메뉴 건너뛰기




Volumn 29, Issue 6, 2015, Pages

Developing a Virtual Laboratory for Construction Bidding Environment Using Agent-Based Modeling

Author keywords

Agent based modeling; Competitive bidding; Optimal markup; Risk aversion; Simulation

Indexed keywords

AUTONOMOUS AGENTS; COMMERCE; COMPETITION; CONTRACTORS; COST ESTIMATING; PROJECT MANAGEMENT; RISK PERCEPTION; SIMULATION PLATFORM;

EID: 84945157715     PISSN: 08873801     EISSN: 19435487     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000440     Document Type: Article
Times cited : (35)

References (87)
  • 1
    • 0025669404 scopus 로고
    • Decision-support system for modeling bid/no-bid decision problem
    • Ahmad, I. (1990). " Decision-support system for modeling bid/no-bid decision problem." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1990)116:4(595), 595-608. JCEMD4 0733-9364
    • (1990) J. Constr. Eng. Manage. , pp. 595-608
    • Ahmad, I.1
  • 2
    • 0024053852 scopus 로고
    • Questionnaire survey on bidding in construction
    • Ahmad, I., and, Minkarah, I. (1988). " Questionnaire survey on bidding in construction." J. Manage. Eng., 10.1061/(ASCE)9742-597X(1988)4:3(229), 229-243. JMENEA 0742-597X
    • (1988) J. Manage. Eng. , pp. 229-243
    • Ahmad, I.1    Minkarah, I.2
  • 3
    • 84863377634 scopus 로고    scopus 로고
    • Data mining framework to optimize the bid selection policy for competitively bid highway construction projects
    • Art Chaovalitwongse, W., Wang, W., Williams, T., and, Chaovalitwongse, P. (2012). " Data mining framework to optimize the bid selection policy for competitively bid highway construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000386, 277-286. JCEMD4 0733-9364
    • (2012) J. Constr. Eng. Manage. , pp. 277-286
    • Wang, W.1    Williams, T.2    Chaovalitwongse, P.3
  • 5
    • 84872169947 scopus 로고    scopus 로고
    • Agent-based modeling of occupants and their impact on energy use in commercial buildings
    • Azar, E., and, Menassa, C. (2012). " Agent-based modeling of occupants and their impact on energy use in commercial buildings." J. Comput. Civ. Eng., 10.1061/(ASCE)CP.1943-5487.0000158, 506-518. JCCEE5 0887-3801
    • (2012) J. Comput. Civ. Eng. , pp. 506-518
    • Azar, E.1    Menassa, C.2
  • 6
    • 84891421777 scopus 로고    scopus 로고
    • A framework to evaluate energy saving potential from occupancy interventions in typical U.S. Commercial buildings
    • Azar, E., and, Menassa, C. (2014). " A framework to evaluate energy saving potential from occupancy interventions in typical U.S. commercial buildings." J. Comput. Civ. Eng., 10.1061/(ASCE)CP.1943-5487.0000318, 63-78. JCCEE5 0887-3801
    • (2014) J. Comput. Civ. Eng. , pp. 63-78
    • Azar, E.1    Menassa, C.2
  • 7
    • 0037076428 scopus 로고    scopus 로고
    • Tools and techniques for developing policies for complex and uncertain systems
    • Austrian Society for Cybernetic Studies, Vienna, Austria
    • Bankes, S. C. (2002). " Tools and techniques for developing policies for complex and uncertain systems." Proc., National Academy of Sciences of the United States of America, Austrian Society for Cybernetic Studies, Vienna, Austria, 7263-7266.
    • (2002) Proc. National Academy of Sciences of the United States of America , pp. 7263-7266
    • Bankes, S.C.1
  • 10
    • 0035426615 scopus 로고    scopus 로고
    • Multi-criteria assessment of the probability of winning in the competitive bidding process
    • Cagno, E., Caron, F., and, Perego, A. (2001). " Multi-criteria assessment of the probability of winning in the competitive bidding process." Int. J. Project Manage., 19 (6), 313-324. 10.1016/S0263-7863(00)00020-X IPMAEL
    • (2001) Int. J. Project Manage. , vol.19 , Issue.6 , pp. 313-324
    • Cagno, E.1    Caron, F.2    Perego, A.3
  • 11
    • 0020297936 scopus 로고
    • General bidding model
    • Carr, R. I. (1982). " General bidding model." J. Constr. Div., 108 (4), 639-650. JCCEAZ 0569-7948
    • (1982) J. Constr. Div. , vol.108 , Issue.4 , pp. 639-650
    • Carr, R.I.1
  • 12
    • 0020721480 scopus 로고
    • Impact of number of bidders on competition
    • Carr, R. I. (1983). " Impact of number of bidders on competition." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1983)109:1(61), 61-73. JCEMD4 0733-9364
    • (1983) J. Constr. Eng. Manage. , pp. 61-73
    • Carr, R.I.1
  • 13
    • 0017949368 scopus 로고
    • Bidding strategy using multiple regression
    • Carr, R. I., and, Sandahl, J. W. (1978). " Bidding strategy using multiple regression." J. Constr. Div., 104 (1), 15-26. JCCEAZ 0569-7948
    • (1978) J. Constr. Div. , vol.104 , Issue.1 , pp. 15-26
    • Carr, R.I.1    Sandahl, J.W.2
  • 14
    • 34250307613 scopus 로고    scopus 로고
    • Fuzzy logic model for determining minimum bid markup
    • Chao, L. C. (2007). " Fuzzy logic model for determining minimum bid markup." Comput. Aided Civ. Infrastruct. Eng., 22 (6), 449-460. 10.1111/mice.2007.22.issue-6
    • (2007) Comput. Aided Civ. Infrastruct. Eng. , vol.22 , Issue.6 , pp. 449-460
    • Chao, L.C.1
  • 15
    • 84873543295 scopus 로고    scopus 로고
    • Block Configuration Modeling: A novel simulation model to emulate building occupant peer networks and their impact on building energy consumption
    • Chen, J., Jain, R. K., and, Taylor, J. E. (2013). " Block Configuration Modeling: A novel simulation model to emulate building occupant peer networks and their impact on building energy consumption." Appl. Energy, 105, 358-368. 10.1016/j.apenergy.2012.12.036 APENDX 0306-2619
    • (2013) Appl. Energy , vol.105 , pp. 358-368
    • Chen, J.1    Jain, R.K.2    Taylor, J.E.3
  • 16
    • 0034269643 scopus 로고    scopus 로고
    • Key factors in bid reasoning model
    • Chua, D., and, Li, D. (2000). " Key factors in bid reasoning model." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2000)126:5(349), 349-357. JCEMD4 0733-9364
    • (2000) J. Constr. Eng. Manage. , pp. 349-357
    • Chua, D.1    Li, D.2
  • 17
    • 0035137161 scopus 로고    scopus 로고
    • Case-based reasoning approach in bid decision making
    • Chua, D., Li, D., and, Chan, W. (2001). " Case-based reasoning approach in bid decision making ". J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:1(35), 35-45. JCEMD4 0733-9364
    • (2001) J. Constr. Eng. Manage. , pp. 35-45
    • Chua, D.1    Li, D.2    Chan, W.3
  • 19
    • 56249122275 scopus 로고    scopus 로고
    • Key challenges in agent-based modelling for geo-spatial simulation
    • Crooks, A. T., Castle, C. J. E., and, Batty, M. (2008). " Key challenges in agent-based modelling for geo-spatial simulation." Comput. Environ. Urban Syst., 32 (6), 417-430. 10.1016/j.compenvurbsys.2008.09.004 CEUSD5
    • (2008) Comput. Environ. Urban Syst. , vol.32 , Issue.6 , pp. 417-430
    • Crooks, A.T.1    Castle, C.J.E.2    Batty, M.3
  • 21
    • 30744450491 scopus 로고    scopus 로고
    • Understanding transportation as a system-of-systems design problem
    • American Institute of Aeronautics and Astronautics, Reston, VA
    • DeLaurentis, D. (2005). " Understanding transportation as a system-of-systems design problem." Proc., 43rd AIAA Aerospace Sciences Meeting and Exhibit, American Institute of Aeronautics and Astronautics, Reston, VA.
    • (2005) Proc. 43rd AIAA Aerospace Sciences Meeting and Exhibit
    • DeLaurentis, D.1
  • 22
    • 11144281352 scopus 로고    scopus 로고
    • A system-of-systems perspective for future public policy decisions
    • DeLaurentis, D., and, Callaway, R. K. (2004). " A system-of-systems perspective for future public policy decisions." Rev. Policy Res., 21 (6), 829-837. 10.1111/ropr.2004.21.issue-6 1541-132X
    • (2004) Rev. Policy Res. , vol.21 , Issue.6 , pp. 829-837
    • DeLaurentis, D.1    Callaway, R.K.2
  • 23
    • 79957932792 scopus 로고    scopus 로고
    • Taxonomy to guide systems-of-systems decision-making in air transportation problems
    • DeLaurentis, D., Crossley, W. A., and, Mane, M. (2011). " Taxonomy to guide systems-of-systems decision-making in air transportation problems." AIAA J. Aircr., 48 (3), 760-770. 10.2514/1.C031008
    • (2011) AIAA J. Aircr. , vol.48 , Issue.3 , pp. 760-770
    • DeLaurentis, D.1    Crossley, W.A.2    Mane, M.3
  • 24
    • 0026381931 scopus 로고
    • Risk and need-for-work premiums in contractor bidding
    • De Neufville, R., and, King, D. (1991). " Risk and need-for-work premiums in contractor bidding." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1991)117:4(659), 659-673. JCEMD4 0733-9364
    • (1991) J. Constr. Eng. Manage. , pp. 659-673
    • De Neufville, R.1    King, D.2
  • 25
    • 85001837235 scopus 로고    scopus 로고
    • Utility-theory model for bid markup decisions
    • Dozzi, S., AbouRizk, S., and, Schroeder, S. (1996). " Utility-theory model for bid markup decisions." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1996)122:2(119), 119-124. JCEMD4 0733-9364
    • (1996) J. Constr. Eng. Manage. , pp. 119-124
    • Dozzi, S.1    AbouRizk, S.2    Schroeder, S.3
  • 26
    • 0001072506 scopus 로고    scopus 로고
    • The effect of contract type and size on competitiveness in bidding
    • Drew, D., and, Skitmore, M. (1997). " The effect of contract type and size on competitiveness in bidding." Constr. Manage. Econ., 15 (5), 469-489. 10.1080/014461997372836
    • (1997) Constr. Manage. Econ. , vol.15 , Issue.5 , pp. 469-489
    • Drew, D.1    Skitmore, M.2
  • 27
    • 33645136594 scopus 로고    scopus 로고
    • Testing Vickery's revenue equivalence theory in construction auctions
    • Drew, D. S., and, Skitmore, M. (2006). " Testing Vickery's revenue equivalence theory in construction auctions." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:4(425), 425-428. JCEMD4 0733-9364
    • (2006) J. Constr. Eng. Manage. , pp. 425-428
    • Drew, D.S.1    Skitmore, M.2
  • 28
    • 0036813520 scopus 로고    scopus 로고
    • The factors influencing bid mark-up decisions of large and medium-size contractors in Singapore
    • Dulaimi, M. F., and, Shan, H. G. (2002). " The factors influencing bid mark-up decisions of large and medium-size contractors in Singapore." Constr. Manage. Econ., 20 (7), 601-610. 10.1080/01446190210159890
    • (2002) Constr. Manage. Econ. , vol.20 , Issue.7 , pp. 601-610
    • Dulaimi, M.F.1    Shan, H.G.2
  • 29
    • 33751297100 scopus 로고    scopus 로고
    • A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions
    • Egemen, M., and, Mohamed, A. N. (2007). " A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions." Build. Environ., 42 (3), 1373-1385. 10.1016/j.buildenv.2005.11.016 BUSCBC 0360-1323
    • (2007) Build. Environ. , vol.42 , Issue.3 , pp. 1373-1385
    • Egemen, M.1    Mohamed, A.N.2
  • 30
    • 77149144146 scopus 로고    scopus 로고
    • Multiagent system for construction dispute resolution (MAS-COR)
    • El-Adaway, I., and, Kandil, A. (2010). " Multiagent system for construction dispute resolution (MAS-COR)." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000144, 303-315. JCEMD4 0733-9364
    • (2010) J. Constr. Eng. Manage. , pp. 303-315
    • El-Adaway, I.1    Kandil, A.2
  • 31
    • 84878885286 scopus 로고    scopus 로고
    • Empirical framework for making the bid/no-bid decision
    • El-Mashaleh, M. (2013). " Empirical framework for making the bid/no-bid decision." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000147, 200-205. JMENEA 0742-597X
    • (2013) J. Manage. Eng. , pp. 200-205
    • El-Mashaleh, M.1
  • 32
    • 84870902397 scopus 로고    scopus 로고
    • A complex systems approach to constructing better models for managing financial markets and the economy
    • Farmer, J. D., et al. (2012). " A complex systems approach to constructing better models for managing financial markets and the economy." Eur. Phys. J. Special Topics, 214 (1), 295-324. 10.1140/epjst/e2012-01696-9 1951-6355
    • (2012) Eur. Phys. J. Special Topics , vol.214 , Issue.1 , pp. 295-324
    • Farmer, J.D.1
  • 33
    • 0002861004 scopus 로고    scopus 로고
    • Competitive bidding strategy model and software system for bid preparation
    • Fayek, A. (1998). " Competitive bidding strategy model and software system for bid preparation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1998)124:1(1), 1-10. JCEMD4 0733-9364
    • (1998) J. Constr. Eng. Manage. , pp. 1-10
    • Fayek, A.1
  • 34
    • 62549162587 scopus 로고    scopus 로고
    • Agent-based urban land markets: Agent's pricing behavior, land prices and urban land use change
    • Filatova, T., Parker, D., and, Van der Veen, A. (2009). " Agent-based urban land markets: Agent's pricing behavior, land prices and urban land use change." J. Artif. Soc. Social Simul., 12 (1), 3.
    • (2009) J. Artif. Soc. Social Simul. , vol.12 , Issue.1 , pp. 3
    • Filatova, T.1    Parker, D.2    Van Der Veen, A.3
  • 35
    • 0001748017 scopus 로고
    • A competitive-bidding strategy
    • Friedman, L. (1956). " A competitive-bidding strategy." Oper. Res., 4 (1), 104-112. 10.1287/opre.4.1.104 OPREAI 0030-364X
    • (1956) Oper. Res. , vol.4 , Issue.1 , pp. 104-112
    • Friedman, L.1
  • 36
    • 0002268578 scopus 로고
    • Bidding strategies and probabilities
    • Gates, M. (1967). " Bidding strategies and probabilities." J. Constr. Eng. Div., 93 (1), 75-110.
    • (1967) J. Constr. Eng. Div. , vol.93 , Issue.1 , pp. 75-110
    • Gates, M.1
  • 37
    • 84863228724 scopus 로고    scopus 로고
    • Getting at systemic risk via an agent-based model of the housing market
    • Geanakoplos, J., et al. (2012). " Getting at systemic risk via an agent-based model of the housing market." Am. Econ. Rev., 102 (3), 53-58. 10.1257/aer.102.3.53 0002-8282
    • (2012) Am. Econ. Rev. , vol.102 , Issue.3 , pp. 53-58
    • Geanakoplos, J.1
  • 38
    • 0028397624 scopus 로고
    • Choosing appropriate construction contracting method
    • Gordon, C. (1994). " Choosing appropriate construction contracting method." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1994)120:1(196), 196-210. JCEMD4 0733-9364
    • (1994) J. Constr. Eng. Manage. , pp. 196-210
    • Gordon, C.1
  • 39
    • 33847148066 scopus 로고    scopus 로고
    • A modified neural network based on subtractive clustering for bidding system
    • IEEE, New York
    • Han, M., Fan, Y., and, Guo, W. (2005). " A modified neural network based on subtractive clustering for bidding system." Proc., Int. Conf. on Neural Networks and Brain, ICNN B '05, IEEE, New York, 128-133.
    • (2005) Proc. Int. Conf. on Neural Networks and Brain, ICNN B '05 , pp. 128-133
    • Han, M.1    Fan, Y.2    Guo, W.3
  • 40
    • 0035576947 scopus 로고    scopus 로고
    • Making a risk-based bid decision for overseas construction projects
    • Han, S. H., and, Diekmann, J. E. (2001). " Making a risk-based bid decision for overseas construction projects." Constr. Manage. Econ., 19 (8), 765-776. 10.1080/01446190110072860
    • (2001) Constr. Manage. Econ. , vol.19 , Issue.8 , pp. 765-776
    • Han, S.H.1    Diekmann, J.E.2
  • 42
    • 0002576968 scopus 로고    scopus 로고
    • Criteria for contractor selection
    • Hatush, Z., and, Skitmore, M. (1997). " Criteria for contractor selection." Constr. Manage. Econ., 15 (1), 19-38. 10.1080/014461997373088
    • (1997) Constr. Manage. Econ. , vol.15 , Issue.1 , pp. 19-38
    • Hatush, Z.1    Skitmore, M.2
  • 43
    • 0028330587 scopus 로고
    • Analogy-based solution to markup estimation problem
    • Hegazy, T., and, Moselhi, O. (1994). " Analogy-based solution to markup estimation problem." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(1994)8:1(72), 72-87. JCCEE5 0887-3801
    • (1994) J. Comput. Civ. Eng. , pp. 72-87
    • Hegazy, T.1    Moselhi, O.2
  • 44
    • 12744258028 scopus 로고    scopus 로고
    • Bid compensation decision model for projects with costly bid preparation
    • Ho, S. (2005). " Bid compensation decision model for projects with costly bid preparation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:2(151), 151-159. JCEMD4 0733-9364
    • (2005) J. Constr. Eng. Manage. , pp. 151-159
    • Ho, S.1
  • 45
    • 84906248603 scopus 로고    scopus 로고
    • Bid compensation theory and strategies for projects with heterogeneous bidders: A game theoretic analysis
    • Ho, S., and, Hsu, Y. (2014). " Bid compensation theory and strategies for projects with heterogeneous bidders: A game theoretic analysis." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000212, 1-10. JMENEA 0742-597X
    • (2014) J. Manage. Eng. , pp. 1-10
    • Ho, S.1    Hsu, Y.2
  • 46
    • 0032098746 scopus 로고    scopus 로고
    • Which contractor selection methodology?
    • Holt, G. D. (1998). " Which contractor selection methodology? " Int. J. Project Manage., 16 (3), 153-164. 10.1016/S0263-7863(97)00035-5 IPMAEL
    • (1998) Int. J. Project Manage. , vol.16 , Issue.3 , pp. 153-164
    • Holt, G.D.1
  • 47
    • 0020139948 scopus 로고
    • Construction risk: Multi-attribute approach
    • Ibbs, C. W., and, Crandall, K. C. (1982). " Construction risk: Multi-attribute approach." J. Constr. Div., 108 (2), 187-200. JCCEAZ 0569-7948
    • (1982) J. Constr. Div. , vol.108 , Issue.2 , pp. 187-200
    • Ibbs, C.W.1    Crandall, K.C.2
  • 48
    • 79955368636 scopus 로고    scopus 로고
    • Association of risk attitude with market diversification in the construction business
    • Kim, H. J., and, Reinschmidt, K. F. (2011 a). " Association of risk attitude with market diversification in the construction business." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000045, 66-74. JMENEA 0742-597X
    • (2011) J. Manage. Eng. , pp. 66-74
    • Kim, H.J.1    Reinschmidt, K.F.2
  • 49
    • 79955389359 scopus 로고    scopus 로고
    • Effects of contractors' risk attitude on competition in construction
    • Kim, H. J., and, Reinschmidt, K. F. (2011 b). " Effects of contractors' risk attitude on competition in construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000284, 275-283. JCEMD4 0733-9364
    • (2011) J. Constr. Eng. Manage. , pp. 275-283
    • Kim, H.J.1    Reinschmidt, K.F.2
  • 50
    • 85014299450 scopus 로고    scopus 로고
    • Academic Press/Elsevier, Burlington, MA, (Nov. 2013)
    • Krishna, V. (2010). Auction theory, Academic Press/Elsevier, Burlington, MA, (http://public.eblib.com/EBLPublic/PublicView.do?ptiID=453046) (Nov. 2013).
    • (2010) Auction Theory
    • Krishna, V.1
  • 51
    • 79955433610 scopus 로고    scopus 로고
    • Risk and price in the bidding process of contractors
    • Larea, S., and, Hughes, W. (2011). " Risk and price in the bidding process of contractors." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000293, 248-258. JCEMD4 0733-9364
    • (2011) J. Constr. Eng. Manage. , pp. 248-258
    • Larea, S.1    Hughes, W.2
  • 52
    • 84991380457 scopus 로고    scopus 로고
    • Combining rule-based expert systems and artificial neural networks for mark-up estimation
    • Li, H., and, Love, P. E. D. (1999). " Combining rule-based expert systems and artificial neural networks for mark-up estimation." Constr. Manage. Econ., 17 (2), 169-176. 10.1080/014461999371664
    • (1999) Constr. Manage. Econ. , vol.17 , Issue.2 , pp. 169-176
    • Li, H.1    Love, P.E.D.2
  • 53
    • 0032673239 scopus 로고    scopus 로고
    • ANN-based mark-up estimation system with self-explanatory capacities
    • Li, H., Shen, L., and, Love, P. (1999). " ANN-based mark-up estimation system with self-explanatory capacities." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:3(185), 185-189. JCEMD4 0733-9364
    • (1999) J. Constr. Eng. Manage. , pp. 185-189
    • Li, H.1    Shen, L.2    Love, P.3
  • 54
    • 0043065381 scopus 로고    scopus 로고
    • Using fuzzy neural network approach to estimate contractors' markup
    • Liu, M., and, Ling, Y. (2003). " Using fuzzy neural network approach to estimate contractors' markup." Build. Environ., 38 (11), 1303-1308. 10.1016/S0360-1323(03)00135-5 BUSCBC 0360-1323
    • (2003) Build. Environ. , vol.38 , Issue.11 , pp. 1303-1308
    • Liu, M.1    Ling, Y.2
  • 55
    • 15944390626 scopus 로고    scopus 로고
    • Modeling a contractor's markup estimation
    • Liu, M., and, Ling, Y. (2005). " Modeling a contractor's markup estimation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:4(391), 391-399. JCEMD4 0733-9364
    • (2005) J. Constr. Eng. Manage. , pp. 391-399
    • Liu, M.1    Ling, Y.2
  • 56
    • 79953756063 scopus 로고    scopus 로고
    • An economic agent-based model of coupled housing and land markets (CHALMS)
    • Magliocca, N., Safirova, E., McConnell, V., and, Walls, M. (2011). " An economic agent-based model of coupled housing and land markets (CHALMS)." Comput. Environ. Urban Syst., 35 (3), 183-191. 10.1016/j.compenvurbsys.2011.01.002 CEUSD5
    • (2011) Comput. Environ. Urban Syst. , vol.35 , Issue.3 , pp. 183-191
    • Magliocca, N.1    Safirova, E.2    McConnell, V.3    Walls, M.4
  • 57
    • 0001812752 scopus 로고
    • Exploration and exploitation in organizational learning
    • March, J. G. (1991). " Exploration and exploitation in organizational learning." Organ. Sci., 2 (1), 71-87. 10.1287/orsc.2.1.71 ORSCEZ 1047-7039
    • (1991) Organ. Sci. , vol.2 , Issue.1 , pp. 71-87
    • March, J.G.1
  • 58
    • 84993012246 scopus 로고    scopus 로고
    • A decision support tool for construction bidding
    • Marzouk, M., and, Moselhi, O. (2003). " A decision support tool for construction bidding." Constr. Innov. Infor. Process Manage., 3 (2), 111-124.
    • (2003) Constr. Innov. Infor. Process Manage. , vol.3 , Issue.2 , pp. 111-124
    • Marzouk, M.1    Moselhi, O.2
  • 60
    • 0034428043 scopus 로고    scopus 로고
    • Agent-based simulation of dynamic online auctions
    • New York
    • Mizuta, H., and, Steiglitz, K. (2000). " Agent-based simulation of dynamic online auctions." Proc., 2000 Winter Simulation Conf., IEEE, New York, 2, 1772-1777.
    • (2000) Proc. 2000 Winter Simulation Conf. IEEE , vol.2 , pp. 1772-1777
    • Mizuta, H.1    Steiglitz, K.2
  • 61
    • 84906217264 scopus 로고    scopus 로고
    • Ex-ante policy analysis in civil infrastructure systems
    • Mostafavi, A., Abraham, D., and, DeLaurentis, D. (2014). " Ex-ante policy analysis in civil infrastructure systems." J. Comput. Civ. Eng., 10.1061/(ASCE)CP.1943-5487.0000350, 1-14. JCCEE5 0887-3801
    • (2014) J. Comput. Civ. Eng. , pp. 1-14
    • Mostafavi, A.1    Abraham, D.2    DeLaurentis, D.3
  • 63
    • 0036744541 scopus 로고    scopus 로고
    • A theoretical framework for determining the minimum number of bidders in construction bidding competitions
    • Ngai, S. C., Drew, D. S., Lo, H. P., and, Skitmore, M. (2002). " A theoretical framework for determining the minimum number of bidders in construction bidding competitions." Constr. Manage. Econ., 20 (6), 473-482. 10.1080/01446190210151041
    • (2002) Constr. Manage. Econ. , vol.20 , Issue.6 , pp. 473-482
    • Ngai, S.C.1    Drew, D.S.2    Lo, H.P.3    Skitmore, M.4
  • 65
    • 77953600574 scopus 로고    scopus 로고
    • Modeling the heterogeneity in contractors' mark-up behavior
    • Oo, B., Drew, D., and, Lo, H. (2010). " Modeling the heterogeneity in contractors' mark-up behavior." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000186, 720-729. JCEMD4 0733-9364
    • (2010) J. Constr. Eng. Manage. , pp. 720-729
    • Oo, B.1    Drew, D.2    Lo, H.3
  • 66
    • 44049108418 scopus 로고    scopus 로고
    • A comparison of contractors' decision to bid behaviour according to different market environments
    • Oo, B. L., Drew, D. S., and, Lo, H. P. (2008). " A comparison of contractors' decision to bid behaviour according to different market environments." Int. J. Project Manage., 26 (4), 439-447. 10.1016/j.ijproman.2007.06.001 IPMAEL
    • (2008) Int. J. Project Manage. , vol.26 , Issue.4 , pp. 439-447
    • Oo, B.L.1    Drew, D.S.2    Lo, H.P.3
  • 67
    • 84855688740 scopus 로고    scopus 로고
    • The effect of bidding success in construction bidding
    • Oo, B. L., Lo, H. P., and, Lim, B. T. H. (2012). " The effect of bidding success in construction bidding." Eng. Constr. Archit. Manage., 19 (1), 25-39. 10.1108/09699981211192553
    • (2012) Eng. Constr. Archit. Manage. , vol.19 , Issue.1 , pp. 25-39
    • Oo, B.L.1    Lo, H.P.2    Lim, B.T.H.3
  • 68
    • 0000964327 scopus 로고    scopus 로고
    • Tendering theory revisited
    • Runeson, G., and, Skitmore, M. (1999). " Tendering theory revisited." Constr. Manage. Econ., 17 (3), 285-296. 10.1080/014461999371493
    • (1999) Constr. Manage. Econ. , vol.17 , Issue.3 , pp. 285-296
    • Runeson, G.1    Skitmore, M.2
  • 69
    • 84901054592 scopus 로고    scopus 로고
    • Modeling of the sustainability goal and objective setting process in the predesign phase of green institutional building projects
    • Said, H., et al. (2013). " Modeling of the sustainability goal and objective setting process in the predesign phase of green institutional building projects." J. Archit. Eng., 10.1061/(ASCE)AE.1943-5568.0000138, 1-11. JAEIED 1076-0431
    • (2013) J. Archit. Eng. , pp. 1-11
    • Said, H.1
  • 70
    • 50149091763 scopus 로고    scopus 로고
    • Agent-based modeling: Approach for improving infrastructure management
    • Sanford Bernhardt, K. L., and, McNeil, S. (2008). " Agent-based modeling: Approach for improving infrastructure management." J. Infrastruct. Syst., 10.1061/(ASCE)1076-0342(2008)14:3(253), 253-261. JITSE4 1076-0342
    • (2008) J. Infrastruct. Syst. , pp. 253-261
    • Sanford Bernhardt, K.L.1    McNeil, S.2
  • 71
    • 0025694105 scopus 로고
    • Bids considering multiple criteria
    • Seydel, J., and, Olson, D. (1990). " Bids considering multiple criteria." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1990)116:4(609), 609-623. JCEMD4 0733-9364
    • (1990) J. Constr. Eng. Manage. , pp. 609-623
    • Seydel, J.1    Olson, D.2
  • 72
    • 0000643379 scopus 로고
    • Factors considered in tendering decisions by top U.K. Contractors
    • Shash, A. A. (1993). " Factors considered in tendering decisions by top U.K. contractors." Constr. Manage. Econ., 11 (2), 111-118. 10.1080/01446199300000004
    • (1993) Constr. Manage. Econ. , vol.11 , Issue.2 , pp. 111-118
    • Shash, A.A.1
  • 73
    • 0032659895 scopus 로고    scopus 로고
    • Optimal bid model for price-time biparameter construction contracts
    • Shen, L., Drew, D., and, Zhang, Z. (1999). " Optimal bid model for price-time biparameter construction contracts." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:3(204), 204-209. JCEMD4 0733-9364
    • (1999) J. Constr. Eng. Manage. , pp. 204-209
    • Shen, L.1    Drew, D.2    Zhang, Z.3
  • 74
    • 0000885441 scopus 로고
    • The construction contract bidder homogeneity assumption: An empirical test
    • Skitmore, M. (1991). " The construction contract bidder homogeneity assumption: An empirical test." Constr. Manage. Econ., 9 (5), 403-429. 10.1080/01446199100000032
    • (1991) Constr. Manage. Econ. , vol.9 , Issue.5 , pp. 403-429
    • Skitmore, M.1
  • 75
    • 0028549898 scopus 로고
    • A multivariate approach to construction contract bidding mark-up strategies
    • Skitmore, M., and, Pemberton, J. (1994). " A multivariate approach to construction contract bidding mark-up strategies." J. Oper. Res. Soc., 45 (11), 1263-1272. 10.1057/jors.1994.199 JORSDZ
    • (1994) J. Oper. Res. Soc. , vol.45 , Issue.11 , pp. 1263-1272
    • Skitmore, M.1    Pemberton, J.2
  • 76
    • 33746850199 scopus 로고    scopus 로고
    • Construction price formation: Full cost pricing or neoclassical microeconomic theory?
    • Skitmore, M., Runeson, G., and, Chang, X. (2006). " Construction price formation: Full cost pricing or neoclassical microeconomic theory? " Constr. Manage. Econ., 24 (7), 773-783. 10.1080/01446190500434849
    • (2006) Constr. Manage. Econ. , vol.24 , Issue.7 , pp. 773-783
    • Skitmore, M.1    Runeson, G.2    Chang, X.3
  • 77
    • 79955442959 scopus 로고    scopus 로고
    • Modeling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks
    • Unsal, H., Taylor, J. (2011 a). " Modeling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000286, 284-293. JCEMD4 0733-9364
    • (2011) J. Constr. Eng. Manage. , pp. 284-293
    • Unsal, H.1    Taylor, J.2
  • 78
    • 84894411230 scopus 로고    scopus 로고
    • An empirical investigation of opportunistic behaviour in project networks and its impact on market efficiency
    • Unsal, H. I., and, Taylor, J. E. (2011 b). " An empirical investigation of opportunistic behaviour in project networks and its impact on market efficiency." Eng. Project Organ. J., 1 (2), 95-106. 10.1080/21573727.2011.569931
    • (2011) Eng. Project Organ. J. , vol.1 , Issue.2 , pp. 95-106
    • Unsal, H.I.1    Taylor, J.E.2
  • 79
    • 71049115473 scopus 로고    scopus 로고
    • Reinforcement learning in supply chains
    • Valluri, A., North, M. J., and, Macal, C. M. (2009). " Reinforcement learning in supply chains." Int. J. Neural Syst., 19 (05), 331-344. 10.1142/S0129065709002063 IJSZEG 0129-0657
    • (2009) Int. J. Neural Syst. , vol.19 , Issue.5 , pp. 331-344
    • Valluri, A.1    North, M.J.2    Macal, C.M.3
  • 80
    • 84980096808 scopus 로고
    • Counterspeculation, auctions, and competitive sealed tenders
    • Vickrey, W. (1961). " Counterspeculation, auctions, and competitive sealed tenders." J. Finance, 16 (1), 8-37. 10.1111/j.1540-6261.1961.tb02789.x 0022-1082
    • (1961) J. Finance , vol.16 , Issue.1 , pp. 8-37
    • Vickrey, W.1
  • 81
    • 79960740091 scopus 로고    scopus 로고
    • The ACEGES laboratory for energy policy: Exploring the production of crude oil
    • Voudouris, V., Stasinopoulos, D., Rigby, R., and, Di Maio, C. (2011). " The ACEGES laboratory for energy policy: Exploring the production of crude oil." Energy Policy, 39 (9), 5480-5489. 10.1016/j.enpol.2011.05.014 ENPYAC
    • (2011) Energy Policy , vol.39 , Issue.9 , pp. 5480-5489
    • Voudouris, V.1    Stasinopoulos, D.2    Rigby, R.3    Di Maio, C.4
  • 82
    • 33846818747 scopus 로고    scopus 로고
    • Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions
    • Wang, W. C., Dzeng, R. J., and, Lu, Y. H. (2007). " Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions." Comput. Aided Civ. Infrastruct. Eng., 22 (3), 223-235. 10.1111/mice.2007.22.issue-3
    • (2007) Comput. Aided Civ. Infrastruct. Eng. , vol.22 , Issue.3 , pp. 223-235
    • Wang, W.C.1    Dzeng, R.J.2    Lu, Y.H.3
  • 83
    • 43549105150 scopus 로고    scopus 로고
    • A critical survey of agent-based wholesale electricity market models
    • Weidlich, A., and, Veit, D. (2008). " A critical survey of agent-based wholesale electricity market models." Energy Econ., 30 (4), 1728-1759. 10.1016/j.eneco.2008.01.003 EECODR 1873-6181
    • (2008) Energy Econ. , vol.30 , Issue.4 , pp. 1728-1759
    • Weidlich, A.1    Veit, D.2
  • 84
    • 0015646550 scopus 로고
    • Utility function determination for bidding models
    • Willenbrock, J. H. (1973). " Utility function determination for bidding models." J. Constr. Div., 99 (1), 133-153. JCCEAZ 0569-7948
    • (1973) J. Constr. Div. , vol.99 , Issue.1 , pp. 133-153
    • Willenbrock, J.H.1
  • 85
    • 84945159897 scopus 로고    scopus 로고
    • XJ Technologies
    • (Dec. 20, 2014)
    • XJ Technologies. (2011). " Anylogic overview." http://www.anylogic.com/overview/ (Dec. 20, 2014).
    • (2011) Anylogic Overview
  • 86
    • 84878857234 scopus 로고    scopus 로고
    • Key factors considered in compiling tender prices for China's public works projects
    • Ye, K., Li, B., and, Shen, L. (2013). " Key factors considered in compiling tender prices for China's public works projects." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000153, 206-215. JMENEA 0742-597X
    • (2013) J. Manage. Eng. , pp. 206-215
    • Ye, K.1    Li, B.2    Shen, L.3
  • 87
    • 84894252986 scopus 로고    scopus 로고
    • Key attributes underpinning different markup decision between public and private projects: A China study
    • Ye, K., Shen, L., Xia, B., and, Li, B. (2014). " Key attributes underpinning different markup decision between public and private projects: A China study." Int. J. Project Manage., 32 (3), 461-472. 10.1016/j.ijproman.2013.06.001 IPMAEL
    • (2014) Int. J. Project Manage. , vol.32 , Issue.3 , pp. 461-472
    • Ye, K.1    Shen, L.2    Xia, B.3    Li, B.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.