메뉴 건너뛰기




Volumn 2, Issue 1, 2009, Pages 90-113

A simulation-enhanced lean design process

Author keywords

Lean manufacturing; Process design; Simulation

Indexed keywords

INDUSTRIAL ENGINEERING; PROCESS DESIGN;

EID: 84975320381     PISSN: 20138423     EISSN: 20130953     Source Type: Journal    
DOI: 10.3926/jiem.2009.v2n1.p90-113     Document Type: Article
Times cited : (95)

References (51)
  • 1
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
    • Abdulmalek, F. A., & Rajgopal, J. (2007). Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study. International Journal of Production Economics, 107(1), 223-236.
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 4
    • 34047189706 scopus 로고    scopus 로고
    • Simulation Model of a Vertically Integrated Supply Chain: A Case Study
    • Byrne, P. J., & Heavey, C. (2006). Simulation Model of a Vertically Integrated Supply Chain: A Case Study. International Journal of Industrial Engineering, 13(2), 126-135.
    • (2006) International Journal of Industrial Engineering , vol.13 , Issue.2 , pp. 126-135
    • Byrne, P.J.1    Heavey, C.2
  • 5
    • 84993090888 scopus 로고    scopus 로고
    • An exploratory analysis in applying lean manufacturing to a labor-intensive industry in China
    • Comm, C. L., & Mathaisel, D. F. X. (2005). An exploratory analysis in applying lean manufacturing to a labor-intensive industry in China. Asia Pacific Journal of Marketing and Logistics, 17(4), 63-80.
    • (2005) Asia Pacific Journal of Marketing and Logistics , vol.17 , Issue.4 , pp. 63-80
    • Comm, C.L.1    Mathaisel, D.F.X.2
  • 6
    • 85051075748 scopus 로고    scopus 로고
    • Manufacturing Engineering, Lean Manufacturing Suppl
    • Conner, G. (2007). Road Map to Lean for the Smaller Shop. Manufacturing Engineering, (Lean Manufacturing Suppl.) 27-29.
    • (2007) Road Map to Lean for the Smaller Shop , pp. 27-29
    • Conner, G.1
  • 7
    • 0034688387 scopus 로고    scopus 로고
    • Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
    • Detty, R. B., & Yingling, J. C. (2000). Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study. International Journal of Production Research, 38(2), 429-445.
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 429-445
    • Detty, R.B.1    Yingling, J.C.2
  • 8
    • 59349103651 scopus 로고    scopus 로고
    • Applying lean thinking: A case study of an Indian steel plant
    • Dhandapani, V., Potter, A., & Naim, M. (2004). Applying lean thinking: a case study of an Indian steel plant. International Journal of Logistics, 7(3), 239-250.
    • (2004) International Journal of Logistics , vol.7 , Issue.3 , pp. 239-250
    • Dhandapani, V.1    Potter, A.2    Naim, M.3
  • 11
    • 33846661137 scopus 로고    scopus 로고
    • Proceedings of the 2005 Winter Simulation Conference.Paper presented at the 2005 Winter Simulation Conference:, Orlando, Florida
    • Ferrin, D. M., Miller M. J., and Muthler D. (2005). Lean sigma and simulation, so what’s the correlation? Proceedings of the 2005 Winter Simulation Conference.Paper presented at the 2005 Winter Simulation Conference:, Orlando, Florida.
    • (2005) Lean Sigma and Simulation, So what’s the Correlation?
    • Ferrin, D.M.1    Miller, M.J.2    Muthler, D.3
  • 13
    • 0033417975 scopus 로고    scopus 로고
    • Lean Production and the Toyota Production System Or, the Case of the Forgotten Production Concepts
    • Hampson, I. (1999). Lean Production and the Toyota Production System Or, the Case of the Forgotten Production Concepts. Economic and Industrial Democracy, 20(3), 369-391.
    • (1999) Economic and Industrial Democracy , vol.20 , Issue.3 , pp. 369-391
    • Hampson, I.1
  • 18
    • 34250876431 scopus 로고    scopus 로고
    • A simulation study of pull system responsiveness considering production condition influences
    • Hung, K.-T., & Liker, J. K. (2007). A simulation study of pull system responsiveness considering production condition influences. International Journal of Industrial and Systems Engineering, 2(2), 123-136.
    • (2007) International Journal of Industrial and Systems Engineering , vol.2 , Issue.2 , pp. 123-136
    • Hung, K.-T.1    Liker, J.K.2
  • 20
    • 0011953661 scopus 로고    scopus 로고
    • Managing complex production processes
    • Khurana, A. (1999). Managing complex production processes. Sloan Management Review, 40(2), 85-97.
    • (1999) Sloan Management Review , vol.40 , Issue.2 , pp. 85-97
    • Khurana, A.1
  • 21
    • 0142102679 scopus 로고
    • Lean Production - The Challenge of Multidimensional Change
    • J.K. Liker, Portland, Or.: Productivity Press
    • Koenigsaecker, G. (1988). Lean Production - The Challenge of Multidimensional Change. In J.K. Liker (Ed.), Becoming lean: inside stories of U.S. manufacturers (pp. 457-475). Portland, Or.: Productivity Press.
    • (1988) Becoming Lean: Inside Stories of U.S. Manufacturers , pp. 457-475
    • Koenigsaecker, G.1
  • 22
    • 33746106470 scopus 로고    scopus 로고
    • Capacity design: An application using discrete-event simulation and designed experiments
    • Kumar, S., & Nottestad, D. A. (2006). Capacity design: an application using discrete-event simulation and designed experiments. IIE Transactions, 38(9), 8p.
    • (2006) IIE Transactions , vol.38 , Issue.9 , pp. 8
    • Kumar, S.1    Nottestad, D.A.2
  • 23
    • 29144500485 scopus 로고    scopus 로고
    • Improving a manufacturing process by mapping and simulation of critical operations
    • Kumar, S., & Phrommathed, P. (2006). Improving a manufacturing process by mapping and simulation of critical operations. Journal of Manufacturing Technology Management, 17(1), 104-132.
    • (2006) Journal of Manufacturing Technology Management , vol.17 , Issue.1 , pp. 104-132
    • Kumar, S.1    Phrommathed, P.2
  • 24
    • 85051084491 scopus 로고    scopus 로고
    • Learnsigma
    • Learnsigma. (2007). What is lean manufacturing? Retrieved February 13, 2009 from http://learnsigma.wordpress.com/2007/11/10/what-is-lean-manufacturing/.
    • (2007) What is Lean Manufacturing?
  • 26
    • 34249027911 scopus 로고    scopus 로고
    • Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
    • Lian, Y. H., & Van Landeghem, H. (2007). Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator. International Journal of Production Research, 45(13), 3037-3058.
    • (2007) International Journal of Production Research , vol.45 , Issue.13 , pp. 3037-3058
    • Lian, Y.H.1    Van Landeghem, H.2
  • 27
    • 33846668212 scopus 로고    scopus 로고
    • Proceedings of the 2005 Winter Simulation Conference Paper presented at the 2005 Winter Simulation Conference:, Orlando, Florida
    • Maas, S. & Standridge, C. R. (2005). Applying simulation to iterative manufacturing cell design. Proceedings of the 2005 Winter Simulation Conference Paper presented at the 2005 Winter Simulation Conference:, Orlando, Florida
    • (2005) Applying Simulation to Iterative Manufacturing Cell Design
    • Maas, S.1    Standridge, C.R.2
  • 28
    • 77949299800 scopus 로고    scopus 로고
    • Assessing the availability and allocation of production capacity in a fabrication facility through simulation modeling: A case study
    • Marvel, J.H., Schaub, M.A., & Weckman, G.R. (2008). Assessing the availability and allocation of production capacity in a fabrication facility through simulation modeling: a case study. International Journal of Industrial Engineering, 15(2), 166-175.
    • (2008) International Journal of Industrial Engineering , vol.15 , Issue.2 , pp. 166-175
    • Marvel, J.H.1    Schaub, M.A.2    Weckman, G.R.3
  • 29
    • 3543061530 scopus 로고
    • Using Simulation to Facilitate Analysis of Manufacturing Strategy
    • McClelland, M. K. (1992). Using Simulation to Facilitate Analysis of Manufacturing Strategy. Journal of business logistics, 13(1), 215-237.
    • (1992) Journal of Business Logistics , vol.13 , Issue.1 , pp. 215-237
    • McClelland, M.K.1
  • 30
    • 33746857517 scopus 로고    scopus 로고
    • Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application
    • McDonald, T., Van Aken, E., & Rentes, A. (2002). Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application. International Journal of Logistics, 5(2), 213-232.
    • (2002) International Journal of Logistics , vol.5 , Issue.2 , pp. 213-232
    • McDonald, T.1    Van Aken, E.2    Rentes, A.3
  • 31
    • 31444436913 scopus 로고    scopus 로고
    • A simulation-based comparison of batch sizes in a continuous processing industry
    • Mehra, S., Inman, R. A., & Tuite, G. (2006). A simulation-based comparison of batch sizes in a continuous processing industry. Production Planning & Control, 17(1), 54-66.
    • (2006) Production Planning & Control , vol.17 , Issue.1 , pp. 54-66
    • Mehra, S.1    Inman, R.A.2    Tuite, G.3
  • 33
    • 0042363456 scopus 로고    scopus 로고
    • A business process change framework for examining lean manufacturing: A case study
    • Motwani, J. (2003). A business process change framework for examining lean manufacturing: a case study. Industrial Management & Data Systems, 103(5), 339-346.
    • (2003) Industrial Management & Data Systems , vol.103 , Issue.5 , pp. 339-346
    • Motwani, J.1
  • 35
    • 0039622932 scopus 로고    scopus 로고
    • Visteon's Sterling Plant Uses Simulation-Based Decision Support in Training, Operations, and Planning
    • Pfeil, G., Holcomb, R., Muir, C. T., & Taj, S. (2000). Visteon's Sterling Plant Uses Simulation-Based Decision Support in Training, Operations, and Planning. Interfaces, 30(1), 115-133.
    • (2000) Interfaces , vol.30 , Issue.1 , pp. 115-133
    • Pfeil, G.1    Holcomb, R.2    Muir, C.T.3    Taj, S.4
  • 37
    • 4344717123 scopus 로고    scopus 로고
    • Simulation as a Tool in Understanding the Concepts of Lean Manufacturing
    • Schroer, B. J. (2004). Simulation as a Tool in Understanding the Concepts of Lean Manufacturing. SIMULATION, 80(3), 171-175.
    • (2004) SIMULATION , vol.80 , Issue.3 , pp. 171-175
    • Schroer, B.J.1
  • 38
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: Context, practice bundles, and performance
    • Shah, R., & Ward, P. T. (2003). Lean manufacturing: context, practice bundles, and performance. Journal of operations management, 21(2), 22.
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 22
    • Shah, R.1    Ward, P.T.2
  • 39
    • 34248550363 scopus 로고    scopus 로고
    • Defining and developing measures of lean production
    • Shah, R., & Ward, P. T. (2007). Defining and developing measures of lean production. Journal of operations management, 25(4), 21.
    • (2007) Journal of Operations Management , vol.25 , Issue.4 , pp. 21
    • Shah, R.1    Ward, P.T.2
  • 40
    • 79960444119 scopus 로고    scopus 로고
    • SigmaFlow
    • SigmaFlow. (2006). Process simulation. Retrieved February 15, 2009 from http://www.sigmaflow.com/vsm/vsm_software.html.
    • (2006) Process Simulation
  • 42
    • 17744380045 scopus 로고    scopus 로고
    • Proceedings of the 2004 Winter Simulation Conference. Paper presented at the 2004 Winter Simulation Conference:, Washington, D.C
    • Standridge, C. R. (2004). How factory physics helps simulation. Proceedings of the 2004 Winter Simulation Conference. Paper presented at the 2004 Winter Simulation Conference:, Washington, D.C.
    • (2004) How Factory Physics Helps Simulation
    • Standridge, C.R.1
  • 43
    • 46149119463 scopus 로고    scopus 로고
    • Proceedings of the 2006 Winter Simulation Conference. Paper presented at the 2004 Winter Simulation Conference:, Monterey, California
    • Standridge, C. R., & Marvel, J. H. (2006). Why lean needs simulation. Proceedings of the 2006 Winter Simulation Conference. Paper presented at the 2004 Winter Simulation Conference:, Monterey, California.
    • (2006) Why Lean Needs Simulation
    • Standridge, C.R.1    Marvel, J.H.2
  • 44
    • 0343916538 scopus 로고    scopus 로고
    • Kaizen pays off for manufacturers
    • Struebing, L. (1997). Kaizen pays off for manufacturers. Quality Progress, 30(4), 16.
    • (1997) Quality Progress , vol.30 , Issue.4 , pp. 16
    • Struebing, L.1
  • 46
  • 48
    • 0032626924 scopus 로고    scopus 로고
    • JIT Manufacturing: A Survey of Implementations in Small and Large U S Manufacturers
    • White, R. E., Pearson, J. N., & Wilson, J. R. (1999). JIT Manufacturing: A Survey of Implementations in Small and Large U S Manufacturers. Management Science, 45(1), 15.
    • (1999) Management Science , vol.45 , Issue.1 , pp. 15
    • White, R.E.1    Pearson, J.N.2    Wilson, J.R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.