메뉴 건너뛰기




Volumn 59, Issue 9, 2013, Pages 2079-2092

Inventory management for an assembly system subject to supply disruptions

Author keywords

Approximations; Dynamic programming; Heuristics; Inventory; Multi item; Multiechelon; Multistage; Production; Stochastic

Indexed keywords

APPROXIMATIONS; HEURISTICS; INVENTORY; MULTI-ITEM; MULTIECHELON; MULTISTAGE; STOCHASTIC;

EID: 84884154643     PISSN: 00251909     EISSN: 15265501     Source Type: Journal    
DOI: 10.1287/mnsc.1120.1660     Document Type: Article
Times cited : (48)

References (42)
  • 1
    • 0032187128 scopus 로고    scopus 로고
    • Inventory management under random supply disruptions and partial backorders
    • Arreola-Risa A, DeCroix G (1998) Inventory management under random supply disruptions and partial backorders. Naval Res. Logist. 45:687-703. (Pubitemid 128587347)
    • (1998) Naval Research Logistics , vol.45 , Issue.7 , pp. 687-703
    • Arreola-Risa, A.1    DeCroix, G.A.2
  • 2
    • 33845541662 scopus 로고    scopus 로고
    • Production and inventory control of a single product assemble-to-order system with multiple customer classes
    • DOI 10.1287/mnsc.1060.0588
    • Benjaafar S, ElHafsi M (2006) Production and inventory control of a single product assemble-to-order system with multiple customer classes. Management Sci. 52:1896-1912. (Pubitemid 44927003)
    • (2006) Management Science , vol.52 , Issue.12 , pp. 1896-1912
    • Benjaafar, S.1    Elhafsi, M.2
  • 3
    • 79957507447 scopus 로고    scopus 로고
    • Optimal control of assembly systems with multiple stages and multiple demand classes
    • Benjaafar S, ElHafsi M, Lee C-Y, Zhou W (2011) Optimal control of assembly systems with multiple stages and multiple demand classes. Oper. Res. 59:522-529.
    • (2011) Oper. Res. , vol.59 , pp. 522-529
    • Benjaafar, S.1    El Hafsi, M.2    Lee, C.-Y.3    Zhou, W.4
  • 4
    • 11844299024 scopus 로고    scopus 로고
    • Managing inventory and supply performance in assembly systems with random supply capacity and demand
    • DOI 10.1287/mnsc.1040.0314
    • Bollapragada R, Rao U, Zhang J (2004) Managing inventory and supply performance in assembly systems with random supply capacity and demand. Management Sci. 50:1729-1743. (Pubitemid 40086746)
    • (2004) Management Science , vol.50 , Issue.12 , pp. 1729-1743
    • Bollapragada, R.1    Rao, U.S.2    Zhang, J.3
  • 5
    • 84858014341 scopus 로고    scopus 로고
    • Optimal control of an assembly system with demand for the end-product and intermediate components
    • Ceryan O, Duenyas I, Koren Y (2012) Optimal control of an assembly system with demand for the end-product and intermediate components. IIE Trans. 44:386-403.
    • (2012) IIE Trans. , vol.44 , pp. 386-403
    • Ceryan, O.1    Duenyas, I.2    Koren, Y.3
  • 6
    • 0001043918 scopus 로고
    • Lower bounds for multi-echelon stochastic inventory systems
    • Chen F, Zheng Y-S (1994) Lower bounds for multi-echelon stochastic inventory systems. Management Sci. 40:1426-1443.
    • (1994) Management Sci. , vol.40 , pp. 1426-1443
    • Chen, F.1    Zheng, Y.-S.2
  • 7
    • 9344261775 scopus 로고    scopus 로고
    • Managing risk to avoid supply-chain breakdown
    • Chopra S, Sodhi M (2004) Managing risk to avoid supply-chain breakdown. MIT Sloan Management Rev. 46:53-61.
    • (2004) MIT Sloan Management Rev. , vol.46 , pp. 53-61
    • Chopra, S.1    Sodhi, M.2
  • 8
    • 0021468518 scopus 로고
    • Computational issues in an infinitehorizon, multiechelon inventory model
    • Federgruen A, Zipkin P (1984) Computational issues in an infinitehorizon, multiechelon inventory model. Oper. Res. 32:818-836. (Pubitemid 14641216)
    • (1984) Operations Research , vol.32 , Issue.4 , pp. 818-836
    • Federgruen, A.1    Zipkin, P.2
  • 9
    • 0035536034 scopus 로고    scopus 로고
    • A simple and effective component procurement policy for stochastic assembly systems
    • Gallien J, Wein L (2001) A simple and effective component procurement policy for stochastic assembly systems. Queuing Systems 38:221-248.
    • (2001) Queuing Systems , vol.38 , pp. 221-248
    • Gallien, J.1    Wein, L.2
  • 10
    • 77953687949 scopus 로고    scopus 로고
    • Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines
    • Gao C, Shen H, Cheng TCE (2011) Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines. Internat. J. Production Econom. 126:341-349.
    • (2011) Internat. J. Production Econom. , vol.126 , pp. 341-349
    • Gao, C.1    Shen, H.2    Cheng, T.C.E.3
  • 11
    • 0028396352 scopus 로고
    • Lot sizing in assembly systems with random component yields
    • Gerchak Y, Wang Y, Yano C (1994) Lot sizing in assembly systems with random component yields. IIE Trans. 26:19-24.
    • (1994) IIE Trans. , vol.26 , pp. 19-24
    • Gerchak, Y.1    Wang, Y.2    Yano, C.3
  • 12
    • 0038549131 scopus 로고    scopus 로고
    • The (Q, r) inventory system with an unreliable supplier
    • Gupta D (1996) The (Q, r) inventory system with an unreliable supplier. INFOR 34:59-76.
    • (1996) INFOR , vol.34 , pp. 59-76
    • Gupta, D.1
  • 13
    • 0031273962 scopus 로고    scopus 로고
    • An inventory problem with two randomly available suppliers
    • Gürlür Ü, Parlar M (1997) An inventory problem with two randomly available suppliers. Oper. Res. 45:904-918. (Pubitemid 127684771)
    • (1997) Operations Research , vol.45 , Issue.6 , pp. 904-918
    • Gurler, U.1    Parlar, M.2
  • 15
    • 3042545957 scopus 로고    scopus 로고
    • Supply management in assembly systems with random yield and random demand
    • Gurnani H, Akella R, Lehoczky J (2000) Supply management in assembly systems with random yield and random demand. IIE Trans. 32:701-714.
    • (2000) IIE Trans. , vol.32 , pp. 701-714
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 17
    • 80052388639 scopus 로고    scopus 로고
    • Ordering quantity decisions considering uncertainty in supply-chain logistics operations
    • Kim H, Lu J-C, Kvam P (2011) Ordering quantity decisions considering uncertainty in supply-chain logistics operations. Internat. J. Production Econom. 134:16-27.
    • (2011) Internat. J. Production Econom. , vol.134 , pp. 16-27
    • Kim, H.1    Lu, J.-C.2    Kvam, P.3
  • 20
    • 80051952996 scopus 로고    scopus 로고
    • A single-period analysis of a two-echelon inventory system with dependent supply uncertainty
    • Masih-Tehrani B, Xu SH, Kumara S, Li H (2011) A single-period analysis of a two-echelon inventory system with dependent supply uncertainty. Transportation Res. Part B 45:1128-1151.
    • (2011) Transportation Res. Part B , vol.45 , pp. 1128-1151
    • Masih-Tehrani, B.1    Xu, S.H.2    Kumara, S.3    Li, H.4
  • 21
    • 0018508646 scopus 로고
    • Reliability and inventory in a production-storage system
    • Meyer R, Rothkopf M, Smith S (1979) Reliability and inventory in a production-storage system. Management Sci. 25:799-807.
    • (1979) Management Sci. , vol.25 , pp. 799-807
    • Meyer, R.1    Rothkopf, M.2    Smith, S.3
  • 22
    • 0031273569 scopus 로고    scopus 로고
    • Analysis of a production/inventory system subject to random disruptions
    • Moinzadeh K, Aggarwal P (1997) Analysis of production/inventory system subject to random disruptions. Management Sci. 43:1577-1588. (Pubitemid 127606213)
    • (1997) Management Science , vol.43 , Issue.11 , pp. 1577-1588
    • Moinzadeh, K.1    Aggarwal, P.2
  • 24
    • 19644400801 scopus 로고    scopus 로고
    • Optimal policies for a capacitated two-echelon inventory system
    • Parker R, Kapuscinski R (2004) Optimal policies for a capacitated two-echelon inventory system. Oper. Res. 52:739-755.
    • (2004) Oper. Res. , vol.52 , pp. 739-755
    • Parker, R.1    Kapuscinski, R.2
  • 25
    • 0031168878 scopus 로고    scopus 로고
    • Continuous-review inventory problem with random supply interruptions
    • PII S0377221796001658
    • Parlar M (1997) Continuous-review inventory problem with random supply interruptions. Eur. J. Oper. Res. 99:366-385. (Pubitemid 127416256)
    • (1997) European Journal of Operational Research , vol.99 , Issue.2 , pp. 366-385
    • Parlar, M.1
  • 26
    • 84989685221 scopus 로고
    • Future supply uncertainty in EOQ models
    • Parlar M, Berkin D (1991) Future supply uncertainty in EOQ models. Naval Res. Logist. 38:107-121.
    • (1991) Naval Res. Logist. , vol.38 , pp. 107-121
    • Parlar, M.1    Berkin, D.2
  • 27
    • 0029342043 scopus 로고
    • Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain
    • Parlar M, Perry D (1995) Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain. Eur. J. Oper. Res. 84:431-443.
    • (1995) Eur. J. Oper. Res. , vol.84 , pp. 431-443
    • Parlar, M.1    Perry, D.2
  • 28
    • 0000317841 scopus 로고    scopus 로고
    • Inventory models of future supply uncertainty with single and multiple suppliers
    • Parlar M, Perry D (1996) Inventory models of future supply uncertainty with single and multiple suppliers. Naval Res. Logist. 43:191-210. (Pubitemid 126558370)
    • (1996) Naval Research Logistics , vol.43 , Issue.2 , pp. 191-210
    • Parlar, M.1    Perry, D.2
  • 29
    • 84884163021 scopus 로고    scopus 로고
    • Japan parts shortage hits auto makers
    • March 24
    • Ramsey M, Moffett S (2011) Japan parts shortage hits auto makers. Wall Street Journal (March 24): B1.
    • (2011) Wall Street Journal
    • Ramsey, M.1    Moffett, S.2
  • 30
    • 0024701994 scopus 로고
    • Optimal inventory policies for assembly systems under random demands
    • Rosling K (1989) Optimal inventory policies for assembly systems under random demands. Oper. Res. 37:565-579.
    • (1989) Oper. Res. , vol.37 , pp. 565-579
    • Rosling, K.1
  • 31
    • 0022131173 scopus 로고
    • Optimal policy for a two-stage assembly system under random demand
    • Schmidt C, Nahmias S (1985) Optimal policy for a two-stage assembly system under random demand. Oper. Res. 33:1130-1145. (Pubitemid 15589832)
    • (1985) Operations Research , vol.33 , Issue.5 , pp. 1130-1145
    • Schmidt, C.P.1    Nahmias, S.2
  • 32
    • 80051783300 scopus 로고    scopus 로고
    • Infinite-horizon models for inventory control under yield uncertainty and disruptions
    • Schmitt A, Snyder L (2012) Infinite-horizon models for inventory control under yield uncertainty and disruptions. Comput. Oper. Res. 39:850-862.
    • (2012) Comput. Oper. Res. , vol.39 , pp. 850-862
    • Schmitt, A.1    Snyder, L.2
  • 36
    • 0036758161 scopus 로고    scopus 로고
    • Performance analysis and optimization of assemble-to-order systems with random lead times
    • Song J-S, Yao D (2002) Performance analysis and optimization of assemble-to-order systems with random lead times. Oper. Res. 50:893-903.
    • (2002) Oper. Res. , vol.50 , pp. 893-903
    • Song, J.-S.1    Yao, D.2
  • 37
    • 0030260009 scopus 로고    scopus 로고
    • Inventory control with information about supply conditions
    • Song J-S, Zipkin P (1996) Inventory control with information about supply conditions. Management Sci. 42:1409-1419. (Pubitemid 126592438)
    • (1996) Management Science , vol.42 , Issue.10 , pp. 1409-1419
    • Song, J.-S.1    Zipkin, P.H.2
  • 38
    • 84884132784 scopus 로고    scopus 로고
    • Order-fulfillment performance measure in an assmble-to-order system with random lead times
    • Song J-S, Xu S, Liu B (1999) Order-fulfillment performance measure in an assmble-to-order system with random lead times. Oper. Res. 50:889-903.
    • (1999) Oper. Res. , vol.50 , pp. 889-903
    • Song, J.-S.1    Xu, S.2    Liu, B.3
  • 39
    • 33745813950 scopus 로고    scopus 로고
    • Perspectives in supply chain risk management
    • DOI 10.1016/j.ijpe.2005.12.006, PII S0925527306000405
    • Tang C (2006) Perspectives in supply chain risk management. Internat. J. Production Econom. 103:451-488. (Pubitemid 44038496)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 451-488
    • Tang, C.S.1
  • 40
    • 33646342992 scopus 로고    scopus 로고
    • On the value of mitigation and contingency strategies for managing supply chain disruption risks
    • DOI 10.1287/mnsc.1060.0515
    • Tomlin B (2006) On the value of mitigation and contingency strategies for managing supply chain disruption risks. Management Sci. 52:639-657. (Pubitemid 43666188)
    • (2006) Management Science , vol.52 , Issue.5 , pp. 639-657
    • Tomlin, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.