![]() |
Volumn 2005, Issue , 2005, Pages 1386-1391
|
Validation of the re-design of a manufacturing work cell using simulation
|
Author keywords
[No Author keywords available]
|
Indexed keywords
CALIBRATION;
COMPUTER SIMULATION;
COMPUTER WORKSTATIONS;
INVENTORY CONTROL;
MATHEMATICAL MODELS;
INJECTOR ASSEMBLY;
PRODUCTION AREA;
SYSTEM BEHAVIOR;
WORKSTATIONS;
LARGE SCALE SYSTEMS;
|
EID: 33846688457
PISSN: 08917736
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/WSC.2005.1574402 Document Type: Conference Paper |
Times cited : (17)
|
References (10)
|