메뉴 건너뛰기




Volumn 19, Issue 3, 2004, Pages 217-237

Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2

Author keywords

[No Author keywords available]

Indexed keywords

PROJECT MANAGEMENT; RISK MANAGEMENT; SOCIETIES AND INSTITUTIONS;

EID: 1642488326     PISSN: 08867798     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.tust.2004.01.001     Document Type: Article
Times cited : (351)

References (21)
  • 1
    • 0000075674 scopus 로고
    • Probability concepts in engineering planning and design
    • New York: Wiley
    • Ang A.H.-S. Tang W.H. Probability concepts in engineering planning and design Decision, Risk and Reliability vol. II 1984 Wiley New York
    • (1984) Decision, Risk and Reliability , vol.2
    • Ang, A.H.-S.1    Tang, W.H.2
  • 2
    • 0004218080 scopus 로고
    • The Engineering Council, London, ISBN 0-9516611-7-5
    • The Engineering Council, 1993. Guidelines on Risk Issues. London, ISBN 0-9516611-7-5
    • (1993) Guidelines on Risk Issues
  • 9
    • 1642444887 scopus 로고    scopus 로고
    • The safety concept for construction of the 4th tube of the Elbe Tunnel in Hamburg
    • Conference September 8-10, 1998, St. Petersburg
    • Bielecki, R., 1998. The safety concept for construction of the 4th tube of the Elbe Tunnel in Hamburg. In: Russian Tunnelling Society: Underground City; Geotechnology and Architecture. Conference September 8-10, 1998, St. Petersburg, pp. 82-89
    • (1998) Russian Tunnelling Society: Underground City; Geotechnology and Architecture , pp. 82-89
    • Bielecki, R.1
  • 11
  • 16
    • 0034073266 scopus 로고    scopus 로고
    • The management process for complex underground and tunnelling projects
    • Reilly J.J. The management process for complex underground and tunnelling projects Tunnelling and Underground Space Technology 15 1 2000 31-44
    • (2000) Tunnelling and Underground Space Technology , vol.15 , Issue.1 , pp. 31-44
    • Reilly, J.J.1
  • 19
    • 0002901564 scopus 로고    scopus 로고
    • Quality systems and risk analysis - New philosophies in underground construction industry
    • Franzén, T., Bergdahl, S.-G., Nordmark, A., (Eds.), Stockholm, June 1998. Rotterdam, Balkema
    • Stille, H., Sturk, R., Olsson, L., 1998. Quality systems and risk analysis - New philosophies in underground construction industry. In: Franzén, T., Bergdahl, S.-G., Nordmark, A., (Eds.), Proc. Underground Construction in Modern Infrastructure, Stockholm, June 1998. Rotterdam, Balkema
    • (1998) Proc. Underground Construction in Modern Infrastructure
    • Stille, H.1    Sturk, R.2    Olsson, L.3
  • 20
    • 0002906614 scopus 로고    scopus 로고
    • System analysis of the Hvalfjördur tunnel
    • Franzén, T., Bergdahl, S.-G., Nordmark, A., (Eds.), Stockholm, June 1998. Rotterdam, Balkema
    • Tengborg, P., Olsson, L., Johansson, J., Brantmark, J., 1998. System analysis of the Hvalfjördur tunnel. In: Franzén, T., Bergdahl, S.-G., Nordmark, A., (Eds.), Proc. Underground Construction in Modern Infrastructure, Stockholm, June 1998. Rotterdam, Balkema
    • (1998) Proc. Underground Construction in Modern Infrastructure
    • Tengborg, P.1    Olsson, L.2    Johansson, J.3    Brantmark, J.4
  • 21
    • 0036072345 scopus 로고    scopus 로고
    • Multiobjective optimization under uncertainty in tunnelling: Application to the design of tunnel support/reinforcement with case histories
    • Tonon F. Bernardini A. Mammino A. Multiobjective optimization under uncertainty in tunnelling: application to the design of tunnel support/reinforcement with case histories Tunnelling and Underground Space Technology 17 1 2002 33-54
    • (2002) Tunnelling and Underground Space Technology , vol.17 , Issue.1 , pp. 33-54
    • Tonon, F.1    Bernardini, A.2    Mammino, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.