-
1
-
-
84880265985
-
Effect of solution representations on tabu search in scheduling applications
-
C.-F. Chen, M.-C. Wu, and K.-H. Lin Effect of solution representations on tabu search in scheduling applications Computers & Operations Research 40 12 2013 2817 2825
-
(2013)
Computers & Operations Research
, vol.40
, Issue.12
, pp. 2817-2825
-
-
Chen, C.-F.1
Wu, M.-C.2
Lin, K.-H.3
-
2
-
-
84861012619
-
Flexible flow shop scheduling with stochastic processing times: A decomposition-based approach
-
S.H. Choi, and K. Wang Flexible flow shop scheduling with stochastic processing times: A decomposition-based approach Computers & Industrial Engineering 63 2 2012 362 373
-
(2012)
Computers & Industrial Engineering
, vol.63
, Issue.2
, pp. 362-373
-
-
Choi, S.H.1
Wang, K.2
-
5
-
-
84911949384
-
Hybrid genetic optimization for solving the batch-scheduling problem in a pharmaceutical industry
-
A. Costa Hybrid genetic optimization for solving the batch-scheduling problem in a pharmaceutical industry Computers & Industrial Engineering 79 2015 130 147
-
(2015)
Computers & Industrial Engineering
, vol.79
, pp. 130-147
-
-
Costa, A.1
-
6
-
-
84876154984
-
A dual encoding-based meta-heuristic algorithm for solving a constrained hybrid flow shop scheduling problem
-
A. Costa, F.A. Cappadonna, and S. Fichera A dual encoding-based meta-heuristic algorithm for solving a constrained hybrid flow shop scheduling problem Computers & Industrial Engineering 64 4 2013 937 958
-
(2013)
Computers & Industrial Engineering
, vol.64
, Issue.4
, pp. 937-958
-
-
Costa, A.1
Cappadonna, F.A.2
Fichera, S.3
-
7
-
-
84930205094
-
Self-adaptive perturbation and multi-neighborhood search for iterated local search on the permutation flow shop problem
-
X. Dong, M. Nowak, P. Chen, and Y. Lin Self-adaptive perturbation and multi-neighborhood search for iterated local search on the permutation flow shop problem Computers & Industrial Engineering 87 2015 176 185
-
(2015)
Computers & Industrial Engineering
, vol.87
, pp. 176-185
-
-
Dong, X.1
Nowak, M.2
Chen, P.3
Lin, Y.4
-
8
-
-
33748279816
-
The permutation flow shop problem with blocking: A tabu search approach
-
J. Grabowski, and J. Pempera The permutation flow shop problem with blocking: A tabu search approach International Journal of Management Science 35 3 2007 302 311
-
(2007)
International Journal of Management Science
, vol.35
, Issue.3
, pp. 302-311
-
-
Grabowski, J.1
Pempera, J.2
-
10
-
-
84865005887
-
Material and capacity requirements planning with dynamic lead times
-
H. Jodlbauer, and S. Reitner Material and capacity requirements planning with dynamic lead times International Journal of Production Research 50 16 2012 4477 4492
-
(2012)
International Journal of Production Research
, vol.50
, Issue.16
, pp. 4477-4492
-
-
Jodlbauer, H.1
Reitner, S.2
-
11
-
-
52049090864
-
A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
-
J. Jungwattanakit, M. Reodecha, P. Chaovalitwongse, and F. Werner A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria Computers & Operations Research 36 2 2009 358 378
-
(2009)
Computers & Operations Research
, vol.36
, Issue.2
, pp. 358-378
-
-
Jungwattanakit, J.1
Reodecha, M.2
Chaovalitwongse, P.3
Werner, F.4
-
12
-
-
73849108250
-
An application of effective genetic algorithms for solving hybrid flow shop scheduling problems
-
C. Kahraman, O. Engin, I. Kaya, and M.K. Yilmaz An application of effective genetic algorithms for solving hybrid flow shop scheduling problems International Journal of Computational Intelligence Systems 1 2 2008 134 147
-
(2008)
International Journal of Computational Intelligence Systems
, vol.1
, Issue.2
, pp. 134-147
-
-
Kahraman, C.1
Engin, O.2
Kaya, I.3
Yilmaz, M.K.4
-
13
-
-
77951174707
-
Integrating production planning and control: Towards a simple model for capacitated ERP
-
J.J. Kanet, and M. Stößlein Integrating production planning and control: Towards a simple model for capacitated ERP Production Planning & Control 21 3 2010 286 300
-
(2010)
Production Planning & Control
, vol.21
, Issue.3
, pp. 286-300
-
-
Kanet, J.J.1
Stößlein, M.2
-
14
-
-
55649089427
-
Integrated model for production planning and scheduling in a supply chain using benchmarked genetic algorithm
-
H. Kim, H.-I.I. Jeong, and J. Park Integrated model for production planning and scheduling in a supply chain using benchmarked genetic algorithm International Journal of Advanced Manufacturing Technology 39 11 2008 1207 1226
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.39
, Issue.11
, pp. 1207-1226
-
-
Kim, H.1
Jeong, H.-I.I.2
Park, J.3
-
15
-
-
84888164715
-
An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop
-
D. Laha, and S.U. Sapkal An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop Computers & Industrial Engineering 67 2014 36 43
-
(2014)
Computers & Industrial Engineering
, vol.67
, pp. 36-43
-
-
Laha, D.1
Sapkal, S.U.2
-
16
-
-
84888287482
-
Improved bounds for hybrid flow shop scheduling with multiprocessor tasks
-
A. Lahimer, P. Lopez, and M. Haouari Improved bounds for hybrid flow shop scheduling with multiprocessor tasks Computers & Industrial Engineering 66 4 2013 1106 1114
-
(2013)
Computers & Industrial Engineering
, vol.66
, Issue.4
, pp. 1106-1114
-
-
Lahimer, A.1
Lopez, P.2
Haouari, M.3
-
17
-
-
84877898257
-
A comparative study of proprietary ERP and open source ERP modules on the value chain
-
S.-H. Lee, S. Trimi, D. Choi, and J.S. Rha A comparative study of proprietary ERP and open source ERP modules on the value chain International Journal of Information & Decision Sciences 3 1 2011 26 38
-
(2011)
International Journal of Information & Decision Sciences
, vol.3
, Issue.1
, pp. 26-38
-
-
Lee, S.-H.1
Trimi, S.2
Choi, D.3
Rha, J.S.4
-
18
-
-
84938851926
-
An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan
-
C.-J. Liao, C.-H. Lee, and H.-C. Lee An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan Computers & Industrial Engineering 88 2015 317 325
-
(2015)
Computers & Industrial Engineering
, vol.88
, pp. 317-325
-
-
Liao, C.-J.1
Lee, C.-H.2
Lee, H.-C.3
-
19
-
-
84904552797
-
Minimizing total earliness and tardiness on a permutation flow shop using VNS and MIP
-
R. M'Hallah Minimizing total earliness and tardiness on a permutation flow shop using VNS and MIP Computers & Industrial Engineering 75 2014 142 156
-
(2014)
Computers & Industrial Engineering
, vol.75
, pp. 142-156
-
-
M'Hallah, R.1
-
20
-
-
33747680295
-
Adaptive genetic algorithm for advanced planning in manufacturing supply chain
-
C. Moon, Y. Seo, Y. Yun, and M. Gen Adaptive genetic algorithm for advanced planning in manufacturing supply chain Journal of Intelligent Manufacturing 17 4 2006 509 522
-
(2006)
Journal of Intelligent Manufacturing
, vol.17
, Issue.4
, pp. 509-522
-
-
Moon, C.1
Seo, Y.2
Yun, Y.3
Gen, M.4
-
21
-
-
44649108891
-
A constructive genetic algorithm for permutation flowshop scheduling
-
M.S. Nagano, R. Ruiz, and L.A.N. Lorena A constructive genetic algorithm for permutation flowshop scheduling Computers & Industrial Engineering 55 1 2008 195 207
-
(2008)
Computers & Industrial Engineering
, vol.55
, Issue.1
, pp. 195-207
-
-
Nagano, M.S.1
Ruiz, R.2
Lorena, L.A.N.3
-
22
-
-
84912568162
-
Scheduling jobs with ready times and precedence constraints on parallel batch machines using metaheuristics
-
A. Bilyk, L. Mönch, and C. Almeder Scheduling jobs with ready times and precedence constraints on parallel batch machines using metaheuristics Computers & Industrial Engineering 78 2014 175 185
-
(2014)
Computers & Industrial Engineering
, vol.78
, pp. 175-185
-
-
Bilyk, A.1
Mönch, L.2
Almeder, C.3
-
23
-
-
34247328705
-
Capacitated lot sizing with alternative routings and overtime decisions
-
A.M. Örnek, and O. Cengiz Capacitated lot sizing with alternative routings and overtime decisions International Journal of Production Research 44 24 2006 5363 5389
-
(2006)
International Journal of Production Research
, vol.44
, Issue.24
, pp. 5363-5389
-
-
Örnek, A.M.1
Cengiz, O.2
-
24
-
-
72049116023
-
Capacitated lot sizing with linked lots for general product structures in job shops
-
C. Öztürk, and A.M. Örnek Capacitated lot sizing with linked lots for general product structures in job shops Computers & Industrial Engineering 58 1 2010 151 164
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.1
, pp. 151-164
-
-
Öztürk, C.1
Örnek, A.M.2
-
25
-
-
84868194760
-
A MIP based heuristic for capacitated MRP systems
-
C. Öztürk, and A.M. Örnek A MIP based heuristic for capacitated MRP systems Computers & Industrial Engineering 63 4 2012 926 942
-
(2012)
Computers & Industrial Engineering
, vol.63
, Issue.4
, pp. 926-942
-
-
Öztürk, C.1
Örnek, A.M.2
-
26
-
-
84902507743
-
A heuristic algorithm for joint optimisation of MRP and scheduling in a mixed model assembly line
-
P.L.K. Palaniappan, and N. Jawahar A heuristic algorithm for joint optimisation of MRP and scheduling in a mixed model assembly line International Journal of Advanced Operations Management 1 2-3 2009 224 249
-
(2009)
International Journal of Advanced Operations Management
, vol.1
, Issue.2-3
, pp. 224-249
-
-
Palaniappan, P.L.K.1
Jawahar, N.2
-
27
-
-
84941561778
-
A genetic algorithm for permutation flow shop scheduling under make to stock production system
-
H.F. Rahman, R. Sarker, and D. Essam A genetic algorithm for permutation flow shop scheduling under make to stock production system Computers & Industrial Engineering 90 2015 12 24
-
(2015)
Computers & Industrial Engineering
, vol.90
, pp. 12-24
-
-
Rahman, H.F.1
Sarker, R.2
Essam, D.3
-
28
-
-
33749074000
-
A new heuristic method for capacitated lot-sizing in multi-stage, multi-machine production systems
-
C. Rong, K. Takahashi, and K. Morikawa A new heuristic method for capacitated lot-sizing in multi-stage, multi-machine production systems Journal of Japan Industrial Management Association 56 5 2005 313 320
-
(2005)
Journal of Japan Industrial Management Association
, vol.56
, Issue.5
, pp. 313-320
-
-
Rong, C.1
Takahashi, K.2
Morikawa, K.3
-
29
-
-
33749076625
-
MRP rescheduling heuristics with capacity extension under deterministic demand
-
C. Rong, K. Takahashi, and K. Morikawa MRP rescheduling heuristics with capacity extension under deterministic demand Computers & Industrial Engineering 51 1 2006 2 13
-
(2006)
Computers & Industrial Engineering
, vol.51
, Issue.1
, pp. 2-13
-
-
Rong, C.1
Takahashi, K.2
Morikawa, K.3
-
30
-
-
79960663361
-
A simulation-based finite capacity MRP procedure not depending on lead time estimation
-
T. Rossi, and M. Pero A simulation-based finite capacity MRP procedure not depending on lead time estimation International Journal of Operational Research 11 3 2011 237 261
-
(2011)
International Journal of Operational Research
, vol.11
, Issue.3
, pp. 237-261
-
-
Rossi, T.1
Pero, M.2
-
31
-
-
36148996530
-
Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
-
D.-F. Shiau, S.-C. Cheng, and Y.-M. Huang Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm Expert Systems with Applications 34 2 2008 1133 1143
-
(2008)
Expert Systems with Applications
, vol.34
, Issue.2
, pp. 1133-1143
-
-
Shiau, D.-F.1
Cheng, S.-C.2
Huang, Y.-M.3
-
32
-
-
84871280484
-
Production planning of mixed-model assembly lines: A heuristic mixed integer programming based approach
-
F. Tonelli, M. Paolucci, D. Anghinolfi, and P. Taticchi Production planning of mixed-model assembly lines: A heuristic mixed integer programming based approach Production Planning & Control 24 1 2013 110 127
-
(2013)
Production Planning & Control
, vol.24
, Issue.1
, pp. 110-127
-
-
Tonelli, F.1
Paolucci, M.2
Anghinolfi, D.3
Taticchi, P.4
-
33
-
-
79954530103
-
Successful global ERP rollout: A case study
-
W.-H. Tsai, E.T.Y. Hwang, J.-C. Chang, C.-W. Lai, and C.H. Yang Successful global ERP rollout: A case study International Journal of Management & Enterprise Development 10 1 2011 1 19
-
(2011)
International Journal of Management & Enterprise Development
, vol.10
, Issue.1
, pp. 1-19
-
-
Tsai, W.-H.1
Hwang, E.T.Y.2
Chang, J.-C.3
Lai, C.-W.4
Yang, C.H.5
-
34
-
-
84893287606
-
Development and analysis of hybrid genetic algorithms for flow shop scheduling with sequence dependent setup time
-
R. Vanchipura, and R. Sridharan Development and analysis of hybrid genetic algorithms for flow shop scheduling with sequence dependent setup time International Journal of Services & Operations Management 17 2 2014 168 193
-
(2014)
International Journal of Services & Operations Management
, vol.17
, Issue.2
, pp. 168-193
-
-
Vanchipura, R.1
Sridharan, R.2
-
35
-
-
84942597200
-
A hybrid estimation of distribution algorithm for simulation-based scheduling in a stochastic permutation flowshop
-
K. Wang, S.H. Choi, and H. Lu A hybrid estimation of distribution algorithm for simulation-based scheduling in a stochastic permutation flowshop Computers & Industrial Engineering 90 2015 186 196
-
(2015)
Computers & Industrial Engineering
, vol.90
, pp. 186-196
-
-
Wang, K.1
Choi, S.H.2
Lu, H.3
-
36
-
-
84872376852
-
A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem
-
S. Wang, and M. Liu A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem Computers & Operations Research 40 4 2013 1064 1075
-
(2013)
Computers & Operations Research
, vol.40
, Issue.4
, pp. 1064-1075
-
-
Wang, S.1
Liu, M.2
-
38
-
-
36248938665
-
Performance of TOC based finite capacity material requirement planning system for a multi-stage assembly factory
-
T. Wuttipornpun, and P. Yenradee Performance of TOC based finite capacity material requirement planning system for a multi-stage assembly factory Production Planning & Control 18 8 2007 703 715
-
(2007)
Production Planning & Control
, vol.18
, Issue.8
, pp. 703-715
-
-
Wuttipornpun, T.1
Yenradee, P.2
-
39
-
-
84906654083
-
Finite capacity material requirement planning system for assembly flow shop with alternative work centres
-
T. Wuttipornpun, and P. Yenradee Finite capacity material requirement planning system for assembly flow shop with alternative work centres International Journal of Industrial & Systems Engineering 18 1 2014 95 124
-
(2014)
International Journal of Industrial & Systems Engineering
, vol.18
, Issue.1
, pp. 95-124
-
-
Wuttipornpun, T.1
Yenradee, P.2
-
40
-
-
79952445871
-
An asynchronous genetic local search algorithm for the permutation flowshop scheduling problem with total flowtime minimization
-
X. Xu, Z. Xu, and X. Gu An asynchronous genetic local search algorithm for the permutation flowshop scheduling problem with total flowtime minimization Expert Systems with Applications 38 7 2011 7970 7979
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.7
, pp. 7970-7979
-
-
Xu, X.1
Xu, Z.2
Gu, X.3
-
42
-
-
84906948369
-
Hybrid sampling strategy-based multiobjective evolutionary algorithm for process planning and scheduling problem
-
W. Zhang, M. Gen, and J. Jo Hybrid sampling strategy-based multiobjective evolutionary algorithm for process planning and scheduling problem Journal of Intelligent Manufacturing 25 5 2014 881 897
-
(2014)
Journal of Intelligent Manufacturing
, vol.25
, Issue.5
, pp. 881-897
-
-
Zhang, W.1
Gen, M.2
Jo, J.3
|