메뉴 건너뛰기




Volumn 50, Issue 16, 2012, Pages 4477-4492

Material and capacity requirements planning with dynamic lead times

Author keywords

capacity planning; dynamic lead times; material requirements planning

Indexed keywords

CAPACITY PLANNING; CAPACITY REQUIREMENT; FINITE CAPACITY; LEAD TIME; LOT SPLITTING; MATERIAL REQUIREMENTS PLANNING; PRODUCTION PLANS; SAFETY STOCK; TRADITIONAL MATERIALS;

EID: 84865005887     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.603707     Document Type: Article
Times cited : (25)

References (27)
  • 1
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker, K., 1984. Sequencing rules and due-date assignments in a job shop. Management Science, 30 (9), 1093-1104.
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.1
  • 3
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity constraints MRP systems
    • Billington, P.J. and Thomas, L.J., 1983. Mathematical programming approaches to capacity constraints MRP systems. Management Science, 29 (10), 1126-1141.
    • (1983) Management Science , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    Thomas, L.J.2
  • 4
    • 0022769864 scopus 로고
    • Heuristics for multi-level lot-sizing with a bottleneck
    • Billington, P.J. and Thomas, L.J., 1986. Heuristics for multi-level lot-sizing with a bottleneck. Management Science, 32 (8), 1403-1415.
    • (1986) Management Science , vol.32 , Issue.8 , pp. 1403-1415
    • Billington, P.J.1    Thomas, L.J.2
  • 5
    • 70449672642 scopus 로고    scopus 로고
    • Capacity requirements planning for twin Fabs of wafer fabrication
    • Chen, J.C., Fan, Y.-C., and Chen, C.-W., 2009. Capacity requirements planning for twin Fabs of wafer fabrication. International Journal of Production Research, 47 (16), 4473-4496.
    • (2009) International Journal of Production Research , vol.47 , Issue.16 , pp. 4473-4496
    • Chen, J.C.1    Fan, Y.-C.2    Chen, C.-W.3
  • 6
    • 70449674536 scopus 로고    scopus 로고
    • Capacity-filtering algorithms for finite-capacity planning of a flexible flow line
    • Choi, B.K. and Seo, J.C., 2009. Capacity-filtering algorithms for finite-capacity planning of a flexible flow line. International Journal of Production Research, 47 (12), 3363-3386.
    • (2009) International Journal of Production Research , vol.47 , Issue.12 , pp. 3363-3386
    • Choi, B.K.1    Seo, J.C.2
  • 7
    • 0018296191 scopus 로고
    • A lot-sizing rule for time phased component demand
    • Groff, G.K., 1979. A lot-sizing rule for time phased component demand. Production and Inventory Management, 20 (1), 47-53.
    • (1979) Production and Inventory Management , vol.20 , Issue.1 , pp. 47-53
    • Groff, G.K.1
  • 8
    • 0001857828 scopus 로고
    • Which lot-sizing techniques are used in material requirements planning?
    • Haddock, J. and Hubicki, D.E., 1989. Which lot-sizing techniques are used in material requirements planning? Production and Inventory Management Journal, 30 (3), 53-56.
    • (1989) Production and Inventory Management Journal , vol.30 , Issue.3 , pp. 53-56
    • Haddock, J.1    Hubicki, D.E.2
  • 9
    • 0020825273 scopus 로고
    • Reducing capacity problems in material requirements planning system
    • Harl, J.E., 1983. Reducing capacity problems in material requirements planning system. Production and Inventory Management, 24 (3), 52-60.
    • (1983) Production and Inventory Management , vol.24 , Issue.3 , pp. 52-60
    • Harl, J.E.1
  • 12
    • 38249039951 scopus 로고
    • Toward a better understanding of lead times in MRP systems
    • Kanet, J.J., 1986. Toward a better understanding of lead times in MRP systems. Journal of Operations Management, 6 (3), 305-315.
    • (1986) Journal of Operations Management , vol.6 , Issue.3 , pp. 305-315
    • Kanet, J.J.1
  • 14
    • 77951174707 scopus 로고    scopus 로고
    • Integrating production planning and control: Towards a simple model for capacitated ERP
    • Kanet, J.J. and Stößlein, M., 2010. Integrating production planning and control: Towards a simple model for capacitated ERP. Production Planning & Control, 21 (3), 286-300.
    • (2010) Production Planning & Control , vol.21 , Issue.3 , pp. 286-300
    • Kanet, J.J.1    Stößlein, M.2
  • 15
    • 66149085616 scopus 로고    scopus 로고
    • A high performance finite capacitated MRP process using a computational grid
    • Lee, H.-G., Park, N., and Park, J., 2009. A high performance finite capacitated MRP process using a computational grid. International Journal of Production Research, 47 (8), 2109-2123.
    • (2009) International Journal of Production Research , vol.47 , Issue.8 , pp. 2109-2123
    • Lee, H.-G.1    Park, N.2    Park, J.3
  • 16
    • 0035918743 scopus 로고    scopus 로고
    • Finite capacity scheduling method for MRP with lot size restrictions
    • Nagendra, P. and Das, S., 2001. Finite capacity scheduling method for MRP with lot size restrictions. International Journal of Production Research, 39 (8), 1603-1623.
    • (2001) International Journal of Production Research , vol.39 , Issue.8 , pp. 1603-1623
    • Nagendra, P.1    Das, S.2
  • 21
    • 84990557283 scopus 로고
    • A new framework for manufacturing planning and control systems
    • Sum, C.C. and Hill, A.V., 1993. A new framework for manufacturing planning and control systems. Decision Sciences, 24 (4), 739-760.
    • (1993) Decision Sciences , vol.24 , Issue.4 , pp. 739-760
    • Sum, C.C.1    Hill, A.V.2
  • 22
    • 0031126052 scopus 로고    scopus 로고
    • Integrating MRP and finite capacity planning
    • Taal, M. and Wortmann, J.C., 1997. Integrating MRP and finite capacity planning. Production Planning & Control, 8 (3), 245-254.
    • (1997) Production Planning & Control , vol.8 , Issue.3 , pp. 245-254
    • Taal, M.1    Wortmann, J.C.2
  • 25
    • 56749183825 scopus 로고    scopus 로고
    • A finite-capacity production scheduling procedure for a Belgian steel company
    • Vanhoucke, M. and Debels, D., 2009. A finite-capacity production scheduling procedure for a Belgian steel company. International Journal of Production Research, 47 (3), 561-584.
    • (2009) International Journal of Production Research , vol.47 , Issue.3 , pp. 561-584
    • Vanhoucke, M.1    Debels, D.2
  • 26
    • 4444312779 scopus 로고    scopus 로고
    • Development of finite capacity material requirement planning system for assembly operations
    • Wuttipornpun, T. and Yenradee, P., 2004. Development of finite capacity material requirement planning system for assembly operations. Production Planning & Control, 15 (5), 534-549.
    • (2004) Production Planning & Control , vol.15 , Issue.5 , pp. 534-549
    • Wuttipornpun, T.1    Yenradee, P.2
  • 27
    • 36248938665 scopus 로고    scopus 로고
    • Performance of TOC based finite capacity material requirement planning system for a multi-stage assembly factory
    • Wuttipornpun, T. and Yenradee, P., 2007. Performance of TOC based finite capacity material requirement planning system for a multi-stage assembly factory. Production Planning & Control, 18 (8), 703-715.
    • (2007) Production Planning & Control , vol.18 , Issue.8 , pp. 703-715
    • Wuttipornpun, T.1    Yenradee, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.