메뉴 건너뛰기




Volumn 79, Issue , 2015, Pages 130-147

Hybrid genetic optimization for solving the batch-scheduling problem in a pharmaceutical industry

Author keywords

Case study; Decoding; Encoding; Multi processor; Parallel machines; Production planning

Indexed keywords

COMPETITION; DECODING; ENCODING (SYMBOLS); GENETIC ALGORITHMS; HEURISTIC ALGORITHMS; PLANNING; PRODUCTION CONTROL; SCHEDULING; SCHEDULING ALGORITHMS; VIRTUAL REALITY;

EID: 84911949384     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2014.11.001     Document Type: Article
Times cited : (35)

References (46)
  • 1
    • 0032552526 scopus 로고    scopus 로고
    • A two-stage methodology for short-term batch plant scheduling: Discrete event simulation and genetic algorithms
    • C. Azzaro-Pantel, L. Bernal-Haro, P. Baudet, S. Domenech, and L. Pibouleau A two-stage methodology for short-term batch plant scheduling: discrete event simulation and genetic algorithms Computers & Chemical Engineering 22 10 1998 1461 1481
    • (1998) Computers & Chemical Engineering , vol.22 , Issue.10 , pp. 1461-1481
    • Azzaro-Pantel, C.1    Bernal-Haro, L.2    Baudet, P.3    Domenech, S.4    Pibouleau, L.5
  • 2
    • 79951578965 scopus 로고    scopus 로고
    • Non-identical parallel machine scheduling using genetic algorithm
    • S. Balin Non-identical parallel machine scheduling using genetic algorithm Expert Systems with Applications 38 6 2011 6814 6821
    • (2011) Expert Systems with Applications , vol.38 , Issue.6 , pp. 6814-6821
    • Balin, S.1
  • 4
    • 84655164335 scopus 로고    scopus 로고
    • Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm
    • J. Behnamian, S.M.T. Fatemi Ghomi, F. Jolai, and O. Amirtaheri Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm Applied Soft Computing 12 2012 768 777
    • (2012) Applied Soft Computing , vol.12 , pp. 768-777
    • Behnamian, J.1    Fatemi Ghomi, S.M.T.2    Jolai, F.3    Amirtaheri, O.4
  • 5
    • 79956127340 scopus 로고    scopus 로고
    • Hybrid metaheuristics in combinatorial optimization: A survey
    • C. Blum, J. Puchinger, G.R. Raidl, and A. Roli Hybrid metaheuristics in combinatorial optimization: A survey Applied Soft Computing 11 2011 4135 4151
    • (2011) Applied Soft Computing , vol.11 , pp. 4135-4151
    • Blum, C.1    Puchinger, J.2    Raidl, G.R.3    Roli, A.4
  • 6
    • 36248981989 scopus 로고    scopus 로고
    • Scheduling of unrelated parallel manufacturing cells with limited human resources
    • G. Celano, A. Costa, and S. Fichera Scheduling of unrelated parallel manufacturing cells with limited human resources International Journal of Production Research 46 2008 405 427
    • (2008) International Journal of Production Research , vol.46 , pp. 405-427
    • Celano, G.1    Costa, A.2    Fichera, S.3
  • 7
    • 84869491524 scopus 로고    scopus 로고
    • A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems - A case study for solar cell industry
    • Y.-Y. Chen, C.-Y. Cheng, L.-C. Wang, and T.-L. Chen A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems - A case study for solar cell industry International Journal of Production Economics 141 2013 66 78
    • (2013) International Journal of Production Economics , vol.141 , pp. 66-78
    • Chen, Y.-Y.1    Cheng, C.-Y.2    Wang, L.-C.3    Chen, T.-L.4
  • 8
    • 84904545094 scopus 로고    scopus 로고
    • Algorithms for scheduling incompatible job families on single batching machine with limited capacity
    • B. Cheng, J. Cai, S. Yang, and X. Hu Algorithms for scheduling incompatible job families on single batching machine with limited capacity Computers and Industrial Engineering 2014 10.1016/j.cie.2014.06.014
    • (2014) Computers and Industrial Engineering
    • Cheng, B.1    Cai, J.2    Yang, S.3    Hu, X.4
  • 10
    • 77955268117 scopus 로고    scopus 로고
    • A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival
    • T.-C. Chiang, H.-C. Cheng, and L.-C. Fu A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival Computers & Operations Research 37 2010 2257 2269
    • (2010) Computers & Operations Research , vol.37 , pp. 2257-2269
    • Chiang, T.-C.1    Cheng, H.-C.2    Fu, L.-C.3
  • 11
    • 84892374283 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for job sequencing and worker allocation in parallel unrelated machines with sequence-dependent setup times
    • A. Costa, F.A. Cappadonna, and S. Fichera A hybrid genetic algorithm for job sequencing and worker allocation in parallel unrelated machines with sequence-dependent setup times International Journal of Advanced Manufacturing Technology 69 2013 2799 2817
    • (2013) International Journal of Advanced Manufacturing Technology , vol.69 , pp. 2799-2817
    • Costa, A.1    Cappadonna, F.A.2    Fichera, S.3
  • 12
    • 84880120844 scopus 로고    scopus 로고
    • Exploration and exploitation in evolutionary algorithms: A survey
    • M. Crepinsek, S.-H. Liu, and M. Mernik Exploration and exploitation in evolutionary algorithms: A survey ACM Computing Surveys 45 3 2013 Art. 35
    • (2013) ACM Computing Surveys , vol.45 , Issue.3
    • Crepinsek, M.1    Liu, S.-H.2    Mernik, M.3
  • 13
    • 81855218582 scopus 로고    scopus 로고
    • A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times
    • P. Damodaran, and M.C. Vélez-Gallego A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times Expert Systems with Applications 39 1 2012 1451 1458
    • (2012) Expert Systems with Applications , vol.39 , Issue.1 , pp. 1451-1458
    • Damodaran, P.1    Vélez-Gallego, M.C.2
  • 14
    • 84873453341 scopus 로고    scopus 로고
    • An optimal online algorithm for single parallel-batch machine scheduling with incompatible job families to minimize makespan
    • R. Fu, T.C.E. Cheng, C.T. Ng, and J. Yuan An optimal online algorithm for single parallel-batch machine scheduling with incompatible job families to minimize makespan Operations Research Letters 41 2013 216 219
    • (2013) Operations Research Letters , vol.41 , pp. 216-219
    • Fu, R.1    Cheng, T.C.E.2    Ng, C.T.3    Yuan, J.4
  • 15
    • 33747786647 scopus 로고    scopus 로고
    • Mathematical model and genetic algorithm for the job shop scheduling problem in mixed- and multi- product assembly environment: A case study based on the apparel industry
    • Z.X. Guo, W.K. Wong, S.Y.S. Leung, J.T. Fan, and S.F. Chan Mathematical model and genetic algorithm for the job shop scheduling problem in mixed- and multi- product assembly environment: A case study based on the apparel industry Computers & Industrial Engineering 50 2006 202 219
    • (2006) Computers & Industrial Engineering , vol.50 , pp. 202-219
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Fan, J.T.4    Chan, S.F.5
  • 16
    • 84876158070 scopus 로고    scopus 로고
    • Modeling and Pareto optimization of multi-objective order scheduling problems in production planning
    • Z.X. Guo, W.K. Wong, Z. Li, and P. Ren Modeling and Pareto optimization of multi-objective order scheduling problems in production planning Computers & Industrial Engineering 64 2013 972 986
    • (2013) Computers & Industrial Engineering , vol.64 , pp. 972-986
    • Guo, Z.X.1    Wong, W.K.2    Li, Z.3    Ren, P.4
  • 17
    • 77954385254 scopus 로고    scopus 로고
    • A binary coding genetic algorithm for multi-purpose process scheduling: A case study
    • Y. He, and C.-W. Hui A binary coding genetic algorithm for multi-purpose process scheduling: A case study Chemical Engineering Science 65 2010 4816 4828
    • (2010) Chemical Engineering Science , vol.65 , pp. 4816-4828
    • He, Y.1    Hui, C.-W.2
  • 18
    • 70350505061 scopus 로고    scopus 로고
    • Springer+Science+Business Media, Inc. New York, NY 10013, USA
    • J. Hermann Handbook of production scheduling 2006 Springer+Science+Business Media, Inc. New York, NY 10013, USA
    • (2006) Handbook of Production Scheduling
    • Hermann, J.1
  • 19
    • 2942630929 scopus 로고    scopus 로고
    • Hybrid genetic algorithm for solving job scheduling problem on non-identical parallel machines based on JIT technique
    • D.C. Huang, and H.D. Guo Hybrid genetic algorithm for solving job scheduling problem on non-identical parallel machines based on JIT technique Computer Integrated Manufacturing Systems 10 3 2004 298 302
    • (2004) Computer Integrated Manufacturing Systems , vol.10 , Issue.3 , pp. 298-302
    • Huang, D.C.1    Guo, H.D.2
  • 20
    • 72049107836 scopus 로고    scopus 로고
    • Parallel dedicated machine scheduling problem with sequence-dependent setups and a single server
    • S. Huang, L. Cai, and X. Zhang Parallel dedicated machine scheduling problem with sequence-dependent setups and a single server Computers & Industrial Engineering 58 2010 165 174
    • (2010) Computers & Industrial Engineering , vol.58 , pp. 165-174
    • Huang, S.1    Cai, L.2    Zhang, X.3
  • 21
    • 70449587606 scopus 로고    scopus 로고
    • Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines
    • J. Jia, and S.J. Mason Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines International Journal of Production Research 47 10 2003 2565 2585
    • (2003) International Journal of Production Research , vol.47 , Issue.10 , pp. 2565-2585
    • Jia, J.1    Mason, S.J.2
  • 22
  • 23
  • 24
    • 77955559888 scopus 로고    scopus 로고
    • MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry
    • G.M. Kopanos, C.A. Mendez, and L. Puigjaner MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry European Journal of Operational Research 207 2010 644 655
    • (2010) European Journal of Operational Research , vol.207 , pp. 644-655
    • Kopanos, G.M.1    Mendez, C.A.2    Puigjaner, L.3
  • 25
    • 78751637765 scopus 로고    scopus 로고
    • A simulated annealing approach to minimize the maximum lateness on uniform parallel machines
    • K. Li, S.-L. Yang, and H.-W. Ma A simulated annealing approach to minimize the maximum lateness on uniform parallel machines Mathematical and Computer Modeling 53 5-6 2011 854 860
    • (2011) Mathematical and Computer Modeling , vol.53 , Issue.56 , pp. 854-860
    • Li, K.1    Yang, S.-L.2    Ma, H.-W.3
  • 26
    • 79151482876 scopus 로고    scopus 로고
    • Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
    • S. Li, C.T. Ng, T.C.E. Cheng, and Yuan Jinjiang Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan European Journal of Operational Research 210 2011 482 488
    • (2011) European Journal of Operational Research , vol.210 , pp. 482-488
    • Li, S.1    Ng, C.T.2    Cheng, T.C.E.3    Jinjiang, Y.4
  • 27
    • 84881016479 scopus 로고    scopus 로고
    • Scheduling unrelated parallel batch processing machines with non-identical job sizes
    • X.L. Li, Y.L. Huang, Q. Tan, and H.P. Chen Scheduling unrelated parallel batch processing machines with non-identical job sizes Computers & Operations Research 40 2013 2983 2990
    • (2013) Computers & Operations Research , vol.40 , pp. 2983-2990
    • Li, X.L.1    Huang, Y.L.2    Tan, Q.3    Chen, H.P.4
  • 28
    • 84898929881 scopus 로고    scopus 로고
    • A comparison of five hybrid metaheuristic algorithms for unrelated parallel-machine scheduling and inbound trucks sequencing in multi-door cross docking systems
    • T.W. Liao, P.C. Chang, R.J. Kuo, and C.-J. Liao A comparison of five hybrid metaheuristic algorithms for unrelated parallel-machine scheduling and inbound trucks sequencing in multi-door cross docking systems Applied Soft Computing 21 2014 180 193
    • (2014) Applied Soft Computing , vol.21 , pp. 180-193
    • Liao, T.W.1    Chang, P.C.2    Kuo, R.J.3    Liao, C.-J.4
  • 30
    • 64549090219 scopus 로고    scopus 로고
    • Scheduling jobs with release dates on parallel batch processing machines
    • L.L. Liu, C.T. Ng, and T.C.E. Cheng Scheduling jobs with release dates on parallel batch processing machines Discrete Applied Mathematics 157 2009 1825 1830
    • (2009) Discrete Applied Mathematics , vol.157 , pp. 1825-1830
    • Liu, L.L.1    Ng, C.T.2    Cheng, T.C.E.3
  • 31
    • 10644277097 scopus 로고    scopus 로고
    • Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines
    • C. Low Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines Computers & Operations Research 32 8 2005 2013 2025
    • (2005) Computers & Operations Research , vol.32 , Issue.8 , pp. 2013-2025
    • Low, C.1
  • 32
    • 33845974930 scopus 로고    scopus 로고
    • A multi-objective production scheduling case study solved by simulated annealing
    • T. Loukil, J. Teghem, and P. Fortemps A multi-objective production scheduling case study solved by simulated annealing European Journal of Operational Research 179 2007 709 722
    • (2007) European Journal of Operational Research , vol.179 , pp. 709-722
    • Loukil, T.1    Teghem, J.2    Fortemps, P.3
  • 33
    • 84865247709 scopus 로고    scopus 로고
    • A hybrid genetic tabu search algorithm for solving job shop scheduling problems: A case study
    • S. Meeran, and M.S. Morshed A hybrid genetic tabu search algorithm for solving job shop scheduling problems: A case study Journal of Intelligent Manufacturing 23 2012 1063 1078
    • (2012) Journal of Intelligent Manufacturing , vol.23 , pp. 1063-1078
    • Meeran, S.1    Morshed, M.S.2
  • 35
    • 70449590249 scopus 로고    scopus 로고
    • A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry
    • H. Missbaurer, W. Hauber, and W. Stadler A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry International Journal of Production Economics 47 15 2009 4147 4172
    • (2009) International Journal of Production Economics , vol.47 , Issue.15 , pp. 4147-4172
    • Missbaurer, H.1    Hauber, W.2    Stadler, W.3
  • 36
    • 13844256873 scopus 로고    scopus 로고
    • Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
    • L. Mönch, H. Balasubramanian, J.W. Fowler, and M.E. Pfund Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times Computers & Operations Research 32 2005 2731 2750
    • (2005) Computers & Operations Research , vol.32 , pp. 2731-2750
    • Mönch, L.1    Balasubramanian, H.2    Fowler, J.W.3    Pfund, M.E.4
  • 38
    • 50549083038 scopus 로고    scopus 로고
    • Engineered versus standard evolutionary algorithms: A case study in batch scheduling with resources
    • G. Sand, J. Till, T. Tometzki, M. Urselmann, S. Engell, and M. Emmerich Engineered versus standard evolutionary algorithms: A case study in batch scheduling with resources Computers & Chemical Engineering 32 11 2008 2706 2722
    • (2008) Computers & Chemical Engineering , vol.32 , Issue.11 , pp. 2706-2722
    • Sand, G.1    Till, J.2    Tometzki, T.3    Urselmann, M.4    Engell, S.5    Emmerich, M.6
  • 39
    • 34249948810 scopus 로고    scopus 로고
    • Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative example
    • C.A. Soman, D.P. Van Donk, and G.J.C. Gaalman Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative example International Journal of Production Economics 108 2007 191 199
    • (2007) International Journal of Production Economics , vol.108 , pp. 191-199
    • Soman, C.A.1    Van Donk, D.P.2    Gaalman, G.J.C.3
  • 40
    • 33847027319 scopus 로고    scopus 로고
    • Scheduling jobs through multiple parallel channels using an expert system
    • H. Soyuer, M. Kocamaz, and Y. Kazancoglu Scheduling jobs through multiple parallel channels using an expert system Production Planning and Control 18 1 2007 35 43
    • (2007) Production Planning and Control , vol.18 , Issue.1 , pp. 35-43
    • Soyuer, H.1    Kocamaz, M.2    Kazancoglu, Y.3
  • 41
    • 80051785207 scopus 로고    scopus 로고
    • Discrete and continuous time representations and mathematical models for large production scheduling problems: A case study from the pharmaceutical industry
    • H. Stefansson, S. Sigmarsdottir, P. Jensson, and N. Shah Discrete and continuous time representations and mathematical models for large production scheduling problems: A case study from the pharmaceutical industry European Journal of Operational Research 215 2011 383 392
    • (2011) European Journal of Operational Research , vol.215 , pp. 383-392
    • Stefansson, H.1    Sigmarsdottir, S.2    Jensson, P.3    Shah, N.4
  • 42
    • 79952187971 scopus 로고    scopus 로고
    • A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
    • E. Vallada, and R. Ruiz A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times European Journal of Operational Research 211 3 2011 612 622
    • (2011) European Journal of Operational Research , vol.211 , Issue.3 , pp. 612-622
    • Vallada, E.1    Ruiz, R.2
  • 44
    • 60549105193 scopus 로고    scopus 로고
    • An evolutionary simulation-optimization approach in solving parallel-machine scheduling problems - A case study
    • T. Yang An evolutionary simulation-optimization approach in solving parallel-machine scheduling problems - A case study Computers and Industrial Engineering 56 2009 1126 1136
    • (2009) Computers and Industrial Engineering , vol.56 , pp. 1126-1136
    • Yang, T.1
  • 45
    • 84872775734 scopus 로고    scopus 로고
    • Parallel machine scheduling with splitting jobs by a hybrid differential evolution algorithm
    • W.-L. Wang, H.-Y. Wang, Y.-W. Zhao, L.-P. Zhang, and X.-L. Xu Parallel machine scheduling with splitting jobs by a hybrid differential evolution algorithm Computers & Operations Research 40 2013 1196 1206
    • (2013) Computers & Operations Research , vol.40 , pp. 1196-1206
    • Wang, W.-L.1    Wang, H.-Y.2    Zhao, Y.-W.3    Zhang, L.-P.4    Xu, X.-L.5
  • 46
    • 71749109559 scopus 로고    scopus 로고
    • Solving the parallel batch-processing machines with different release times, job sizes, and capacity limits by metaheuristics
    • H.M. Wang, and F.D. Chou Solving the parallel batch-processing machines with different release times, job sizes, and capacity limits by metaheuristics Expert Systems with Applications 37 2 2010 1510 1521
    • (2010) Expert Systems with Applications , vol.37 , Issue.2 , pp. 1510-1521
    • Wang, H.M.1    Chou, F.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.