메뉴 건너뛰기




Volumn 88, Issue , 2015, Pages 317-325

An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan

Author keywords

Common components; Scheduling; Setup times; Two stage assembly

Indexed keywords

ASSEMBLY MACHINES; INTEGER PROGRAMMING; MACHINE COMPONENTS; OPTIMAL SYSTEMS; OPTIMIZATION; SCHEDULING; SCHEDULING ALGORITHMS;

EID: 84938851926     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2015.07.018     Document Type: Article
Times cited : (46)

References (22)
  • 1
    • 34147159638 scopus 로고    scopus 로고
    • A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
    • F.S. Al-Anzi, and A. Allahverdi A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times European Journal of Operational Research 182 2007 80 94
    • (2007) European Journal of Operational Research , vol.182 , pp. 80-94
    • Al-Anzi, F.S.1    Allahverdi, A.2
  • 2
    • 33749548509 scopus 로고    scopus 로고
    • Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
    • A. Allahverdi, and F.S. Al-Anzi Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times International Journal of Production Research 44 2006 4713 4735
    • (2006) International Journal of Production Research , vol.44 , pp. 4713-4735
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 3
    • 0032628881 scopus 로고    scopus 로고
    • Scheduling the fabrication and assembly of components in a two-machine flowshop
    • T.C.E. Cheng, and G. Wang Scheduling the fabrication and assembly of components in a two-machine flowshop IIE Transactions 31 1999 135 143
    • (1999) IIE Transactions , vol.31 , pp. 135-143
    • Cheng, T.C.E.1    Wang, G.2
  • 4
    • 0031351397 scopus 로고    scopus 로고
    • A branch and bound algorithm for the two-stage assembly scheduling problem
    • A.M.A. Hariri, and C.N. Potts A branch and bound algorithm for the two-stage assembly scheduling problem European Journal of Operational Research 103 1997 547 556
    • (1997) European Journal of Operational Research , vol.103 , pp. 547-556
    • Hariri, A.M.A.1    Potts, C.N.2
  • 6
    • 0037143044 scopus 로고    scopus 로고
    • Scheduling manufacturing systems for delayed product differentiation in agile manufacturing
    • D. He, and A. Babayan Scheduling manufacturing systems for delayed product differentiation in agile manufacturing International Journal of Production Research 40 2002 2461 2481
    • (2002) International Journal of Production Research , vol.40 , pp. 2461-2481
    • He, D.1    Babayan, A.2
  • 8
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • S.M. Johnson Optimal two-and three-stage production schedules with setup times included Naval Research Logistics Quarterly 1 1954 61 68
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 9
    • 0024714899 scopus 로고
    • Aggregate scheduling of a flexible machining and assembly system
    • A. Kusiak Aggregate scheduling of a flexible machining and assembly system IEEE Transactions on Robotics and Automation 5 1989 451 459
    • (1989) IEEE Transactions on Robotics and Automation , vol.5 , pp. 451-459
    • Kusiak, A.1
  • 10
    • 0027590319 scopus 로고
    • Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
    • C.Y. Lee, T.C.E. Cheng, and B.M.T. Lin Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem Management Science 39 1993 616 625
    • (1993) Management Science , vol.39 , pp. 616-625
    • Lee, C.Y.1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 12
    • 39449086717 scopus 로고    scopus 로고
    • An ant colony optimization algorithm for scheduling in agile manufacturing
    • C.J. Liao, and C.C. Liao An ant colony optimization algorithm for scheduling in agile manufacturing International Journal of Production Research 46 2007 1813 1824
    • (2007) International Journal of Production Research , vol.46 , pp. 1813-1824
    • Liao, C.J.1    Liao, C.C.2
  • 13
    • 0036833213 scopus 로고    scopus 로고
    • Fabrication and assembly scheduling in a two-machine flowshop
    • B.M.T. Lin, and T.C.E. Cheng Fabrication and assembly scheduling in a two-machine flowshop IIE Transactions 34 2002 1015 1020
    • (2002) IIE Transactions , vol.34 , pp. 1015-1020
    • Lin, B.M.T.1    Cheng, T.C.E.2
  • 14
    • 84880214367 scopus 로고    scopus 로고
    • Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
    • A. Mozdgir, S. Fatemi Ghomi, F. Jolai, and J. Navaei Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times International Journal of Production Research 51 2013 3625 3642
    • (2013) International Journal of Production Research , vol.51 , pp. 3625-3642
    • Mozdgir, A.1    Fatemi Ghomi, S.2    Jolai, F.3    Navaei, J.4
  • 15
    • 84888157410 scopus 로고    scopus 로고
    • Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs
    • J. Navaei, S.M.T. Fatemi Ghomi, F. Jolai, and A. Mozdgir Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs Computers & Operations Research 44 2014 52 65
    • (2014) Computers & Operations Research , vol.44 , pp. 52-65
    • Navaei, J.1    Fatemi Ghomi, S.M.T.2    Jolai, F.3    Mozdgir, A.4
  • 17
    • 84892916319 scopus 로고    scopus 로고
    • An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem
    • H. Seidgar, M. Kiani, M. Abedi, and H. Fazlollahtabar An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem International Journal of Production Research 52 2014 1240 1256
    • (2014) International Journal of Production Research , vol.52 , pp. 1240-1256
    • Seidgar, H.1    Kiani, M.2    Abedi, M.3    Fazlollahtabar, H.4
  • 18
    • 43549101965 scopus 로고    scopus 로고
    • A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times
    • C.S. Sung, and H.A. Kim A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times International Journal of Production Economics 113 2009 1038 1048
    • (2009) International Journal of Production Economics , vol.113 , pp. 1038-1048
    • Sung, C.S.1    Kim, H.A.2
  • 20
    • 84906788304 scopus 로고    scopus 로고
    • A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem
    • H.S. Yan, X.Q. Wan, and F.L. Xiong A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem International Journal of Production Research 52 2014 5626 5639
    • (2014) International Journal of Production Research , vol.52 , pp. 5626-5639
    • Yan, H.S.1    Wan, X.Q.2    Xiong, F.L.3
  • 21
    • 2642555389 scopus 로고    scopus 로고
    • Scheduling for two-stage production system with setup and assembly operations
    • M. Yokoyama Scheduling for two-stage production system with setup and assembly operations Computers & Operations Research 31 2004 2063 2078
    • (2004) Computers & Operations Research , vol.31 , pp. 2063-2078
    • Yokoyama, M.1
  • 22
    • 36849060379 scopus 로고    scopus 로고
    • Flow-shop scheduling with setup and assembly operations
    • M. Yokoyama Flow-shop scheduling with setup and assembly operations European Journal of Operational Research 187 2008 1184 1195
    • (2008) European Journal of Operational Research , vol.187 , pp. 1184-1195
    • Yokoyama, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.