-
1
-
-
84993019210
-
Using genetic algorithms to solve optimization problems in construction
-
0969-9988.
-
Al-Tabtabai, H., and Alex, P. A. (1999). " Using genetic algorithms to solve optimization problems in construction. " Eng., Constr., Archit. Manage. 0969-9988, 6 (2), 121-132.
-
(1999)
Eng., Constr., Archit. Manage.
, vol.6
, Issue.2
, pp. 121-132
-
-
Al-Tabtabai, H.1
Alex, P.A.2
-
2
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W. T., Chua, D. K. H., and Kannan, G. (1996). " Construction resource scheduling with genetic algorithms. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 122 (2), 125-132. 10.1061/(ASCE)0733-9364(1996)122:2(125) (Pubitemid 126567089)
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.-T.1
Chua, D.K.H.2
Kannan, G.3
-
3
-
-
0032592184
-
A tutorial survey of job-shop scheduling problems using genetic algorithms. Part II: Hybrid genetic search strategies
-
" CINDDL 0360-8352,. 10.1016/S0360-8352(99)00136-9
-
Cheng, R., Gen, M., and Tsujimura, Y. (1999). " A tutorial survey of job-shop scheduling problems using genetic algorithms. Part II: Hybrid genetic search strategies. " Comput. Ind. Eng. CINDDL 0360-8352, 36, 343-364. 10.1016/S0360-8352(99)00136-9
-
(1999)
Comput. Ind. Eng.
, vol.36
, pp. 343-364
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
4
-
-
0036028136
-
Site pre-cast yard layout arrangement through genetic algorithms
-
DOI 10.1016/S0926-5805(01)00044-9, PII S0926580501000449
-
Cheung, S. O., Tong, K. L. T., and Tam, C. M. (2002). " Site pre-cast yard layout arrangement through genetic algorithms. " Journal of Automation in Construction, 11 (1), 35-46. 10.1016/S0926-5805(01)00044-9 (Pubitemid 32833464)
-
(2002)
Automation in Construction
, vol.11
, Issue.1
, pp. 35-46
-
-
Cheung, S.-O.1
Tong, T.K.-L.2
Tam, C.-M.3
-
5
-
-
0011153905
-
-
IGLC, Berkeley, Calif.
-
Choo, H. Y., and Tommelein, I. D. (1999). Space scheduling using flow analysis, IGLC, Berkeley, Calif.
-
(1999)
Space Scheduling Using Flow Analysis
-
-
Choo, H.Y.1
Tommelein, I.D.2
-
7
-
-
13944250354
-
Fuzzy decision support system for manufacturing facilities layout planning
-
DOI 10.1016/j.dss.2003.12.007, PII S0167923604000351
-
Deb, S. K., and Bhattacharyya, B. (2005). " Fuzzy decision support system for manufacturing facilities layout planning. " Decision Support Sys. DSSYDK 0167-9236, 40 (2), 305-314. 10.1016/j.dss.2003.12.007 (Pubitemid 40266067)
-
(2005)
Decision Support Systems
, vol.40
, Issue.2
, pp. 305-314
-
-
Deb, S.K.1
Bhattacharyya, B.2
-
8
-
-
0032592166
-
Optimisation of process planning functions by genetic algorithm
-
CINDDL 0360-8352,. 10.1016/S0360-8352(99)00133-3
-
Dereli, T., and Filiz, I. H. (1999). " Optimisation of process planning functions by genetic algorithm. " Comput. Ind. Eng. CINDDL 0360-8352, 36, 281-308. 10.1016/S0360-8352(99)00133-3
-
(1999)
Comput. Ind. Eng.
, vol.36
, pp. 281-308
-
-
Dereli, T.1
Filiz, I.H.2
-
11
-
-
0031185489
-
Learning and re-using information in space layout planning problems using genetic engineering
-
PII S0954181096000519
-
Gero, J. S., and Kazakov, V. (1997). " Learning and reusing information in space layout planning problems using genetic engineering. " Artif. Intell. Eng. AIENEJ 0954-1810, 11 (3), 329-334. 10.1016/S0954-1810(96) 00051-9 (Pubitemid 127384389)
-
(1997)
Artificial Intelligence in Engineering
, vol.11
, Issue.3 SPEC. ISS.
, pp. 329-334
-
-
Gero, J.S.1
Kazakov, V.A.2
-
12
-
-
0032654594
-
Genetics algorithms and testing for equipment selection
-
" JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
Haidar, A., Naoum, S., Howes, R., and Tah, J. (1999). " Genetics algorithms and testing for equipment selection. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (1), 32-38. 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 32-38
-
-
Haidar, A.1
Naoum, S.2
Howes, R.3
Tah, J.4
-
13
-
-
0033101918
-
Development and validation of genetic algorithm-based facility layout-A case study in the pharmaceutical industry
-
" IJPRB8 0020-7543, 10.1080/002075499191508
-
Hamamoto, S., Yih, Y., and Salvendy, G. (1999). " Development and validation of genetic algorithm-based facility layout-A case study in the pharmaceutical industry. " Int. J. Prod. Res. IJPRB8 0020-7543, 37 (4), 749-768. 10.1080/002075499191508
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.4
, pp. 749-768
-
-
Hamamoto, S.1
Yih, Y.2
Salvendy, G.3
-
15
-
-
0032676409
-
Scheduling to minimize product design time using a genetic algorithm
-
" IJPRB8 0020-7543, 10.1080/002075499191300
-
Lam, F. S. C., Lin, B. C., Sriksandarajah, C., and Yan, H. (1999). " Scheduling to minimize product design time using a genetic algorithm. " Int. J. Prod. Res. IJPRB8 0020-7543, 37 (6), 1369-1386. 10.1080/002075499191300
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.6
, pp. 1369-1386
-
-
Lam, F.S.C.1
Lin, B.C.2
Sriksandarajah, C.3
Yan, H.4
-
16
-
-
5244262334
-
Improved genetic algorithms for time-cost optimization
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1997)123:3(233)
-
Li, H., and Love, P. E. D. (1997). " Improved genetic algorithms for time-cost optimization. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 123 (3), 233-237. 10.1061/(ASCE)0733-9364(1997)123:3(233)
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.E.D.2
-
17
-
-
0032187321
-
Site-Level Facilities Layout Using Genetic Algorithms
-
Li, H., and Love, P. E. D. (1998). " Site-level facilities layout using genetic algorithms. " J. Comput. Civ. Eng. JCCEE5 0887-3801, 12 (4), 227-231. 10.1061/(ASCE)0887-3801(1998)12:4(227) (Pubitemid 128497199)
-
(1998)
Journal of Computing in Civil Engineering
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.E.D.2
-
18
-
-
0033880829
-
Genetic search for solving construction site-level unequal-area facility layout problems
-
DOI 10.1016/S0926-5805(99)00006-0
-
Li, H., and Love, P. E. D. (2000). " Genetic search for solving construction-site-level unequal-area facility layout problems. " Autom. Constr. AUCOES 0926-5805, 9, 217-226. 10.1016/S0926-5805(99)00006-0 (Pubitemid 30541681)
-
(2000)
Automation in construction
, vol.9
, Issue.2
, pp. 217-226
-
-
Li, H.1
Love, P.E.D.2
-
19
-
-
0002613952
-
Application of genetic algorithms to the problem of determining the laying sequence for a continuous girder reinforced concrete flooring system
-
", Y. C. Loo, ed., Gold Coast, Australia.
-
Natsuaki, Y., Mukandai, S., Yasuda, K., and Furuta, H. (1995). " Application of genetic algorithms to the problem of determining the laying sequence for a continuous girder reinforced concrete flooring system. " EASEC-5, building for the 21st century, Y. C. Loo, ed., Gold Coast, Australia, 811-816.
-
(1995)
EASEC-5, Building for the 21st Century
, pp. 811-816
-
-
Natsuaki, Y.1
Mukandai, S.2
Yasuda, K.3
Furuta, H.4
-
20
-
-
0033079877
-
A genetic algorithms-based approach for design of manufacturing systems: An industrial application
-
" IJPRB8 0020-7543, 10.1080/002075499191670
-
Rao, H. A., Pham, S. N., and Gu, P. (1999). " A genetic algorithms-based approach for design of manufacturing systems: An industrial application. " Int. J. Prod. Res. IJPRB8 0020-7543, 37 (3), 557-580. 10.1080/002075499191670
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.3
, pp. 557-580
-
-
Rao, H.A.1
Pham, S.N.2
Gu, P.3
-
21
-
-
0031362303
-
Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story building construction
-
S. Anderson, ed., ASCE, New York.
-
Riley, D., and Sanvido, V. (1997). " Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story building construction. " Proc., Construction Congress V, S. Anderson, ed., ASCE, New York, 102-109.
-
(1997)
Proc., Construction Congress v
, pp. 102-109
-
-
Riley, D.1
Sanvido, V.2
-
23
-
-
2342435265
-
Site layout planning using nonstructural fuzzy decision support system
-
DOI 10.1061/(ASCE)0733-9364(2002)128:3(220)
-
Tam, C. M., Tong, K. L. T., Leung, W. T. A., and Chiu, W. C. G. (2002). " Site layout planning using non-structural fuzzy decision support system. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (3), 220-231. 10.1061/(ASCE)0733-9364(2002)128:3(220) (Pubitemid 40265547)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.3
, pp. 220-231
-
-
Tam, C.M.1
Tong, T.K.L.2
Leung, A.W.T.3
Chiu, G.W.C.4
-
24
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1994)120:1(96)
-
Thabet, W. Y., and Beliveau, Y. J. (1994). " Modeling work space to schedule repetitive floors in multistory buildings. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 120 (1), 96-116. 10.1061/(ASCE)0733-9364(1994)120: 1(96)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
25
-
-
0030825017
-
SCaRC: Space-constrained resource-constrained scheduling system
-
JCCEE5 0887-3801, 10.1061/(ASCE)0887-3801(1997)11:1(48)
-
Thabet, W. Y., and Beliveau, Y. J. (1997). " SCaRC: Space-constrained resource-constrained scheduling system. " J. Comput. Civ. Eng. JCCEE5 0887-3801, 11 (1), 48-59. 10.1061/(ASCE)0887-3801(1997)11:1(48)
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.1
, pp. 48-59
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
26
-
-
0005390622
-
Space-time characterization for resource management on construction sites
-
" B. J. Goodno and J. R. Wright, eds., ASCE, New York.
-
Tommelein, I. D., Castillo, J. G., and Zouein, P. P. (1992). " Space-time characterization for resource management on construction sites. ", B. J. Goodno, and, J. R. Wright, eds., Proc., 8th Conf. on Computing in Civil Engineering, ASCE, New York, 623-630.
-
(1992)
Proc., 8th Conf. on Computing in Civil Engineering
, pp. 623-630
-
-
Tommelein, I.D.1
Castillo, J.G.2
Zouein, P.P.3
-
27
-
-
85009629376
-
Lane-based optimization method for multi-period analysis of isolated signal control junctions
-
1812-8602,. 10.1080/18128600608685655
-
Wong, C. K., and Wong, S. C. (2006). " Lane-based optimization method for multi-period analysis of isolated signal control junctions. " Transportmetrica 1812-8602, 2, 53-85. 10.1080/18128600608685655
-
(2006)
Transportmetrica
, vol.2
, pp. 53-85
-
-
Wong, C.K.1
Wong, S.C.2
-
28
-
-
0027151062
-
Space schedule construction
-
ASCE, New York.
-
Zouein, P. P., and Tommelein, I. D. (1993). " Space schedule construction. " Proc., 5th Intl. Conf. on Computing in Civil and Building Engineering, ASCE, New York, 1770-1777.
-
(1993)
Proc., 5th Intl. Conf. on Computing in Civil and Building Engineering
, pp. 1770-1777
-
-
Zouein, P.P.1
Tommelein, I.D.2
|