-
1
-
-
34247645554
-
Multicriteria decision model for outsourcing contracts selection based on utility function and ELECTRE method
-
Almeida, A. T., 2007. Multicriteria decision model for outsourcing contracts selection based on utility function and ELECTRE method. Computers & Operations Research, 34:3569–3574.
-
(2007)
Computers & Operations Research
, vol.34
, pp. 3569-3574
-
-
Almeida, A.T.1
-
2
-
-
79957834884
-
Economic risk assessment of advanced process technologies for bioethanol production in South Africa: Monte Carlo analysis
-
Amigun, B., Petrie, D., and Görgens, J., 2011. Economic risk assessment of advanced process technologies for bioethanol production in South Africa:Monte Carlo analysis. Renewable Energy, 36:3178–3186.
-
(2011)
Renewable Energy
, vol.36
, pp. 3178-3186
-
-
Amigun, B.1
Petrie, D.2
Görgens, J.3
-
3
-
-
34547503605
-
Compartment fire risk analysis by advanced Monte Carlo simulation
-
Au, S. K., Wang, Z. H., and Lo, S. M., 2007. Compartment fire risk analysis by advanced Monte Carlo simulation. Engineering Structures, 29:2381–2390.
-
(2007)
Engineering Structures
, vol.29
, pp. 2381-2390
-
-
Au, S.K.1
Wang, Z.H.2
Lo, S.M.3
-
4
-
-
71749091169
-
Maritime RISk Assessment (MARISA), a fuzzy approach to define an individual ship risk factor
-
Balmat, J. F., Lafont, F., Maifret, R., and Pessel, N., 2009. Maritime RISk Assessment (MARISA), a fuzzy approach to define an individual ship risk factor. Ocean Engineering, 36:1278–1286.
-
(2009)
Ocean Engineering
, vol.36
, pp. 1278-1286
-
-
Balmat, J.F.1
Lafont, F.2
Maifret, R.3
Pessel, N.4
-
5
-
-
79959889119
-
Risk management in projects: Peculiarities of Lithuanian construction companies
-
Banaitienė, N., Banaitis, A., and Norkus, A., 2011. Risk management in projects:Peculiarities of Lithuanian construction companies. International Journal of Strategic Property Management, 15:60–73.
-
(2011)
International Journal of Strategic Property Management
, vol.15
, pp. 60-73
-
-
Banaitienė, N.1
Banaitis, A.2
Norkus, A.3
-
6
-
-
0042393940
-
-
Paris, Franch: Direction Scientifique SEMA
-
Benayoun, R., Roy, B., and Sussman, N., 1966. “Manual de reference du programme electre, Note de Synthese et Formation, No. 25”. Paris, Franch:Direction Scientifique SEMA.
-
(1966)
Manual de reference du programme electre, Note de Synthese et Formation, No. 25
-
-
Benayoun, R.1
Roy, B.2
Sussman, N.3
-
7
-
-
34250856294
-
-
Köhl M., Carlsson B., Jorgensen G.J., Czanderna A.W., (eds), UK: Elsevier Ltd
-
Carlsson, B., 2004. Initial Risk Analysis of Potential Failure Modes. Performance and Durability Assessment, Chapter 4.2 Edited by:Köhl, M., Carlsson, B., Jorgensen, G. J., and Czanderna, A. W., 147–157. UK:Elsevier Ltd.
-
(2004)
Initial Risk Analysis of Potential Failure Modes. Performance and Durability Assessment
, pp. 147-157
-
-
Carlsson, B.1
-
8
-
-
56449101146
-
Assessing fire risk using Monte Carlo simulations of fire spread
-
Carmel, Y., Paz, Sh., Jahashan, F., and Shoshan, M., 2009. Assessing fire risk using Monte Carlo simulations of fire spread. Forest Ecology and Management, 257:370–377.
-
(2009)
Forest Ecology and Management
, vol.257
, pp. 370-377
-
-
Carmel, Y.1
Paz, S.2
Jahashan, F.3
Shoshan, M.4
-
9
-
-
71649099640
-
A comparative assessment of thin-film photovoltaic production processes using the ELECTRE III method
-
Cavallaro, F., 2010. A comparative assessment of thin-film photovoltaic production processes using the ELECTRE III method. Energy Policy, 38:463–474.
-
(2010)
Energy Policy
, vol.38
, pp. 463-474
-
-
Cavallaro, F.1
-
11
-
-
40649120097
-
Fuzzy risk analysis based on measures of similarity between interval-valued fuzzy numbers
-
Chen, Sh. J., and Chen, Sh. M., 2008. Fuzzy risk analysis based on measures of similarity between interval-valued fuzzy numbers. Computers & Mathematics with Applications, 55:1670–1685.
-
(2008)
Computers & Mathematics with Applications
, vol.55
, pp. 1670-1685
-
-
Chen, S.J.1
Chen, S.M.2
-
12
-
-
58349111688
-
Fuzzy risk analysis based on ranking generalized fuzzy numbers with different heights and different spreads
-
Chen, Sh. M., and Chen, J. H., 2009a. Fuzzy risk analysis based on ranking generalized fuzzy numbers with different heights and different spreads. Expert Systems with Applications, 36:6833–6842.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 6833-6842
-
-
Chen, S.M.1
Chen, J.H.2
-
13
-
-
58749104951
-
Fuzzy risk analysis based on similarity measures between interval-valued fuzzy numbers and interval-valued fuzzy number arithmetic operators
-
Chen, Sh. M., and Chen, J. H., 2009b. Fuzzy risk analysis based on similarity measures between interval-valued fuzzy numbers and interval-valued fuzzy number arithmetic operators. Expert Systems with Applications, 36:6309–6317.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 6309-6317
-
-
Chen, S.M.1
Chen, J.H.2
-
14
-
-
79952445219
-
Analyzing fuzzy risk based on similarity measures between interval-valued fuzzy numbers
-
Chen, Sh. M., and Sanguansat, K., 2011a. Analyzing fuzzy risk based on similarity measures between interval-valued fuzzy numbers. Expert Systems with Applications, 38:8612–8621.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 8612-8621
-
-
Chen, S.M.1
Sanguansat, K.2
-
15
-
-
78049530302
-
Analyzing fuzzy risk based on a new fuzzy ranking method between generalized fuzzy numbers
-
Chen, Sh. M., and Sanguansat, K., 2011b. Analyzing fuzzy risk based on a new fuzzy ranking method between generalized fuzzy numbers. Expert Systems with Applications, 38:2163–2171.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 2163-2171
-
-
Chen, S.M.1
Sanguansat, K.2
-
16
-
-
58349114847
-
Fuzzy risk analysis based on ranking fuzzy numbers using α-cuts, belief features and signal/noise ratios
-
Chen, Sh. M., and Wang, Ch. H., 2009. Fuzzy risk analysis based on ranking fuzzy numbers using α-cuts, belief features and signal/noise ratios. Expert Systems with Applications, 36:5576–5581.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 5576-5581
-
-
Chen, S.M.1
Wang, C.H.2
-
20
-
-
71549166004
-
Fuzzy inference system for the risk assessment of liquefied natural gas carriers during loading/offloading at terminals
-
Elsayed, T., 2009. Fuzzy inference system for the risk assessment of liquefied natural gas carriers during loading/offloading at terminals. Applied Ocean Research, 31:179–185.
-
(2009)
Applied Ocean Research
, vol.31
, pp. 179-185
-
-
Elsayed, T.1
-
21
-
-
1642488326
-
Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2
-
Eskesen, S. D., Tengborg, P., Kampmann, J., and Veicherts, T. H., 2004. Guidelines for tunnelling risk management:International Tunnelling Association, Working Group No. 2. Tunnelling and Underground Space Technology, 19:217–237.
-
(2004)
Tunnelling and Underground Space Technology
, vol.19
, pp. 217-237
-
-
Eskesen, S.D.1
Tengborg, P.2
Kampmann, J.3
Veicherts, T.H.4
-
22
-
-
79955432101
-
Design of fault trees as a practical method for risk analysis of CCS: Application to the different life stages of deep aquifer storage, combining long-term and short-term issues
-
Farret, R., Gombert, P., Lahaie, F., Cherkaoui, A., Lafortune, S., and Roux, P., 2011. Design of fault trees as a practical method for risk analysis of CCS:Application to the different life stages of deep aquifer storage, combining long-term and short-term issues. Energy Procedia, 4:4193–4198.
-
(2011)
Energy Procedia
, vol.4
, pp. 4193-4198
-
-
Farret, R.1
Gombert, P.2
Lahaie, F.3
Cherkaoui, A.4
Lafortune, S.5
Roux, P.6
-
23
-
-
67649425748
-
Analysis on fuzzy risk of landfall typhoon in Zhejiang province of China
-
Feng, L. H., and Luo, G. Y., 2009. Analysis on fuzzy risk of landfall typhoon in Zhejiang province of China. Mathematics and Computers in Simulation, 79:3258–3266.
-
(2009)
Mathematics and Computers in Simulation
, vol.79
, pp. 3258-3266
-
-
Feng, L.H.1
Luo, G.Y.2
-
24
-
-
67649840714
-
Methodology for computer aided fuzzy fault tree analysis
-
Ferdous, R., Khan, F., Veitch, B., and Amyotte, P. R., 2009. Methodology for computer aided fuzzy fault tree analysis. Process Safety and Environmental Protection, 87:217–226.
-
(2009)
Process Safety and Environmental Protection
, vol.87
, pp. 217-226
-
-
Ferdous, R.1
Khan, F.2
Veitch, B.3
Amyotte, P.R.4
-
25
-
-
83055186865
-
An integrated model for prioritizing strategies of the Iranian mining sector
-
Fouladgar, M. M., Yazdani-Chamzini, A., and Zavadskas, E. K., 2011. An integrated model for prioritizing strategies of the Iranian mining sector. Technological and Economic Development of Economy, 17:459–483.
-
(2011)
Technological and Economic Development of Economy
, vol.17
, pp. 459-483
-
-
Fouladgar, M.M.1
Yazdani-Chamzini, A.2
Zavadskas, E.K.3
-
26
-
-
84867362558
-
Risk evaluation of tunneling projects
-
Fouladgar, M. M., Yazdani-Chamzini, A., and Zavadskas, E. K., 2012. Risk evaluation of tunneling projects. Archives of Civil and Mechanical Engineering, 12:1–12.
-
(2012)
Archives of Civil and Mechanical Engineering
, vol.12
, pp. 1-12
-
-
Fouladgar, M.M.1
Yazdani-Chamzini, A.2
Zavadskas, E.K.3
-
27
-
-
33644781536
-
The accidental risk assessment methodology for industries (ARAMIS)/layer of protection analysis (LOPA) methodology: A step forward towards convergent practices in risk assessment?
-
Gowland, R., 2006. The accidental risk assessment methodology for industries (ARAMIS)/layer of protection analysis (LOPA) methodology:A step forward towards convergent practices in risk assessment?. Journal of Hazardous Materials, 130:307–310.
-
(2006)
Journal of Hazardous Materials
, vol.130
, pp. 307-310
-
-
Gowland, R.1
-
28
-
-
79953673850
-
An improved fuzzy risk analysis based on a new similarity measures of generalized fuzzy numbers
-
Hejazi, S. R., Doostparast, A., and Hosseini, S. M., 2011. An improved fuzzy risk analysis based on a new similarity measures of generalized fuzzy numbers. Expert Systems with Applications, 38:9179–9185.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 9179-9185
-
-
Hejazi, S.R.1
Doostparast, A.2
Hosseini, S.M.3
-
29
-
-
77949745320
-
Mastering risks during mechanized excavation in urban centers with highly complex ground conditions
-
Herrenknecht, E. H. M., and Bäppler, K., 2006. Mastering risks during mechanized excavation in urban centers with highly complex ground conditions. Tunnelling and Underground Space Technology, 21:260
-
(2006)
Tunnelling and Underground Space Technology
, vol.21
, pp. 260
-
-
Herrenknecht, E.H.M.1
Bäppler, K.2
-
30
-
-
61449227351
-
Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM
-
Hong, E. S., Lee, I. M., Shin, H. S., Nam, S. W., and Kong, J. S., 2009. Quantitative risk evaluation based on event tree analysis technique:Application to the design of shield TBM. Tunnelling and Underground Space Technology, 24:269–277.
-
(2009)
Tunnelling and Underground Space Technology
, vol.24
, pp. 269-277
-
-
Hong, E.S.1
Lee, I.M.2
Shin, H.S.3
Nam, S.W.4
Kong, J.S.5
-
31
-
-
58349118905
-
Risk evaluation of green components to hazardous substance using FMEA and FAHP
-
Hu, A. H., Hsu, Ch. W., Kuo, T. Ch., and Wu, W. Ch., 2009. Risk evaluation of green components to hazardous substance using FMEA and FAHP. Expert Systems with Applications, 36:7142–7147.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 7142-7147
-
-
Hu, A.H.1
Hsu, C.W.2
Kuo, T.C.3
Wu, W.C.4
-
32
-
-
69249240130
-
A fuzzy decision-making approach for portfolio management with direct real estate investment
-
Hui, E. C. M., Lau, O. M. F., and Lo, K. K., 2009. A fuzzy decision-making approach for portfolio management with direct real estate investment. International Journal of Strategic Property Management, 13:191–204.
-
(2009)
International Journal of Strategic Property Management
, vol.13
, pp. 191-204
-
-
Hui, E.C.M.1
Lau, O.M.F.2
Lo, K.K.3
-
33
-
-
78049531038
-
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
-
Idrus, A., Nuruddin, M. F., and Rohman, M. A., 2011. Development of project cost contingency estimation model using risk analysis and fuzzy expert system. Expert Systems with Applications, 38:1501–1508.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 1501-1508
-
-
Idrus, A.1
Nuruddin, M.F.2
Rohman, M.A.3
-
35
-
-
84860611922
-
Using an integrated model for shaft sinking method selection
-
Lashgari, A., Fouladgar, M. M., Yazdani-Chamzini, A., and Skibniewski, M. J., 2011. Using an integrated model for shaft sinking method selection. Journal of Civil Engineering and Management, 17:569–580.
-
(2011)
Journal of Civil Engineering and Management
, vol.17
, pp. 569-580
-
-
Lashgari, A.1
Fouladgar, M.M.2
Yazdani-Chamzini, A.3
Skibniewski, M.J.4
-
36
-
-
0030165001
-
Group decision making using fuzzy sets theory for evaluating the rate of aggregative risk in software development
-
Lee, H. M., 1996. Group decision making using fuzzy sets theory for evaluating the rate of aggregative risk in software development. Fuzzy Sets and Systems, 80:261–271.
-
(1996)
Fuzzy Sets and Systems
, vol.80
, pp. 261-271
-
-
Lee, H.M.1
-
37
-
-
38649136310
-
Fuzzy risk analysis based on fuzzy numbers with different shapes and different deviations
-
Lee, L. W., and Chen, Sh. M., 2008. Fuzzy risk analysis based on fuzzy numbers with different shapes and different deviations. Expert Systems with Applications, 34:2763–2771.
-
(2008)
Expert Systems with Applications
, vol.34
, pp. 2763-2771
-
-
Lee, L.W.1
Chen, S.M.2
-
38
-
-
70349174310
-
Risk analysis by FMEA as an element of analytical validation
-
Leeuwen, J. F., Nauta, M. J., Kaste, D., Odekerken-Rombouts, Y. M. C. F., Oldenhof, M. T., Vredenbregt, M. J., and Barends, D. M., 2009. Risk analysis by FMEA as an element of analytical validation. Journal of Pharmaceutical and Biomedical Analysis, 50:1085–1087.
-
(2009)
Journal of Pharmaceutical and Biomedical Analysis
, vol.50
, pp. 1085-1087
-
-
Leeuwen, J.F.1
Nauta, M.J.2
Kaste, D.3
Odekerken-Rombouts, Y.M.C.F.4
Oldenhof, M.T.5
Vredenbregt, M.J.6
Barends, D.M.7
-
39
-
-
0023499407
-
Application of event tree risk analysis to fisheries management
-
Linder, E., Patil, G. P., and Vaughan, D. S., 1987. Application of event tree risk analysis to fisheries management. Ecological Modelling, 36:15–28.
-
(1987)
Ecological Modelling
, vol.36
, pp. 15-28
-
-
Linder, E.1
Patil, G.P.2
Vaughan, D.S.3
-
40
-
-
62749096767
-
Fault tree analysis for integrated and probabilistic risk analysis of drinking water systems
-
Lindhe, A., Rosén, L., Norberg, T., and Bergstedt, O., 2009. Fault tree analysis for integrated and probabilistic risk analysis of drinking water systems. Water Research, 43:1641–1653.
-
(2009)
Water Research
, vol.43
, pp. 1641-1653
-
-
Lindhe, A.1
Rosén, L.2
Norberg, T.3
Bergstedt, O.4
-
43
-
-
33845486359
-
Analyse de la signifiance de diverses procédures d'agrégation multicritère
-
Martel, J. M., and Roy, B., 2006. Analyse de la signifiance de diverses procédures d'agrégation multicritère. INFOR, 44:119–215.
-
(2006)
INFOR
, vol.44
, pp. 119-215
-
-
Martel, J.M.1
Roy, B.2
-
44
-
-
33748038338
-
Arenal-type pyroclastic flows: A probabilistic event tree risk analysis
-
Meloy, A. F., 2006. Arenal-type pyroclastic flows:A probabilistic event tree risk analysis. Journal of Volcanology and Geothermal Research, 157:121–134.
-
(2006)
Journal of Volcanology and Geothermal Research
, vol.157
, pp. 121-134
-
-
Meloy, A.F.1
-
45
-
-
79151484001
-
An application of fuzzy fault tree analysis for spread mooring systems
-
Mentes, A., and Helvacioglu, I. H., 2011. An application of fuzzy fault tree analysis for spread mooring systems. Ocean Engineering, 38:285–294.
-
(2011)
Ocean Engineering
, vol.38
, pp. 285-294
-
-
Mentes, A.1
Helvacioglu, I.H.2
-
46
-
-
1342309731
-
Use of multi-criteria decision-aids for risk zoning and management of large area subjected to mining-induced hazards
-
Merad, M.M., Verdel, T., Roy, B., and Kouniali, S., 2004. Use of multi-criteria decision-aids for risk zoning and management of large area subjected to mining-induced hazards. Tunneling and Underground Space Technology, 19:125–138.
-
(2004)
Tunneling and Underground Space Technology
, vol.19
, pp. 125-138
-
-
Merad, M.M.1
Verdel, T.2
Roy, B.3
Kouniali, S.4
-
47
-
-
77958561759
-
Modeling of bilevel games and incentives for sustainable critical infrastructure system
-
Miao, X., Yu, B., Xi, B., and Tang, Y. -H., 2010. Modeling of bilevel games and incentives for sustainable critical infrastructure system. Technological and Economic Development of Economy, 16:365–379.
-
(2010)
Technological and Economic Development of Economy
, vol.16
, pp. 365-379
-
-
Miao, X.1
Yu, B.2
Xi, B.3
Tang, Y.H.4
-
48
-
-
44949289937
-
Use of fuzzy set theory for level-I studies in probabilistic risk assessment
-
Misra, K. B., and Weber, G. G., 1990. Use of fuzzy set theory for level-I studies in probabilistic risk assessment. Fuzzy Sets and Systems, 37:139–160.
-
(1990)
Fuzzy Sets and Systems
, vol.37
, pp. 139-160
-
-
Misra, K.B.1
Weber, G.G.2
-
49
-
-
57149093801
-
Developing an event tree for probabilistic hazard and risk assessment at Vesuvius
-
Neri, A., Aspinall, W. P., Cioni, R., Bertagnini, A., Baxter, P. J., Zuccaro, G., and … Woo, G., 2008. Developing an event tree for probabilistic hazard and risk assessment at Vesuvius. Journal of Volcanology and Geothermal Research, 178:397–415.
-
(2008)
Journal of Volcanology and Geothermal Research
, vol.178
, pp. 397-415
-
-
Neri, A.1
Aspinall, W.P.2
Cioni, R.3
Bertagnini, A.4
Baxter, P.J.5
Zuccaro, G.6
Woo, G.7
-
51
-
-
38649095673
-
Application of the multicriteria analysis method Electre III for the optimisation of decentralised energy systems
-
Papadopoulos, A., and Karagiannidis, A., 2008. Application of the multicriteria analysis method Electre III for the optimisation of decentralised energy systems. Omega, 36:766–776.
-
(2008)
Omega
, vol.36
, pp. 766-776
-
-
Papadopoulos, A.1
Karagiannidis, A.2
-
52
-
-
51649112021
-
Management and control of cost and risk for tunneling and infrastructure projects
-
Singapore: ITA
-
Reilly, J., and Brown, J., 2004. “Management and control of cost and risk for tunneling and infrastructure projects”. In Proceedings of the World Tunneling Conference, International Tunneling Association, May 2004, Singapore 1–8. Singapore:ITA.
-
(2004)
Proceedings of the World Tunneling Conference, International Tunneling Association
, pp. 1-8
-
-
Reilly, J.1
Brown, J.2
-
53
-
-
34250689510
-
Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties
-
Rezaie, K., Amalnik, M. S., Gereie, A., Ostadi, B., and Shakhseniaee, M., 2007. Using extended Monte Carlo simulation method for the improvement of risk management:Consideration of relationships between uncertainties. Applied Mathematics and Computation, 190:1492–1501.
-
(2007)
Applied Mathematics and Computation
, vol.190
, pp. 1492-1501
-
-
Rezaie, K.1
Amalnik, M.S.2
Gereie, A.3
Ostadi, B.4
Shakhseniaee, M.5
-
54
-
-
84855243444
-
Probabilistic risk analysis and fault trees: Initial discussion of application to identification of risk at a wellhead
-
Rodak, C., and Silliman, S., 2012. Probabilistic risk analysis and fault trees:Initial discussion of application to identification of risk at a wellhead. Advances in Water Resources, 36:133–145.
-
(2012)
Advances in Water Resources
, vol.36
, pp. 133-145
-
-
Rodak, C.1
Silliman, S.2
-
55
-
-
0001888627
-
Classement et choix en présence de points de vue multiples (la méthod ELECTRE)
-
Roy, B., 1968. Classement et choix en présence de points de vue multiples (la méthod ELECTRE). R.I.R.O, 8:57–75.
-
(1968)
R.I.R.O
, vol.8
, pp. 57-75
-
-
Roy, B.1
-
56
-
-
0003151709
-
ELECTRE III: Algorithme de classement basé sur une représentation floue des préférences en présence des critères multiples
-
Roy, B., 1978. ELECTRE III:Algorithme de classement basé sur une représentation floue des préférences en présence des critères multiples. Cahiers du CERO, 20:3–24.
-
(1978)
Cahiers du CERO
, vol.20
, pp. 3-24
-
-
Roy, B.1
-
58
-
-
0020369715
-
Ranking of suburban line extension projects on the Paris metro system by a multicriteria method
-
Roy, B., and Hugonnard, J. C., 1982. Ranking of suburban line extension projects on the Paris metro system by a multicriteria method. Transportation Research Part A:General, 16:301–312.
-
(1982)
Transportation Research Part A: General
, vol.16
, pp. 301-312
-
-
Roy, B.1
Hugonnard, J.C.2
-
60
-
-
0345910482
-
An overview on ‘The European school of MCDA: Emergence, basic features and current works
-
Roy, B., and Vanderpooten, D., 1997. An overview on ‘The European school of MCDA:Emergence, basic features and current works’. European Journal of Operational Research, 99:26–27.
-
(1997)
European Journal of Operational Research
, vol.99
, pp. 26-27
-
-
Roy, B.1
Vanderpooten, D.2
-
62
-
-
77956130092
-
Intermodal transportation within the green supply chain: An approach based on the ELECTRE method
-
France: IEEE
-
Sawadogo, M., and Anciaux, D., 2009. “Intermodal transportation within the green supply chain:An approach based on the ELECTRE method”. In Proceedings of the IEEE. International Conference on Computers & Industrial Engineering (CIE 2009), 6–9 July 2009, University of Technology of Troyes, France 839–844. France:IEEE.
-
(2009)
Proceedings of the IEEE. International Conference on Computers & Industrial Engineering (CIE 2009)
, pp. 839-844
-
-
Sawadogo, M.1
Anciaux, D.2
-
63
-
-
0035042953
-
The use of Monte Carlo simulation techniques for risk assessment: Study of a municipal waste incinerator
-
Schuhmacher, M., Meneses, M., Xifró, A., and Domingo, J. L., 2001. The use of Monte Carlo simulation techniques for risk assessment:Study of a municipal waste incinerator. Chemosphere, 43:787–799.
-
(2001)
Chemosphere
, vol.43
, pp. 787-799
-
-
Schuhmacher, M.1
Meneses, M.2
Xifró, A.3
Domingo, J.L.4
-
64
-
-
39749196795
-
Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions
-
Shahriar, K., Sharifzadeh, M., and Hamidi, J. K., 2008. Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions. Tunnelling and Underground Space Technology, 23(3):318–325.
-
(2008)
Tunnelling and Underground Space Technology
, vol.23
, Issue.3
, pp. 318-325
-
-
Shahriar, K.1
Sharifzadeh, M.2
Hamidi, J.K.3
-
65
-
-
77952639016
-
Strengths and weaknesses of Monte Carlo simulation models and Bayesian belief networks in microbial risk assessment
-
Smid, J. H., Verloo, D., Barker, G. C., and Havelaar, A. H., 2010. Strengths and weaknesses of Monte Carlo simulation models and Bayesian belief networks in microbial risk assessment. International Journal of Food Microbiology, 139:S57–S63.
-
(2010)
International Journal of Food Microbiology
, vol.139
, pp. S57-S63
-
-
Smid, J.H.1
Verloo, D.2
Barker, G.C.3
Havelaar, A.H.4
-
66
-
-
56949098913
-
Systemic accident risk assessment in air traffic by Monte Carlo simulation
-
Stroeve, S. H., Blom, H. A. P., and Bakker, G. J., 2009. Systemic accident risk assessment in air traffic by Monte Carlo simulation. Safety Science, 47:238–249.
-
(2009)
Safety Science
, vol.47
, pp. 238-249
-
-
Stroeve, S.H.1
Blom, H.A.P.2
Bakker, G.J.3
-
67
-
-
70349092704
-
Multi-criteria optimization system for decision making in construction design and management
-
Turskis, Z., Zavadskas, E. K., and Peldschus, F., 2009. Multi-criteria optimization system for decision making in construction design and management. Inžinerinė Ekonomika–Engineering Economics, 1:7–17.
-
(2009)
Inžinerinė Ekonomika–Engineering Economics
, vol.1
, pp. 7-17
-
-
Turskis, Z.1
Zavadskas, E.K.2
Peldschus, F.3
-
68
-
-
70949106739
-
Multicriteria verbal analysis for the decision of construction problems
-
Ustinovichius, L., Barvidas, A., Vishnevskaja, A., and Ashikhminc, I. V., 2009. Multicriteria verbal analysis for the decision of construction problems. Technological and Economic Development of Economy, 15:326–340.
-
(2009)
Technological and Economic Development of Economy
, vol.15
, pp. 326-340
-
-
Ustinovichius, L.1
Barvidas, A.2
Vishnevskaja, A.3
Ashikhminc, I.V.4
-
69
-
-
79951769268
-
Extension of the ELECTRE method based on interval-valued fuzzy sets
-
Vahdani, B., and Hadipour, H., 2011. Extension of the ELECTRE method based on interval-valued fuzzy sets. Soft Computing, 15(3):569–579.
-
(2011)
Soft Computing
, vol.15
, Issue.3
, pp. 569-579
-
-
Vahdani, B.1
Hadipour, H.2
-
70
-
-
79952151258
-
Protecting built property against fire disasters: Multi attribute decision making with respect to fire risk
-
Vaidogas, E. R., and Sakenaite, J., 2010. Protecting built property against fire disasters:Multi attribute decision making with respect to fire risk. International Journal of Strategic Property Management, 14:391–407.
-
(2010)
International Journal of Strategic Property Management
, vol.14
, pp. 391-407
-
-
Vaidogas, E.R.1
Sakenaite, J.2
-
71
-
-
70350568142
-
Ideas and developments in importance measures and fault-tree techniques for reliability and risk analysis
-
Vaurio, J. K., 2010. Ideas and developments in importance measures and fault-tree techniques for reliability and risk analysis. Reliability Engineering & System Safety, 95:99–107.
-
(2010)
Reliability Engineering & System Safety
, vol.95
, pp. 99-107
-
-
Vaurio, J.K.1
-
72
-
-
79955652908
-
Generic event trees and probabilities for the release of different types of hazardous materials
-
Vílchez, J. A., Espejo, V., and Casal, J., 2011. Generic event trees and probabilities for the release of different types of hazardous materials. Journal of Loss Prevention in the Process Industries, 24:281–287.
-
(2011)
Journal of Loss Prevention in the Process Industries
, vol.24
, pp. 281-287
-
-
Vílchez, J.A.1
Espejo, V.2
Casal, J.3
-
73
-
-
56349166784
-
Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean
-
Wang, Y. M., Chin, K. S., Poon, G. K. K., and Yang, J. B., 2009. Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean. Expert Systems with Applications, 36:1195–1207.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 1195-1207
-
-
Wang, Y.M.1
Chin, K.S.2
Poon, G.K.K.3
Yang, J.B.4
-
74
-
-
53849129234
-
A new approach for fuzzy risk analysis based on similarity measures of generalized fuzzy numbers
-
Wei, Sh. H., and Chen, Sh. M., 2009a. A new approach for fuzzy risk analysis based on similarity measures of generalized fuzzy numbers. Expert Systems with Applications, 36:589–598.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 589-598
-
-
Wei, S.H.1
Chen, S.M.2
-
75
-
-
56349098810
-
Fuzzy risk analysis based on interval-valued fuzzy numbers
-
Wei, Sh. H., and Chen, Sh. M., 2009b. Fuzzy risk analysis based on interval-valued fuzzy numbers. Expert Systems with Applications, 36:2285–2299.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 2285-2299
-
-
Wei, S.H.1
Chen, S.M.2
-
76
-
-
45849087315
-
Correlated sampling techniques used in Monte Carlo simulation for risk assessment
-
Wu, Y. F., 2008. Correlated sampling techniques used in Monte Carlo simulation for risk assessment. International Journal of Pressure Vessels and Piping, 85:662–669.
-
(2008)
International Journal of Pressure Vessels and Piping
, vol.85
, pp. 662-669
-
-
Wu, Y.F.1
-
77
-
-
79954601977
-
Multiple failure modes analysis and weighted risk priority number evaluation in FMEA
-
Xiao, N., Huang, H. Z., Li, Y., He, L., and Jin, T., 2011. Multiple failure modes analysis and weighted risk priority number evaluation in FMEA. Engineering Failure Analysis, 18:1162–1170.
-
(2011)
Engineering Failure Analysis
, vol.18
, pp. 1162-1170
-
-
Xiao, N.1
Huang, H.Z.2
Li, Y.3
He, L.4
Jin, T.5
-
78
-
-
70449526532
-
A method for fuzzy risk analysis based on the new similarity of trapezoidal fuzzy numbers
-
Xu, Zh., Shang, Sh., Qian, W., and Shu, W., 2010. A method for fuzzy risk analysis based on the new similarity of trapezoidal fuzzy numbers. Expert Systems with Applications, 37:1920–1927.
-
(2010)
Expert Systems with Applications
, vol.37
, pp. 1920-1927
-
-
Xu, Z.1
Shang, S.2
Qian, W.3
Shu, W.4
-
80
-
-
84860634344
-
Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods
-
Yazdani-Chamzini, A., and Yakhchali, S. H., 2012. Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods. Tunnelling and Underground Space Technology, 30:194–204.
-
(2012)
Tunnelling and Underground Space Technology
, vol.30
, pp. 194-204
-
-
Yazdani-Chamzini, A.1
Yakhchali, S.H.2
-
81
-
-
0141648467
-
A web-based tunneling-induced building/utility damage assessment system: TURISK
-
Yoo, Ch., and Kim, J. H., 2003. A web-based tunneling-induced building/utility damage assessment system:TURISK. Tunnelling and Underground Space Technology, 18:497–511.
-
(2003)
Tunnelling and Underground Space Technology
, vol.18
, pp. 497-511
-
-
Yoo, C.1
Kim, J.H.2
-
82
-
-
30044451095
-
IT-based tunnelling risk management system (IT-TURISK)–Development and implementation
-
Yoo, C., Jeon, Y.W., and Choi, B.S., 2006. IT-based tunnelling risk management system (IT-TURISK)–Development and implementation. Tunnelling and Underground Space Technology, 21(2):190–202.
-
(2006)
Tunnelling and Underground Space Technology
, vol.21
, Issue.2
, pp. 190-202
-
-
Yoo, C.1
Jeon, Y.W.2
Choi, B.S.3
-
86
-
-
77950264952
-
Risk assessment of construction projects
-
Zavadskas, E. K., Turskis, Z., and Tamosaitiene, J., 2010. Risk assessment of construction projects. Journal of Civil Engineering and Management, 16:33–46.
-
(2010)
Journal of Civil Engineering and Management
, vol.16
, pp. 33-46
-
-
Zavadskas, E.K.1
Turskis, Z.2
Tamosaitiene, J.3
-
87
-
-
77950245689
-
Contractor selection for construction works by applying SAW-G and TOPSIS grey techniques
-
Zavadskas, E. K., Vilutiene, T., Turskis, Z., and Tamosaitiene, J., 2010. Contractor selection for construction works by applying SAW-G and TOPSIS grey techniques. Journal of Business Economics and Management, 11:34–55.
-
(2010)
Journal of Business Economics and Management
, vol.11
, pp. 34-55
-
-
Zavadskas, E.K.1
Vilutiene, T.2
Turskis, Z.3
Tamosaitiene, J.4
-
88
-
-
77956616005
-
Risk prioritization in failure mode and effects analysis under uncertainty
-
Zhang, Z., and Chu, X., 2011. Risk prioritization in failure mode and effects analysis under uncertainty. Expert Systems with Applications, 38:206–214.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 206-214
-
-
Zhang, Z.1
Chu, X.2
|