-
1
-
-
0345356702
-
Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems
-
Allam, S. I. (1988). " Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems." Constr. Manage. Econ., 6 (2), 93-115 10.1080/01446198800000010.
-
(1988)
Constr. Manage. Econ.
, vol.6
, Issue.2
, pp. 93-115
-
-
Allam, S.I.1
-
2
-
-
84939475842
-
Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling
-
04014082
-
Bettemir, Ö., and, Rifat, S. (2014). " Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000323, 04014082. JMENEA 0742-597X
-
(2014)
J. Manage. Eng.
-
-
Bettemir, Ö.1
Rifat, S.2
-
3
-
-
0002284602
-
-
Proc. 3rd Int. Conf. on Genetic Algorithms, Morgan Kaufmann Publishers, San Francisco
-
Deb, K., and, Goldberg, D. E. (1989). " An investigation of niche and species formation in genetic function optimization." Proc., 3rd Int. Conf. on Genetic Algorithms, Morgan Kaufmann Publishers, San Francisco, 42-50.
-
(1989)
An Investigation of Niche and Species Formation in Genetic Function Optimization
, pp. 42-50
-
-
Deb, K.1
Goldberg, D.E.2
-
4
-
-
84855937977
-
Multiobjective optimization of resource leveling and allocation during construction scheduling
-
Dho, H. J., and, El-Rayes, K. (2011). " Multiobjective optimization of resource leveling and allocation during construction scheduling." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000368, 1080-1088. JCEMD4 0733-9364
-
(2011)
J. Constr. Eng. Manage.
, pp. 1080-1088
-
-
Dho, H.J.1
El-Rayes, K.2
-
5
-
-
0001195356
-
Resource leveling in construction by optimization
-
Easa, S. (1989). " Resource leveling in construction by optimization." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1989)115:2(302), 302-316. JCEMD4 0733-9364
-
(1989)
J. Constr. Eng. Manage.
, pp. 302-316
-
-
Easa, S.1
-
6
-
-
70350051317
-
Optimizing resource leveling in construction projects
-
El-Rayes, K., and, Dho, H. J. (2009). " Optimizing resource leveling in construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000097, 1172-1180. JMENEA 0742-597X
-
(2009)
J. Constr. Eng. Manage.
, pp. 1172-1180
-
-
El-Rayes, K.1
Dho, H.J.2
-
8
-
-
0025444361
-
Packing method for resource leveling
-
Harris, H. (1990). " Packing method for resource leveling." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1990)116:2(331), 331-350. JCEMD4 0733-9364
-
(1990)
J. Constr. Eng. Manage.
, pp. 331-350
-
-
Harris, H.1
-
9
-
-
85044160449
-
-
Proc. Eastern Joint IRE-AIEE-ACM Comp. Conf. ACM, New York
-
Kelley, J. E., and, Walker, M. R. (1959). " Critical-path planning and scheduling." Proc., Eastern Joint IRE-AIEE-ACM Comp. Conf., ACM, New York.
-
(1959)
Critical-path Planning and Scheduling
-
-
Kelley, J.E.1
Walker, M.R.2
-
11
-
-
0020087944
-
Multi-project scheduling: Categorization of heuristic rules performance
-
Kurtulus, I., and, Davis, E. W. (1982). " Multi-project scheduling: Categorization of heuristic rules performance." Manage. Sci., 28 (2), 161-172. 10.1287/mnsc.28.2.161 MSCIAM 0025-1909
-
(1982)
Manage. Sci.
, vol.28
, Issue.2
, pp. 161-172
-
-
Kurtulus, I.1
Davis, E.W.2
-
12
-
-
0001494926
-
A genetic-algorithm-based resource-constrained construction scheduling system
-
Leu, S., and, Yang, C. (1999 a). " A genetic-algorithm-based resource-constrained construction scheduling system." Constr. Manage. Econ., 17 (6), 767-776. 10.1080/014461999371105
-
(1999)
Constr. Manage. Econ.
, vol.17
, Issue.6
, pp. 767-776
-
-
Leu, S.1
Yang, C.2
-
13
-
-
0033312040
-
Ga-based multicriteria optimal model for construction scheduling
-
Leu, S., and, Yang, C. (1999 b). " Ga-based multicriteria optimal model for construction scheduling." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:6(420), 420-427. JCEMD4 0733-9364
-
(1999)
J. Constr. Eng. Manage.
, pp. 420-427
-
-
Leu, S.1
Yang, C.2
-
14
-
-
0034324916
-
Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
-
Leu, S., Yang, C., and, Huang, J. (2000). " Resource leveling in construction by genetic algorithm-based optimization and its decision support system application." Autom. Constr., 10 (1), 27-41. 10.1016/S0926-5805(99)00011-4 AUCOES 0926-5805
-
(2000)
Autom. Constr.
, vol.10
, Issue.1
, pp. 27-41
-
-
Leu, S.1
Yang, C.2
Huang, J.3
-
15
-
-
57949111466
-
Genetic algorithms optimization for normalized normal constraint method under Pareto construction
-
Martínez, M., García-Nieto, S., Sanchis, J., and, Blasco, X. (2009). " Genetic algorithms optimization for normalized normal constraint method under Pareto construction." Adv. Eng. Softw., 40 (4), 260-267. 10.1016/j.advengsoft.2008.04.004
-
(2009)
Adv. Eng. Softw.
, vol.40
, Issue.4
, pp. 260-267
-
-
Martínez, M.1
García-Nieto, S.2
Sanchis, J.3
Blasco, X.4
-
16
-
-
84936858332
-
Multimode resource-constrained scheduling and leveling for practical-size projects
-
04014092
-
Menesi, W., and, Hegazy, T. (2014). " Multimode resource-constrained scheduling and leveling for practical-size projects." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000338, 04014092. JMENEA 0742-597X
-
(2014)
J. Manage. Eng.
-
-
Menesi, W.1
Hegazy, T.2
-
17
-
-
0041969992
-
The normalized normal constraint method for generating the Pareto frontier
-
Messac, A., Ismail-Yahaya, A., and, Mattson, C. (2003). " The normalized normal constraint method for generating the Pareto frontier." Struct. Multidiscip. Optim., 25 (2), 86-98. 10.1007/s00158-002-0276-1 SMOTB4 1615-1488
-
(2003)
Struct. Multidiscip. Optim.
, vol.25
, Issue.2
, pp. 86-98
-
-
Messac, A.1
Ismail-Yahaya, A.2
Mattson, C.3
-
18
-
-
0000448376
-
Genetic algorithms, tournament selection, and the effects of noise
-
Miller, B. L., and, Golderberg, D. E. (1995). " Genetic algorithms, tournament selection, and the effects of noise." Compos. Syst., 9 (3), 193-212.
-
(1995)
Compos. Syst.
, vol.9
, Issue.3
, pp. 193-212
-
-
Miller, B.L.1
Golderberg, D.E.2
-
19
-
-
84873381703
-
Time, cost, and environmental impact analysis on construction operation optimization using genetic algorithms
-
Ozcan-Deniz, G., Zhu, Y., and, Ceron, V. (2011). " Time, cost, and environmental impact analysis on construction operation optimization using genetic algorithms." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000098, 265-272. JMENEA 0742-597X
-
(2011)
J. Manage. Eng.
, pp. 265-272
-
-
Ozcan-Deniz, G.1
Zhu, Y.2
Ceron, V.3
-
20
-
-
49249121672
-
Genetic algorithm-based multi-objective model for scheduling of linear construction projects
-
Senouci, A., and, Al-Derham, H. (2008). " Genetic algorithm-based multi-objective model for scheduling of linear construction projects." Adv. Eng. Software, 39 (12), 1023-1028. 10.1016/j.advengsoft.2007.08.002
-
(2008)
Adv. Eng. Software
, vol.39
, Issue.12
, pp. 1023-1028
-
-
Senouci, A.1
Al-Derham, H.2
-
21
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
Senouci, A., and, Eldin, N. (2004). " Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2004)130:6(869), 869-877. JCEMD4 0733-9364
-
(2004)
J. Constr. Eng. Manage.
, pp. 869-877
-
-
Senouci, A.1
Eldin, N.2
|