue on Occupational Health and Safety in the Construction Industry
-
(2013)
Construct. Manage. Econom.
, vol.31
, Issue.6
, pp. 661-674
-
-
Melzner, J.1
Zhang, S.2
Teizer, J.3
Bargstädt, H.-J.4
-
31
-
-
0029393358
-
Qualitative geometric reasoner for integrated design
-
P. Chinowsky, and K. Reinschmidt Qualitative geometric reasoner for integrated design J. Comput. Civil Eng. 9 4 1995 250 258
-
(1995)
J. Comput. Civil Eng.
, vol.9
, Issue.4
, pp. 250-258
-
-
Chinowsky, P.1
Reinschmidt, K.2
-
32
-
-
0025721235
-
Topological models for boundary representation: A comparison with n-dimensional generalized maps
-
P. Lienhardt Topological models for boundary representation: a comparison with n-dimensional generalized maps Comput. - Aided Des. 23 1 1991 59 81
-
(1991)
Comput. - Aided Des.
, vol.23
, Issue.1
, pp. 59-81
-
-
Lienhardt, P.1
-
33
-
-
38249008181
-
Analogical representation of space and time
-
R. Howarth, and H. Buxton Analogical representation of space and time Image Vis. Comput. 10 7 1992 467 478
-
(1992)
Image Vis. Comput.
, vol.10
, Issue.7
, pp. 467-478
-
-
Howarth, R.1
Buxton, H.2
-
34
-
-
57549107496
-
Specification and implementation of directional operators in a 3D spatial query language for building information models
-
A. Borrmann, and E. Rank Specification and implementation of directional operators in a 3D spatial query language for building information models Adv. Eng. Inform. 23 1 2009 32 44
-
(2009)
Adv. Eng. Inform.
, vol.23
, Issue.1
, pp. 32-44
-
-
Borrmann, A.1
Rank, E.2
-
35
-
-
70149125381
-
Topological analysis of 3D building models using a spatial query language
-
A. Borrmann, and E. Rank Topological analysis of 3D building models using a spatial query language Adv. Eng. Inform. 23 4 2009 370 385
-
(2009)
Adv. Eng. Inform.
, vol.23
, Issue.4
, pp. 370-385
-
-
Borrmann, A.1
Rank, E.2
|