-
2
-
-
0000955243
-
A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
-
Brandimarte, P. and Calderini, M. (1995) 'A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling', International Journal of Production Research,Vol. 33, No. 1, pp.161-181.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.1
, pp. 161-181
-
-
Brandimarte, P.1
Calderini, M.2
-
3
-
-
0001794206
-
The distributed asynchronous scheduler
-
M. Zweben and M.S. Fox (Eds), San Francisco, CA: Morgan Kaufman Publishers
-
Burke, P. and Prosser, P. (1994) 'The distributed asynchronous scheduler', M. Zweben and M.S. Fox (Eds). Intelligent Scheduling, San Francisco, CA: Morgan Kaufman Publishers, pp.309-339.
-
(1994)
Intelligent Scheduling
, pp. 309-339
-
-
Burke, P.1
Prosser, P.2
-
4
-
-
2642547919
-
Modeling of integrated, distributed and cooperative process planning system using an agent-based approach
-
Chan, F.T.S., Zhang, J. and Li, P. (2001) 'Modeling of integrated, distributed and cooperative process planning system using an agent-based approach', Proceedings of the Institution of Mechanical Engineering (Part B: Engineering Manufacture),Vol 215(B10), pp.1437-1451.
-
(2001)
Proceedings of the Institution of Mechanical Engineering (Part B: Engineering Manufacture)
, vol.215
, Issue.B10
, pp. 1437-1451
-
-
Chan, F.T.S.1
Zhang, J.2
Li, P.3
-
5
-
-
0012857111
-
An integrated artificial intelligent computer-aided process planning system
-
Chang, P.T. and Chang, C.H. (2000) 'An integrated artificial intelligent computer-aided process planning system', International Journal of Computer Integrated Manufacturing, Vol. 13, No. 6, pp.483-497.
-
(2000)
International Journal of Computer Integrated Manufacturing
, vol.13
, Issue.6
, pp. 483-497
-
-
Chang, P.T.1
Chang, C.H.2
-
6
-
-
84876152333
-
Scheduling with flexible process plans
-
Chen, Q. and Khoshnevis, B. (1993) 'Scheduling with flexible process plans', Production Planning and Control, Vol. 4, No. 4, pp.333-343.
-
(1993)
Production Planning and Control
, vol.4
, Issue.4
, pp. 333-343
-
-
Chen, Q.1
Khoshnevis, B.2
-
8
-
-
33748423569
-
Process planning and scheduling with multiagent systems
-
Kluwer Academic Publishers
-
Denkena, B., Tonshoff, H.K., Zwick, M. and Woelk, P.O. (2002) 'Process planning and scheduling with multiagent systems', Knowledge and Technology Integration in Production and Services - Balancing Knowledge and Technology in Product and Service Life Cycle, Kluwer Academic Publishers, pp.339-348.
-
(2002)
Knowledge and Technology Integration in Production and Services - Balancing Knowledge and Technology in Product and Service Life Cycle
, pp. 339-348
-
-
Denkena, B.1
Tonshoff, H.K.2
Zwick, M.3
Woelk, P.O.4
-
9
-
-
0001811353
-
Logistics Management System (LMS): Integrating decision technologies for dispatch scheduling in semiconductor manufacturing
-
M. Zweben and M.S. Fox (Eds), San Francisco, CA: Morgan Kaufman Publishers
-
Fordyce, K. and Sullivan, G.G. (1994) 'Logistics Management System (LMS): integrating decision technologies for dispatch scheduling in semiconductor manufacturing', M. Zweben and M.S. Fox (Eds). Intelligent Scheduling, San Francisco, CA: Morgan Kaufman Publishers, pp.473-516.
-
(1994)
Intelligent Scheduling
, pp. 473-516
-
-
Fordyce, K.1
Sullivan, G.G.2
-
10
-
-
0036352425
-
Scheduling of flexible-sequenced process plans in a mould manufacturing shop
-
Gan, P.Y. and Lee, K.S. (2002) 'Scheduling of flexible-sequenced process plans in a mould manufacturing shop', International Journal of Advanced Manufacturing Technology, Vol. 20, pp.214-222.
-
(2002)
International Journal of Advanced Manufacturing Technology
, vol.20
, pp. 214-222
-
-
Gan, P.Y.1
Lee, K.S.2
-
11
-
-
1142292504
-
Task allocation using a market-based planning mechanism
-
Melbourne, Australia
-
Goldberg, D., Cicirello, V. and Dias, M.B. (2003) 'Task allocation using a market-based planning mechanism', Proceedings of the International Conference on Autonomous Agent and Multiple Agent Systems (AAMAS'03), Melbourne, Australia, Vol. 2, pp.996-997.
-
(2003)
Proceedings of the International Conference on Autonomous Agent and Multiple Agent Systems (AAMAS'03)
, vol.2
, pp. 996-997
-
-
Goldberg, D.1
Cicirello, V.2
Dias, M.B.3
-
12
-
-
0031121228
-
Bidding-based process planning and scheduling in a multiagent system
-
Gu, P., Balasubramanian, S. and Nome, D.H. (1997) 'Bidding-based process planning and scheduling in a multiagent system', Computers and Industrial Engineering, Vol. 32, No. 2, pp.477-496.
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.2
, pp. 477-496
-
-
Gu, P.1
Balasubramanian, S.2
Nome, D.H.3
-
13
-
-
1342302588
-
Affordable space systems manufacturing: Intelligent synthesis technology, process planning and production scheduling
-
CIE-21281, Pittsburgh, PA
-
Herrmann, J.W., Eleischer, M., Lin, E., Mathur, V. and Glasser, J. (2001) 'Affordable space systems manufacturing: intelligent synthesis technology, process planning and production scheduling', ASME DETC 2001, CIE-21281, Pittsburgh, PA.
-
(2001)
ASME DETC 2001
-
-
Herrmann, J.W.1
Eleischer, M.2
Lin, E.3
Mathur, V.4
Glasser, J.5
-
14
-
-
79251627866
-
A progressive approach for the integration of process planning and scheduling
-
Huang, S.H., Zhang, H.C. and Smith, M.L. (1995) 'A progressive approach for the integration of process planning and scheduling', IEE Transactions, Vol. 27, No. 4, pp.456-464.
-
(1995)
IEE Transactions
, vol.27
, Issue.4
, pp. 456-464
-
-
Huang, S.H.1
Zhang, H.C.2
Smith, M.L.3
-
17
-
-
0029733731
-
A collaborative process planning and scheduling system
-
Kempenaers, J., Pinte, J., Detand, J. and Kruth, J.P. (1996) 'A collaborative process planning and scheduling system', Advances in Engineering Software, Vol. 25, No. 1, pp.3-8.
-
(1996)
Advances in Engineering Software
, vol.25
, Issue.1
, pp. 3-8
-
-
Kempenaers, J.1
Pinte, J.2
Detand, J.3
Kruth, J.P.4
-
18
-
-
0032690982
-
Scheduling in a production environment with multiple process plans per job
-
Kim, K.H. and Egbelu, P.J. (1999) 'Scheduling in a production environment with multiple process plans per job', International Journal of Production Research, Vol. 37, No. 12, pp.2725-2753.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.12
, pp. 2725-2753
-
-
Kim, K.H.1
Egbelu, P.J.2
-
19
-
-
0027073047
-
A CAPP system for nonlinear process plans
-
Kruth, J.P. and Detand, J. (1992) 'A CAPP system for nonlinear process plans', Annals of CIRP, Vol. 41, No. 1, pp.489-492.
-
(1992)
Annals of CIRP
, vol.41
, Issue.1
, pp. 489-492
-
-
Kruth, J.P.1
Detand, J.2
-
20
-
-
0035175069
-
Integration of process planning and scheduling using simulation based genetic algorithms
-
Lee, H. and Kim, S.S. (2001) 'Integration of process planning and scheduling using simulation based genetic algorithms', International Journal of Advanced Manufacturing Technology, Vol 18, No. 8, pp.586-590.
-
(2001)
International Journal of Advanced Manufacturing Technology
, vol.18
, Issue.8
, pp. 586-590
-
-
Lee, H.1
Kim, S.S.2
-
21
-
-
0141885117
-
Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism
-
Lee, Y., Kumara, S.R. and Chatterjee, K. (2003) 'Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism'. Journal of Intelligent Manufacturing, Vol. 14, No. 5. pp.471-484.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.5
, pp. 471-484
-
-
Lee, Y.1
Kumara, S.R.2
Chatterjee, K.3
-
22
-
-
33748435526
-
APPSS - An agent-based dynamic process planning and scheduling system
-
Lim, M. and Zhang, Z. (2000) 'APPSS - an agent-based dynamic process planning and scheduling system'. Proceedings of the IFAC Workshop, pp.51-56.
-
(2000)
Proceedings of the IFAC Workshop
, pp. 51-56
-
-
Lim, M.1
Zhang, Z.2
-
23
-
-
84950937653
-
Integrated shop floor control using autonomous agents
-
Lin, G.Y.J. and Solberg, J.J. (1992) 'Integrated shop floor control using autonomous agents', IIE Transactions: Design and Manufacturing, Vol. 24, No. 3, pp.57-71.
-
(1992)
IIE Transactions: Design and Manufacturing
, vol.24
, Issue.3
, pp. 57-71
-
-
Lin, G.Y.J.1
Solberg, J.J.2
-
24
-
-
0000762544
-
Exploiting problem structure for distributed constraint optimization
-
San Francisco, CA: AAAI Press/MIT Press
-
Liu, J. and Sycara, K.P. (1995) 'Exploiting problem structure for distributed constraint optimization', Proceedings of the First International Conference on Multi-Agent Systems, San Francisco, CA: AAAI Press/MIT Press, pp.246-253.
-
(1995)
Proceedings of the First International Conference on Multi-agent Systems
, pp. 246-253
-
-
Liu, J.1
Sycara, K.P.2
-
25
-
-
79953758495
-
On-line integration of process planning module with production scheduling
-
Mamalis, G., Malagardis, I. and Kanbouris, K. (1996) 'On-line integration of process planning module with production scheduling'. International Journal of Advanced Manufacturing Technology, Vol. 12, No. 5, pp.330-338.
-
(1996)
International Journal of Advanced Manufacturing Technology
, vol.12
, Issue.5
, pp. 330-338
-
-
Mamalis, G.1
Malagardis, I.2
Kanbouris, K.3
-
26
-
-
0012781929
-
Mechanized process selection for planning new designs
-
Paper 737
-
Nieble, B.W. (1965) 'Mechanized process selection for planning new designs', ASTME, Paper 737.
-
(1965)
ASTME
-
-
Nieble, B.W.1
-
27
-
-
0000481860
-
A simulated annealing approach to integrated production scheduling
-
Palmer, G.J. (1996) 'A simulated annealing approach to integrated production scheduling', Journal of Intelligent Manufacturing, Vol. 7, No. 3, pp. 163-176.
-
(1996)
Journal of Intelligent Manufacturing
, vol.7
, Issue.3
, pp. 163-176
-
-
Palmer, G.J.1
-
28
-
-
0032599586
-
Enhancing manufacturing product development through learning agent system over internet
-
Park, H.G. and Baik, J.M. (1999) 'Enhancing manufacturing product development through learning agent system over internet'. Computers and Industrial Engineering, Vol. 37, pp. 117-120.
-
(1999)
Computers and Industrial Engineering
, vol.37
, pp. 117-120
-
-
Park, H.G.1
Baik, J.M.2
-
29
-
-
0030673502
-
The AARIA agent architecture: An example of requirements-driven agent-based system design
-
Marina del Rey, CA
-
Parunak, V.D., Baker, A.D. and Clark, S.J. (1997) 'The AARIA agent architecture: an example of requirements-driven agent-based system design', Proceedings of the First International Conference on Autonomous Agents, Marina del Rey, CA.
-
(1997)
Proceedings of the First International Conference on Autonomous Agents
-
-
Parunak, V.D.1
Baker, A.D.2
Clark, S.J.3
-
30
-
-
0008649140
-
Evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems
-
Workshop on Intelligent Manufacturing, Montreal, Canada
-
Saad, A., Biswas, G., Kawamura, K., Johnson, M.E. and Salama, A. (1995) 'Evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems'. Proceedings of the 1995 International Joint Conference on Artificial Intelligence (IJCAI'95), Workshop on Intelligent Manufacturing, Montreal, Canada. pp.310-321.
-
(1995)
Proceedings of the 1995 International Joint Conference on Artificial Intelligence (IJCAI'95)
, pp. 310-321
-
-
Saad, A.1
Biswas, G.2
Kawamura, K.3
Johnson, M.E.4
Salama, A.5
-
31
-
-
0032648655
-
Integrating flexible process plans with scheduling in flexible manufacturing systems
-
Saygin, C. and Kilic, S.E. (1999) 'Integrating flexible process plans with scheduling in flexible manufacturing systems', International Journal of Advanced Manufacturing Technology, Vol. 15, No. 4, pp.268-280.
-
(1999)
International Journal of Advanced Manufacturing Technology
, vol.15
, Issue.4
, pp. 268-280
-
-
Saygin, C.1
Kilic, S.E.2
-
32
-
-
0036200385
-
Distributed manufacturing scheduling using intelligent agents
-
Shen, W. (2002) 'Distributed manufacturing scheduling using intelligent agents', IEEE Expert/Intelligent Systems, Vol. 17, No. 1, pp.88-94.
-
(2002)
IEEE Expert/Intelligent Systems
, vol.17
, Issue.1
, pp. 88-94
-
-
Shen, W.1
-
33
-
-
0141954033
-
Editorial of the special issue on agent-based manufacturing process planning and scheduling
-
Shen, W. and Ghenniwa, H. (2003) 'Editorial of the special issue on agent-based manufacturing process planning and scheduling', Journal of Intelligent Manufacturing, Vol. 14, No. 5, pp.427-428.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.5
, pp. 427-428
-
-
Shen, W.1
Ghenniwa, H.2
-
34
-
-
84947882613
-
Applications of agent systems in intelligent manufacturing: An update review
-
to appear
-
Shen, W., Hao, Q., Yoon, H.J. and Nome, D.H. (to appear) 'Applications of agent systems in intelligent manufacturing: an update review'. International Journal of Manufacturing Technology and Management.
-
International Journal of Manufacturing Technology and Management
-
-
Shen, W.1
Hao, Q.2
Yoon, H.J.3
Nome, D.H.4
-
35
-
-
0035127673
-
Dynamic manufacturing scheduling using both functional and resource related agents
-
Shen, W. and Norrie, D.H. (2001) 'Dynamic manufacturing scheduling using both functional and resource related agents', Integrated Computer-Aided Engineering, Vol. 8, No. 1, pp. 17-30.
-
(2001)
Integrated Computer-aided Engineering
, vol.8
, Issue.1
, pp. 17-30
-
-
Shen, W.1
Norrie, D.H.2
-
36
-
-
0003573348
-
-
London, UK: Taylor and Francis
-
Shen, W., Norrie, D.H. and Barthès, J.P. (2001) Multi-Agent Systems for Concurrent Intelligent Design and Manufacturing, London, UK: Taylor and Francis.
-
(2001)
Multi-agent Systems for Concurrent Intelligent Design and Manufacturing
-
-
Shen, W.1
Norrie, D.H.2
Barthès, J.P.3
-
37
-
-
0029369568
-
Distributed artificial intelligence in manufacturing systems control
-
Shih, W. and Srihari, K. (1995) 'Distributed artificial intelligence in manufacturing systems control', Computers and Industrial Engineering, Vol. 29, Nos. 1-4, pp.199-203.
-
(1995)
Computers and Industrial Engineering
, vol.29
, Issue.1-4
, pp. 199-203
-
-
Shih, W.1
Srihari, K.2
-
38
-
-
0032311567
-
A multi-agent approach to process planning and fabrication in distributed manufacturing
-
Sluga, A., Butala, P. and Bervar, G. (1998) 'A multi-agent approach to process planning and fabrication in distributed manufacturing', Computers and Industrial Engineering, Vol. 35. Nos. 3/4, pp.455-458.
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.3-4
, pp. 455-458
-
-
Sluga, A.1
Butala, P.2
Bervar, G.3
-
39
-
-
0019180974
-
The contract net protocol: High-level communication and control in a distributed problem solver
-
Smith, R.G. (1980) 'The contract net protocol: high-level communication and control in a distributed problem solver', IEEE Transactions on Computers, Vol. C-29, No. 12, pp. 1104-1113.
-
(1980)
IEEE Transactions on Computers
, vol.C-29
, Issue.12
, pp. 1104-1113
-
-
Smith, R.G.1
-
41
-
-
0035836316
-
A distributed multiagent environment for product design and manufacturing planning
-
Sun, J., Zhang, Y.F. and Nee, A.Y.C. (2001) 'A distributed multiagent environment for product design and manufacturing planning', International Journal of Production Research, Vol. 39, No. 4, pp.625-645.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.4
, pp. 625-645
-
-
Sun, J.1
Zhang, Y.F.2
Nee, A.Y.C.3
-
42
-
-
0033885605
-
Integration of process planning and scheduling a review
-
Tan, W. (2000) 'Integration of process planning and scheduling a review'. Journal of Intelligent Manufacturing, Vol. 11, pp.51-63.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, pp. 51-63
-
-
Tan, W.1
-
43
-
-
0036966344
-
DPP: A distributed process planning approach using function blocks
-
DETC2002/DFM-34194, Montreal, Canada
-
Wang, L. (2002) 'DPP: a distributed process planning approach using function blocks'. Proceedings of ASME Design Engineering Technical Conference, DETC2002/DFM-34194, Montreal, Canada.
-
(2002)
Proceedings of ASME Design Engineering Technical Conference
-
-
Wang, L.1
-
44
-
-
33748430523
-
Function block based integration of process planning, scheduling and execution for RMS
-
Ann Arbor, MI
-
Wang, L., Hao, Q. and Shen, W. (2003) 'Function block based integration of process planning, scheduling and execution for RMS', Proceedings of CIRP Second International Conference on Reconfigurable Manufacturing, Ann Arbor, MI.
-
(2003)
Proceedings of CIRP Second International Conference on Reconfigurable Manufacturing
-
-
Wang, L.1
Hao, Q.2
Shen, W.3
-
45
-
-
33748413649
-
Function block design and development in distributed process planning
-
Toronto, Canada
-
Wang, L., Jin, W. and Feng, H-Y. (2004a) 'Function block design and development in distributed process planning', Proceedings of 14th International Conference on Flexible Automation and Intelligent Manufacturing, Toronto, Canada, Vol. 2, pp.783-791.
-
(2004)
Proceedings of 14th International Conference on Flexible Automation and Intelligent Manufacturing
, vol.2
, pp. 783-791
-
-
Wang, L.1
Jin, W.2
Feng, H.-Y.3
-
46
-
-
23244458543
-
Function-block enabled job shop planning and control with uncertainty
-
IMECE2004-59279, Anaheim. CA
-
Wang, L., Liu, Z., Shen. W. and Lang, S. (2004b) 'Function-block enabled job shop planning and control with uncertainty', Proceedings of ASME International Mechanical Engineering Congress and Exposition, IMECE2004-59279, Anaheim. CA.
-
(2004)
Proceedings of ASME International Mechanical Engineering Congress and Exposition
-
-
Wang, L.1
Liu, Z.2
Shen, W.3
Lang, S.4
-
47
-
-
0141988713
-
DPP: An agent-based approach for distributed process planning
-
Wang, L. and Shen, W. (2003) 'DPP: an agent-based approach for distributed process planning', Journal of Intelligent Manufacturing, Vol. 14, No. 5, pp.429-440.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.5
, pp. 429-440
-
-
Wang, L.1
Shen, W.2
-
48
-
-
1542605225
-
Internet scheduling environment with market driven agents
-
Yen, B.P.C. and Wu, O.Q. (2003) 'Internet scheduling environment with market driven agents', IEEE transactions on Systems, Man and Cybernetics - Part A: Systems and Humans, Vol. 34, No. 2, pp.281-289.
-
(2003)
IEEE Transactions on Systems, Man and Cybernetics - Part A: Systems and Humans
, vol.34
, Issue.2
, pp. 281-289
-
-
Yen, B.P.C.1
Wu, O.Q.2
-
49
-
-
0033345048
-
Object oriented manufacturing resource modeling for adaptive process planning
-
Zhang, Y., Feng, S.C., Wang, X., Tian, W. and Wu, R. (1999) 'Object oriented manufacturing resource modeling for adaptive process planning', International Journal of Production Research, Vol. 37, No. 18, pp.4179-4195.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.18
, pp. 4179-4195
-
-
Zhang, Y.1
Feng, S.C.2
Wang, X.3
Tian, W.4
Wu, R.5
-
50
-
-
0027151172
-
IPPM - A prototype to integrate process planning and job shop scheduling functions
-
Zhang, H.C. and Merchant, E. (1993) 'IPPM - a prototype to integrate process planning and job shop scheduling functions', CIRP Annals, Vol. 42, No. 1, pp.513-518.
-
(1993)
CIRP Annals
, vol.42
, Issue.1
, pp. 513-518
-
-
Zhang, H.C.1
Merchant, E.2
-
51
-
-
0033889902
-
A cooperative agent modeling approach for process planning
-
Zhao, F.L., Tso, S.K. and Wu, P.S.Y. (2000) 'A cooperative agent modeling approach for process planning', Computers in Industry, Vol. 41, No. 1, pp.83-97.
-
(2000)
Computers in Industry
, vol.41
, Issue.1
, pp. 83-97
-
-
Zhao, F.L.1
Tso, S.K.2
Wu, P.S.Y.3
-
52
-
-
0029220198
-
The integration of process planning and shop floor scheduling in small batch part manufacturing
-
Zijm, W.H.M. (1995) 'The integration of process planning and shop floor scheduling in small batch part manufacturing'. Annals of the CIRP, Vol. 44, No. 1, pp.429-432.
-
(1995)
Annals of the CIRP
, vol.44
, Issue.1
, pp. 429-432
-
-
Zijm, W.H.M.1
|