메뉴 건너뛰기




Volumn 155, Issue , 2014, Pages 91-108

A tight approximation for an EOQ model with supply disruptions

Author keywords

Approximations; Continuous review; EOQ; Inventory; Power of two policies; Supply disruptions

Indexed keywords

COST FUNCTIONS; SUPPLY CHAINS; DROUGHT;

EID: 84906230473     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2014.01.025     Document Type: Article
Times cited : (36)

References (49)
  • 1
    • 0035247534 scopus 로고    scopus 로고
    • A discrete-time Markov production-inventory model with machine breakdowns
    • N. Abboud A discrete-time Markov production-inventory model with machine breakdowns Comput. Ind. Eng. 39 1 2001 95 107
    • (2001) Comput. Ind. Eng. , vol.39 , Issue.1 , pp. 95-107
    • Abboud, N.1
  • 2
    • 0032187128 scopus 로고    scopus 로고
    • Inventory management under random supply disruptions and partial backorders
    • A. Arreola-Risa, and G.A. DeCroix Inventory management under random supply disruptions and partial backorders Naval Res. Logist. 45 7 1998 687 703
    • (1998) Naval Res. Logist. , vol.45 , Issue.7 , pp. 687-703
    • Arreola-Risa, A.1    Decroix, G.A.2
  • 3
    • 84926406147 scopus 로고    scopus 로고
    • Inventory strategies to manage supply disruptions
    • H. Gurnani, A. Mehrotra, S. Ray, Springer-Verlag London chapter 5
    • Z. Atan, and L.V. Snyder Inventory strategies to manage supply disruptions H. Gurnani, A. Mehrotra, S. Ray, Supply Chain Disruptions Theory and Practice of Managing Risk 2012 Springer-Verlag London 115 139 chapter 5.
    • (2012) Supply Chain Disruptions Theory and Practice of Managing Risk , pp. 115-139
    • Atan, Z.1    Snyder, L.V.2
  • 6
    • 84989758310 scopus 로고
    • Note on "future supply uncertainty in EOQ models"
    • E. Berk, and A. Arreola-Risa Note on "Future supply uncertainty in EOQ models" Naval Res. Logist. 41 1 1994 129 132
    • (1994) Naval Res. Logist. , vol.41 , Issue.1 , pp. 129-132
    • Berk, E.1    Arreola-Risa, A.2
  • 7
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • T. Bielecki, and P.R. Kumar Optimality of zero-inventory policies for unreliable manufacturing systems Oper. Res. 36 4 1988 532 541
    • (1988) Oper. Res. , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 8
    • 84906241646 scopus 로고    scopus 로고
    • The vise trapping PC makers; Caught between rising chip prices and stingy consumers
    • P. Burrows The vise trapping PC makers; caught between rising chip prices and stingy consumers Bus. Week 3652 October (25) 1999 40
    • (1999) Bus. Week , vol.3652 , Issue.OCTOBER 25 , pp. 40
    • Burrows, P.1
  • 9
    • 0023313014 scopus 로고
    • Inventory policy in the presence of market disruptions
    • H.-P. Chao Inventory policy in the presence of market disruptions Oper. Res. 35 2 1987 274 281
    • (1987) Oper. Res. , vol.35 , Issue.2 , pp. 274-281
    • Chao, H.-P.1
  • 11
    • 34547673287 scopus 로고    scopus 로고
    • The importance of decoupling recurrent and disruption risks in a supply chain
    • S. Chopra, G. Reinhardt, and U. Mohan The importance of decoupling recurrent and disruption risks in a supply chain Naval Res. Logist. 54 5 2007 544 555
    • (2007) Naval Res. Logist. , vol.54 , Issue.5 , pp. 544-555
    • Chopra, S.1    Reinhardt, G.2    Mohan, U.3
  • 12
    • 0036033283 scopus 로고    scopus 로고
    • An inventory-location model formulation, solution algorithm and computational results
    • M.S. Daskin, C.R. Coullard, and Z.-J.M. Shen An inventory-location model formulation, solution algorithm and computational results Ann. Oper. Res. 110 1-4 2002 83 106
    • (2002) Ann. Oper. Res. , vol.110 , Issue.14 , pp. 83-106
    • Daskin, M.S.1    Coullard, C.R.2    Shen, Z.-J.M.3
  • 14
    • 0031197705 scopus 로고    scopus 로고
    • Analysis of a deterministic demand production/inventory system under nonstationary supply uncertainty
    • R. Güllü, E. Onol, and N. Erkip Analysis of a deterministic demand production/inventory system under nonstationary supply uncertainty IIE Trans. 29 8 1997 703 709
    • (1997) IIE Trans. , vol.29 , Issue.8 , pp. 703-709
    • Güllü, R.1    Onol, E.2    Erkip, N.3
  • 15
    • 0038549131 scopus 로고    scopus 로고
    • The (Q, r) inventory system with an unreliable supplier
    • D. Gupta The (Q, r) inventory system with an unreliable supplier INFOR 34 2 1996 59 76
    • (1996) INFOR , vol.34 , Issue.2 , pp. 59-76
    • Gupta, D.1
  • 16
    • 0031273962 scopus 로고    scopus 로고
    • An inventory problem with two randomly available suppliers
    • Ü. Gürler, and M. Parlar An inventory problem with two randomly available suppliers Oper. Res. 45 6 1997 904 918
    • (1997) Oper. Res. , vol.45 , Issue.6 , pp. 904-918
    • Gürler, Ü.1    Parlar, M.2
  • 17
    • 0000356787 scopus 로고
    • How many parts to make at once
    • 152
    • Harris, F.W., 1913. How many parts to make at once. Fact.: Mag. Manag. 10 (2), 135-136, 152.
    • (1913) Fact.: Mag. Manag. , vol.10 , Issue.2 , pp. 135-136
    • Harris, F.W.1
  • 18
    • 77952518874 scopus 로고    scopus 로고
    • A closed-form approximation solution for an inventory model with supply disruptions and non-ZIO reorder policy
    • D. Heimann, and F. Waage A closed-form approximation solution for an inventory model with supply disruptions and non-ZIO reorder policy J. Syst., Cybern., Inf. 5 4 2007 1 12
    • (2007) J. Syst., Cybern., Inf. , vol.5 , Issue.4 , pp. 1-12
    • Heimann, D.1    Waage, F.2
  • 19
    • 0029252650 scopus 로고
    • Production rate control for failure-prone production systems with no backlog permitted
    • J.-Q. Hu Production rate control for failure-prone production systems with no backlog permitted IEEE Trans. Autom. Control 40 2 1995 291 295
    • (1995) IEEE Trans. Autom. Control , vol.40 , Issue.2 , pp. 291-295
    • Hu, J.-Q.1
  • 20
    • 33646747051 scopus 로고    scopus 로고
    • The only lifeline was the Wal-Mart
    • D. Leonard The only lifeline was the Wal-Mart Fortune 152 7 2005 74 80
    • (2005) Fortune , vol.152 , Issue.7 , pp. 74-80
    • Leonard, D.1
  • 21
    • 0032764917 scopus 로고    scopus 로고
    • Analysis of a production-inventory system with machine breakdowns and shutdowns
    • B. Liu, and J. Cao Analysis of a production-inventory system with machine breakdowns and shutdowns Comput. Oper. Res. 26 1 1999 73 91
    • (1999) Comput. Oper. Res. , vol.26 , Issue.1 , pp. 73-91
    • Liu, B.1    Cao, J.2
  • 22
    • 0018508646 scopus 로고
    • Reliability and inventory in a production-storage system
    • R.R. Meyer, M.H. Rothkopf, and S.A. Smith Reliability and inventory in a production-storage system Manag. Sci. 25 8 1979 799 807
    • (1979) Manag. Sci. , vol.25 , Issue.8 , pp. 799-807
    • Meyer, R.R.1    Rothkopf, M.H.2    Smith, S.A.3
  • 23
    • 0038323263 scopus 로고    scopus 로고
    • Supply interruptions in a lost-sales inventory system with random lead time
    • E. Mohebbi Supply interruptions in a lost-sales inventory system with random lead time Comput. Oper. Res. 30 3 2003 411 426
    • (2003) Comput. Oper. Res. , vol.30 , Issue.3 , pp. 411-426
    • Mohebbi, E.1
  • 24
    • 0242662638 scopus 로고    scopus 로고
    • A replenishment model for the supply-uncertainty problem
    • E. Mohebbi A replenishment model for the supply-uncertainty problem Int. J. Prod. Econ. 87 1 2004 25 37
    • (2004) Int. J. Prod. Econ. , vol.87 , Issue.1 , pp. 25-37
    • Mohebbi, E.1
  • 25
    • 0031273569 scopus 로고    scopus 로고
    • Analysis of a production/inventory system subject to random disruptions
    • K. Moinzadeh, and P. Aggarwal Analysis of a production/inventory system subject to random disruptions Manag. Sci. 43 11 1997 1577 1588
    • (1997) Manag. Sci. , vol.43 , Issue.11 , pp. 1577-1588
    • Moinzadeh, K.1    Aggarwal, P.2
  • 27
    • 0031168878 scopus 로고    scopus 로고
    • Continuous-review inventory problem with random supply interruptions
    • M. Parlar Continuous-review inventory problem with random supply interruptions Eur. J. Oper. Res. 99 2 1997 366 385
    • (1997) Eur. J. Oper. Res. , vol.99 , Issue.2 , pp. 366-385
    • Parlar, M.1
  • 28
    • 84989685221 scopus 로고
    • Future supply uncertainty in EOQ models
    • M. Parlar, and D. Berkin Future supply uncertainty in EOQ models Naval Res. Logist. 38 1 1991 107 121
    • (1991) Naval Res. Logist. , vol.38 , Issue.1 , pp. 107-121
    • Parlar, M.1    Berkin, D.2
  • 29
    • 0029342043 scopus 로고
    • Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain
    • M. Parlar, and D. Perry Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain Eur. J. Oper. Res. 84 2 1995 431 443
    • (1995) Eur. J. Oper. Res. , vol.84 , Issue.2 , pp. 431-443
    • Parlar, M.1    Perry, D.2
  • 30
    • 0000317841 scopus 로고    scopus 로고
    • Inventory models of future supply uncertainty with single and multiple suppliers
    • M. Parlar, and D. Perry Inventory models of future supply uncertainty with single and multiple suppliers Naval Res. Logist. 43 2 1996 191 210
    • (1996) Naval Res. Logist. , vol.43 , Issue.2 , pp. 191-210
    • Parlar, M.1    Perry, D.2
  • 31
    • 36549064794 scopus 로고    scopus 로고
    • A supply chain design model with unreliable supply
    • L. Qi, and Z.-J.M. Shen A supply chain design model with unreliable supply Naval Res. Logist. 54 8 2007 829 844
    • (2007) Naval Res. Logist. , vol.54 , Issue.8 , pp. 829-844
    • Qi, L.1    Shen, Z.-J.M.2
  • 32
    • 70350191844 scopus 로고    scopus 로고
    • A continuous-review inventory model with disruptions at both supplier and retailer
    • L. Qi, Z.-J.M. Shen, and L.V. Snyder A continuous-review inventory model with disruptions at both supplier and retailer Prod. Oper. Manag. 18 5 2009 516 532
    • (2009) Prod. Oper. Manag. , vol.18 , Issue.5 , pp. 516-532
    • Qi, L.1    Shen, Z.-J.M.2    Snyder, L.V.3
  • 33
    • 77952509551 scopus 로고    scopus 로고
    • The effect of supply disruptions on supply chain design decisions
    • L. Qi, Z.-J.M. Shen, and L.V. Snyder The effect of supply disruptions on supply chain design decisions Transp. Sci. 44 2 2010 274 289
    • (2010) Transp. Sci. , vol.44 , Issue.2 , pp. 274-289
    • Qi, L.1    Shen, Z.-J.M.2    Snyder, L.V.3
  • 34
    • 41149143786 scopus 로고    scopus 로고
    • Supply disruptions with time-dependent parameters
    • A.M. Ross, Y. Rong, and L.V. Snyder Supply disruptions with time-dependent parameters Comput. Oper. Res. 35 11 2008 3504 3529
    • (2008) Comput. Oper. Res. , vol.35 , Issue.11 , pp. 3504-3529
    • Ross, A.M.1    Rong, Y.2    Snyder, L.V.3
  • 35
    • 0022162807 scopus 로고
    • 98%-effective integer-ratio lot-sizing for one-warehouse multi-retailer systems
    • R. Roundy 98%-effective integer-ratio lot-sizing for one-warehouse multi-retailer systems Manag. Sci. 31 11 1985 1416 1430
    • (1985) Manag. Sci. , vol.31 , Issue.11 , pp. 1416-1430
    • Roundy, R.1
  • 36
    • 77950368643 scopus 로고    scopus 로고
    • Inventory systems with stochastic demand and supply Properties and approximations
    • A.J. Schmitt, L.V. Snyder, and Z.-J.M. Shen Inventory systems with stochastic demand and supply Properties and approximations Eur. J. Oper. Res. 206 2 2010 313 328
    • (2010) Eur. J. Oper. Res. , vol.206 , Issue.2 , pp. 313-328
    • Schmitt, A.J.1    Snyder, L.V.2    Shen, Z.-J.M.3
  • 37
    • 80051783300 scopus 로고    scopus 로고
    • Infinite-horizon models for inventory control under yield uncertainty and disruptions
    • A. Schmitt, and L.V. Snyder Infinite-horizon models for inventory control under yield uncertainty and disruptions Comput. Oper. Res. 39 4 2012 850 862
    • (2012) Comput. Oper. Res. , vol.39 , Issue.4 , pp. 850-862
    • Schmitt, A.1    Snyder, L.V.2
  • 39
    • 84893778524 scopus 로고    scopus 로고
    • A multiple sourcing inventory model under disruption risk
    • L. Silbermayr, and S. Minner A multiple sourcing inventory model under disruption risk Int. J. Prod. Econ. 149 2014 37 46
    • (2014) Int. J. Prod. Econ. , vol.149 , pp. 37-46
    • Silbermayr, L.1    Minner, S.2
  • 43
    • 0030260009 scopus 로고    scopus 로고
    • Inventory control with information about supply conditions
    • J.-S. Song, and P.H. Zipkin Inventory control with information about supply conditions Manag. Sci. 42 10 1996 1409 1419
    • (1996) Manag. Sci. , vol.42 , Issue.10 , pp. 1409-1419
    • Song, J.-S.1    Zipkin, P.H.2
  • 44
    • 33646342992 scopus 로고    scopus 로고
    • On the value of mitigation and contingency strategies for managing supply chain disruption risks
    • B.T. Tomlin On the value of mitigation and contingency strategies for managing supply chain disruption risks Manag. Sci. 52 5 2006 639 657
    • (2006) Manag. Sci. , vol.52 , Issue.5 , pp. 639-657
    • Tomlin, B.T.1
  • 46
    • 0026871547 scopus 로고
    • Optimal ordering policies when anticipating a disruption in supply or demand
    • H.J. Weiss, and E.C. Rosenthal Optimal ordering policies when anticipating a disruption in supply or demand Eur. J. Oper. Res. 59 3 1992 370 382
    • (1992) Eur. J. Oper. Res. , vol.59 , Issue.3 , pp. 370-382
    • Weiss, H.J.1    Rosenthal, E.C.2
  • 47
    • 0001198301 scopus 로고
    • Lot sizing with random yield a review
    • C.A. Yano, and H.L. Lee Lot sizing with random yield a review Oper. Res. 43 2 1995 311 334
    • (1995) Oper. Res. , vol.43 , Issue.2 , pp. 311-334
    • Yano, C.A.1    Lee, H.L.2
  • 48
    • 84886717879 scopus 로고    scopus 로고
    • Dynamic replenishment, production, and pricing decisions, in the face of supply disruption and random price-sensitive demand
    • S.X. Zhu Dynamic replenishment, production, and pricing decisions, in the face of supply disruption and random price-sensitive demand Int. J. Prod. Econ. 146 2 2013 612 619
    • (2013) Int. J. Prod. Econ. , vol.146 , Issue.2 , pp. 612-619
    • Zhu, S.X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.