-
1
-
-
84861864856
-
A branch and bound and parallel genetic algorithm for the job shop scheduling problem with blocking
-
AitZai, A., Benmedjdoub, B. and Boudhar, M. (2012) 'A branch and bound and parallel genetic algorithm for the job shop scheduling problem with blocking', International Journal of Operational Research, Vol. 14, No. 3, pp.343-365
-
(2012)
International Journal of Operational Research
, vol.14
, Issue.3
, pp. 343-365
-
-
Aitzai, A.1
Benmedjdoub, B.2
Boudhar, M.3
-
2
-
-
36849051282
-
The significance of reducing setup times/setup costs
-
Allahverdi, A. and Soroush, H.M. (2008) 'The significance of reducing setup times/setup costs', European Journal of Operational Research, Vol. 187, No. 3, pp.978-984
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 978-984
-
-
Allahverdi, A.1
Soroush, H.M.2
-
3
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi, A., Ng, C.T., Cheng, T.C.E. and Kovalyov, M.Y. (2008) 'A survey of scheduling problems with setup times or costs', European Journal of Operational Research, Vol. 187,No. 3, pp.985-1032
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
4
-
-
84874159754
-
Solving a generalised precedence multiobjective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm
-
Amiri, M., Abtahi, A-M. and Damghani, K. (2013) 'Solving a generalised precedence multiobjective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm', International Journal of Services and Operations Management, Vol. 14, No. 3, pp.355-372
-
(2013)
International Journal of Services and Operations Management
, vol.14
, Issue.3
, pp. 355-372
-
-
Amiri, M.1
Abtahi, A.-M.2
Damghani, K.3
-
5
-
-
77955343902
-
An approach to the minimisation of makespan in the textile industry using ant colony optimisation
-
Amuthakkannan, R., Babu, C.K. and Kannan, S.M. (2010) 'An approach to the minimisation of makespan in the textile industry using ant colony optimisation', International Journal of Services and Operations Management, Vol. 7, No. 2, pp. 215-230
-
(2010)
International Journal of Services and Operations Management
, vol.7
, Issue.2
, pp. 215-230
-
-
Amuthakkannan, R.1
Babu, C.K.2
Kannan, S.M.3
-
6
-
-
34248229256
-
Agility in two-stage hybrid flow shop parallel machine scheduling through simulated annealing
-
Arumugam, C., Raja, K. and Selladurai, V. (2007) 'Agility in two-stage hybrid flow shop parallel machine scheduling through simulated annealing', International Journal of Services and Operations Management, Vol. 3 No. 3, pp. 332-354
-
(2007)
International Journal of Services and Operations Management
, vol.3
, Issue.3
, pp. 332-354
-
-
Arumugam, C.1
Raja, K.2
Selladurai, V.3
-
7
-
-
78049425643
-
A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
-
Bouabda, R., Jarboui, B., Eddaly, M. and Rebaï, A. (2011) 'A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times', Computers & Operations Research, Vol. 38, No. 1, pp.387-393
-
(2011)
Computers & Operations Research
, vol.38
, Issue.1
, pp. 387-393
-
-
Bouabda, R.1
Jarboui, B.2
Eddaly, M.3
Rebaï, A.4
-
8
-
-
77953243004
-
Scheduling with arranged multi-purpose machines
-
Boudhar, M. and Tchikou, H. (2010) 'Scheduling with arranged multi-purpose machines', International Journal of Operational Research, Vol. 8, No. 3, pp.379-397
-
(2010)
International Journal of Operational Research
, vol.8
, Issue.3
, pp. 379-397
-
-
Boudhar, M.1
Tchikou, H.2
-
9
-
-
84859210627
-
Sequence-dependent group scheduling problem on unrelated-parallel machines
-
Bozorgirad, M.A. and Logendran, R. (2012) 'Sequence-dependent group scheduling problem on unrelated-parallel machines', Expert Systems with Applications, Vol. 39, No. 10,pp.9021-9030
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.10
, pp. 9021-9030
-
-
Bozorgirad, M.A.1
Logendran, R.2
-
10
-
-
84862904090
-
Genetic algorithm for chance constrained reliability stochastic optimisation problems
-
Charles, V. and Udhayakumar, A. (2012) 'Genetic algorithm for chance constrained reliability stochastic optimisation problems', International Journal of Operational Research, Vol. 14,No. 4, pp.417-432
-
(2012)
International Journal of Operational Research
, vol.14
, Issue.4
, pp. 417-432
-
-
Charles, V.1
Udhayakumar, A.2
-
11
-
-
79954584266
-
A genetic algorithm for one-job m-machine flowshop lot streaming with variable sublots
-
Defersha, F.M. and Chen, M. (2011) 'A genetic algorithm for one-job m-machine flowshop lot streaming with variable sublots', International Journal of Operational Research, Vol. 10,No. 4, pp.458-468
-
(2011)
International Journal of Operational Research
, vol.10
, Issue.4
, pp. 458-468
-
-
Defersha, F.M.1
Chen, M.2
-
12
-
-
70349925982
-
Bi-criteria m-machine flow shop scheduling with sequence-dependent setup times
-
Eren T.A. (2011) 'Bi-criteria m-machine flow shop scheduling with sequence-dependent setup times', Applied Mathematical Modeling, Vol. 34, No. 2, pp.284-293
-
(2011)
Applied Mathematical Modeling
, vol.34
, Issue.2
, pp. 284-293
-
-
Eren, T.A.1
-
13
-
-
33748519291
-
An ant colony algorithm for scheduling in flow shops with sequence-dependent setup times of jobs
-
Gajpal, Y., Rajendran, C. and Ziegler, H. (2006) 'An ant colony algorithm for scheduling in flow shops with sequence-dependent setup times of jobs', International Journal of Advanced Manufacturing Technology, Vol. 30, Nos. 5-6, pp.416-424
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, Issue.5-6
, pp. 416-424
-
-
Gajpal, Y.1
Rajendran, C.2
Ziegler, H.3
-
14
-
-
84858334118
-
An agent-based genetic algorithm for hybrid flowshops with sequencedependentsetup times to minimise makespan
-
Gómez-Gasquet, P., Andrés, C. and Larioa, F.C. (2012) 'An agent-based genetic algorithm for hybrid flowshops with sequencedependentsetup times to minimise makespan', Expert Systems with Applications, Vol. 39, No. 9, pp.8095-8107
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.9
, pp. 8095-8107
-
-
Gómez-Gasquet, P.1
Andrés, C.2
Larioa, F.C.3
-
15
-
-
0000044050
-
Flow shop schedules with sequence dependent setup times
-
Gupta, J.N.D. (1986) 'Flow shop schedules with sequence dependent setup times', Journal of Operations Research Society Japan, Vol. 29, No. 3, pp.206-19
-
(1986)
Journal of Operations Research Society Japan
, vol.29
, Issue.3
, pp. 206-219
-
-
Gupta, J.N.D.1
-
16
-
-
79957623395
-
A multiple objective approach to scheduling the preventive maintenance of modular aircraft components
-
Joo, S. and Min, H. (2011) 'A multiple objective approach to scheduling the preventive maintenance of modular aircraft components', International Journal of Services and Operations Management, Vol. 9, No. 1, pp.18-31
-
(2011)
International Journal of Services and Operations Management
, vol.9
, Issue.1
, pp. 18-31
-
-
Joo, S.1
Min, H.2
-
17
-
-
80053900598
-
Development of simulation-based metamodels for the analysis of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of an FMS
-
Joseph, O.A. and Sridharan, R. (2011) 'Development of simulation-based metamodels for the analysis of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of an FMS', International Journal of Operational Research, Vol. 12, No. 3,pp.333-361
-
(2011)
International Journal of Operational Research
, vol.12
, Issue.3
, pp. 333-361
-
-
Joseph, O.A.1
Sridharan, R.2
-
18
-
-
77951458130
-
Scheduling in resourceconstrained multiple projects to minimise the weighted tardiness and weighted earliness of projects
-
Kanagasabapathi, B., Rajendran, C. and Ananthanarayanan, K. (2010) 'Scheduling in resourceconstrained multiple projects to minimise the weighted tardiness and weighted earliness of projects', International Journal of Operational Research, Vol. 7, No. 3, pp.334-386
-
(2010)
International Journal of Operational Research
, vol.7
, Issue.3
, pp. 334-386
-
-
Kanagasabapathi, B.1
Rajendran, C.2
Ananthanarayanan, K.3
-
19
-
-
64949187197
-
Determining the optimum safety stock under rolling schedules for capacitated multi-item production systems
-
Kanyalkar, A.P. and Adil, G.K. (2009) 'Determining the optimum safety stock under rolling schedules for capacitated multi-item production systems', International Journal of Services and Operations Management, Vol. 5, No. 4, pp.498-519
-
(2009)
International Journal of Services and Operations Management
, vol.5
, Issue.4
, pp. 498-519
-
-
Kanyalkar, A.P.1
Adil, G.K.2
-
20
-
-
84859574731
-
A PSO-based procedure for a bi-level multiobjective TOC-based job-shop scheduling problem
-
Kasemset, C. and Kachitvichyanukul, V. (2012) 'A PSO-based procedure for a bi-level multiobjective TOC-based job-shop scheduling problem', International Journal of Operational Research, Vol. 14, No. 1, pp.50-69
-
(2012)
International Journal of Operational Research
, vol.14
, Issue.1
, pp. 50-69
-
-
Kasemset, C.1
Kachitvichyanukul, V.2
-
21
-
-
84866042189
-
Parameter tuning of ant system using fuzzy logic controller
-
Komarudin and Wong, K.Y. (2012) 'Parameter tuning of ant system using fuzzy logic controller', International Journal of Operational Research, Vol. 15, No. 2, pp.125-135
-
(2012)
International Journal of Operational Research
, vol.15
, Issue.2
, pp. 125-135
-
-
Komarudin1
Wong, K.Y.2
-
22
-
-
84873357941
-
Simulated annealing-based algorithm for the capacitated hub routing problem
-
Kumar, P.N.R. and Sivakumar, A.I. (2013) 'Simulated annealing-based algorithm for the capacitated hub routing problem', International Journal of Services and Operations Management, Vol. 14, No. 2, pp.221-235
-
(2013)
International Journal of Services and Operations Management
, vol.14
, Issue.2
, pp. 221-235
-
-
Kumar, P.N.R.1
Sivakumar, A.I.2
-
23
-
-
34248208175
-
Improved heuristically guided genetic algorithm for the flow shop scheduling problem
-
Laha, D. and Mandal, P. (2007) 'Improved heuristically guided genetic algorithm for the flow shop scheduling problem', International Journal of Services and Operations Management, Vol. 3, No. 3, pp.316-331
-
(2007)
International Journal of Services and Operations Management
, vol.3
, Issue.3
, pp. 316-331
-
-
Laha, D.1
Mandal, P.2
-
24
-
-
33847354353
-
Production planning and control with outsourcing using artificial intelligence
-
Lawrynowicz, A. (2007) 'Production planning and control with outsourcing using artificial intelligence', International Journal of Services and Operations Management, Vol. 3, No. 2pp.193-209
-
(2007)
International Journal of Services and Operations Management
, vol.3
, Issue.2
, pp. 193-209
-
-
Lawrynowicz, A.1
-
25
-
-
79957978863
-
Tuning metaheuristics: A data mining based approach for particle swarm optimization
-
Lessmann, S., Caserta, M. And Arango, I.M. (2011) 'Tuning metaheuristics: A data mining based approach for particle swarm optimization', Expert Systems with Applications, Vol. 38, No. 10, pp.12826-12838
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.10
, pp. 12826-12838
-
-
Lessmann, S.1
Caserta, M.2
Arango, I.M.3
-
26
-
-
77952189815
-
Minimising earliness and tardiness on parallel machines with sequence-dependent setups
-
Magableh, G.M. and Mason, S.J. (2010) 'Minimising earliness and tardiness on parallel machines with sequence-dependent setups', International Journal of Operational Research, Vol. 8, No. 1, pp.42-61
-
(2010)
International Journal of Operational Research
, vol.8
, Issue.1
, pp. 42-61
-
-
Magableh, G.M.1
Mason, S.J.2
-
27
-
-
0020699921
-
A heuristic algorithm for the m-machine, n- job flow-shop sequencing problem
-
Nawaz, M., Enscore, E.E. and Ham, I. (1983) 'A heuristic algorithm for the m-machine, n- job flow-shop sequencing problem', Omega, Vol. 11, No. 1, pp.91-97
-
(1983)
Omega
, vol.11
, Issue.1
, pp. 91-97
-
-
Nawaz, M.1
Enscore, E.E.2
Ham, I.3
-
28
-
-
84868619331
-
An efficient differential evolution algorithm for multi-mode resource-constrained project scheduling problems
-
Nguyen, S. and Kachitvichyanukul, V. (2012) 'An efficient differential evolution algorithm for multi-mode resource-constrained project scheduling problems', International Journal of Operational Research, Vol. 15, No. 4, pp.466-481
-
(2012)
International Journal of Operational Research
, vol.15
, Issue.4
, pp. 466-481
-
-
Nguyen, S.1
Kachitvichyanukul, V.2
-
29
-
-
84862849053
-
A genetic algorithm-based fuzzy goal programming approach for solving fractional bilevel programming problems
-
Pal, B.B. and Gupta, S. (2012) 'A genetic algorithm-based fuzzy goal programming approach for solving fractional bilevel programming problems', International Journal of Operational Research, Vol. 14, No. 4, pp.453-471
-
(2012)
International Journal of Operational Research
, vol.14
, Issue.4
, pp. 453-471
-
-
Pal, B.B.1
Gupta, S.2
-
30
-
-
85014346197
-
Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times: Water flow-like algorithm approach
-
Pargar, F. and Zandieh, M. (2012) 'Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times: water flow-like algorithm approach', International Journal of Production Research, Vol. 50, No. 10, pp.2609-23
-
(2012)
International Journal of Production Research
, vol.50
, Issue.10
, pp. 2609-2623
-
-
Pargar, F.1
Zandieh, M.2
-
31
-
-
0031190804
-
A simulated annealing heuristic for scheduling to minimize weighted tardiness in a flowshop with sequence dependent setup times of jobs - A case study
-
Parthasarathy, S. and Rajendran, C. (1997) 'A simulated annealing heuristic for scheduling to minimize weighted tardiness in a flowshop with sequence dependent setup times of jobs - a case study', Production Planning and Control, Vol. 8, No. 5, pp.475-83
-
(1997)
Production Planning and Control
, vol.8
, Issue.5
, pp. 475-483
-
-
Parthasarathy, S.1
Rajendran, C.2
-
32
-
-
79958784624
-
An artificial neural network based heuristic for flow shop scheduling problems
-
Ramanan, T.R., Sridharan, R., Shashikant, K.S. and Haq, A.N. (2011) 'An artificial neural network based heuristic for flow shop scheduling problems', Journal of Intelligent Manufacturing, Vol. 22, No. 2, pp.279-88
-
(2011)
Journal of Intelligent Manufacturing
, vol.22
, Issue.2
, pp. 279-288
-
-
Ramanan, T.R.1
Sridharan, R.2
Shashikant, K.S.3
Haq, A.N.4
-
33
-
-
0032189491
-
Heuristics for the flow line problem with setup costs
-
Rios-Mercado, R.Z. and Bard, J.F. (1998) 'Heuristics for the flow line problem with setup costs', European Journal of Operational Research, Vol. 110, No. 1, pp.76-98
-
(1998)
European Journal of Operational Research
, vol.110
, Issue.1
, pp. 76-98
-
-
Rios-Mercado, R.Z.1
Bard, J.F.2
-
34
-
-
27144540137
-
A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility
-
Ruiz, R., and Maroto, C. (2006) 'A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility', European Journal of Operational Research,Vol. 169, No. 3, pp.781-800
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 781-800
-
-
Ruiz, R.1
Maroto, C.2
-
35
-
-
12344285964
-
Solving the flow shop scheduling problem with sequence dependent setup times using advanced meta heuristic
-
Ruiz, R., Maroto, C. and Alcatraz, J. (2005) 'Solving the flow shop scheduling problem with sequence dependent setup times using advanced meta heuristic', European Journal of Operational Research , Vol. 165, No. 1, pp.34-54
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.1
, pp. 34-54
-
-
Ruiz, R.1
Maroto, C.2
Alcatraz, J.3
-
36
-
-
84866738116
-
Carryover sequence-dependent group scheduling with the integration of internal and external setup times
-
Sabouni, M.T.Y. and Logendran, R. (2013) 'Carryover sequence-dependent group scheduling with the integration of internal and external setup times', European Journal of Operational Research, Vol. 224, No. 1, pp.8-22
-
(2013)
European Journal of Operational Research
, vol.224
, Issue.1
, pp. 8-22
-
-
Sabouni, M.T.Y.1
Logendran, R.2
-
37
-
-
84874147820
-
Optimisation of distribution quantity in a multi- product multiperiod supply chain using genetic algorithm
-
Sobhani, F. and Wong, K.Y. (2013) 'Optimisation of distribution quantity in a multi- product multiperiod supply chain using genetic algorithm', International Journal of Services and Operations Management, Vol. 14, No. 3, pp.277- 297
-
(2013)
International Journal of Services and Operations Management
, vol.14
, Issue.3
, pp. 277-297
-
-
Sobhani, F.1
Wong, K.Y.2
-
38
-
-
84859418574
-
Minimising tool switching and indexing times by ant colony optimisation in automatic machining centres
-
Solimanpur, M. and Rastgordani, R. (2012) 'Minimising tool switching and indexing times by ant colony optimisation in automatic machining centres', International Journal of perational Research, Vol. 13, No. 4, pp.465-479
-
(2012)
International Journal of Perational Research
, vol.13
, Issue.4
, pp. 465-479
-
-
Solimanpur, M.1
Rastgordani, R.2
-
39
-
-
67849099655
-
Minimising a weighted quadratic function of job lateness in the stochastic single machine scheduling problem
-
Soroush, H.M. and Alqallaf, F.A. (2009) 'Minimising a weighted quadratic function of job lateness in the stochastic single machine scheduling problem', International Journal of OperationalResearch, Vol. 6, No. 4, pp.538-572
-
(2009)
International Journal of OperationalResearch
, vol.6
, Issue.4
, pp. 538-572
-
-
Soroush, H.M.1
Alqallaf, F.A.2
-
40
-
-
84857298868
-
Minimising variance of job completion times in a single machine
-
Srinivasan, G. and Srirangacharyulu, B. (2012) 'Minimising variance of job completion times in a single machine', International Journal of Operational Research, Vol. 13, No. 1, pp.110-127
-
(2012)
International Journal of Operational Research
, vol.13
, Issue.1
, pp. 110-127
-
-
Srinivasan, G.1
Srirangacharyulu, B.2
-
41
-
-
0027201278
-
Benchmarks for basic scheduling problems
-
Taillard, E. (1993) 'Benchmarks for basic scheduling problems', European Journal of Operational Research, Vol. 64, No. 2, pp.278-85
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.2
, pp. 278-285
-
-
Taillard, E.1
-
42
-
-
84866166333
-
An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times
-
Tanaka, S. and Araki, M. (2013) 'An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times', Computers & Operations Research, Vol. 40, No. 1, pp.344-352
-
(2013)
Computers & Operations Research
, vol.40
, Issue.1
, pp. 344-352
-
-
Tanaka, S.1
Araki, M.2
-
43
-
-
84888643208
-
Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence-dependent setup times
-
DOI:10.1007/s00170-012-4571-8
-
Vanchipura, R. and Sridharan, R. (2012) 'Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence-dependent setup times', International Journal of Advanced Manufacturing Technology, pp.1-17, DOI:10.1007/s00170-012-4571-8
-
(2012)
International Journal of Advanced Manufacturing Technology
, pp. 1-17
-
-
Vanchipura, R.1
Sridharan, R.2
-
44
-
-
84874319235
-
Taguchi method for parameter design in ACO algorithm for distribution-allocation in a two-stage supply chain
-
DOI: 10.1007/s00170-012-4104-5
-
Vinay, V.P. and Sridharan, R. (2012) 'Taguchi method for parameter design in ACO algorithm for distribution-allocation in a two-stage supply chain', International Journal of Advanced Manufacturing Technology online first, pp.1-11, DOI: 10.1007/s00170-012- 4104-5
-
(2012)
International Journal of Advanced Manufacturing Technology Online First
, pp. 1-11
-
-
Vinay, V.P.1
Sridharan, R.2
-
45
-
-
39049173098
-
Dynamic job-shop scheduling with sequence- dependent setup times: Simulation modeling and analysis
-
Vinod, V. and Sridharan, R. (2008) 'Dynamic job-shop scheduling with sequence- dependent setup times: simulation modeling and analysis', International Journal of Advanced Manufacturing Technology, Vol. 36, Nos. 3-4, pp.355-72
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.36
, Issue.3-4
, pp. 355-372
-
-
Vinod, V.1
Sridharan, R.2
-
46
-
-
39749143379
-
Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study
-
Vinod, V. and Sridharan, R. (2008) 'Scheduling a dynamic job shop production system with sequence-dependent setups: an experimental study', Robotics and Computer- Integrated Manufacturing, Vol. 24, No. 3, pp.435-449
-
(2008)
Robotics and Computer- Integrated Manufacturing
, vol.24
, Issue.3
, pp. 435-449
-
-
Vinod, V.1
Sridharan, R.2
|