메뉴 건너뛰기




Volumn 2, Issue , 2004, Pages 1103-1107

How factory physics helps simulation

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COST EFFECTIVENESS; CUSTOMER SATISFACTION; FACTORY AUTOMATION; INDUSTRIAL APPLICATIONS; LARGE SCALE SYSTEMS; PLANT MANAGEMENT; PRODUCTION CONTROL; PROJECT MANAGEMENT;

EID: 17744380045     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (17)

References (8)
  • 2
    • 17744379223 scopus 로고    scopus 로고
    • Unpublished masters project, School of Engineering, Grand Valley State University, Grand Rapids, Michigan
    • Grimard, C. 2003. EMD assembly line. Unpublished masters project, School of Engineering, Grand Valley State University, Grand Rapids, Michigan.
    • (2003) EMD Assembly Line
    • Grimard, C.1
  • 3
    • 1642560596 scopus 로고    scopus 로고
    • How the expertfit distribution-fitting software can make your simulation models more valid
    • ed., S. Chick, P.J. Sanchez, D. Ferrin, and D. J. Morris, Institute of Electrical and Electronics Engineers, Piscataway, NJ
    • Law, A. M. and M. G. McComas. 2003. How the Expertfit distribution-fitting software can make your simulation models more valid. In Proceedings of the 2003 Winter Simulation Conference, ed., S. Chick, P.J. Sanchez, D. Ferrin, and D. J. Morris, 169-174. Institute of Electrical and Electronics Engineers, Piscataway, NJ.
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 169-174
    • Law, A.M.1    McComas, M.G.2
  • 4
    • 0000861722 scopus 로고
    • A proof of the queueing formula L = λW
    • Little, J. D. C. 1961. A proof of the queueing formula L = λW. Operations Research 9 (3).
    • (1961) Operations Research , vol.9 , Issue.3
    • Little, J.D.C.1
  • 5
    • 17744368932 scopus 로고    scopus 로고
    • Unpublished masters project proposal, School of Engineering, Grand Valley State University, Grand Rapids, Michigan
    • Mass, S. 2003. A procedure for multi-product scheduling and inventory management. Unpublished masters project proposal, School of Engineering, Grand Valley State University, Grand Rapids, Michigan.
    • (2003) A Procedure for Multi-product Scheduling and Inventory Management
    • Mass, S.1
  • 6
    • 17744389841 scopus 로고    scopus 로고
    • Measures, models, and factory physics
    • Presentation to the [accessed August 6, 2004]
    • Spearman, M. 2003. Measures, models, and factory physics. Presentation to the Michigan Simulation Users Group 2003 Annual Conference. Available online via 〈www.m- sug.org〉 [accessed August 6, 2004].
    • (2003) Michigan Simulation Users Group 2003 Annual Conference
    • Spearman, M.1
  • 7
    • 0034430506 scopus 로고    scopus 로고
    • An MSE-based simulation capability for strategic and tactical logistics
    • ed., J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, Institute of Electrical and Electronics Engineers, Piscataway, NJ
    • Standridge, C. R. and D. R. Heltne. 2000. An MSE-based simulation capability for strategic and tactical logistics. In Proceedings of the 2000 Winter Simulation Conference, ed., J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, 1107-1113. Institute of Electrical and Electronics Engineers, Piscataway, NJ.
    • (2000) Proceedings of the 2000 Winter Simulation Conference , pp. 1107-1113
    • Standridge, C.R.1    Heltne, D.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.