-
1
-
-
0037115842
-
Capacity estimation of a multi-product unreliable production line
-
Abdul-Kader, W. and Gahrbi, A. (2002). Capacity estimation of a multi-product unreliable production line. International Journal of Production Research, 40(18): 4815-4834.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.18
, pp. 4815-4834
-
-
Abdul-Kader, W.1
Gahrbi, A.2
-
2
-
-
33746459892
-
Choosing the appropriate capacity for a make-to-forecast production environment using a Markov analysis approach
-
Akinc, U. and Meredith, J. (2006). Choosing the appropriate capacity for a make-to-forecast production environment using a Markov analysis approach. IIE Transactions, 38: 847-858.
-
(2006)
IIE Transactions
, vol.38
, pp. 847-858
-
-
Akinc, U.1
Meredith, J.2
-
3
-
-
14944376633
-
Managing flexible capacity in a make-to-order environment
-
Bish, E.K., Muriel, A., and Biller, S. (2005). Managing Flexible Capacity in a Make-to-Order Environment. Management Science, 51(2): 167-180.
-
(2005)
Management Science
, vol.51
, Issue.2
, pp. 167-180
-
-
Bish, E.K.1
Muriel, A.2
Biller, S.3
-
4
-
-
34047189706
-
Simulation model of a vertically integrated supply chain: A case study
-
Byrne, P.J. and Heavey, C. (2006). Simulation Model of a Vertically Integrated Supply Chain: A Case Study. International Journal of Industrial Engineering, 13(2): 126-135.
-
(2006)
International Journal of Industrial Engineering
, vol.13
, Issue.2
, pp. 126-135
-
-
Byrne, P.J.1
Heavey, C.2
-
5
-
-
0035669820
-
Integration of capacity planning techniques for tool portfolio planning in semiconductor manufacturing
-
Chou, Y-C., Wu, C-S., Kao, C-E., and Hsieh, S-H. (2001). Integration of Capacity Planning Techniques for Tool Portfolio Planning in Semiconductor Manufacturing. International Journal of Industrial Engineering, 8(4): 279-288.
-
(2001)
International Journal of Industrial Engineering
, vol.8
, Issue.4
, pp. 279-288
-
-
Chou, Y.-C.1
Wu, C.-S.2
Kao, C.-E.3
Hsieh, S.-H.4
-
6
-
-
0038110576
-
Strategic capacity management: Meeting technological demands and performance criteria
-
Dekkers, R. (2003). Strategic capacity management: meeting technological demands and performance criteria. Journal of Materials Processing Technology, 139: 385-393.
-
(2003)
Journal of Materials Processing Technology
, vol.139
, pp. 385-393
-
-
Dekkers, R.1
-
7
-
-
0028516896
-
Capacity analysis in repetitive assemble-to-order manufacturing systems
-
Fumero, F. and Vercellis, C. (1994). Capacity analysis in repetitive assemble-to-order manufacturing systems. European Journal of Operations Research, 78: 204-215.
-
(1994)
European Journal of Operations Research
, vol.78
, pp. 204-215
-
-
Fumero, F.1
Vercellis, C.2
-
9
-
-
33644998525
-
A general strategic capacity planning model under demand uncertainty
-
Huh, W.T., Roundy, R.O., and Cakanyildirim, M. (2006). A General Strategic Capacity Planning Model under Demand Uncertainty. Naval Research Logistics, 53: 137-150.
-
(2006)
Naval Research Logistics
, vol.53
, pp. 137-150
-
-
Huh, W.T.1
Roundy, R.O.2
Cakanyildirim, M.3
-
10
-
-
33746106470
-
Capacity design: An application using discrete-event simulation and designed experiments
-
Kumar, S. and Nottestad, D.A. (2006). Capacity design: an application using discrete-event simulation and designed experiments. IIE Transactions, 38: 729-736.
-
(2006)
IIE Transactions
, vol.38
, pp. 729-736
-
-
Kumar, S.1
Nottestad, D.A.2
-
11
-
-
33846673681
-
Validating the capacity planning process and flowline product sequencing through simulation analysis
-
Institute of Electrical and Electronics Engineers
-
Marvel, J.H., Schaub, M. and Weckman, G. (2005). Validating the Capacity Planning Process and Flowline Product Sequencing through Simulation Analysis. Proceedings of the 2005 Winter Simulation Conference, Institute of Electrical and Electronics Engineers, pp. 2112-2118.
-
(2005)
Proceedings of the 2005 Winter Simulation Conference
, pp. 2112-2118
-
-
Marvel, J.H.1
Schaub, M.2
Weckman, G.3
-
12
-
-
31444436913
-
A simulation-based comparison of batch sizes in a continuous processing industry
-
Mehra, S., Inman, R.A., and Tuite, G. (2006). A simulation-based comparison of batch sizes in a continuous processing industry. Production Planning & Control, 17(1): 54-66.
-
(2006)
Production Planning & Control
, vol.17
, Issue.1
, pp. 54-66
-
-
Mehra, S.1
Inman, R.A.2
Tuite, G.3
-
13
-
-
0031102504
-
Capacity driven due date settings in make-to-order production systems
-
Ozdamar, L. and Yazgac, T. (1997). Capacity driven due date settings in make-to-order production systems. International Journal of Production Economics, 49: 29-44.
-
(1997)
International Journal of Production Economics
, vol.49
, pp. 29-44
-
-
Ozdamar, L.1
Yazgac, T.2
-
14
-
-
0033325132
-
Validation and verification of simulation models
-
Institute of Electrical and Electronics Engineers
-
Sargent, R. G. (1999). Validation and verification of simulation models Proceedings of the 2005 Winter Simulation Conference, Institute of Electrical and Electronics Engineers, pp. 39-48.
-
(1999)
Proceedings of the 2005 Winter Simulation Conference
, pp. 39-48
-
-
Sargent, R.G.1
-
16
-
-
1642518629
-
Simulation based optimization for supply chain configuration design
-
Institute of Electrical and Electronics Engineers
-
Truong, T.H. and Azadivar, F. (2003). Simulation Based Optimization for Supply Chain Configuration Design. Proceedings of the 2003 Winter Simulation Conference, Institute of Electrical and Electronics Engineers, pp. 1268-1275.
-
(2003)
Proceedings of the 2003 Winter Simulation Conference
, pp. 1268-1275
-
-
Truong, T.H.1
Azadivar, F.2
-
17
-
-
33744970469
-
Reduced discrete-event simulation models for medium-term production scheduling
-
Volker, S. and Gmilkowsky, P. (2003). Reduced Discrete-Event Simulation Models for Medium-Term Production Scheduling. Systems Analysis Modeling Simulation, 43(7): 867-883.
-
(2003)
Systems Analysis Modeling Simulation
, vol.43
, Issue.7
, pp. 867-883
-
-
Volker, S.1
Gmilkowsky, P.2
-
18
-
-
0031331284
-
A simulation-based backward planning approach for order release
-
Institute of Electrical and Electronics Engineers
-
Watson, E. F., D. J. Medeiros, and R. P. Sadowski. (1997). A simulation-based backward planning approach for order release. Proceedings of the 1997 Winter Simulation Conference, Institute of Electrical and Electronics Engineers, pp 765-772.
-
(1997)
Proceedings of the 1997 Winter Simulation Conference
, pp. 765-772
-
-
Watson, E.F.1
Medeiros, D.J.2
Sadowski, R.P.3
|