-
1
-
-
84887838095
-
Economic and environmental assessment of deconstruction strategies using building information modeling
-
Akbarnezhad, A., Ong, K. C. G., and, Chandra, L. R. (2014). " Economic and environmental assessment of deconstruction strategies using building information modeling." Autom. Constr., 37 (1), 131-144. 10.1016/j.autcon.2013.10.017 AUCOES 0926-5805
-
(2014)
Autom. Constr.
, vol.37
, Issue.1
, pp. 131-144
-
-
Akbarnezhad, A.1
Ong, K.C.G.2
Chandra, L.R.3
-
2
-
-
33846316381
-
A review of interactive methods for multiobjective integer and mixed-integer programming
-
Alves, M. J., and, Clímaco, J. (2007). " A review of interactive methods for multiobjective integer and mixed-integer programming." Eur. J. Oper. Res., 180 (1), 99-115. 10.1016/j.ejor.2006.02.033 EJORDT 0377-2217
-
(2007)
Eur. J. Oper. Res.
, vol.180
, Issue.1
, pp. 99-115
-
-
Alves, M.J.1
Clímaco, J.2
-
3
-
-
84875509018
-
What is dynamic site layout planning?
-
Canadian Society for Civil Engineering, Montreal
-
Andayesh, M., and, Sadeghpour, F. (2012). " What is dynamic site layout planning? " CSCE 125th Anniversary Annual General Conf., Canadian Society for Civil Engineering, Montreal, 1.
-
(2012)
CSCE 125th Anniversary Annual General Conf.
, pp. 1
-
-
Andayesh, M.1
Sadeghpour, F.2
-
4
-
-
84871747122
-
Dynamic site layout planning through minimization of total potential energy
-
Andayesh, M., and, Sadeghpour, F. (2013). " Dynamic site layout planning through minimization of total potential energy." Autom. Constr., 31, 92-102. 10.1016/j.autcon.2012.11.039 AUCOES 0926-5805
-
(2013)
Autom. Constr.
, vol.31
, pp. 92-102
-
-
Andayesh, M.1
Sadeghpour, F.2
-
5
-
-
84899867149
-
The time dimension in site layout planning
-
Andayesh, M., and, Sadeghpour, F. (2014). " The time dimension in site layout planning." Autom. Constr., 44, 129-139. 10.1016/j.autcon.2014.03.021 AUCOES 0926-5805
-
(2014)
Autom. Constr.
, vol.44
, pp. 129-139
-
-
Andayesh, M.1
Sadeghpour, F.2
-
6
-
-
0036644699
-
On the hardness of the quadratic assignment problem with metaheuristics
-
Angel, E., and, Zissimopoulos, V. (2002). " On the hardness of the quadratic assignment problem with metaheuristics." J. Heuristics, 8 (4), 399-414. 10.1023/A:1015454612213 1381-1231
-
(2002)
J. Heuristics
, vol.8
, Issue.4
, pp. 399-414
-
-
Angel, E.1
Zissimopoulos, V.2
-
8
-
-
84867883768
-
Construction workspace management: The development and application of a novel nD planning approach and tool
-
Chavada, R., Dawood, N. N., and, Kassem, M. (2012). " Construction workspace management: The development and application of a novel nD planning approach and tool." J. Inform. Technol. Constr., 17 (1), 213-236. 1874-4753
-
(2012)
J. Inform. Technol. Constr.
, vol.17
, Issue.1
, pp. 213-236
-
-
Chavada, R.1
Dawood, N.N.2
Kassem, M.3
-
9
-
-
84912528857
-
A BIM based construction site layout planning framework considering actual travel paths
-
International Association for Automation and Robotics in Construction (IAARC), Bratislava, Slovakia
-
Cheng, J. C. P., and, Kumar, S. S. (2014). " A BIM based construction site layout planning framework considering actual travel paths." Proc., 31st Int. Symp. on Automation and Robotics in Construction and Mining, International Association for Automation and Robotics in Construction (IAARC), Bratislava, Slovakia, 450-457.
-
(2014)
Proc. 31st Int. Symp. on Automation and Robotics in Construction and Mining
, pp. 450-457
-
-
Cheng, J.C.P.1
Kumar, S.S.2
-
10
-
-
84863674891
-
Early stage multi-level cost estimation for schematic BIM models
-
Cheung, F. K. T., Rihan, J., Tah, J., Duce, D., and, Kurul, E. (2012). " Early stage multi-level cost estimation for schematic BIM models." Autom. Constr., 27 (1), 67-77. 10.1016/j.autcon.2012.05.008 AUCOES 0926-5805
-
(2012)
Autom. Constr.
, vol.27
, Issue.1
, pp. 67-77
-
-
Cheung, F.K.T.1
Rihan, J.2
Tah, J.3
Duce, D.4
Kurul, E.5
-
12
-
-
47749092071
-
New mathematical optimization model for construction site layout
-
Easa, S., and, Hossain, K. (2008). " New mathematical optimization model for construction site layout." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2008)134:8(653), 653-662. JCEMD4 0733-9364
-
(2008)
J. Constr. Eng. Manage.
, pp. 653-662
-
-
Easa, S.1
Hossain, K.2
-
13
-
-
13944281386
-
Dynamic layout of construction temporary facilities considering safety
-
Elbeltagi, E., Hegazy, T., and, Eldosouky, A. (2004). " Dynamic layout of construction temporary facilities considering safety." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2004)130:4(534), 534-541. JCEMD4 0733-9364
-
(2004)
J. Constr. Eng. Manage.
, pp. 534-541
-
-
Elbeltagi, E.1
Hegazy, T.2
Eldosouky, A.3
-
14
-
-
0035501643
-
Schedule-dependent evolution of site layout planning
-
Elbeltagi, E., Hegazy, T., Hosny, A. H., and, Eldosouky, A. (2001). " Schedule-dependent evolution of site layout planning." Constr. Manage. Econ., 19 (7), 689-697. 10.1080/01446190110066713
-
(2001)
Constr. Manage. Econ.
, vol.19
, Issue.7
, pp. 689-697
-
-
Elbeltagi, E.1
Hegazy, T.2
Hosny, A.H.3
Eldosouky, A.4
-
15
-
-
27744546885
-
Trade-off between safety and cost in planning construction site layouts
-
El-Rayes, K., and, Khalafallah, A. (2005). " Trade-off between safety and cost in planning construction site layouts." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:11(1186), 1186-1195. JCEMD4 0733-9364
-
(2005)
J. Constr. Eng. Manage.
, pp. 1186-1195
-
-
El-Rayes, K.1
Khalafallah, A.2
-
16
-
-
0035482725
-
A hospital facility layout problem finally solved
-
Hahn, P. M., and, Krarup, J. (2001). " A hospital facility layout problem finally solved." J. Intell. Manuf., 12 (5), 487-496. 10.1023/A:1012252420779 JIMNEM 0956-5515
-
(2001)
J. Intell. Manuf.
, vol.12
, Issue.5
, pp. 487-496
-
-
Hahn, P.M.1
Krarup, J.2
-
18
-
-
84949660197
-
A multi-objective mixed integer non-linear programming model for construction site layout planning to minimise noise pollution and transport costs
-
Hammad, A. W. A., Akbarnezhad, A., and, Rey, D. (2015). " A multi-objective mixed integer non-linear programming model for construction site layout planning to minimise noise pollution and transport costs." Autom. Constr., 61, 73-85 10.1016/j.autcon.2015.10.010. AUCOES 0926-5805
-
(2015)
Autom. Constr.
, vol.61
, pp. 73-85
-
-
Hammad, A.W.A.1
Akbarnezhad, A.2
Rey, D.3
-
19
-
-
84912570397
-
A mixed-integer nonlinear programming model for minimising construction site noise levels through site layout optimisation
-
International Association for Automation and Robotics in Construction (IAARC), Bratislava, Slovakia
-
Hammad, A. W. A., Rey, D., and, Akbarnezhad, A. (2016). " A mixed-integer nonlinear programming model for minimising construction site noise levels through site layout optimisation." Proc., 31st Int. Symp. on Automation and Robotics in Construction and Mining, ISARC 2014, International Association for Automation and Robotics in Construction (IAARC), Bratislava, Slovakia, 722-729.
-
(2016)
Proc. 31st Int. Symp. on Automation and Robotics in Construction and Mining, ISARC 2014
, pp. 722-729
-
-
Hammad, A.W.A.1
Rey, D.2
Akbarnezhad, A.3
-
20
-
-
84857357646
-
Aligning building information model tools and construction management methods
-
Hartmann, T., van Meerveld, H., Vossebeld, N., and, Adriaanse, A. (2012). " Aligning building information model tools and construction management methods." Autom. Constr., 22 (1), 605-613. 10.1016/j.autcon.2011.12.011 AUCOES 0926-5805
-
(2012)
Autom. Constr.
, vol.22
, Issue.1
, pp. 605-613
-
-
Hartmann, T.1
Van Meerveld, H.2
Vossebeld, N.3
Adriaanse, A.4
-
21
-
-
0033156961
-
EvoSite: Evolution-based model for site layout planning
-
Hegazy, T., and, Elbeltagi, E. (1999). " EvoSite: Evolution-based model for site layout planning." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(1999)13:3(198), 198-206. JCCEE5 0887-3801
-
(1999)
J. Comput. Civ. Eng.
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
22
-
-
84934988457
-
Integration of building information modeling and economic and environmental impact analysis to support sustainable building design
-
Inyim, P., Rivera, J., and, Zhu, Y. (2015). " Integration of building information modeling and economic and environmental impact analysis to support sustainable building design." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000308, A4014002. JMENEA 0742-597X
-
(2015)
J. Manage. Eng.
, pp. A4014002
-
-
Inyim, P.1
Rivera, J.2
Zhu, Y.3
-
23
-
-
84867859668
-
Optimizing location of tower cranes on construction sites through GIS and BIM integration
-
Irizarry, J., and, Karan, E. P. (2012). " Optimizing location of tower cranes on construction sites through GIS and BIM integration." J. Inform. Technol. Constr., 17 (1), 351-366. 1874-4753
-
(2012)
J. Inform. Technol. Constr.
, vol.17
, Issue.1
, pp. 351-366
-
-
Irizarry, J.1
Karan, E.P.2
-
24
-
-
33646737223
-
Minimizing construction-related hazards in airport expansion projects
-
Khalafallah, A., and, El-Rayes, K. (2006). " Minimizing construction-related hazards in airport expansion projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:6(562), 562-572. JCEMD4 0733-9364
-
(2006)
J. Constr. Eng. Manage.
, pp. 562-572
-
-
Khalafallah, A.1
El-Rayes, K.2
-
25
-
-
34248344222
-
The application of the ant colony optimization algorithm to the construction site layout planning problem
-
Lam, K., Ning, X., and, Ng, T. (2007). " The application of the ant colony optimization algorithm to the construction site layout planning problem." Constr. Manage. Econ., 25 (4), 359-374. 10.1080/01446190600972870
-
(2007)
Constr. Manage. Econ.
, vol.25
, Issue.4
, pp. 359-374
-
-
Lam, K.1
Ning, X.2
Ng, T.3
-
26
-
-
15744404885
-
Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects
-
Lam, K. C., Tang, C. M., and, Lee, W. C. (2005). " Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects." Constr. Manage. Econ., 23 (2), 127-145. 10.1080/0144619042000202834
-
(2005)
Constr. Manage. Econ.
, vol.23
, Issue.2
, pp. 127-145
-
-
Lam, K.C.1
Tang, C.M.2
Lee, W.C.3
-
27
-
-
0032187321
-
Site-level facilities layout using genetic algorithms
-
Li, H., and, Love, P. (1998). " Site-level facilities layout using genetic algorithms." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(1998)12:4(227), 227-231. JCCEE5 0887-3801
-
(1998)
J. Comput. Civ. Eng.
, pp. 227-231
-
-
Li, H.1
Love, P.2
-
28
-
-
0033880829
-
Genetic search for solving construction site-level unequal-area facility layout problems
-
Li, H., and, Love, P. E. (2000). " Genetic search for solving construction site-level unequal-area facility layout problems." Autom. Constr., 9 (2), 217-226. 10.1016/S0926-5805(99)00006-0 AUCOES 0926-5805
-
(2000)
Autom. Constr.
, vol.9
, Issue.2
, pp. 217-226
-
-
Li, H.1
Love, P.E.2
-
29
-
-
84880072694
-
Generating applicable synthetic instances for branch problems
-
Lopes, L., and, Smith-Miles, K. (2013). " Generating applicable synthetic instances for branch problems." Oper. Res., 61 (3), 563-577. 10.1287/opre.2013.1169 OPREAI 0030-364X
-
(2013)
Oper. Res.
, vol.61
, Issue.3
, pp. 563-577
-
-
Lopes, L.1
Smith-Miles, K.2
-
30
-
-
4344695708
-
Genetic algorithms for construction site layout in project planning
-
Mawdesley, M., Al-jibouri, S., and, Yang, H. (2002). " Genetic algorithms for construction site layout in project planning." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2002)128:5(418), 418-426. JCEMD4 0733-9364
-
(2002)
J. Constr. Eng. Manage.
, pp. 418-426
-
-
Mawdesley, M.1
Al-Jibouri, S.2
Yang, H.3
-
31
-
-
0142186028
-
Proposed genetic algorithms for construction site layout
-
Mawdesley, M. J., and, Al-Jibouri, S. H. (2003). " Proposed genetic algorithms for construction site layout." Eng. Appl. Artif. Intell., 16 (5-6), 501-509. 10.1016/j.engappai.2003.09.002 EAAIE6 0952-1976
-
(2003)
Eng. Appl. Artif. Intell.
, vol.16
, Issue.5-6
, pp. 501-509
-
-
Mawdesley, M.J.1
Al-Jibouri, S.H.2
-
32
-
-
84912574551
-
A computational framework for estimating the carbon footprint of construction
-
International Association for Automation and Robotics in Construction (IAARC), Bratislava, Slovakia
-
Nadoushani, Z. S. M., and, Akbarnezhad, A. (2014). " A computational framework for estimating the carbon footprint of construction." Proc., 31st Int. Symp. on Automation and Robotics in Construction and Mining, ISARC 2014, International Association for Automation and Robotics in Construction (IAARC), Bratislava, Slovakia, 714-721.
-
(2014)
Proc. 31st Int. Symp. on Automation and Robotics in Construction and Mining, ISARC 2014
, pp. 714-721
-
-
Nadoushani, Z.S.M.1
Akbarnezhad, A.2
-
33
-
-
70449526183
-
Dynamic construction site layout planning using max-min ant system
-
Ning, X., Lam, K.-C., and, Lam, M. C.-K. (2010). " Dynamic construction site layout planning using max-min ant system." Autom. Constr., 19 (1), 55-65. 10.1016/j.autcon.2009.09.002 AUCOES 0926-5805
-
(2010)
Autom. Constr.
, vol.19
, Issue.1
, pp. 55-65
-
-
Ning, X.1
Lam, K.-C.2
Lam, M.C.-K.3
-
34
-
-
0141990673
-
A hybrid CAD-based construction site layout planning system using genetic algorithms
-
Osman, H. M., Georgy, M. E., and, Ibrahim, M. E. (2003). " A hybrid CAD-based construction site layout planning system using genetic algorithms." Autom. Constr., 12 (6), 749-764. 10.1016/S0926-5805(03)00058-X AUCOES 0926-5805
-
(2003)
Autom. Constr.
, vol.12
, Issue.6
, pp. 749-764
-
-
Osman, H.M.1
Georgy, M.E.2
Ibrahim, M.E.3
-
36
-
-
0033159967
-
New complexity measures for the facility layout problem: An empirical study using traditional and neural network analysis
-
Rossin, D. F., Springer, M. C., and, Klein, B. D. (1999). " New complexity measures for the facility layout problem: An empirical study using traditional and neural network analysis." Comput. Ind. Eng., 36 (3), 585-602. CINDDL 10.1016/S0360-8352(99)00153-9
-
(1999)
Comput. Ind. Eng.
, vol.36
, Issue.3
, pp. 585-602
-
-
Rossin, D.F.1
Springer, M.C.2
Klein, B.D.3
-
37
-
-
84884241256
-
Performance of global optimization models for dynamic site layout planning of construction projects
-
Said, H., and, El-Rayes, K. (2013). " Performance of global optimization models for dynamic site layout planning of construction projects." Autom. Constr., 36 (1), 71-78. 10.1016/j.autcon.2013.08.008 AUCOES 0926-5805
-
(2013)
Autom. Constr.
, vol.36
, Issue.1
, pp. 71-78
-
-
Said, H.1
El-Rayes, K.2
-
38
-
-
84862625365
-
Line planning in public transportation: Models and methods
-
Schöbel, A. (2011). " Line planning in public transportation: Models and methods." OR Spectrum, 34 (3), 491-510. 10.1007/s00291-011-0251-6
-
(2011)
OR Spectrum
, vol.34
, Issue.3
, pp. 491-510
-
-
Schöbel, A.1
-
39
-
-
80052260522
-
Measuring instance difficulty for combinatorial optimization problems
-
Smith-Miles, K., and, Lopes, L. (2012). " Measuring instance difficulty for combinatorial optimization problems." Comput. Oper. Res., 39 (5), 875-889. 10.1016/j.cor.2011.07.006 CMORAP 0305-0548
-
(2012)
Comput. Oper. Res.
, vol.39
, Issue.5
, pp. 875-889
-
-
Smith-Miles, K.1
Lopes, L.2
-
40
-
-
80855147859
-
Discovering the suitability of optimisation algorithms by learning from evolved instances
-
Smith-Miles, K., and, van Hemert, J. (2011). " Discovering the suitability of optimisation algorithms by learning from evolved instances." Ann. Math. Artif. Intell., 61 (2), 87-104. 10.1007/s10472-011-9230-5 AMAIEC 1012-2443
-
(2011)
Ann. Math. Artif. Intell.
, vol.61
, Issue.2
, pp. 87-104
-
-
Smith-Miles, K.1
Van Hemert, J.2
-
41
-
-
0000589005
-
Sight plan model for site layout
-
Tommelein, I., Levitt, R., and, Hayes-Roth, B. (1992). " Sight plan model for site layout." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1992)118:4(749), 749-766. JCEMD4 0733-9364
-
(1992)
J. Constr. Eng. Manage.
, pp. 749-766
-
-
Tommelein, I.1
Levitt, R.2
Hayes-Roth, B.3
-
42
-
-
77956845478
-
Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning
-
Wong, C., Fung, I., and, Tam, C. (2010). " Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000214, 1116-1128. JCEMD4 0733-9364
-
(2010)
J. Constr. Eng. Manage.
, pp. 1116-1128
-
-
Wong, C.1
Fung, I.2
Tam, C.3
-
43
-
-
84863711984
-
Multi-objective dynamic construction site layout planning in fuzzy random environment
-
Xu, J., and, Li, Z. (2012). " Multi-objective dynamic construction site layout planning in fuzzy random environment." Autom. Constr., 27, 155-169. 10.1016/j.autcon.2012.05.017 AUCOES 0926-5805
-
(2012)
Autom. Constr.
, vol.27
, pp. 155-169
-
-
Xu, J.1
Li, Z.2
-
44
-
-
84889057012
-
Construction site layout planning using multi-objective artificial bee colony algorithm with Levy flights
-
Yahya, M., and, Saka, M. P. (2014). " Construction site layout planning using multi-objective artificial bee colony algorithm with Levy flights." Autom. Constr., 38 (1), 14-29. 10.1016/j.autcon.2013.11.001 AUCOES 0926-5805
-
(2014)
Autom. Constr.
, vol.38
, Issue.1
, pp. 14-29
-
-
Yahya, M.1
Saka, M.P.2
-
45
-
-
79551684087
-
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
-
Zhang, J. P., and, Hu, Z. Z. (2011). " BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies." Autom. Constr. Build. Inform. Model. Changing Constr. Pract., 20 (2), 155-166.
-
(2011)
Autom. Constr. Build. Inform. Model. Changing Constr. Pract.
, vol.20
, Issue.2
, pp. 155-166
-
-
Zhang, J.P.1
Hu, Z.Z.2
-
46
-
-
0033313625
-
Dynamic layout planning using a hybrid incremental solution method
-
Zouein, P., and, Tommelein, I. (1999). " Dynamic layout planning using a hybrid incremental solution method." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:6(400), 400-408. JCEMD4 0733-9364
-
(1999)
J. Constr. Eng. Manage.
, pp. 400-408
-
-
Zouein, P.1
Tommelein, I.2
|