Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm

Author keywords

Construction schedule; Cost; Duration; Genetic algorithm; Multiobjective optimization; Optimization; Resource leveling

Indexed keywords

ALGORITHMS; COMMERCE; COSTS; ECONOMIC AND SOCIAL EFFECTS; GENETIC ALGORITHMS; OPTIMIZATION;

EID: 84958592722     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000374     Document Type: Article
Times cited : (34)

References (22)
  • 1
    • 0345356702 scopus 로고
    • Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems
    • Allam, S. I. (1988). " Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems." Constr. Manage. Econ., 6 (2), 93-115 10.1080/01446198800000010.
    • (1988) Constr. Manage. Econ. , vol.6 , Issue.2 , pp. 93-115
    • Allam, S.I.1
  • 2
    • 84939475842 scopus 로고    scopus 로고
    • Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling
    • 04014082
    • Bettemir, Ö., and, Rifat, S. (2014). " Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000323, 04014082. JMENEA 0742-597X
    • (2014) J. Manage. Eng.
    • Bettemir, Ö.1    Rifat, S.2
  • 4
    • 84855937977 scopus 로고    scopus 로고
    • Multiobjective optimization of resource leveling and allocation during construction scheduling
    • Dho, H. J., and, El-Rayes, K. (2011). " Multiobjective optimization of resource leveling and allocation during construction scheduling." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000368, 1080-1088. JCEMD4 0733-9364
    • (2011) J. Constr. Eng. Manage. , pp. 1080-1088
    • Dho, H.J.1    El-Rayes, K.2
  • 5
    • 0001195356 scopus 로고
    • Resource leveling in construction by optimization
    • Easa, S. (1989). " Resource leveling in construction by optimization." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1989)115:2(302), 302-316. JCEMD4 0733-9364
    • (1989) J. Constr. Eng. Manage. , pp. 302-316
    • Easa, S.1
  • 6
    • 70350051317 scopus 로고    scopus 로고
    • Optimizing resource leveling in construction projects
    • El-Rayes, K., and, Dho, H. J. (2009). " Optimizing resource leveling in construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000097, 1172-1180. JMENEA 0742-597X
    • (2009) J. Constr. Eng. Manage. , pp. 1172-1180
    • El-Rayes, K.1    Dho, H.J.2
  • 8
    • 0025444361 scopus 로고
    • Packing method for resource leveling
    • Harris, H. (1990). " Packing method for resource leveling." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1990)116:2(331), 331-350. JCEMD4 0733-9364
    • (1990) J. Constr. Eng. Manage. , pp. 331-350
    • Harris, H.1
  • 11
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • Kurtulus, I., and, Davis, E. W. (1982). " Multi-project scheduling: Categorization of heuristic rules performance." Manage. Sci., 28 (2), 161-172. 10.1287/mnsc.28.2.161 MSCIAM 0025-1909
    • (1982) Manage. Sci. , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.1    Davis, E.W.2
  • 12
    • 0001494926 scopus 로고    scopus 로고
    • A genetic-algorithm-based resource-constrained construction scheduling system
    • Leu, S., and, Yang, C. (1999 a). " A genetic-algorithm-based resource-constrained construction scheduling system." Constr. Manage. Econ., 17 (6), 767-776. 10.1080/014461999371105
    • (1999) Constr. Manage. Econ. , vol.17 , Issue.6 , pp. 767-776
    • Leu, S.1    Yang, C.2
  • 13
    • 0033312040 scopus 로고    scopus 로고
    • Ga-based multicriteria optimal model for construction scheduling
    • Leu, S., and, Yang, C. (1999 b). " Ga-based multicriteria optimal model for construction scheduling." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:6(420), 420-427. JCEMD4 0733-9364
    • (1999) J. Constr. Eng. Manage. , pp. 420-427
    • Leu, S.1    Yang, C.2
  • 14
    • 0034324916 scopus 로고    scopus 로고
    • Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
    • Leu, S., Yang, C., and, Huang, J. (2000). " Resource leveling in construction by genetic algorithm-based optimization and its decision support system application." Autom. Constr., 10 (1), 27-41. 10.1016/S0926-5805(99)00011-4 AUCOES 0926-5805
    • (2000) Autom. Constr. , vol.10 , Issue.1 , pp. 27-41
    • Leu, S.1    Yang, C.2    Huang, J.3
  • 15
    • 57949111466 scopus 로고    scopus 로고
    • Genetic algorithms optimization for normalized normal constraint method under Pareto construction
    • Martínez, M., García-Nieto, S., Sanchis, J., and, Blasco, X. (2009). " Genetic algorithms optimization for normalized normal constraint method under Pareto construction." Adv. Eng. Softw., 40 (4), 260-267. 10.1016/j.advengsoft.2008.04.004
    • (2009) Adv. Eng. Softw. , vol.40 , Issue.4 , pp. 260-267
    • Martínez, M.1    García-Nieto, S.2    Sanchis, J.3    Blasco, X.4
  • 16
    • 84936858332 scopus 로고    scopus 로고
    • Multimode resource-constrained scheduling and leveling for practical-size projects
    • 04014092
    • Menesi, W., and, Hegazy, T. (2014). " Multimode resource-constrained scheduling and leveling for practical-size projects." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000338, 04014092. JMENEA 0742-597X
    • (2014) J. Manage. Eng.
    • Menesi, W.1    Hegazy, T.2
  • 17
    • 0041969992 scopus 로고    scopus 로고
    • The normalized normal constraint method for generating the Pareto frontier
    • Messac, A., Ismail-Yahaya, A., and, Mattson, C. (2003). " The normalized normal constraint method for generating the Pareto frontier." Struct. Multidiscip. Optim., 25 (2), 86-98. 10.1007/s00158-002-0276-1 SMOTB4 1615-1488
    • (2003) Struct. Multidiscip. Optim. , vol.25 , Issue.2 , pp. 86-98
    • Messac, A.1    Ismail-Yahaya, A.2    Mattson, C.3
  • 18
    • 0000448376 scopus 로고
    • Genetic algorithms, tournament selection, and the effects of noise
    • Miller, B. L., and, Golderberg, D. E. (1995). " Genetic algorithms, tournament selection, and the effects of noise." Compos. Syst., 9 (3), 193-212.
    • (1995) Compos. Syst. , vol.9 , Issue.3 , pp. 193-212
    • Miller, B.L.1    Golderberg, D.E.2
  • 19
    • 84873381703 scopus 로고    scopus 로고
    • Time, cost, and environmental impact analysis on construction operation optimization using genetic algorithms
    • Ozcan-Deniz, G., Zhu, Y., and, Ceron, V. (2011). " Time, cost, and environmental impact analysis on construction operation optimization using genetic algorithms." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000098, 265-272. JMENEA 0742-597X
    • (2011) J. Manage. Eng. , pp. 265-272
    • Ozcan-Deniz, G.1    Zhu, Y.2    Ceron, V.3
  • 20
    • 49249121672 scopus 로고    scopus 로고
    • Genetic algorithm-based multi-objective model for scheduling of linear construction projects
    • Senouci, A., and, Al-Derham, H. (2008). " Genetic algorithm-based multi-objective model for scheduling of linear construction projects." Adv. Eng. Software, 39 (12), 1023-1028. 10.1016/j.advengsoft.2007.08.002
    • (2008) Adv. Eng. Software , vol.39 , Issue.12 , pp. 1023-1028
    • Senouci, A.1    Al-Derham, H.2
  • 21
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • Senouci, A., and, Eldin, N. (2004). " Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2004)130:6(869), 869-877. JCEMD4 0733-9364
    • (2004) J. Constr. Eng. Manage. , pp. 869-877
    • Senouci, A.1    Eldin, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.