-
1
-
-
84887519883
-
An efficient approach for solving reliable facility location models
-
Aboolian, R., Cui, T. and Shen, Z.-J.M. (2013) An efficient approach for solving reliable facility location models. INFORMS Journal of Computing, 25(4), 720-729.
-
(2013)
INFORMS Journal of Computing
, vol.25
, Issue.4
, pp. 720-729
-
-
Aboolian, R.1
Cui, T.2
Shen, Z.-J.M.3
-
2
-
-
77957240034
-
The budget constrained r-interdiction median problem with capacity expansion
-
Aksen, D., Piyade, N. and Aras, N. (2009) The budget constrained r-interdiction median problem with capacity expansion. Central European Journal of Opearations Research, 18(3), 269-291.
-
(2009)
Central European Journal of Opearations Research
, vol.18
, Issue.3
, pp. 269-291
-
-
Aksen, D.1
Piyade, N.2
Aras, N.3
-
3
-
-
0001001215
-
Diversification under supply uncertainty
-
Anupindi, R. and Akella, R. (1993) Diversification under supply uncertainty. Management Science, 39(8), 944-963.
-
(1993)
Management Science
, vol.39
, Issue.8
, pp. 944-963
-
-
Anupindi, R.1
Akella, R.2
-
4
-
-
0342467932
-
Analysis of an inventory system under backorder correlated deterministic demand and geometric supply process
-
Argon, N.T., Güllü, R. and Erkip, N. (2001) Analysis of an inventory system under backorder correlated deterministic demand and geometric supply process. International Journal of Production Economics, 71(1-3), 247-254.
-
(2001)
International Journal of Production Economics
, vol.71
, Issue.1-3
, pp. 247-254
-
-
Argon, N.T.1
Güllü, R.2
Erkip, N.3
-
5
-
-
0032187128
-
Inventory management under random supply disruption and partial backorders
-
Arreola-Risa, A. and DeCroix, G.A. (1998) Inventory management under random supply disruption and partial backorders. Naval Research Logistics, 45, 687-703.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 687-703
-
-
Arreola-Risa, A.1
DeCroix, G.A.2
-
6
-
-
84954402265
-
-
Working paper, Technical University of Eindhoven, Eindhoven, The Netherlands
-
Atan, Z. and Chockalingam, A. (2014) Pricing as a disruption recovery strategy, Working paper, Technical University of Eindhoven, Eindhoven, The Netherlands.
-
(2014)
Pricing as a Disruption Recovery Strategy
-
-
Atan, Z.1
Chockalingam, A.2
-
7
-
-
84954377428
-
Inventory optimization for perishables subject to supply disruptions
-
Atan, Z. and Rousseau, M. (2015) Inventory optimization for perishables subject to supply disruptions. Optimization Letters.
-
(2015)
Optimization Letters
-
-
Atan, Z.1
Rousseau, M.2
-
8
-
-
84953837568
-
Inventory strategies to manage supply disruptions
-
Gurnani, H., Mehrotra, A. and Ray, S. (eds), Springer-Verlag, London
-
Atan, Z. and Snyder, L. (2010) Inventory strategies to manage supply disruptions, in Managing Supply Disruptions, Gurnani, H., Mehrotra, A. and Ray, S. (eds), Springer-Verlag, London, pp. 115-139.
-
(2010)
Managing Supply Disruptions
, pp. 115-139
-
-
Atan, Z.1
Snyder, L.2
-
9
-
-
84926398843
-
-
Working paper, Lehigh University, Bethlehem, PA
-
Atan, Z. and Snyder, L.V. (2012) Disruptions in one-warehouse multiple-retailer systems. Working paper, Lehigh University, Bethlehem, PA.
-
(2012)
Disruptions in One-warehouse Multiple-retailer Systems
-
-
Atan, Z.1
Snyder, L.V.2
-
10
-
-
84886724036
-
Strategies for protecting supply chain networks against facility and transportation disruptions: An improved Benders decomposition approach
-
Azad, N., Saharidis, G., Davoudpour, H., Malekly, H. and Yektamaram, S. (2013) Strategies for protecting supply chain networks against facility and transportation disruptions: an improved Benders decomposition approach. Annals of Operations Research, 210(1), 125-163.
-
(2013)
Annals of Operations Research
, vol.210
, Issue.1
, pp. 125-163
-
-
Azad, N.1
Saharidis, G.2
Davoudpour, H.3
Malekly, H.4
Yektamaram, S.5
-
11
-
-
33749475482
-
Vulnerable options in supply chains: Effect of the supplier competition
-
Babich, V. (2006) Vulnerable options in supply chains: effect of the supplier competition. Naval Research Logistics, 53(7), 656-673.
-
(2006)
Naval Research Logistics
, vol.53
, Issue.7
, pp. 656-673
-
-
Babich, V.1
-
12
-
-
78149313497
-
Independence of capacity ordering and financial subsidies to risky suppliers
-
Babich, V. (2010) Independence of capacity ordering and financial subsidies to risky suppliers. Manufacturing & Service Operations Management, 12(4), 583-607.
-
(2010)
Manufacturing & Service Operations Management
, vol.12
, Issue.4
, pp. 583-607
-
-
Babich, V.1
-
13
-
-
33847315023
-
Competition and diversification effects in supply chains with supplier default risk
-
Babich, V., Burnetas, A.N. and Ritchken, P.H. (2007) Competition and diversification effects in supply chains with supplier default risk. Manufacturing and Service Operations Management, 9(2), 123-146.
-
(2007)
Manufacturing and Service Operations Management
, vol.9
, Issue.2
, pp. 123-146
-
-
Babich, V.1
Burnetas, A.N.2
Ritchken, P.H.3
-
14
-
-
32644449735
-
SPAR: Stochastic programming with adversarial recourse
-
Bailey, M.D., Shechter, S.M. and Schaefer, A.J. (2006) SPAR: stochastic programming with adversarial recourse. Operations Research Letters, 34(3), 307-315.
-
(2006)
Operations Research Letters
, vol.34
, Issue.3
, pp. 307-315
-
-
Bailey, M.D.1
Shechter, S.M.2
Schaefer, A.J.3
-
15
-
-
0041386156
-
Impulse control of a Brownian inventory system with supplier uncertainty
-
Bar-Lev, S.K., Parlar, M. and Perry, D. (1993) Impulse control of a Brownian inventory system with supplier uncertainty. Journal of Stochastic Analysis and Applications, 11, 11-27.
-
(1993)
Journal of Stochastic Analysis and Applications
, vol.11
, pp. 11-27
-
-
Bar-Lev, S.K.1
Parlar, M.2
Perry, D.3
-
16
-
-
0347568237
-
How many suppliers are best? A decision-analysis approach
-
Berger, P.D., Gerstenfeld, A. and Zeng, A.Z. (2004) How many suppliers are best? A decision-analysis approach. Omega, 32, 9-15.
-
(2004)
Omega
, vol.32
, pp. 9-15
-
-
Berger, P.D.1
Gerstenfeld, A.2
Zeng, A.Z.3
-
18
-
-
84989758310
-
Note on: Future supply uncertainty in EOQ models
-
Berk, E. and Arreola-Risa, A. (1994) Note on: future supply uncertainty in EOQ models. Naval Research Logistics, 41, 129-132.
-
(1994)
Naval Research Logistics
, vol.41
, pp. 129-132
-
-
Berk, E.1
Arreola-Risa, A.2
-
19
-
-
79952987429
-
Optimal search path for service in the presence of disruptions
-
Berman, O., Ianovsky, E. and Krass, D. (2011) Optimal search path for service in the presence of disruptions. Computers and Operations Research, 38, 1562-1571.
-
(2011)
Computers and Operations Research
, vol.38
, pp. 1562-1571
-
-
Berman, O.1
Ianovsky, E.2
Krass, D.3
-
20
-
-
34247543614
-
Facility reliability issues in network p-median problems: Strategic centralization and co-location effects
-
Berman, O., Krass, D. and Menezes, M.B.C. (2007) Facility reliability issues in network p-median problems: strategic centralization and co-location effects. Operations Research, 55(2), 332-350.
-
(2007)
Operations Research
, vol.55
, Issue.2
, pp. 332-350
-
-
Berman, O.1
Krass, D.2
Menezes, M.B.C.3
-
21
-
-
72449206639
-
Optimal facility location in the presence of disruptions and incomplete information
-
Berman, O., Krass, D. and Menezes, M.B.C. (2009) Optimal facility location in the presence of disruptions and incomplete information. Decision Sciences, 40(4), 845-868.
-
(2009)
Decision Sciences
, vol.40
, Issue.4
, pp. 845-868
-
-
Berman, O.1
Krass, D.2
Menezes, M.B.C.3
-
22
-
-
84868618698
-
Location and reliability problems on a line: Impact of objectives and correlated failures on optimal location patterns
-
Berman, O., Krass, D. and Menezes, M.B.C. (2013) Location and reliability problems on a line: impact of objectives and correlated failures on optimal location patterns. Omega, 41, 766-779.
-
(2013)
Omega
, vol.41
, pp. 766-779
-
-
Berman, O.1
Krass, D.2
Menezes, M.B.C.3
-
23
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
Bielecki, T. and Kumar, P.R. (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 36(4), 532-541.
-
(1988)
Operations Research
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
24
-
-
25144488496
-
-
Technical report, University of Illinois at Urbana-Champaign, Urbana-Champaign, IL
-
Bundschuh, M., Klabjan, D. and Thurston, D.L. (2003) Modeling robust and reliable supply chains, Technical report, University of Illinois at Urbana-Champaign, Urbana-Champaign, IL.
-
(2003)
Modeling Robust and Reliable Supply Chains
-
-
Bundschuh, M.1
Klabjan, D.2
Thurston, D.L.3
-
25
-
-
78649478947
-
Prepositioning supplies in preparation for disasters
-
Campbell, A. and Jones, P. (2011) Prepositioning supplies in preparation for disasters. European Journal of Operational Research, 209(2), 156-165.
-
(2011)
European Journal of Operational Research
, vol.209
, Issue.2
, pp. 156-165
-
-
Campbell, A.1
Jones, P.2
-
26
-
-
0023313014
-
Inventory policy in the presence of market disruptions
-
Chao, H.-P. (1987) Inventory policy in the presence of market disruptions. Operations Research, 35(2), 274-281.
-
(1987)
Operations Research
, vol.35
, Issue.2
, pp. 274-281
-
-
Chao, H.-P.1
-
27
-
-
8344252362
-
EPRI reduces fuel inventory costs in the electric utility industry
-
Chao, H.-P., Chapel, S.W., Clark, C.E.J., Morris, P.A., Sandling, M.J. and Grimes, R.C. (1989) EPRI reduces fuel inventory costs in the electric utility industry. Interfaces, 19(1), 48-67.
-
(1989)
Interfaces
, vol.19
, Issue.1
, pp. 48-67
-
-
Chao, H.-P.1
Chapel, S.W.2
Clark, C.E.J.3
Morris, P.A.4
Sandling, M.J.5
Grimes, R.C.6
-
29
-
-
84862786179
-
A periodic-review inventory system with a capacitated backup supplier for mitigating supply disruptions
-
Chen, J., Zhao, X. and Zhou, Y. (2012) A periodic-review inventory system with a capacitated backup supplier for mitigating supply disruptions. European Journal of Operational Research, 219, 312-323.
-
(2012)
European Journal of Operational Research
, vol.219
, pp. 312-323
-
-
Chen, J.1
Zhao, X.2
Zhou, Y.3
-
30
-
-
79959784133
-
Joint inventory-location problem under the risk of probabilistic facility disruptions
-
Chen, Q., Li, X. and Ouyang, Y. (2011) Joint inventory-location problem under the risk of probabilistic facility disruptions. Transportation Research Part B, 45, 911-1003.
-
(2011)
Transportation Research Part B
, vol.45
, pp. 911-1003
-
-
Chen, Q.1
Li, X.2
Ouyang, Y.3
-
31
-
-
84892935811
-
Supply disruptions, heterogeneous beliefs, and production efficiencies
-
Chen, Y.-J. (2014) Supply disruptions, heterogeneous beliefs, and production efficiencies. Production and Operations Management, 23(1), 127-137.
-
(2014)
Production and Operations Management
, vol.23
, Issue.1
, pp. 127-137
-
-
Chen, Y.-J.1
-
32
-
-
34547673287
-
The importance of decoupling recurrent and disruption risks in a supply chain
-
Chopra, S., Reinhardt, G. and Mohan, U. (2007) The importance of decoupling recurrent and disruption risks in a supply chain. Naval Research Logistics, 54(5), 544-555.
-
(2007)
Naval Research Logistics
, vol.54
, Issue.5
, pp. 544-555
-
-
Chopra, S.1
Reinhardt, G.2
Mohan, U.3
-
33
-
-
9344261775
-
Managing risk to avoid supply-chain breakdown
-
Chopra, S. and Sodhi, M.S. (2004) Managing risk to avoid supply-chain breakdown. Sloan Management Review, 46(1), 53-61.
-
(2004)
Sloan Management Review
, vol.46
, Issue.1
, pp. 53-61
-
-
Chopra, S.1
Sodhi, M.S.2
-
34
-
-
33947208987
-
Protecting critical assets: The r-interdiction median problem with fortification
-
Church, R.L. and Scaparra, M.P. (2006) Protecting critical assets: the r-interdiction median problem with fortification. Geographical Analysis, 39(2), 129-146.
-
(2006)
Geographical Analysis
, vol.39
, Issue.2
, pp. 129-146
-
-
Church, R.L.1
Scaparra, M.P.2
-
35
-
-
85039422750
-
Analysis of facility systems' reliability when subject to attack or a natural disaster
-
Murray, A.T. and Grubesic, T.H. (eds). Springer, New York, NY
-
Church, R.L. and Scaparra, M.P. (2007) Analysis of facility systems' reliability when subject to attack or a natural disaster, in Reliability and Vulnerability in Critical Infrastructure: A Quantitative Geographic Perspective, Murray, A.T. and Grubesic, T.H. (eds). Springer, New York, NY, pp. 221-241.
-
(2007)
Reliability and Vulnerability in Critical Infrastructure: A Quantitative Geographic Perspective
, pp. 221-241
-
-
Church, R.L.1
Scaparra, M.P.2
-
36
-
-
26044461304
-
Identifying critical infrastructure: The median and covering facility interdiction problems
-
Church, R.L., Scaparra, M.P. and Middleton, R.S. (2004) Identifying critical infrastructure: the median and covering facility interdiction problems. Annals of the Association of American Geographers, 94(3), 491-502.
-
(2004)
Annals of the Association of American Geographers
, vol.94
, Issue.3
, pp. 491-502
-
-
Church, R.L.1
Scaparra, M.P.2
Middleton, R.S.3
-
37
-
-
0000879068
-
Optimal policies for a multi-echelon inventory problem
-
Clark, A.J. and Scarf, H. (1960) Optimal policies for a multi-echelon inventory problem. Management Science, 6(4), 475-490.
-
(1960)
Management Science
, vol.6
, Issue.4
, pp. 475-490
-
-
Clark, A.J.1
Scarf, H.2
-
38
-
-
1842782745
-
Disruption management
-
Clausen, J., Hansen, J., Larsen, J. and Larsen, A. (2001) Disruption management. OR/MS Today, 28(5), 40-43.
-
(2001)
OR/MS Today
, vol.28
, Issue.5
, pp. 40-43
-
-
Clausen, J.1
Hansen, J.2
Larsen, J.3
Larsen, A.4
-
40
-
-
77955879952
-
Reliable facility location design under the risk of disruptions
-
Cui, T., Ouyang, Y. and Shen, Z.-J.M. (2010) Reliable facility location design under the risk of disruptions. Operations Research, 58(4), 998-1011.
-
(2010)
Operations Research
, vol.58
, Issue.4
, pp. 998-1011
-
-
Cui, T.1
Ouyang, Y.2
Shen, Z.-J.M.3
-
41
-
-
33847319230
-
A newsvendor's procurement problem when suppliers are unreliable
-
Dada, M., Petruzzi, N. and Schwarz, L. (2007) A newsvendor's procurement problem when suppliers are unreliable. Manufacturing and Service Operations Management, 9(1), 9-32.
-
(2007)
Manufacturing and Service Operations Management
, vol.9
, Issue.1
, pp. 9-32
-
-
Dada, M.1
Petruzzi, N.2
Schwarz, L.3
-
42
-
-
0022730939
-
Configuration of physical distribution networks
-
Daganzo, C.F. and Newell, G.F. (1986) Configuration of physical distribution networks. Networks, 16, 113-132.
-
(1986)
Networks
, vol.16
, pp. 113-132
-
-
Daganzo, C.F.1
Newell, G.F.2
-
43
-
-
0003755938
-
-
second edition, Wiley, New York, NY
-
Daskin, M.S. (2013) Network and Discrete Location: Models, Algorithms, and Applications, second edition, Wiley, New York, NY.
-
(2013)
Network and Discrete Location: Models, Algorithms, and Applications
-
-
Daskin, M.S.1
-
44
-
-
0036033283
-
An inventory-location model: Formulation, solution algorithm and computational results
-
Daskin, M.S., Coullard, C.R. and Shen, Z.-J.M. (2002) An inventory-location model: formulation, solution algorithm and computational results. Annals of Operations Research, 110, 83-106.
-
(2002)
Annals of Operations Research
, vol.110
, pp. 83-106
-
-
Daskin, M.S.1
Coullard, C.R.2
Shen, Z.-J.M.3
-
45
-
-
84884154643
-
Inventory management for an assembly system subject to supply disruptions
-
DeCroix, G.A. (2013) Inventory management for an assembly system subject to supply disruptions. Management Science, 59, 2079-2092.
-
(2013)
Management Science
, vol.59
, pp. 2079-2092
-
-
DeCroix, G.A.1
-
47
-
-
84867517509
-
Managing disruption risk: The interplay between operations and insurance
-
Dong, L. and Tomlin, B. (2012) Managing disruption risk: the interplay between operations and insurance. Management Science, 58(10), 1898-1915.
-
(2012)
Management Science
, vol.58
, Issue.10
, pp. 1898-1915
-
-
Dong, L.1
Tomlin, B.2
-
48
-
-
0023363351
-
Heuristic solution methods for two location problems with unreliable facilities
-
Drezner, Z. (1987) Heuristic solution methods for two location problems with unreliable facilities. Journal of the Operational Research Society, 38(6), 509-514.
-
(1987)
Journal of the Operational Research Society
, vol.38
, Issue.6
, pp. 509-514
-
-
Drezner, Z.1
-
51
-
-
25144487120
-
Recovering cyclic schedules using dynamic produce-up-to policies
-
Eisenstein, D. (2005) Recovering cyclic schedules using dynamic produce-up-to policies. Operations Research, 53(4), 675-688.
-
(2005)
Operations Research
, vol.53
, Issue.4
, pp. 675-688
-
-
Eisenstein, D.1
-
52
-
-
71349088069
-
Buyer perceptions of supply disruption risk: A behavioral view and empirical assessment
-
Ellis, S.C., Henry, R.M. and Shockley, J. (2010) Buyer perceptions of supply disruption risk: A behavioral view and empirical assessment. Journal of Operations Management, 28, 34-46.
-
(2010)
Journal of Operations Management
, vol.28
, pp. 34-46
-
-
Ellis, S.C.1
Henry, R.M.2
Shockley, J.3
-
53
-
-
0000832726
-
Effects of centralization on expected costs in a multi-location newsboy problem
-
Eppen, G.D. (1979) Effects of centralization on expected costs in a multi-location newsboy problem. Management Science, 25(5), 498-501.
-
(1979)
Management Science
, vol.25
, Issue.5
, pp. 498-501
-
-
Eppen, G.D.1
-
54
-
-
61349164948
-
Selecting a portfolio of suppliers under demand and supply risks
-
Federgruen, A. and Yang, N. (2008) Selecting a portfolio of suppliers under demand and supply risks. Operations Research, 56(4), 916-936.
-
(2008)
Operations Research
, vol.56
, Issue.4
, pp. 916-936
-
-
Federgruen, A.1
Yang, N.2
-
55
-
-
72149086470
-
Optimal supply diversification under general supply risks
-
Federgruen, A. and Yang, N. (2009) Optimal supply diversification under general supply risks. Operations Research, 57(6), 1451-1468.
-
(2009)
Operations Research
, vol.57
, Issue.6
, pp. 1451-1468
-
-
Federgruen, A.1
Yang, N.2
-
56
-
-
0000096090
-
Maximizing the minimum source-sink path subject to a budget constraint
-
Fulkerson, D.R. and Harding, G.C. (1977) Maximizing the minimum source-sink path subject to a budget constraint. Mathematical Programming, 13, 116-118.
-
(1977)
Mathematical Programming
, vol.13
, pp. 116-118
-
-
Fulkerson, D.R.1
Harding, G.C.2
-
57
-
-
0028407941
-
When is a base stock policy optimal in recovering disrupted cyclic schedules
-
Gallego, G. (1994) When is a base stock policy optimal in recovering disrupted cyclic schedules. Naval Research Logistics, 41(3), 317-333.
-
(1994)
Naval Research Logistics
, vol.41
, Issue.3
, pp. 317-333
-
-
Gallego, G.1
-
58
-
-
84927953707
-
-
Working Paper, Anderson Graduate School of Management, University of California, Riverside, CA
-
Gao, L. and Li, Z. (2010) Managing supply interruptions with contract coordination and information sharing. Working Paper, Anderson Graduate School of Management, University of California, Riverside, CA.
-
(2010)
Managing Supply Interruptions with Contract Coordination and Information Sharing
-
-
Gao, L.1
Li, Z.2
-
59
-
-
50849106725
-
Nature plays with dice - Terrorists do not: Allocating resources to counter strategic versus probabilistic risks
-
Golany, B., Kaplan, E.H., Marmur, A. and Rothblum, U.G. (2009) Nature plays with dice - terrorists do not: allocating resources to counter strategic versus probabilistic risks. European Journal of Operational Research, 192(1), 198-208.
-
(2009)
European Journal of Operational Research
, vol.192
, Issue.1
, pp. 198-208
-
-
Golany, B.1
Kaplan, E.H.2
Marmur, A.3
Rothblum, U.G.4
-
61
-
-
0026927270
-
Production batching with machine breakdowns and safety stocks
-
Groenevelt, H., Pintelon, L. and Seidmann, A. (1992a) Production batching with machine breakdowns and safety stocks. Operations Research, 40(5), 959-971.
-
(1992)
Operations Research
, vol.40
, Issue.5
, pp. 959-971
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
62
-
-
0026454137
-
Production lot sizing with machine breakdowns
-
Groenevelt, H., Pintelon, L. and Seidmann, A. (1992b) Production lot sizing with machine breakdowns. Management Science, 38(1), 104-123.
-
(1992)
Management Science
, vol.38
, Issue.1
, pp. 104-123
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
63
-
-
4043162890
-
Multiple lotsizing in production to order with random yields: Review of recent advances
-
Grosfeld-Nir, A. and Gerchak, Y. (2004) Multiple lotsizing in production to order with random yields: review of recent advances. Annals of Operations Research, 126(1-4), 43-69.
-
(2004)
Annals of Operations Research
, vol.126
, Issue.1-4
, pp. 43-69
-
-
Grosfeld-Nir, A.1
Gerchak, Y.2
-
64
-
-
0031197705
-
Analysis of a deterministic demand production/inventory system under nonstationary supply uncertainty
-
Güllü, R., Önol, E. and Erkip, N. (1997) Analysis of a deterministic demand production/inventory system under nonstationary supply uncertainty. IIE Transactions, 29, 703-709.
-
(1997)
IIE Transactions
, vol.29
, pp. 703-709
-
-
Güllü, R.1
Önol, E.2
Erkip, N.3
-
65
-
-
0345072526
-
Analysis of an inventory system under supply uncertainty
-
Güllü, R., Önol, E. and Erkip, N. (1999) Analysis of an inventory system under supply uncertainty. International Journal of Production Economics, 59, 377-385.
-
(1999)
International Journal of Production Economics
, vol.59
, pp. 377-385
-
-
Güllü, R.1
Önol, E.2
Erkip, N.3
-
66
-
-
84866397774
-
Supply-side story: Risks, guarantees, competition, and information asymmetry
-
Gümüş, M., Ray, S. and Gurnani, H. (2012) Supply-side story: risks, guarantees, competition, and information asymmetry. Management Science, 58(9), 1694-1714.
-
(2012)
Management Science
, vol.58
, Issue.9
, pp. 1694-1714
-
-
Gümüş, M.1
Ray, S.2
Gurnani, H.3
-
67
-
-
0038549131
-
The (Q, r) inventory system with an unreliable supplier
-
Gupta, D. (1996) The (Q, r) inventory system with an unreliable supplier. INFOR, 34(2), 59-76.
-
(1996)
INFOR
, vol.34
, Issue.2
, pp. 59-76
-
-
Gupta, D.1
-
68
-
-
0031273962
-
An inventory problem with two randomly available suppliers
-
Gürler, U. and Parlar, M. (1997) An inventory problem with two randomly available suppliers. Operations Research, 45(6), 904-918.
-
(1997)
Operations Research
, vol.45
, Issue.6
, pp. 904-918
-
-
Gürler, U.1
Parlar, M.2
-
69
-
-
84893973261
-
Ordering behavior under supply risk: An experimental investigation
-
Gurnani, H., Ramachandran, K., Ray, S. and Xia, Y. (2014) Ordering behavior under supply risk: An experimental investigation. Manufacturing & Service Operations Management, 16(1), 61-75.
-
(2014)
Manufacturing & Service Operations Management
, vol.16
, Issue.1
, pp. 61-75
-
-
Gurnani, H.1
Ramachandran, K.2
Ray, S.3
Xia, Y.4
-
70
-
-
33744799033
-
A bargaining model for a first-time interaction under asymmetric beliefs of supply reliability
-
Gurnani, H. and Shi, M. (2006) A bargaining model for a first-time interaction under asymmetric beliefs of supply reliability. Management Science, 52(6), 865-880.
-
(2006)
Management Science
, vol.52
, Issue.6
, pp. 865-880
-
-
Gurnani, H.1
Shi, M.2
-
72
-
-
0002875063
-
Avoid the pitfalls in supplier development
-
Handfield, R.B., Krause, D.R., Scannell, T.V. and Monczka, R.M. (2010) Avoid the pitfalls in supplier development. MIT Sloan Management Review, 41(2), 37-49.
-
(2010)
MIT Sloan Management Review
, vol.41
, Issue.2
, pp. 37-49
-
-
Handfield, R.B.1
Krause, D.R.2
Scannell, T.V.3
Monczka, R.M.4
-
73
-
-
84954400446
-
-
Working paper, Lehigh University, Bethlehem, PA
-
He, L. and Snyder, L.V. (2013) Management of a distribution system under supply risk. Working paper, Lehigh University, Bethlehem, PA.
-
(2013)
Management of a Distribution System under Supply Risk
-
-
He, L.1
Snyder, L.V.2
-
74
-
-
84954404051
-
-
Working paper, Lehigh University, Bethlehem, PA
-
He, L., Snyder, L.V. and DeCroix, G.A. (2013) Management of an assembly system subject to supply disruptions. Working paper, Lehigh University, Bethlehem, PA.
-
(2013)
Management of an Assembly System Subject to Supply Disruptions
-
-
He, L.1
Snyder, L.V.2
DeCroix, G.A.3
-
75
-
-
77952518874
-
A closed-form approximation solution for an inventory model with supply disruptions and non-ZIO reorder policy
-
Heimann, D. and Waage, F. (2007) A closed-form approximation solution for an inventory model with supply disruptions and non-ZIO reorder policy. Journal of Systemics, Cybernetics, and Informatics, 5(4), 1-12.
-
(2007)
Journal of Systemics, Cybernetics, and Informatics
, vol.5
, Issue.4
, pp. 1-12
-
-
Heimann, D.1
Waage, F.2
-
76
-
-
0345377643
-
The effect of supply chain glitches on shareholder wealth
-
Hendricks, K.B. and Singhal, V.R. (2003) The effect of supply chain glitches on shareholder wealth. Journal of Operations Management, 21(5), 501-522.
-
(2003)
Journal of Operations Management
, vol.21
, Issue.5
, pp. 501-522
-
-
Hendricks, K.B.1
Singhal, V.R.2
-
77
-
-
20944448179
-
Association between supply chain glitches and operating performance
-
Hendricks, K.B. and Singhal, V.R. (2005a) Association between supply chain glitches and operating performance. Management Science, 51(5), 695-711.
-
(2005)
Management Science
, vol.51
, Issue.5
, pp. 695-711
-
-
Hendricks, K.B.1
Singhal, V.R.2
-
78
-
-
19844379817
-
An empirical analysis of the effect of supply chain disruptions on long-run stock price performance and equity risk of the firm
-
Hendricks, K.B. and Singhal, V.R. (2005b) An empirical analysis of the effect of supply chain disruptions on long-run stock price performance and equity risk of the firm. Production and Operations Management, 14(1), 35-52.
-
(2005)
Production and Operations Management
, vol.14
, Issue.1
, pp. 35-52
-
-
Hendricks, K.B.1
Singhal, V.R.2
-
79
-
-
84906218817
-
-
Working Paper, Stephen M. Ross School of Business, University of Michigan, Ann Arbor, MI
-
Hopp, W.J., Iravani, S.M.R. and Liu, Z. (2009) Strategic risk from supply chain disruptions. Working Paper, Stephen M. Ross School of Business, University of Michigan, Ann Arbor, MI.
-
(2009)
Strategic Risk from Supply Chain Disruptions
-
-
Hopp, W.J.1
Iravani, S.M.R.2
Liu, Z.3
-
80
-
-
73449131071
-
-
Working Paper, Department of Industrial Engineering and Management Science, Northwestern University, Evanston, IL
-
Hopp, W.J. and Yin, Z. (2006) Protecting supply chain networks against catastrophic failures. Working Paper, Department of Industrial Engineering and Management Science, Northwestern University, Evanston, IL.
-
(2006)
Protecting Supply Chain Networks Against Catastrophic Failures
-
-
Hopp, W.J.1
Yin, Z.2
-
81
-
-
84929206641
-
Managing supply disruptions when sourcing from reliable and unreliable suppliers
-
Hu, B. and Kostamis, D. (2015) Managing supply disruptions when sourcing from reliable and unreliable suppliers. Production and Operations Management, 24(5), 808-820.
-
(2015)
Production and Operations Management
, vol.24
, Issue.5
, pp. 808-820
-
-
Hu, B.1
Kostamis, D.2
-
82
-
-
84872726890
-
Managing risk of supply disruptions: Incentives for capacity restoration
-
Hu, X., Gurnani, H. and Wang, L. (2013) Managing risk of supply disruptions: incentives for capacity restoration. Production and Operations Management, 22(1), 137-150.
-
(2013)
Production and Operations Management
, vol.22
, Issue.1
, pp. 137-150
-
-
Hu, X.1
Gurnani, H.2
Wang, L.3
-
83
-
-
24144467380
-
Contingency management under asymmetric information
-
Iyer, A.V., Deshpande, V. and Wu, Z. (2005) Contingency management under asymmetric information. Operations Research Letters, 33(6), 572-580.
-
(2005)
Operations Research Letters
, vol.33
, Issue.6
, pp. 572-580
-
-
Iyer, A.V.1
Deshpande, V.2
Wu, Z.3
-
84
-
-
55349100212
-
Reformulation and sampling to solve a stochastic network interdiction problem
-
Janjarassuk, U. and Linderoth, J.T. (2008) Reformulation and sampling to solve a stochastic network interdiction problem. Networks, 52(3), 120-132.
-
(2008)
Networks
, vol.52
, Issue.3
, pp. 120-132
-
-
Janjarassuk, U.1
Linderoth, J.T.2
-
85
-
-
84949549992
-
-
Technical report, Lehigh University, Bethlehem, PA
-
Jeon, H.-M., Snyder, L.V. and Shen, Z.-J.M. (2008) Location-inventory models with supply disruptions, Technical report, Lehigh University, Bethlehem, PA.
-
(2008)
Location-inventory Models with Supply Disruptions
-
-
Jeon, H.-M.1
Snyder, L.V.2
Shen, Z.-J.M.3
-
86
-
-
0029290411
-
Principles on the benefits of manufacturing process flexibility
-
Jordan, W.C. and Graves, S.C. (1995) Principles on the benefits of manufacturing process flexibility. Management Science, 41(4), 577-594.
-
(1995)
Management Science
, vol.41
, Issue.4
, pp. 577-594
-
-
Jordan, W.C.1
Graves, S.C.2
-
87
-
-
84954382504
-
Picking up the pieces: Shippers and carriers seek alternatives to transportation networks damaged by Hurricane Katrina
-
Journal of Commerce
-
Journal of Commerce. (2005) Picking up the pieces: shippers and carriers seek alternatives to transportation networks damaged by Hurricane Katrina. Journal of Commerce.
-
(2005)
Journal of Commerce
-
-
-
89
-
-
23244465489
-
Design of survivable networks: A survey
-
Kerivin, H. and Mahjoub, A.R. (2005) Design of survivable networks: a survey. Networks, 46(1), 1-21.
-
(2005)
Networks
, vol.46
, Issue.1
, pp. 1-21
-
-
Kerivin, H.1
Mahjoub, A.R.2
-
90
-
-
77956626891
-
Contracting for infrequent restoration and recovery of mission-critical systems
-
Kim, S.-H., Cohen, M.A., Netessine, S. and Veeraraghavan, S. (2010) Contracting for infrequent restoration and recovery of mission-critical systems. Management Science, 56(9), 1551-1567.
-
(2010)
Management Science
, vol.56
, Issue.9
, pp. 1551-1567
-
-
Kim, S.-H.1
Cohen, M.A.2
Netessine, S.3
Veeraraghavan, S.4
-
92
-
-
84954393000
-
Edmonton's striking Safeway workers brace for a long strike
-
9 September
-
Kleiss, K. (2009) Edmonton's striking Safeway workers brace for a long strike. Calgary Herald, 9 September.
-
(2009)
Calgary Herald
-
-
Kleiss, K.1
-
93
-
-
0027005571
-
Algorithms for robust single and multiple period layout planning for manufacturing systems
-
Kouvelis, P., Kurawarwala, A.A. and Gutiérrez, G.J. (1992) Algorithms for robust single and multiple period layout planning for manufacturing systems. European Journal of Operational Research, 63, 287-303.
-
(1992)
European Journal of Operational Research
, vol.63
, pp. 287-303
-
-
Kouvelis, P.1
Kurawarwala, A.A.2
Gutiérrez, G.J.3
-
94
-
-
0035314338
-
On solving unreliable planar location problems
-
Lee, S.-D. (2001) On solving unreliable planar location problems. Computers and Operations Research, 28(4), 329-344.
-
(2001)
Computers and Operations Research
, vol.28
, Issue.4
, pp. 329-344
-
-
Lee, S.-D.1
-
95
-
-
84877989081
-
Managing inventory in global supply chains facing port-of-entry disruption risks
-
Lewis, B.M., Erera, A.L., Nowak, M.A. and White, C.C. (2013) Managing inventory in global supply chains facing port-of-entry disruption risks. Transportation Science, 47(2), 162-180.
-
(2013)
Transportation Science
, vol.47
, Issue.2
, pp. 162-180
-
-
Lewis, B.M.1
Erera, A.L.2
Nowak, M.A.3
White, C.C.4
-
96
-
-
33747833038
-
Enhancing agility by timely sharing of supply information
-
Li, G., Lin, Y., Wang, S. and Yan, H. (2006) Enhancing agility by timely sharing of supply information. Supply Chain Management: An International Journal, 11(5), 425-435.
-
(2006)
Supply Chain Management: An International Journal
, vol.11
, Issue.5
, pp. 425-435
-
-
Li, G.1
Lin, Y.2
Wang, S.3
Yan, H.4
-
97
-
-
74449091492
-
Competition and cooperation in a single-retailer two-supplier supply chain with supply disruption
-
Li, J., Wang, S. and Cheng, T.C.E. (2010) Competition and cooperation in a single-retailer two-supplier supply chain with supply disruption. International Journal of Production Economics, 124, 137-150.
-
(2010)
International Journal of Production Economics
, vol.124
, pp. 137-150
-
-
Li, J.1
Wang, S.2
Cheng, T.C.E.3
-
98
-
-
84872414247
-
Reliable facility location design under disruptions
-
Li, Q., Zeng, B. and Savachkin, Z. (2013) Reliable facility location design under disruptions. Computers and Operations Research, 40, 901-909.
-
(2013)
Computers and Operations Research
, vol.40
, pp. 901-909
-
-
Li, Q.1
Zeng, B.2
Savachkin, Z.3
-
99
-
-
77549084109
-
A continuum approximation approach to reliable facility location design under correlated probabilistic disruptions
-
Li, X. and Ouyang, Y. (2010) A continuum approximation approach to reliable facility location design under correlated probabilistic disruptions. Transportation Research-Part B, 44(4), 535-548.
-
(2010)
Transportation Research-Part B
, vol.44
, Issue.4
, pp. 535-548
-
-
Li, X.1
Ouyang, Y.2
-
100
-
-
0842329036
-
A periodic-review inventory system with supply interruptions
-
Li, Z., Xu, S.H. and Hayya, J. (2004) A periodic-review inventory system with supply interruptions. Probability in the Engineering an Informational Sciences, 18, 33-53.
-
(2004)
Probability in the Engineering an Informational Sciences
, vol.18
, pp. 33-53
-
-
Li, Z.1
Xu, S.H.2
Hayya, J.3
-
101
-
-
80052886607
-
Optimizing protection strategies for supply chains: Comparing classic decision making criteria in an uncertain environment
-
Liberatore, F. and Scaparra, M.P. (2011) Optimizing protection strategies for supply chains: comparing classic decision making criteria in an uncertain environment. Annals of the Association of American Geographers, 101(6), 1241-1258.
-
(2011)
Annals of the Association of American Geographers
, vol.101
, Issue.6
, pp. 1241-1258
-
-
Liberatore, F.1
Scaparra, M.P.2
-
102
-
-
78049418283
-
Analysis of facility protection strategies against an uncertain number of attacks: The stochastic R-interdiction median problem with fortification
-
Liberatore, F., Scaparra, M.P. and Daskin, M.S. (2011) Analysis of facility protection strategies against an uncertain number of attacks: the stochastic R-interdiction median problem with fortification. Computers & Operations Research, 38(1), 357-366.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.1
, pp. 357-366
-
-
Liberatore, F.1
Scaparra, M.P.2
Daskin, M.S.3
-
103
-
-
79957550136
-
Optimization methods for hedging against disruptions with ripple effects in location analysis
-
Liberatore, F., Scaparra, M.P. and Daskin, M.S. (2012) Optimization methods for hedging against disruptions with ripple effects in location analysis. Omega, 40(1), 21-30.
-
(2012)
Omega
, vol.40
, Issue.1
, pp. 21-30
-
-
Liberatore, F.1
Scaparra, M.P.2
Daskin, M.S.3
-
104
-
-
84924246384
-
-
Working Paper, Department of Industrial Engineering and Management Sciences, Northwestern University, Evanston, IL
-
Lim, M., Bassamboo, A., Chopra, S. and Daskin, M.S. (2011) Flexibility and fragility: supply chain network design with disruption risks. Working Paper, Department of Industrial Engineering and Management Sciences, Northwestern University, Evanston, IL.
-
(2011)
Flexibility and Fragility: Supply Chain Network Design with Disruption Risks
-
-
Lim, M.1
Bassamboo, A.2
Chopra, S.3
Daskin, M.S.4
-
105
-
-
75149122009
-
A facility reliability problem: Formulation, properties, and algorithm
-
Lim, M., Daskin, M.S., Bassamboo, A. and Chopra, S. (2010) A facility reliability problem: formulation, properties, and algorithm. Naval Research Logistics, 57(1), 58-70.
-
(2010)
Naval Research Logistics
, vol.57
, Issue.1
, pp. 58-70
-
-
Lim, M.1
Daskin, M.S.2
Bassamboo, A.3
Chopra, S.4
-
106
-
-
84881298732
-
Facility location decisions with random disruptions and imperfect estimation
-
Lim, M., Daskin, M.S., Bassamboo, A. and Chopra, S. (2013) Facility location decisions with random disruptions and imperfect estimation. Manufacturing and Service Operations Management, 15(2), 239-249.
-
(2013)
Manufacturing and Service Operations Management
, vol.15
, Issue.2
, pp. 239-249
-
-
Lim, M.1
Daskin, M.S.2
Bassamboo, A.3
Chopra, S.4
-
107
-
-
0032764917
-
Analysis of a production-inventory system with machine breakdowns and shutdowns
-
Liu, B. and Cao, J. (1999) Analysis of a production-inventory system with machine breakdowns and shutdowns. Computers and Operations Research, 26, 73-91.
-
(1999)
Computers and Operations Research
, vol.26
, pp. 73-91
-
-
Liu, B.1
Cao, J.2
-
108
-
-
84893319551
-
-
Working paper, Kent Business School, University of Kent, Canterbury, UK
-
Losada, C., Scaparra, M.P. and Church, R.L. (2010a) Interdiction of p-median systems with facility recovery time and frequent disruptions: a resiliency analysis. Working paper, Kent Business School, University of Kent, Canterbury, UK.
-
(2010)
Interdiction of P-median Systems with Facility Recovery Time and Frequent Disruptions: A Resiliency Analysis
-
-
Losada, C.1
Scaparra, M.P.2
Church, R.L.3
-
109
-
-
77954938191
-
On a bi-level formulation to protect uncapacitated p-median systems with facility recovery time and frequent disruptions
-
Losada, C., Scaparra, M.P. and Church, R.L. (2010b) On a bi-level formulation to protect uncapacitated p-median systems with facility recovery time and frequent disruptions. Electronic Notes in Discrete Mathematics, 36, 591-598.
-
(2010)
Electronic Notes in Discrete Mathematics
, vol.36
, pp. 591-598
-
-
Losada, C.1
Scaparra, M.P.2
Church, R.L.3
-
110
-
-
84870560912
-
The stochastic interdiction median problem with disruption intensity levels
-
Losada, C., Scaparra, M.P., Church, R.L. and Daskin, M.S. (2012) The stochastic interdiction median problem with disruption intensity levels. Annals of Operations Research, 201, 345-365.
-
(2012)
Annals of Operations Research
, vol.201
, pp. 345-365
-
-
Losada, C.1
Scaparra, M.P.2
Church, R.L.3
Daskin, M.S.4
-
111
-
-
84906278525
-
Modeling a severe supply chain disruption and post-disaster decision making with application to the Japanese earthquake and tsunami
-
MacKenzie, C.A., Barker, K. and Santos, J.R. (2014) Modeling a severe supply chain disruption and post-disaster decision making with application to the Japanese earthquake and tsunami. IIE Transactions, 46(12), 1243-1260.
-
(2014)
IIE Transactions
, vol.46
, Issue.12
, pp. 1243-1260
-
-
MacKenzie, C.A.1
Barker, K.2
Santos, J.R.3
-
112
-
-
84870886496
-
Risk-diversification and risk-pooling in supply chain network design
-
Mak, H.-Y. and Shen, Z.-J.M. (2012) Risk-diversification and risk-pooling in supply chain network design. IIE Transactions, 44(8), 603-621.
-
(2012)
IIE Transactions
, vol.44
, Issue.8
, pp. 603-621
-
-
Mak, H.-Y.1
Shen, Z.-J.M.2
-
113
-
-
80051952996
-
A single-period analysis of a two-echelon inventory system with dependent supply uncertainty
-
Masih-Tehrani, B., Xu, S.H., Kumara, S. and Li, H. (2011) A single-period analysis of a two-echelon inventory system with dependent supply uncertainty. Transportation Research Part B: Methodological, 45(8), 1128-1151.
-
(2011)
Transportation Research Part B: Methodological
, vol.45
, Issue.8
, pp. 1128-1151
-
-
Masih-Tehrani, B.1
Xu, S.H.2
Kumara, S.3
Li, H.4
-
114
-
-
79960965310
-
Sourcing decisions under risks of catastrophic event disruptions
-
Meena, P.L., Sarmah, S.P. and Sarkar, A. (2011) Sourcing decisions under risks of catastrophic event disruptions. Transportation Research Part E, 46, 1058-1074.
-
(2011)
Transportation Research Part E
, vol.46
, pp. 1058-1074
-
-
Meena, P.L.1
Sarmah, S.P.2
Sarkar, A.3
-
115
-
-
0018508646
-
Reliability and inventory in a production-storage system
-
Meyer, R.R., Rothkopf, M.H. and Smith, S.A. (1979) Reliability and inventory in a production-storage system. Management Science, 25(8), 799-807.
-
(1979)
Management Science
, vol.25
, Issue.8
, pp. 799-807
-
-
Meyer, R.R.1
Rothkopf, M.H.2
Smith, S.A.3
-
117
-
-
0038323263
-
Supply interruptions in a lost-sales inventory system with random lead time
-
Mohebbi, E. (2003) Supply interruptions in a lost-sales inventory system with random lead time. Computers and Operations Research, 30, 411-426.
-
(2003)
Computers and Operations Research
, vol.30
, pp. 411-426
-
-
Mohebbi, E.1
-
118
-
-
0242662638
-
A replenishment model for the supply-uncertainty problem
-
Mohebbi, E. (2004) A replenishment model for the supply-uncertainty problem. International Journal of Production Economics, 87(1), 25-37.
-
(2004)
International Journal of Production Economics
, vol.87
, Issue.1
, pp. 25-37
-
-
Mohebbi, E.1
-
119
-
-
33748422388
-
When supplier's availability affects the replenishment lead time: An extension of the supply-interruption problem
-
Mohebbi, E. and Hao, D. (2006) When supplier's availability affects the replenishment lead time: an extension of the supply-interruption problem. European Journal of Operational Research, 175, 992-1008.
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 992-1008
-
-
Mohebbi, E.1
Hao, D.2
-
120
-
-
46849087546
-
An inventory model with non-resuming randomly interruptible lead time
-
Mohebbi, E. and Hao, D. (2008) An inventory model with non-resuming randomly interruptible lead time. International Journal of Production Economics, 114, 755-768.
-
(2008)
International Journal of Production Economics
, vol.114
, pp. 755-768
-
-
Mohebbi, E.1
Hao, D.2
-
121
-
-
0031273569
-
Analysis of a production/inventory system subject to random disruptions
-
Moinzadeh, K. and Aggarwal, P. (1997) Analysis of a production/inventory system subject to random disruptions. Management Science, 43(11), 1577-1588.
-
(1997)
Management Science
, vol.43
, Issue.11
, pp. 1577-1588
-
-
Moinzadeh, K.1
Aggarwal, P.2
-
123
-
-
70350376637
-
Managing supply chains in times of crisis: A review of literature and insights
-
Natarajarathinam, M., Capar, I. and Narayanan, A. (2009) Managing supply chains in times of crisis: a review of literature and insights. International Journal of Physical Distribution & Logistics Management, 39(7), 535-573.
-
(2009)
International Journal of Physical Distribution & Logistics Management
, vol.39
, Issue.7
, pp. 535-573
-
-
Natarajarathinam, M.1
Capar, I.2
Narayanan, A.3
-
124
-
-
78649463377
-
Designing robust coverage networks to hedge against worst-case facility losses
-
O'Hanley, J.R. and Church, R.L. (2011) Designing robust coverage networks to hedge against worst-case facility losses. European Journal of Operational Research, 209(1), 23-36.
-
(2011)
European Journal of Operational Research
, vol.209
, Issue.1
, pp. 23-36
-
-
O'Hanley, J.R.1
Church, R.L.2
-
125
-
-
33845590576
-
The importance of in situ site loss in nature reserve selection: Balancing notions of complementarity and robustness
-
O'Hanley, J.R., Church, R.L. and Gilless, J.K. (2007a) The importance of in situ site loss in nature reserve selection: balancing notions of complementarity and robustness. Biological Conservation, 135(2), 170-180.
-
(2007)
Biological Conservation
, vol.135
, Issue.2
, pp. 170-180
-
-
O'Hanley, J.R.1
Church, R.L.2
Gilless, J.K.3
-
126
-
-
33751024126
-
Locating and protecting critical reserve sites to minimize expected and worst-case losses
-
O'Hanley, J.R., Church, R.L. and Gilless, J.K. (2007b) Locating and protecting critical reserve sites to minimize expected and worst-case losses. Biological Conservation, 134(1), 130-141.
-
(2007)
Biological Conservation
, vol.134
, Issue.1
, pp. 130-141
-
-
O'Hanley, J.R.1
Church, R.L.2
Gilless, J.K.3
-
127
-
-
0042639298
-
Inventory models with unreliable suppliers in a random environment
-
Özekici, S. and Parlar, M. (1999) Inventory models with unreliable suppliers in a random environment. Annals of Operations Research, 91, 123-136.
-
(1999)
Annals of Operations Research
, vol.91
, pp. 123-136
-
-
Özekici, S.1
Parlar, M.2
-
128
-
-
0031168878
-
Continuous-review inventory problem with random supply interruptions
-
Parlar, M. (1997) Continuous-review inventory problem with random supply interruptions. European Journal of Operational Research, 99, 366-385.
-
(1997)
European Journal of Operational Research
, vol.99
, pp. 366-385
-
-
Parlar, M.1
-
129
-
-
0034156489
-
Probabilistic analysis of renewal cycles: An application to a non-Markovian inventory problem with multiple objectives
-
Parlar, M. (2000) Probabilistic analysis of renewal cycles: an application to a non-Markovian inventory problem with multiple objectives. Operations Research, 48(2), 243-255.
-
(2000)
Operations Research
, vol.48
, Issue.2
, pp. 243-255
-
-
Parlar, M.1
-
130
-
-
84989685221
-
Future supply uncertainty in EOQ models
-
Parlar, M. and Berkin, D. (1991) Future supply uncertainty in EOQ models. Naval Research Logistics, 38, 107-121.
-
(1991)
Naval Research Logistics
, vol.38
, pp. 107-121
-
-
Parlar, M.1
Berkin, D.2
-
131
-
-
0029342043
-
Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain
-
Parlar, M. and Perry, D. (1995) Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain. European Journal of Operational Research, 84, 431-443.
-
(1995)
European Journal of Operational Research
, vol.84
, pp. 431-443
-
-
Parlar, M.1
Perry, D.2
-
132
-
-
0000317841
-
Inventory models of future supply uncertainty with single and multiple suppliers
-
Parlar, M. and Perry, D. (1996) Inventory models of future supply uncertainty with single and multiple suppliers. Naval Research Logistics, 43, 191-210.
-
(1996)
Naval Research Logistics
, vol.43
, pp. 191-210
-
-
Parlar, M.1
Perry, D.2
-
133
-
-
0038210330
-
A periodic review inventory model with Markovian supply availability
-
Parlar, M., Wang, Y. and Gerchak, Y. (1995) A periodic review inventory model with Markovian supply availability. International Journal of Production Economics, 42, 131-136.
-
(1995)
International Journal of Production Economics
, vol.42
, pp. 131-136
-
-
Parlar, M.1
Wang, Y.2
Gerchak, Y.3
-
134
-
-
80051945257
-
Design of reliable logistics network with facility disruptions
-
Peng, P., Snyder, L.V., Liu, Z. and Lim, A. (2011) Design of reliable logistics network with facility disruptions. Transportation Research-Part B, 45(8), 1190-1211.
-
(2011)
Transportation Research-Part B
, vol.45
, Issue.8
, pp. 1190-1211
-
-
Peng, P.1
Snyder, L.V.2
Liu, Z.3
Lim, A.4
-
135
-
-
0024945301
-
Analysis of a production-inventory system with unreliable production facility
-
Posner, M.J. and Berg, M. (1989) Analysis of a production-inventory system with unreliable production facility. Operations Research Letters, 8, 339-345.
-
(1989)
Operations Research Letters
, vol.8
, pp. 339-345
-
-
Posner, M.J.1
Berg, M.2
-
136
-
-
84868494327
-
A continuous-review inventory model with random disruptions at the primary supplier
-
Qi, L. (2013) A continuous-review inventory model with random disruptions at the primary supplier. European Journal of Operational Research, 225(1), 59-74.
-
(2013)
European Journal of Operational Research
, vol.225
, Issue.1
, pp. 59-74
-
-
Qi, L.1
-
137
-
-
36549064794
-
A supply chain design model with unreliable supply
-
Qi, L. and Shen, Z.-J.M. (2007) A supply chain design model with unreliable supply. Naval Research Logistics, 54(8), 829-844.
-
(2007)
Naval Research Logistics
, vol.54
, Issue.8
, pp. 829-844
-
-
Qi, L.1
Shen, Z.-J.M.2
-
138
-
-
70350191844
-
A continuous-review inventory model with disruptions at both supplier and retailer
-
Qi, L., Shen, Z.-J.M. and Snyder, L.V. (2009) A continuous-review inventory model with disruptions at both supplier and retailer. Production and Operations Management, 18(5), 516-532.
-
(2009)
Production and Operations Management
, vol.18
, Issue.5
, pp. 516-532
-
-
Qi, L.1
Shen, Z.-J.M.2
Snyder, L.V.3
-
139
-
-
77952509551
-
The effect of supply disruptions on supply chain design decisions
-
Qi, L., Shen, Z.-J.M. and Snyder, L.V. (2010) The effect of supply disruptions on supply chain design decisions. Transportation Science, 44(2), 274-289.
-
(2010)
Transportation Science
, vol.44
, Issue.2
, pp. 274-289
-
-
Qi, L.1
Shen, Z.-J.M.2
Snyder, L.V.3
-
140
-
-
84954390340
-
-
Working paper, Lehigh University, Bethlehem, PA
-
Rong, Y., Atan, Z. and Snyder, L.V. (2015) Heuristics for base-stock levels in multi-echelon distribution networks, Working paper, Lehigh University, Bethlehem, PA.
-
(2015)
Heuristics for Base-stock Levels in Multi-echelon Distribution Networks
-
-
Rong, Y.1
Atan, Z.2
Snyder, L.V.3
-
141
-
-
73449085182
-
The impact of ordering behavior on order-quantity variability: A study of forward and reverse bullwhip effects
-
Rong, Y., Shen, Z.-J.M. and Snyder, L.V. (2009a) The impact of ordering behavior on order-quantity variability: a study of forward and reverse bullwhip effects. Flexible Services and Manufacturing Journal, 20(1), 95-124.
-
(2009)
Flexible Services and Manufacturing Journal
, vol.20
, Issue.1
, pp. 95-124
-
-
Rong, Y.1
Shen, Z.-J.M.2
Snyder, L.V.3
-
142
-
-
73449097374
-
-
Working paper, Lehigh University, Bethlehem, PA
-
Rong, Y., Shen, Z.-J.M. and Snyder, L.V. (2009b) Pricing during disruptions: A cause of the reverse bullwhip effect, Working paper, Lehigh University, Bethlehem, PA.
-
(2009)
Pricing during Disruptions: A Cause of the Reverse Bullwhip Effect
-
-
Rong, Y.1
Shen, Z.-J.M.2
Snyder, L.V.3
-
143
-
-
73449127837
-
-
Working paper, Lehigh University, Bethlehem, PA
-
Rong, Y., Snyder, L.V. and Shen, Z.-J.M. (2009) Bullwhip and reverse bullwhip effects under rationing game, Working paper, Lehigh University, Bethlehem, PA.
-
(2009)
Bullwhip and Reverse Bullwhip Effects under Rationing Game
-
-
Rong, Y.1
Snyder, L.V.2
Shen, Z.-J.M.3
-
144
-
-
0024701994
-
Optimal inventory policies for assembly systems under random demands
-
Rosling, K. (1989) Optimal inventory policies for assembly systems under random demands. Operations Research, 37(4), 565-579.
-
(1989)
Operations Research
, vol.37
, Issue.4
, pp. 565-579
-
-
Rosling, K.1
-
145
-
-
41149143786
-
Supply disruptions with time-dependent parameters
-
Ross, A.M., Rong, Y. and Snyder, L.V. (2008) Supply disruptions with time-dependent parameters. Computers and Operations Research, 35(11), 3504-3529.
-
(2008)
Computers and Operations Research
, vol.35
, Issue.11
, pp. 3504-3529
-
-
Ross, A.M.1
Rong, Y.2
Snyder, L.V.3
-
146
-
-
33748148203
-
The optimal number of suppliers considering the costs of individual supplier failures
-
Ruiz-Torres, A.J. and Mahmoodi, F. (2007) The optimal number of suppliers considering the costs of individual supplier failures. Omega, 35, 104-115.
-
(2007)
Omega
, vol.35
, pp. 104-115
-
-
Ruiz-Torres, A.J.1
Mahmoodi, F.2
-
147
-
-
84864650963
-
The value of flexible suppliers and disruption risk information: Newsvendor analysis with recourse
-
Saghafian, S. and Van Oyen, M.P. (2012) The value of flexible suppliers and disruption risk information: newsvendor analysis with recourse. IIE Transactions, 44(10), 834-867.
-
(2012)
IIE Transactions
, vol.44
, Issue.10
, pp. 834-867
-
-
Saghafian, S.1
Van Oyen, M.P.2
-
148
-
-
77955843860
-
Selection of supply portfolio under disruption risks
-
Sawik, T. (2011) Selection of supply portfolio under disruption risks. Omega, 39, 194-208.
-
(2011)
Omega
, vol.39
, pp. 194-208
-
-
Sawik, T.1
-
149
-
-
79951870675
-
Optimal allocation of protective resources in shortest-path networks
-
Scaparra, M.P. and Cappanera, P. (2011) Optimal allocation of protective resources in shortest-path networks. Transportation Science, 45(1), 64-80.
-
(2011)
Transportation Science
, vol.45
, Issue.1
, pp. 64-80
-
-
Scaparra, M.P.1
Cappanera, P.2
-
150
-
-
35348951490
-
A bilevel mixed-integer program for critical infrastructure protection planning
-
Scaparra, M.P. and Church, R.L. (2008a) A bilevel mixed-integer program for critical infrastructure protection planning. Computers and Operations Research, 35(6), 1905-1923.
-
(2008)
Computers and Operations Research
, vol.35
, Issue.6
, pp. 1905-1923
-
-
Scaparra, M.P.1
Church, R.L.2
-
151
-
-
38949181266
-
An exact solution approach for the interdiction median problem with fortification
-
Scaparra, M.P. and Church, R.L. (2008b) An exact solution approach for the interdiction median problem with fortification. European Journal of Operational Research, 189, 76-92.
-
(2008)
European Journal of Operational Research
, vol.189
, pp. 76-92
-
-
Scaparra, M.P.1
Church, R.L.2
-
152
-
-
84859036409
-
Protecting supply systems to mitigate potential disaster: A model to fortify capacitated facilities
-
Scaparra, M.P. and Church, R.L. (2012) Protecting supply systems to mitigate potential disaster: a model to fortify capacitated facilities. International Regional Science Review, 35(2), 188-210.
-
(2012)
International Regional Science Review
, vol.35
, Issue.2
, pp. 188-210
-
-
Scaparra, M.P.1
Church, R.L.2
-
153
-
-
80051941447
-
Strategies for customer service level protection under multi-echelon supply chain disruption risk
-
Schmitt, A.J. (2011) Strategies for customer service level protection under multi-echelon supply chain disruption risk. Transportaion Research Part B: Methodological, 45(8), 1266-1283.
-
(2011)
Transportaion Research Part B: Methodological
, vol.45
, Issue.8
, pp. 1266-1283
-
-
Schmitt, A.J.1
-
154
-
-
77951560561
-
Quantifying supply chain disruption risk using Monte Carlo and discrete-event simulation
-
Schmitt, A.J. and Singh, M. (2009) Quantifying supply chain disruption risk using Monte Carlo and discrete-event simulation, in Proceedings of the 2009 Winter Simulation Conference, pp. 1237-1248.
-
(2009)
Proceedings of the 2009 Winter Simulation Conference
, pp. 1237-1248
-
-
Schmitt, A.J.1
Singh, M.2
-
155
-
-
84863223841
-
A quantitative analysis of disruption risk in a multi-echelon supply chain
-
Schmitt, A.J. and Singh, M. (2012) A quantitative analysis of disruption risk in a multi-echelon supply chain. International Journal of Production Economics, 139(1), 22-32.
-
(2012)
International Journal of Production Economics
, vol.139
, Issue.1
, pp. 22-32
-
-
Schmitt, A.J.1
Singh, M.2
-
156
-
-
80051783300
-
Infinite-horizon models for inventory control under yield uncertainty and disruptions
-
Schmitt, A.J. and Snyder, L.V. (2012) Infinite-horizon models for inventory control under yield uncertainty and disruptions. Computers and Operations Research, 39(4), 850-862.
-
(2012)
Computers and Operations Research
, vol.39
, Issue.4
, pp. 850-862
-
-
Schmitt, A.J.1
Snyder, L.V.2
-
157
-
-
77950368643
-
Inventory systems with stochastic demand and supply: Properties and approximations
-
Schmitt, A.J., Snyder, L.V. and Shen, Z.-J.M. (2010) Inventory systems with stochastic demand and supply: properties and approximations. European Journal of Operational Research, 206(2), 313-328.
-
(2010)
European Journal of Operational Research
, vol.206
, Issue.2
, pp. 313-328
-
-
Schmitt, A.J.1
Snyder, L.V.2
Shen, Z.-J.M.3
-
158
-
-
84921279023
-
Centralization versus decentralization: Risk pooling, risk diversification, and supply uncertainty in a one-warehouse multiple-retailer system
-
Schmitt, A.J., Snyder, L.V. and Shen, Z.-J.M. (2015) Centralization versus decentralization: risk pooling, risk diversification, and supply uncertainty in a one-warehouse multiple-retailer system. Omega, 52, 201-212.
-
(2015)
Omega
, vol.52
, pp. 201-212
-
-
Schmitt, A.J.1
Snyder, L.V.2
Shen, Z.-J.M.3
-
159
-
-
84928008255
-
Sourcing strategies to manage supply disruptions
-
Gurnani, H., Mehrotra, A. and Ray, S. (eds), Springer-Verlag, London
-
Schmitt, A.J. and Tomlin, B.T. (2012) Sourcing strategies to manage supply disruptions, in Managing Supply Disruptions. Gurnani, H., Mehrotra, A. and Ray, S. (eds), Springer-Verlag, London, pp. 51-72.
-
(2012)
Managing Supply Disruptions
, pp. 51-72
-
-
Schmitt, A.J.1
Tomlin, B.T.2
-
160
-
-
53549110783
-
Inventory and pricing decisions in a single-period problem involving risky supply
-
Serel, D. (2008) Inventory and pricing decisions in a single-period problem involving risky supply. International Journal of Production Economics, 116(1), 115-128.
-
(2008)
International Journal of Production Economics
, vol.116
, Issue.1
, pp. 115-128
-
-
Serel, D.1
-
161
-
-
84940579496
-
-
Working paper, University of British Columbia, Vancouver, BC, Canada
-
Serpa, J. and Krishnan, H. (2014) The strategic role of business insurance in managing supply chain risk, Working paper, University of British Columbia, Vancouver, BC, Canada.
-
(2014)
The Strategic Role of Business Insurance in Managing Supply Chain Risk
-
-
Serpa, J.1
Krishnan, H.2
-
162
-
-
0037293822
-
A joint location-inventory model
-
Shen, Z.-J.M., Coullard, C.R. and Daskin, M.S. (2003) A joint location-inventory model. Transportation Science, 37(1), 40-55.
-
(2003)
Transportation Science
, vol.37
, Issue.1
, pp. 40-55
-
-
Shen, Z.-J.M.1
Coullard, C.R.2
Daskin, M.S.3
-
163
-
-
79961088807
-
The reliable facility location problem: Formulations, heuristics, and approximation algorithms
-
Shen, Z.-J.M., Zhan, R.L. and Zhang, J. (2011) The reliable facility location problem: formulations, heuristics, and approximation algorithms. INFORMS Journal on Computing, 23, 470-482.
-
(2011)
INFORMS Journal on Computing
, vol.23
, pp. 470-482
-
-
Shen, Z.-J.M.1
Zhan, R.L.2
Zhang, J.3
-
165
-
-
84914673591
-
A reliable budget-constrained facility location/network design problem with unreliable facilities
-
Shishebori, D., Snyder, L. and Jabalameli, M. (2014) A reliable budget-constrained facility location/network design problem with unreliable facilities. Networks and Spatial Economics 14(3), 549-580.
-
(2014)
Networks and Spatial Economics
, vol.14
, Issue.3
, pp. 549-580
-
-
Shishebori, D.1
Snyder, L.2
Jabalameli, M.3
-
166
-
-
0006446982
-
-
John Wiley & Sons, New York, NY
-
Shooman, M.L. (2002) Reliability of Computer Systems and Networks: Fault Tolerance, Analysis, and Design, John Wiley & Sons, New York, NY.
-
(2002)
Reliability of Computer Systems and Networks: Fault Tolerance, Analysis, and Design
-
-
Shooman, M.L.1
-
167
-
-
77953320406
-
-
Working paper, College of Business, City University of Hong Kong, Hong Kong
-
Shou, B. and Li, Z. (2013) Managing supply uncertainty under chain-to-chain competition.' Working paper, College of Business, City University of Hong Kong, Hong Kong.
-
(2013)
Managing Supply Uncertainty under Chain-to-chain Competition
-
-
Shou, B.1
Li, Z.2
-
168
-
-
80052892540
-
GM says strike reduced its earnings by $2.83 billion in 2nd and 3rd periods
-
17 August
-
Simison, R.L. (1998) GM says strike reduced its earnings by $2.83 billion in 2nd and 3rd periods. Wall Street Journal, 17 August, p. 1.
-
(1998)
Wall Street Journal
, pp. 1
-
-
Simison, R.L.1
-
169
-
-
33646348751
-
Facility location under uncertainty: A review
-
Snyder, L.V. (2006) Facility location under uncertainty: a review. IIE Transactions, 38(7), 537-554.
-
(2006)
IIE Transactions
, vol.38
, Issue.7
, pp. 537-554
-
-
Snyder, L.V.1
-
170
-
-
84906230473
-
A tight approximation for a continuous-review inventory model with supplier disruptions
-
Snyder, L.V. (2014) A tight approximation for a continuous-review inventory model with supplier disruptions. International Journal of Production Economics, 155, 91-108.
-
(2014)
International Journal of Production Economics
, vol.155
, pp. 91-108
-
-
Snyder, L.V.1
-
171
-
-
25144463125
-
Reliability models for facility location: The expected failure cost case
-
Snyder, L.V. and Daskin, M.S. (2005) Reliability models for facility location: the expected failure cost case. Transportation Science, 39(3), 400-416.
-
(2005)
Transportation Science
, vol.39
, Issue.3
, pp. 400-416
-
-
Snyder, L.V.1
Daskin, M.S.2
-
172
-
-
33748497383
-
Stochastic p-robust location problems
-
Snyder, L.V. and Daskin, M.S. (2006) Stochastic p-robust location problems. IIE Transactions, 38(11), 971-985.
-
(2006)
IIE Transactions
, vol.38
, Issue.11
, pp. 971-985
-
-
Snyder, L.V.1
Daskin, M.S.2
-
173
-
-
84991906331
-
Models for reliable supply chain network design
-
A.T. and Grubesic, T.H. (eds), Springer, New York, NY
-
Snyder, L.V. and Daskin, M.S. (2007) Models for reliable supply chain network design, in Reliability and Vulnerability in Critical Infrastructure: A Quantitative Geographic Perspective Murray, A.T. and Grubesic, T.H. (eds), Springer, New York, NY, pp. 257-289.
-
(2007)
Reliability and Vulnerability in Critical Infrastructure: A Quantitative Geographic Perspective Murray
, pp. 257-289
-
-
Snyder, L.V.1
Daskin, M.S.2
-
174
-
-
56349140172
-
Planning for disruptions in supply chain networks
-
Johnson, M.P., Norman, B. and Secomandi, N. (eds), INFORMS, Hanover, MD
-
Snyder, L.V., Scaparra, M.P., Daskin, M.L. and Church, R.C. (2006) Planning for disruptions in supply chain networks, in Tutorials in Operations Research, Johnson, M.P., Norman, B. and Secomandi, N. (eds), INFORMS, Hanover, MD, pp. 234-257.
-
(2006)
Tutorials in Operations Research
, pp. 234-257
-
-
Snyder, L.V.1
Scaparra, M.P.2
Daskin, M.L.3
Church, R.C.4
-
175
-
-
73449144661
-
-
Working Paper, P.C. Rossin College of Engineering and Applied Sciences, Lehigh University, Bethlehem, PA
-
Snyder, L.V. and Shen, Z.-J.M. (2006) Supply and demand uncertainty in multi-echelon supply chains. Working Paper, P.C. Rossin College of Engineering and Applied Sciences, Lehigh University, Bethlehem, PA.
-
(2006)
Supply and Demand Uncertainty in Multi-echelon Supply Chains
-
-
Snyder, L.V.1
Shen, Z.-J.M.2
-
176
-
-
73449135365
-
-
Working Paper, P.C. Rossin College of Engineering and Applied Sciences, Lehigh University, Bethlehem, PA
-
Snyder, L.V. and Tomlin, B.T. (2008) Inventory management with advanced warning of disruptions. Working Paper, P.C. Rossin College of Engineering and Applied Sciences, Lehigh University, Bethlehem, PA.
-
(2008)
Inventory Management with Advanced Warning of Disruptions
-
-
Snyder, L.V.1
Tomlin, B.T.2
-
177
-
-
0030260009
-
Inventory control with information about supply conditions
-
Song, J.-S. and Zipkin, P.H. (1996) Inventory control with information about supply conditions. Management Science, 42(10), 1409-1419.
-
(1996)
Management Science
, vol.42
, Issue.10
, pp. 1409-1419
-
-
Song, J.-S.1
Zipkin, P.H.2
-
180
-
-
33745813950
-
Perspectives in supply chain risk management
-
Tang, C.S. (2006a) Perspectives in supply chain risk management. International Journal of Production Economics, 103(2), 451-488.
-
(2006)
International Journal of Production Economics
, vol.103
, Issue.2
, pp. 451-488
-
-
Tang, C.S.1
-
181
-
-
85132615183
-
Robust strategies for mitigating supply chain disruptions
-
Tang, C.S. (2006b) Robust strategies for mitigating supply chain disruptions. International Journal of Logistics, 9(1), 33-45.
-
(2006)
International Journal of Logistics
, vol.9
, Issue.1
, pp. 33-45
-
-
Tang, C.S.1
-
183
-
-
84904724844
-
Managing disruptions in decentralized supply chains with endogenous supply process reliability
-
Tang, S.Y., Gurnani, H. and Gupta, D. (2014) Managing disruptions in decentralized supply chains with endogenous supply process reliability. Production and Operations Management, 23(7), 1198-1211.
-
(2014)
Production and Operations Management
, vol.23
, Issue.7
, pp. 1198-1211
-
-
Tang, S.Y.1
Gurnani, H.2
Gupta, D.3
-
184
-
-
33646342992
-
On the value of mitigation and contingency strategies for managing supply chain disruption risks
-
Tomlin, B.T. (2006) On the value of mitigation and contingency strategies for managing supply chain disruption risks. Management Science, 52(5), 639-657.
-
(2006)
Management Science
, vol.52
, Issue.5
, pp. 639-657
-
-
Tomlin, B.T.1
-
185
-
-
67649770080
-
Disruption-management strategies for short life-cycle products
-
Tomlin, B.T. (2009a) Disruption-management strategies for short life-cycle products. Naval Research Logistics, 56(4), 318-347.
-
(2009)
Naval Research Logistics
, vol.56
, Issue.4
, pp. 318-347
-
-
Tomlin, B.T.1
-
186
-
-
67649998398
-
The impact of supply learning when suppliers are unreliable
-
Tomlin, B.T. (2009b) The impact of supply learning when suppliers are unreliable. Manufacturing & Service Operations Management, 11(2), 192-209.
-
(2009)
Manufacturing & Service Operations Management
, vol.11
, Issue.2
, pp. 192-209
-
-
Tomlin, B.T.1
-
187
-
-
25144444083
-
On the value of mix flexibility and dual sourcing in unreliable newsvendor networks
-
Tomlin, B.T. and Wang, Y. (2005) On the value of mix flexibility and dual sourcing in unreliable newsvendor networks. Manufacturing and Service Operations Management, 7(1), 37-57.
-
(2005)
Manufacturing and Service Operations Management
, vol.7
, Issue.1
, pp. 37-57
-
-
Tomlin, B.T.1
Wang, Y.2
-
188
-
-
70350649009
-
Managing supply chain disruptions
-
Vakharia, A.J. and Yenipazarli, A. (2008) Managing supply chain disruptions. Foundations and Trends in Technology, Information and Operations Management, 2(4), 243-325.
-
(2008)
Foundations and Trends in Technology, Information and Operations Management
, vol.2
, Issue.4
, pp. 243-325
-
-
Vakharia, A.J.1
Yenipazarli, A.2
-
189
-
-
77955712416
-
Supply chain risk management: Literature review and future research
-
Vanany, I., Zailan, S. and Pujawan, N. (2009) Supply chain risk management: literature review and future research. International Journal of Information Systems and Supply Chain Management, 2(1), 16-33.
-
(2009)
International Journal of Information Systems and Supply Chain Management
, vol.2
, Issue.1
, pp. 16-33
-
-
Vanany, I.1
Zailan, S.2
Pujawan, N.3
-
190
-
-
67349280311
-
Supplier default dependencies: Empirical evidence from the automotive industry
-
Wagner, S.M., Bode, C. and Koziol, P. (2009) Supplier default dependencies: empirical evidence from the automotive industry. European Journal of Operational Research, 199(1), 150-161.
-
(2009)
European Journal of Operational Research
, vol.199
, Issue.1
, pp. 150-161
-
-
Wagner, S.M.1
Bode, C.2
Koziol, P.3
-
191
-
-
84954398768
-
Too big in Japan, Toyota struggles
-
May 12
-
Wall Street Journal. (2011) Too big in Japan, Toyota struggles. May 12.
-
(2011)
Wall Street Journal
-
-
-
192
-
-
77954584993
-
Mitigating supply risk: Dueal sourcing or process improvement?
-
Wang, Y., Gilland, W. and Tomlin, B. (2010) Mitigating supply risk: dueal sourcing or process improvement?. Manufacturing & Service Operations Management, 12(3), 489-510.
-
(2010)
Manufacturing & Service Operations Management
, vol.12
, Issue.3
, pp. 489-510
-
-
Wang, Y.1
Gilland, W.2
Tomlin, B.3
-
193
-
-
73049097589
-
To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating
-
Wang, Y. and Tomlin, B.T. (2009) To wait or not to wait: optimal ordering under lead time uncertainty and forecast updating. Naval Research Logistics, 56(8), 766-779.
-
(2009)
Naval Research Logistics
, vol.56
, Issue.8
, pp. 766-779
-
-
Wang, Y.1
Tomlin, B.T.2
-
194
-
-
84896490076
-
Improving reliability of a shared supplier with competition and spillovers
-
Wang, Y., Xiao, Y. and Yang, N. (2014) Improving reliability of a shared supplier with competition and spillovers. European Journal of Operational Research, 236, 499-510.
-
(2014)
European Journal of Operational Research
, vol.236
, pp. 499-510
-
-
Wang, Y.1
Xiao, Y.2
Yang, N.3
-
195
-
-
0026871547
-
Optimal ordering policies when anticipating a disruption in supply or demand
-
Weiss, H.J. and Rosenthal, E.C. (1992) Optimal ordering policies when anticipating a disruption in supply or demand. European Journal of Operational Research, 59(3), 370-382.
-
(1992)
European Journal of Operational Research
, vol.59
, Issue.3
, pp. 370-382
-
-
Weiss, H.J.1
Rosenthal, E.C.2
-
196
-
-
34247470405
-
The impact of transportation disruptions on supply chain performance
-
Wilson, M.C. (2007) The impact of transportation disruptions on supply chain performance. Transportation Research Part E, 43, 295-320.
-
(2007)
Transportation Research Part E
, vol.43
, pp. 295-320
-
-
Wilson, M.C.1
-
197
-
-
0009075090
-
Removing arcs from a network
-
Wollmer, R. (1964) Removing arcs from a network. Operations Research, 12, 934-940.
-
(1964)
Operations Research
, vol.12
, pp. 934-940
-
-
Wollmer, R.1
-
198
-
-
79953070276
-
Sharing demand and supply risk in a supply chain
-
Xia, Y., Ramachandran, K. and Gurnani, H. (2011) Sharing demand and supply risk in a supply chain. IIE Transactions, 43, 451-469.
-
(2011)
IIE Transactions
, vol.43
, pp. 451-469
-
-
Xia, Y.1
Ramachandran, K.2
Gurnani, H.3
-
199
-
-
1642502335
-
Real-time disruption management in a two-stage production and inventory system
-
Xia, Y., Yang, M.-H., Golany, B., Gilbert, S.M. and Yu, G. (2004) Real-time disruption management in a two-stage production and inventory system. IIE Transactions, 36(2), 111-125.
-
(2004)
IIE Transactions
, vol.36
, Issue.2
, pp. 111-125
-
-
Xia, Y.1
Yang, M.-H.2
Golany, B.3
Gilbert, S.M.4
Yu, G.5
-
200
-
-
33646515786
-
Supply chain disruption management and evolutionarily stable strategies of retailers in the quantity-setting duopoly situation with homogeneous goods
-
Xiao, T. and Yu, G. (2006) Supply chain disruption management and evolutionarily stable strategies of retailers in the quantity-setting duopoly situation with homogeneous goods. European Journal of Operational Research, 173, 648-668.
-
(2006)
European Journal of Operational Research
, vol.173
, pp. 648-668
-
-
Xiao, T.1
Yu, G.2
-
201
-
-
62549098117
-
Modeling supplier selection and the use of option contracts for global supply chain design
-
Xu, N. and Nozick, L. (2009) Modeling supplier selection and the use of option contracts for global supply chain design. Computers and Operations Research, 36(10), 2786-2800.
-
(2009)
Computers and Operations Research
, vol.36
, Issue.10
, pp. 2786-2800
-
-
Xu, N.1
Nozick, L.2
-
202
-
-
69549112877
-
An inventory system with two suppliers and default risk
-
Yan, X. and Liu, K. (2009) An inventory system with two suppliers and default risk. Operations Research Letters, 37, 322-326.
-
(2009)
Operations Research Letters
, vol.37
, pp. 322-326
-
-
Yan, X.1
Liu, K.2
-
203
-
-
24144493803
-
Disruption management in production planning
-
Yang, J., Qi, X. and Yu, G. (2005) Disruption management in production planning. Naval Research Logistics, 52(5), 420-442.
-
(2005)
Naval Research Logistics
, vol.52
, Issue.5
, pp. 420-442
-
-
Yang, J.1
Qi, X.2
Yu, G.3
-
204
-
-
67649946343
-
Supply disruptions, asymmetric information, and a backup production option
-
Yang, Z., Aydin, G., Babich, V. and Beil, D.R. (2009) Supply disruptions, asymmetric information, and a backup production option. Management Science, 55(2), 192-209.
-
(2009)
Management Science
, vol.55
, Issue.2
, pp. 192-209
-
-
Yang, Z.1
Aydin, G.2
Babich, V.3
Beil, D.R.4
-
205
-
-
84861386898
-
Using a dual-sourcing option in the presence of asymmetric information about supplier reliability: Competition vs. diversification
-
Yang, Z., Aydin, G., Babich, V. and Beil, D.R. (2012) Using a dual-sourcing option in the presence of asymmetric information about supplier reliability: competition vs. diversification. Manufacturing & Service Operations Management, 14(2), 202-217.
-
(2012)
Manufacturing & Service Operations Management
, vol.14
, Issue.2
, pp. 202-217
-
-
Yang, Z.1
Aydin, G.2
Babich, V.3
Beil, D.R.4
-
206
-
-
84928948613
-
Does a procurement service provider generate value for the buyer through information about supply risks?
-
Yang, Z. and Babich, V. (2014) Does a procurement service provider generate value for the buyer through information about supply risks?. Management Science, 61(5), 979-998.
-
(2014)
Management Science
, vol.61
, Issue.5
, pp. 979-998
-
-
Yang, Z.1
Babich, V.2
-
207
-
-
0001198301
-
Lot sizing with random yield: A review
-
Yano, C.A. and Lee, H.A. (1995) Lot sizing with random yield: a review. Operations Research, 43(2), 311-334.
-
(1995)
Operations Research
, vol.43
, Issue.2
, pp. 311-334
-
-
Yano, C.A.1
Lee, H.A.2
-
208
-
-
84967644784
-
-
World Scientific Publishing Co., River Edge, NJ
-
Yu, G. and Qi, X. (2004) Disruption Management: Framework, Models, and Applications, World Scientific Publishing Co., River Edge, NJ.
-
(2004)
Disruption Management: Framework, Models, and Applications
-
-
Yu, G.1
Qi, X.2
-
209
-
-
56549091922
-
Single or dual sourcing: Decision-making in the presence of supply chain disruption risks
-
Yu, H., Zeng, A. and Zhao, L. (2009) Single or dual sourcing: decision-making in the presence of supply chain disruption risks. Omega, 37(4), 788-800.
-
(2009)
Omega
, vol.37
, Issue.4
, pp. 788-800
-
-
Yu, H.1
Zeng, A.2
Zhao, L.3
-
210
-
-
84954370439
-
-
Working Paper, Department of Industrial Engineering and Operations Research, University of California-Berkeley, Berkeley, CA
-
Zhan, R.L., Daskin, M.S. and Shen, Z.-J.M. (2008) Facility reliability with site-specific failure probabilities. Working Paper, Department of Industrial Engineering and Operations Research, University of California-Berkeley, Berkeley, CA.
-
(2008)
Facility Reliability with Site-specific Failure Probabilities
-
-
Zhan, R.L.1
Daskin, M.S.2
Shen, Z.-J.M.3
|