메뉴 건너뛰기




Volumn 17, Issue 2, 2014, Pages 168-193

Development and analysis of hybrid genetic algorithms for flow shop scheduling with sequence dependent setup time

Author keywords

Flow shop; Hybrid genetic algorithm; Parameter tuning; SDST; Sequence dependent setup time

Indexed keywords


EID: 84893287606     PISSN: 17442370     EISSN: 17442389     Source Type: Journal    
DOI: 10.1504/IJSOM.2014.058842     Document Type: Article
Times cited : (15)

References (46)
  • 1
    • 84861864856 scopus 로고    scopus 로고
    • A branch and bound and parallel genetic algorithm for the job shop scheduling problem with blocking
    • AitZai, A., Benmedjdoub, B. and Boudhar, M. (2012) 'A branch and bound and parallel genetic algorithm for the job shop scheduling problem with blocking', International Journal of Operational Research, Vol. 14, No. 3, pp.343-365
    • (2012) International Journal of Operational Research , vol.14 , Issue.3 , pp. 343-365
    • Aitzai, A.1    Benmedjdoub, B.2    Boudhar, M.3
  • 2
    • 36849051282 scopus 로고    scopus 로고
    • The significance of reducing setup times/setup costs
    • Allahverdi, A. and Soroush, H.M. (2008) 'The significance of reducing setup times/setup costs', European Journal of Operational Research, Vol. 187, No. 3, pp.978-984
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 978-984
    • Allahverdi, A.1    Soroush, H.M.2
  • 4
    • 84874159754 scopus 로고    scopus 로고
    • Solving a generalised precedence multiobjective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm
    • Amiri, M., Abtahi, A-M. and Damghani, K. (2013) 'Solving a generalised precedence multiobjective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm', International Journal of Services and Operations Management, Vol. 14, No. 3, pp.355-372
    • (2013) International Journal of Services and Operations Management , vol.14 , Issue.3 , pp. 355-372
    • Amiri, M.1    Abtahi, A.-M.2    Damghani, K.3
  • 5
  • 6
    • 34248229256 scopus 로고    scopus 로고
    • Agility in two-stage hybrid flow shop parallel machine scheduling through simulated annealing
    • Arumugam, C., Raja, K. and Selladurai, V. (2007) 'Agility in two-stage hybrid flow shop parallel machine scheduling through simulated annealing', International Journal of Services and Operations Management, Vol. 3 No. 3, pp. 332-354
    • (2007) International Journal of Services and Operations Management , vol.3 , Issue.3 , pp. 332-354
    • Arumugam, C.1    Raja, K.2    Selladurai, V.3
  • 7
    • 78049425643 scopus 로고    scopus 로고
    • A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
    • Bouabda, R., Jarboui, B., Eddaly, M. and Rebaï, A. (2011) 'A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times', Computers & Operations Research, Vol. 38, No. 1, pp.387-393
    • (2011) Computers & Operations Research , vol.38 , Issue.1 , pp. 387-393
    • Bouabda, R.1    Jarboui, B.2    Eddaly, M.3    Rebaï, A.4
  • 9
    • 84859210627 scopus 로고    scopus 로고
    • Sequence-dependent group scheduling problem on unrelated-parallel machines
    • Bozorgirad, M.A. and Logendran, R. (2012) 'Sequence-dependent group scheduling problem on unrelated-parallel machines', Expert Systems with Applications, Vol. 39, No. 10,pp.9021-9030
    • (2012) Expert Systems with Applications , vol.39 , Issue.10 , pp. 9021-9030
    • Bozorgirad, M.A.1    Logendran, R.2
  • 10
    • 84862904090 scopus 로고    scopus 로고
    • Genetic algorithm for chance constrained reliability stochastic optimisation problems
    • Charles, V. and Udhayakumar, A. (2012) 'Genetic algorithm for chance constrained reliability stochastic optimisation problems', International Journal of Operational Research, Vol. 14,No. 4, pp.417-432
    • (2012) International Journal of Operational Research , vol.14 , Issue.4 , pp. 417-432
    • Charles, V.1    Udhayakumar, A.2
  • 11
    • 79954584266 scopus 로고    scopus 로고
    • A genetic algorithm for one-job m-machine flowshop lot streaming with variable sublots
    • Defersha, F.M. and Chen, M. (2011) 'A genetic algorithm for one-job m-machine flowshop lot streaming with variable sublots', International Journal of Operational Research, Vol. 10,No. 4, pp.458-468
    • (2011) International Journal of Operational Research , vol.10 , Issue.4 , pp. 458-468
    • Defersha, F.M.1    Chen, M.2
  • 12
    • 70349925982 scopus 로고    scopus 로고
    • Bi-criteria m-machine flow shop scheduling with sequence-dependent setup times
    • Eren T.A. (2011) 'Bi-criteria m-machine flow shop scheduling with sequence-dependent setup times', Applied Mathematical Modeling, Vol. 34, No. 2, pp.284-293
    • (2011) Applied Mathematical Modeling , vol.34 , Issue.2 , pp. 284-293
    • Eren, T.A.1
  • 13
    • 33748519291 scopus 로고    scopus 로고
    • An ant colony algorithm for scheduling in flow shops with sequence-dependent setup times of jobs
    • Gajpal, Y., Rajendran, C. and Ziegler, H. (2006) 'An ant colony algorithm for scheduling in flow shops with sequence-dependent setup times of jobs', International Journal of Advanced Manufacturing Technology, Vol. 30, Nos. 5-6, pp.416-424
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.5-6 , pp. 416-424
    • Gajpal, Y.1    Rajendran, C.2    Ziegler, H.3
  • 14
    • 84858334118 scopus 로고    scopus 로고
    • An agent-based genetic algorithm for hybrid flowshops with sequencedependentsetup times to minimise makespan
    • Gómez-Gasquet, P., Andrés, C. and Larioa, F.C. (2012) 'An agent-based genetic algorithm for hybrid flowshops with sequencedependentsetup times to minimise makespan', Expert Systems with Applications, Vol. 39, No. 9, pp.8095-8107
    • (2012) Expert Systems with Applications , vol.39 , Issue.9 , pp. 8095-8107
    • Gómez-Gasquet, P.1    Andrés, C.2    Larioa, F.C.3
  • 15
    • 0000044050 scopus 로고
    • Flow shop schedules with sequence dependent setup times
    • Gupta, J.N.D. (1986) 'Flow shop schedules with sequence dependent setup times', Journal of Operations Research Society Japan, Vol. 29, No. 3, pp.206-19
    • (1986) Journal of Operations Research Society Japan , vol.29 , Issue.3 , pp. 206-219
    • Gupta, J.N.D.1
  • 16
    • 79957623395 scopus 로고    scopus 로고
    • A multiple objective approach to scheduling the preventive maintenance of modular aircraft components
    • Joo, S. and Min, H. (2011) 'A multiple objective approach to scheduling the preventive maintenance of modular aircraft components', International Journal of Services and Operations Management, Vol. 9, No. 1, pp.18-31
    • (2011) International Journal of Services and Operations Management , vol.9 , Issue.1 , pp. 18-31
    • Joo, S.1    Min, H.2
  • 17
    • 80053900598 scopus 로고    scopus 로고
    • Development of simulation-based metamodels for the analysis of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of an FMS
    • Joseph, O.A. and Sridharan, R. (2011) 'Development of simulation-based metamodels for the analysis of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of an FMS', International Journal of Operational Research, Vol. 12, No. 3,pp.333-361
    • (2011) International Journal of Operational Research , vol.12 , Issue.3 , pp. 333-361
    • Joseph, O.A.1    Sridharan, R.2
  • 18
    • 77951458130 scopus 로고    scopus 로고
    • Scheduling in resourceconstrained multiple projects to minimise the weighted tardiness and weighted earliness of projects
    • Kanagasabapathi, B., Rajendran, C. and Ananthanarayanan, K. (2010) 'Scheduling in resourceconstrained multiple projects to minimise the weighted tardiness and weighted earliness of projects', International Journal of Operational Research, Vol. 7, No. 3, pp.334-386
    • (2010) International Journal of Operational Research , vol.7 , Issue.3 , pp. 334-386
    • Kanagasabapathi, B.1    Rajendran, C.2    Ananthanarayanan, K.3
  • 19
    • 64949187197 scopus 로고    scopus 로고
    • Determining the optimum safety stock under rolling schedules for capacitated multi-item production systems
    • Kanyalkar, A.P. and Adil, G.K. (2009) 'Determining the optimum safety stock under rolling schedules for capacitated multi-item production systems', International Journal of Services and Operations Management, Vol. 5, No. 4, pp.498-519
    • (2009) International Journal of Services and Operations Management , vol.5 , Issue.4 , pp. 498-519
    • Kanyalkar, A.P.1    Adil, G.K.2
  • 20
    • 84859574731 scopus 로고    scopus 로고
    • A PSO-based procedure for a bi-level multiobjective TOC-based job-shop scheduling problem
    • Kasemset, C. and Kachitvichyanukul, V. (2012) 'A PSO-based procedure for a bi-level multiobjective TOC-based job-shop scheduling problem', International Journal of Operational Research, Vol. 14, No. 1, pp.50-69
    • (2012) International Journal of Operational Research , vol.14 , Issue.1 , pp. 50-69
    • Kasemset, C.1    Kachitvichyanukul, V.2
  • 21
    • 84866042189 scopus 로고    scopus 로고
    • Parameter tuning of ant system using fuzzy logic controller
    • Komarudin and Wong, K.Y. (2012) 'Parameter tuning of ant system using fuzzy logic controller', International Journal of Operational Research, Vol. 15, No. 2, pp.125-135
    • (2012) International Journal of Operational Research , vol.15 , Issue.2 , pp. 125-135
    • Komarudin1    Wong, K.Y.2
  • 23
    • 34248208175 scopus 로고    scopus 로고
    • Improved heuristically guided genetic algorithm for the flow shop scheduling problem
    • Laha, D. and Mandal, P. (2007) 'Improved heuristically guided genetic algorithm for the flow shop scheduling problem', International Journal of Services and Operations Management, Vol. 3, No. 3, pp.316-331
    • (2007) International Journal of Services and Operations Management , vol.3 , Issue.3 , pp. 316-331
    • Laha, D.1    Mandal, P.2
  • 24
    • 33847354353 scopus 로고    scopus 로고
    • Production planning and control with outsourcing using artificial intelligence
    • Lawrynowicz, A. (2007) 'Production planning and control with outsourcing using artificial intelligence', International Journal of Services and Operations Management, Vol. 3, No. 2pp.193-209
    • (2007) International Journal of Services and Operations Management , vol.3 , Issue.2 , pp. 193-209
    • Lawrynowicz, A.1
  • 25
    • 79957978863 scopus 로고    scopus 로고
    • Tuning metaheuristics: A data mining based approach for particle swarm optimization
    • Lessmann, S., Caserta, M. And Arango, I.M. (2011) 'Tuning metaheuristics: A data mining based approach for particle swarm optimization', Expert Systems with Applications, Vol. 38, No. 10, pp.12826-12838
    • (2011) Expert Systems with Applications , vol.38 , Issue.10 , pp. 12826-12838
    • Lessmann, S.1    Caserta, M.2    Arango, I.M.3
  • 26
    • 77952189815 scopus 로고    scopus 로고
    • Minimising earliness and tardiness on parallel machines with sequence-dependent setups
    • Magableh, G.M. and Mason, S.J. (2010) 'Minimising earliness and tardiness on parallel machines with sequence-dependent setups', International Journal of Operational Research, Vol. 8, No. 1, pp.42-61
    • (2010) International Journal of Operational Research , vol.8 , Issue.1 , pp. 42-61
    • Magableh, G.M.1    Mason, S.J.2
  • 27
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n- job flow-shop sequencing problem
    • Nawaz, M., Enscore, E.E. and Ham, I. (1983) 'A heuristic algorithm for the m-machine, n- job flow-shop sequencing problem', Omega, Vol. 11, No. 1, pp.91-97
    • (1983) Omega , vol.11 , Issue.1 , pp. 91-97
    • Nawaz, M.1    Enscore, E.E.2    Ham, I.3
  • 28
    • 84868619331 scopus 로고    scopus 로고
    • An efficient differential evolution algorithm for multi-mode resource-constrained project scheduling problems
    • Nguyen, S. and Kachitvichyanukul, V. (2012) 'An efficient differential evolution algorithm for multi-mode resource-constrained project scheduling problems', International Journal of Operational Research, Vol. 15, No. 4, pp.466-481
    • (2012) International Journal of Operational Research , vol.15 , Issue.4 , pp. 466-481
    • Nguyen, S.1    Kachitvichyanukul, V.2
  • 29
    • 84862849053 scopus 로고    scopus 로고
    • A genetic algorithm-based fuzzy goal programming approach for solving fractional bilevel programming problems
    • Pal, B.B. and Gupta, S. (2012) 'A genetic algorithm-based fuzzy goal programming approach for solving fractional bilevel programming problems', International Journal of Operational Research, Vol. 14, No. 4, pp.453-471
    • (2012) International Journal of Operational Research , vol.14 , Issue.4 , pp. 453-471
    • Pal, B.B.1    Gupta, S.2
  • 30
    • 85014346197 scopus 로고    scopus 로고
    • Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times: Water flow-like algorithm approach
    • Pargar, F. and Zandieh, M. (2012) 'Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times: water flow-like algorithm approach', International Journal of Production Research, Vol. 50, No. 10, pp.2609-23
    • (2012) International Journal of Production Research , vol.50 , Issue.10 , pp. 2609-2623
    • Pargar, F.1    Zandieh, M.2
  • 31
    • 0031190804 scopus 로고    scopus 로고
    • A simulated annealing heuristic for scheduling to minimize weighted tardiness in a flowshop with sequence dependent setup times of jobs - A case study
    • Parthasarathy, S. and Rajendran, C. (1997) 'A simulated annealing heuristic for scheduling to minimize weighted tardiness in a flowshop with sequence dependent setup times of jobs - a case study', Production Planning and Control, Vol. 8, No. 5, pp.475-83
    • (1997) Production Planning and Control , vol.8 , Issue.5 , pp. 475-483
    • Parthasarathy, S.1    Rajendran, C.2
  • 32
  • 34
    • 27144540137 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility
    • Ruiz, R., and Maroto, C. (2006) 'A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility', European Journal of Operational Research,Vol. 169, No. 3, pp.781-800
    • (2006) European Journal of Operational Research , vol.169 , Issue.3 , pp. 781-800
    • Ruiz, R.1    Maroto, C.2
  • 35
    • 12344285964 scopus 로고    scopus 로고
    • Solving the flow shop scheduling problem with sequence dependent setup times using advanced meta heuristic
    • Ruiz, R., Maroto, C. and Alcatraz, J. (2005) 'Solving the flow shop scheduling problem with sequence dependent setup times using advanced meta heuristic', European Journal of Operational Research , Vol. 165, No. 1, pp.34-54
    • (2005) European Journal of Operational Research , vol.165 , Issue.1 , pp. 34-54
    • Ruiz, R.1    Maroto, C.2    Alcatraz, J.3
  • 36
    • 84866738116 scopus 로고    scopus 로고
    • Carryover sequence-dependent group scheduling with the integration of internal and external setup times
    • Sabouni, M.T.Y. and Logendran, R. (2013) 'Carryover sequence-dependent group scheduling with the integration of internal and external setup times', European Journal of Operational Research, Vol. 224, No. 1, pp.8-22
    • (2013) European Journal of Operational Research , vol.224 , Issue.1 , pp. 8-22
    • Sabouni, M.T.Y.1    Logendran, R.2
  • 37
    • 84874147820 scopus 로고    scopus 로고
    • Optimisation of distribution quantity in a multi- product multiperiod supply chain using genetic algorithm
    • Sobhani, F. and Wong, K.Y. (2013) 'Optimisation of distribution quantity in a multi- product multiperiod supply chain using genetic algorithm', International Journal of Services and Operations Management, Vol. 14, No. 3, pp.277- 297
    • (2013) International Journal of Services and Operations Management , vol.14 , Issue.3 , pp. 277-297
    • Sobhani, F.1    Wong, K.Y.2
  • 38
    • 84859418574 scopus 로고    scopus 로고
    • Minimising tool switching and indexing times by ant colony optimisation in automatic machining centres
    • Solimanpur, M. and Rastgordani, R. (2012) 'Minimising tool switching and indexing times by ant colony optimisation in automatic machining centres', International Journal of perational Research, Vol. 13, No. 4, pp.465-479
    • (2012) International Journal of Perational Research , vol.13 , Issue.4 , pp. 465-479
    • Solimanpur, M.1    Rastgordani, R.2
  • 39
    • 67849099655 scopus 로고    scopus 로고
    • Minimising a weighted quadratic function of job lateness in the stochastic single machine scheduling problem
    • Soroush, H.M. and Alqallaf, F.A. (2009) 'Minimising a weighted quadratic function of job lateness in the stochastic single machine scheduling problem', International Journal of OperationalResearch, Vol. 6, No. 4, pp.538-572
    • (2009) International Journal of OperationalResearch , vol.6 , Issue.4 , pp. 538-572
    • Soroush, H.M.1    Alqallaf, F.A.2
  • 41
    • 0027201278 scopus 로고
    • Benchmarks for basic scheduling problems
    • Taillard, E. (1993) 'Benchmarks for basic scheduling problems', European Journal of Operational Research, Vol. 64, No. 2, pp.278-85
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 278-285
    • Taillard, E.1
  • 42
    • 84866166333 scopus 로고    scopus 로고
    • An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times
    • Tanaka, S. and Araki, M. (2013) 'An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times', Computers & Operations Research, Vol. 40, No. 1, pp.344-352
    • (2013) Computers & Operations Research , vol.40 , Issue.1 , pp. 344-352
    • Tanaka, S.1    Araki, M.2
  • 43
    • 84888643208 scopus 로고    scopus 로고
    • Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence-dependent setup times
    • DOI:10.1007/s00170-012-4571-8
    • Vanchipura, R. and Sridharan, R. (2012) 'Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence-dependent setup times', International Journal of Advanced Manufacturing Technology, pp.1-17, DOI:10.1007/s00170-012-4571-8
    • (2012) International Journal of Advanced Manufacturing Technology , pp. 1-17
    • Vanchipura, R.1    Sridharan, R.2
  • 44
    • 84874319235 scopus 로고    scopus 로고
    • Taguchi method for parameter design in ACO algorithm for distribution-allocation in a two-stage supply chain
    • DOI: 10.1007/s00170-012-4104-5
    • Vinay, V.P. and Sridharan, R. (2012) 'Taguchi method for parameter design in ACO algorithm for distribution-allocation in a two-stage supply chain', International Journal of Advanced Manufacturing Technology online first, pp.1-11, DOI: 10.1007/s00170-012- 4104-5
    • (2012) International Journal of Advanced Manufacturing Technology Online First , pp. 1-11
    • Vinay, V.P.1    Sridharan, R.2
  • 45
    • 39049173098 scopus 로고    scopus 로고
    • Dynamic job-shop scheduling with sequence- dependent setup times: Simulation modeling and analysis
    • Vinod, V. and Sridharan, R. (2008) 'Dynamic job-shop scheduling with sequence- dependent setup times: simulation modeling and analysis', International Journal of Advanced Manufacturing Technology, Vol. 36, Nos. 3-4, pp.355-72
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.3-4 , pp. 355-372
    • Vinod, V.1    Sridharan, R.2
  • 46
    • 39749143379 scopus 로고    scopus 로고
    • Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study
    • Vinod, V. and Sridharan, R. (2008) 'Scheduling a dynamic job shop production system with sequence-dependent setups: an experimental study', Robotics and Computer- Integrated Manufacturing, Vol. 24, No. 3, pp.435-449
    • (2008) Robotics and Computer- Integrated Manufacturing , vol.24 , Issue.3 , pp. 435-449
    • Vinod, V.1    Sridharan, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.