-
1
-
-
0025669404
-
Decision-support system for modeling bid/no-bid decision problem
-
Ahmad, I. (1990). " Decision-support system for modeling bid/no-bid decision problem." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1990)116:4(595), 595-608. JCEMD4 0733-9364
-
(1990)
J. Constr. Eng. Manage.
, pp. 595-608
-
-
Ahmad, I.1
-
2
-
-
0024053852
-
Questionnaire survey on bidding in construction
-
Ahmad, I., and, Minkarah, I. (1988). " Questionnaire survey on bidding in construction." J. Manage. Eng., 10.1061/(ASCE)9742-597X(1988)4:3(229), 229-243. JMENEA 0742-597X
-
(1988)
J. Manage. Eng.
, pp. 229-243
-
-
Ahmad, I.1
Minkarah, I.2
-
3
-
-
84863377634
-
Data mining framework to optimize the bid selection policy for competitively bid highway construction projects
-
Art Chaovalitwongse, W., Wang, W., Williams, T., and, Chaovalitwongse, P. (2012). " Data mining framework to optimize the bid selection policy for competitively bid highway construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000386, 277-286. JCEMD4 0733-9364
-
(2012)
J. Constr. Eng. Manage.
, pp. 277-286
-
-
Wang, W.1
Williams, T.2
Chaovalitwongse, P.3
-
5
-
-
84872169947
-
Agent-based modeling of occupants and their impact on energy use in commercial buildings
-
Azar, E., and, Menassa, C. (2012). " Agent-based modeling of occupants and their impact on energy use in commercial buildings." J. Comput. Civ. Eng., 10.1061/(ASCE)CP.1943-5487.0000158, 506-518. JCCEE5 0887-3801
-
(2012)
J. Comput. Civ. Eng.
, pp. 506-518
-
-
Azar, E.1
Menassa, C.2
-
6
-
-
84891421777
-
A framework to evaluate energy saving potential from occupancy interventions in typical U.S. Commercial buildings
-
Azar, E., and, Menassa, C. (2014). " A framework to evaluate energy saving potential from occupancy interventions in typical U.S. commercial buildings." J. Comput. Civ. Eng., 10.1061/(ASCE)CP.1943-5487.0000318, 63-78. JCCEE5 0887-3801
-
(2014)
J. Comput. Civ. Eng.
, pp. 63-78
-
-
Azar, E.1
Menassa, C.2
-
7
-
-
0037076428
-
Tools and techniques for developing policies for complex and uncertain systems
-
Austrian Society for Cybernetic Studies, Vienna, Austria
-
Bankes, S. C. (2002). " Tools and techniques for developing policies for complex and uncertain systems." Proc., National Academy of Sciences of the United States of America, Austrian Society for Cybernetic Studies, Vienna, Austria, 7263-7266.
-
(2002)
Proc. National Academy of Sciences of the United States of America
, pp. 7263-7266
-
-
Bankes, S.C.1
-
9
-
-
0037076425
-
Agent-based modeling: Methods and techniques for simulating human systems
-
Vienna, Austria
-
Bonabeau, E. (2002). " Agent-based modeling: Methods and techniques for simulating human systems." Proc., National Academy of Sciences of the United States of America, Austrian Society for Cybernetic Studies, Vienna, Austria, 7280-7287.
-
(2002)
Proc. National Academy of Sciences of the United States of America, Austrian Society for Cybernetic Studies
, pp. 7280-7287
-
-
Bonabeau, E.1
-
10
-
-
0035426615
-
Multi-criteria assessment of the probability of winning in the competitive bidding process
-
Cagno, E., Caron, F., and, Perego, A. (2001). " Multi-criteria assessment of the probability of winning in the competitive bidding process." Int. J. Project Manage., 19 (6), 313-324. 10.1016/S0263-7863(00)00020-X IPMAEL
-
(2001)
Int. J. Project Manage.
, vol.19
, Issue.6
, pp. 313-324
-
-
Cagno, E.1
Caron, F.2
Perego, A.3
-
11
-
-
0020297936
-
General bidding model
-
Carr, R. I. (1982). " General bidding model." J. Constr. Div., 108 (4), 639-650. JCCEAZ 0569-7948
-
(1982)
J. Constr. Div.
, vol.108
, Issue.4
, pp. 639-650
-
-
Carr, R.I.1
-
12
-
-
0020721480
-
Impact of number of bidders on competition
-
Carr, R. I. (1983). " Impact of number of bidders on competition." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1983)109:1(61), 61-73. JCEMD4 0733-9364
-
(1983)
J. Constr. Eng. Manage.
, pp. 61-73
-
-
Carr, R.I.1
-
13
-
-
0017949368
-
Bidding strategy using multiple regression
-
Carr, R. I., and, Sandahl, J. W. (1978). " Bidding strategy using multiple regression." J. Constr. Div., 104 (1), 15-26. JCCEAZ 0569-7948
-
(1978)
J. Constr. Div.
, vol.104
, Issue.1
, pp. 15-26
-
-
Carr, R.I.1
Sandahl, J.W.2
-
14
-
-
34250307613
-
Fuzzy logic model for determining minimum bid markup
-
Chao, L. C. (2007). " Fuzzy logic model for determining minimum bid markup." Comput. Aided Civ. Infrastruct. Eng., 22 (6), 449-460. 10.1111/mice.2007.22.issue-6
-
(2007)
Comput. Aided Civ. Infrastruct. Eng.
, vol.22
, Issue.6
, pp. 449-460
-
-
Chao, L.C.1
-
15
-
-
84873543295
-
Block Configuration Modeling: A novel simulation model to emulate building occupant peer networks and their impact on building energy consumption
-
Chen, J., Jain, R. K., and, Taylor, J. E. (2013). " Block Configuration Modeling: A novel simulation model to emulate building occupant peer networks and their impact on building energy consumption." Appl. Energy, 105, 358-368. 10.1016/j.apenergy.2012.12.036 APENDX 0306-2619
-
(2013)
Appl. Energy
, vol.105
, pp. 358-368
-
-
Chen, J.1
Jain, R.K.2
Taylor, J.E.3
-
16
-
-
0034269643
-
Key factors in bid reasoning model
-
Chua, D., and, Li, D. (2000). " Key factors in bid reasoning model." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2000)126:5(349), 349-357. JCEMD4 0733-9364
-
(2000)
J. Constr. Eng. Manage.
, pp. 349-357
-
-
Chua, D.1
Li, D.2
-
17
-
-
0035137161
-
Case-based reasoning approach in bid decision making
-
Chua, D., Li, D., and, Chan, W. (2001). " Case-based reasoning approach in bid decision making ". J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:1(35), 35-45. JCEMD4 0733-9364
-
(2001)
J. Constr. Eng. Manage.
, pp. 35-45
-
-
Chua, D.1
Li, D.2
Chan, W.3
-
18
-
-
10444220813
-
-
3rd Ed. Cengage Learning, Mason, OH
-
Clemen, R. T., and, Reilly, T. (2014). Making hard decisions with decision tools, 3rd Ed., Cengage Learning, Mason, OH.
-
(2014)
Making Hard Decisions with Decision Tools
-
-
Clemen, R.T.1
Reilly, T.2
-
19
-
-
56249122275
-
Key challenges in agent-based modelling for geo-spatial simulation
-
Crooks, A. T., Castle, C. J. E., and, Batty, M. (2008). " Key challenges in agent-based modelling for geo-spatial simulation." Comput. Environ. Urban Syst., 32 (6), 417-430. 10.1016/j.compenvurbsys.2008.09.004 CEUSD5
-
(2008)
Comput. Environ. Urban Syst.
, vol.32
, Issue.6
, pp. 417-430
-
-
Crooks, A.T.1
Castle, C.J.E.2
Batty, M.3
-
20
-
-
0004192228
-
-
Blackwell Business, Cambridge, U.K
-
Cyert, R. M., and, March, J. G. (1992). A behavioral theory of the firm, Blackwell Business, Cambridge, U.K.
-
(1992)
A Behavioral Theory of the Firm
-
-
Cyert, R.M.1
March, J.G.2
-
21
-
-
30744450491
-
Understanding transportation as a system-of-systems design problem
-
American Institute of Aeronautics and Astronautics, Reston, VA
-
DeLaurentis, D. (2005). " Understanding transportation as a system-of-systems design problem." Proc., 43rd AIAA Aerospace Sciences Meeting and Exhibit, American Institute of Aeronautics and Astronautics, Reston, VA.
-
(2005)
Proc. 43rd AIAA Aerospace Sciences Meeting and Exhibit
-
-
DeLaurentis, D.1
-
22
-
-
11144281352
-
A system-of-systems perspective for future public policy decisions
-
DeLaurentis, D., and, Callaway, R. K. (2004). " A system-of-systems perspective for future public policy decisions." Rev. Policy Res., 21 (6), 829-837. 10.1111/ropr.2004.21.issue-6 1541-132X
-
(2004)
Rev. Policy Res.
, vol.21
, Issue.6
, pp. 829-837
-
-
DeLaurentis, D.1
Callaway, R.K.2
-
23
-
-
79957932792
-
Taxonomy to guide systems-of-systems decision-making in air transportation problems
-
DeLaurentis, D., Crossley, W. A., and, Mane, M. (2011). " Taxonomy to guide systems-of-systems decision-making in air transportation problems." AIAA J. Aircr., 48 (3), 760-770. 10.2514/1.C031008
-
(2011)
AIAA J. Aircr.
, vol.48
, Issue.3
, pp. 760-770
-
-
DeLaurentis, D.1
Crossley, W.A.2
Mane, M.3
-
24
-
-
0026381931
-
Risk and need-for-work premiums in contractor bidding
-
De Neufville, R., and, King, D. (1991). " Risk and need-for-work premiums in contractor bidding." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1991)117:4(659), 659-673. JCEMD4 0733-9364
-
(1991)
J. Constr. Eng. Manage.
, pp. 659-673
-
-
De Neufville, R.1
King, D.2
-
25
-
-
85001837235
-
Utility-theory model for bid markup decisions
-
Dozzi, S., AbouRizk, S., and, Schroeder, S. (1996). " Utility-theory model for bid markup decisions." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1996)122:2(119), 119-124. JCEMD4 0733-9364
-
(1996)
J. Constr. Eng. Manage.
, pp. 119-124
-
-
Dozzi, S.1
AbouRizk, S.2
Schroeder, S.3
-
26
-
-
0001072506
-
The effect of contract type and size on competitiveness in bidding
-
Drew, D., and, Skitmore, M. (1997). " The effect of contract type and size on competitiveness in bidding." Constr. Manage. Econ., 15 (5), 469-489. 10.1080/014461997372836
-
(1997)
Constr. Manage. Econ.
, vol.15
, Issue.5
, pp. 469-489
-
-
Drew, D.1
Skitmore, M.2
-
27
-
-
33645136594
-
Testing Vickery's revenue equivalence theory in construction auctions
-
Drew, D. S., and, Skitmore, M. (2006). " Testing Vickery's revenue equivalence theory in construction auctions." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:4(425), 425-428. JCEMD4 0733-9364
-
(2006)
J. Constr. Eng. Manage.
, pp. 425-428
-
-
Drew, D.S.1
Skitmore, M.2
-
28
-
-
0036813520
-
The factors influencing bid mark-up decisions of large and medium-size contractors in Singapore
-
Dulaimi, M. F., and, Shan, H. G. (2002). " The factors influencing bid mark-up decisions of large and medium-size contractors in Singapore." Constr. Manage. Econ., 20 (7), 601-610. 10.1080/01446190210159890
-
(2002)
Constr. Manage. Econ.
, vol.20
, Issue.7
, pp. 601-610
-
-
Dulaimi, M.F.1
Shan, H.G.2
-
29
-
-
33751297100
-
A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions
-
Egemen, M., and, Mohamed, A. N. (2007). " A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions." Build. Environ., 42 (3), 1373-1385. 10.1016/j.buildenv.2005.11.016 BUSCBC 0360-1323
-
(2007)
Build. Environ.
, vol.42
, Issue.3
, pp. 1373-1385
-
-
Egemen, M.1
Mohamed, A.N.2
-
30
-
-
77149144146
-
Multiagent system for construction dispute resolution (MAS-COR)
-
El-Adaway, I., and, Kandil, A. (2010). " Multiagent system for construction dispute resolution (MAS-COR)." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000144, 303-315. JCEMD4 0733-9364
-
(2010)
J. Constr. Eng. Manage.
, pp. 303-315
-
-
El-Adaway, I.1
Kandil, A.2
-
31
-
-
84878885286
-
Empirical framework for making the bid/no-bid decision
-
El-Mashaleh, M. (2013). " Empirical framework for making the bid/no-bid decision." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000147, 200-205. JMENEA 0742-597X
-
(2013)
J. Manage. Eng.
, pp. 200-205
-
-
El-Mashaleh, M.1
-
32
-
-
84870902397
-
A complex systems approach to constructing better models for managing financial markets and the economy
-
Farmer, J. D., et al. (2012). " A complex systems approach to constructing better models for managing financial markets and the economy." Eur. Phys. J. Special Topics, 214 (1), 295-324. 10.1140/epjst/e2012-01696-9 1951-6355
-
(2012)
Eur. Phys. J. Special Topics
, vol.214
, Issue.1
, pp. 295-324
-
-
Farmer, J.D.1
-
33
-
-
0002861004
-
Competitive bidding strategy model and software system for bid preparation
-
Fayek, A. (1998). " Competitive bidding strategy model and software system for bid preparation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1998)124:1(1), 1-10. JCEMD4 0733-9364
-
(1998)
J. Constr. Eng. Manage.
, pp. 1-10
-
-
Fayek, A.1
-
34
-
-
62549162587
-
Agent-based urban land markets: Agent's pricing behavior, land prices and urban land use change
-
Filatova, T., Parker, D., and, Van der Veen, A. (2009). " Agent-based urban land markets: Agent's pricing behavior, land prices and urban land use change." J. Artif. Soc. Social Simul., 12 (1), 3.
-
(2009)
J. Artif. Soc. Social Simul.
, vol.12
, Issue.1
, pp. 3
-
-
Filatova, T.1
Parker, D.2
Van Der Veen, A.3
-
35
-
-
0001748017
-
A competitive-bidding strategy
-
Friedman, L. (1956). " A competitive-bidding strategy." Oper. Res., 4 (1), 104-112. 10.1287/opre.4.1.104 OPREAI 0030-364X
-
(1956)
Oper. Res.
, vol.4
, Issue.1
, pp. 104-112
-
-
Friedman, L.1
-
36
-
-
0002268578
-
Bidding strategies and probabilities
-
Gates, M. (1967). " Bidding strategies and probabilities." J. Constr. Eng. Div., 93 (1), 75-110.
-
(1967)
J. Constr. Eng. Div.
, vol.93
, Issue.1
, pp. 75-110
-
-
Gates, M.1
-
37
-
-
84863228724
-
Getting at systemic risk via an agent-based model of the housing market
-
Geanakoplos, J., et al. (2012). " Getting at systemic risk via an agent-based model of the housing market." Am. Econ. Rev., 102 (3), 53-58. 10.1257/aer.102.3.53 0002-8282
-
(2012)
Am. Econ. Rev.
, vol.102
, Issue.3
, pp. 53-58
-
-
Geanakoplos, J.1
-
38
-
-
0028397624
-
Choosing appropriate construction contracting method
-
Gordon, C. (1994). " Choosing appropriate construction contracting method." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1994)120:1(196), 196-210. JCEMD4 0733-9364
-
(1994)
J. Constr. Eng. Manage.
, pp. 196-210
-
-
Gordon, C.1
-
39
-
-
33847148066
-
A modified neural network based on subtractive clustering for bidding system
-
IEEE, New York
-
Han, M., Fan, Y., and, Guo, W. (2005). " A modified neural network based on subtractive clustering for bidding system." Proc., Int. Conf. on Neural Networks and Brain, ICNN B '05, IEEE, New York, 128-133.
-
(2005)
Proc. Int. Conf. on Neural Networks and Brain, ICNN B '05
, pp. 128-133
-
-
Han, M.1
Fan, Y.2
Guo, W.3
-
40
-
-
0035576947
-
Making a risk-based bid decision for overseas construction projects
-
Han, S. H., and, Diekmann, J. E. (2001). " Making a risk-based bid decision for overseas construction projects." Constr. Manage. Econ., 19 (8), 765-776. 10.1080/01446190110072860
-
(2001)
Constr. Manage. Econ.
, vol.19
, Issue.8
, pp. 765-776
-
-
Han, S.H.1
Diekmann, J.E.2
-
41
-
-
0004153943
-
-
7th Ed. Wiley, NJ
-
Harris, F., and, McCaffer, R. (2013). Modern construction management, 7th Ed., Wiley, NJ.
-
(2013)
Modern Construction Management
-
-
Harris, F.1
McCaffer, R.2
-
42
-
-
0002576968
-
Criteria for contractor selection
-
Hatush, Z., and, Skitmore, M. (1997). " Criteria for contractor selection." Constr. Manage. Econ., 15 (1), 19-38. 10.1080/014461997373088
-
(1997)
Constr. Manage. Econ.
, vol.15
, Issue.1
, pp. 19-38
-
-
Hatush, Z.1
Skitmore, M.2
-
43
-
-
0028330587
-
Analogy-based solution to markup estimation problem
-
Hegazy, T., and, Moselhi, O. (1994). " Analogy-based solution to markup estimation problem." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(1994)8:1(72), 72-87. JCCEE5 0887-3801
-
(1994)
J. Comput. Civ. Eng.
, pp. 72-87
-
-
Hegazy, T.1
Moselhi, O.2
-
44
-
-
12744258028
-
Bid compensation decision model for projects with costly bid preparation
-
Ho, S. (2005). " Bid compensation decision model for projects with costly bid preparation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:2(151), 151-159. JCEMD4 0733-9364
-
(2005)
J. Constr. Eng. Manage.
, pp. 151-159
-
-
Ho, S.1
-
45
-
-
84906248603
-
Bid compensation theory and strategies for projects with heterogeneous bidders: A game theoretic analysis
-
Ho, S., and, Hsu, Y. (2014). " Bid compensation theory and strategies for projects with heterogeneous bidders: A game theoretic analysis." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000212, 1-10. JMENEA 0742-597X
-
(2014)
J. Manage. Eng.
, pp. 1-10
-
-
Ho, S.1
Hsu, Y.2
-
46
-
-
0032098746
-
Which contractor selection methodology?
-
Holt, G. D. (1998). " Which contractor selection methodology? " Int. J. Project Manage., 16 (3), 153-164. 10.1016/S0263-7863(97)00035-5 IPMAEL
-
(1998)
Int. J. Project Manage.
, vol.16
, Issue.3
, pp. 153-164
-
-
Holt, G.D.1
-
47
-
-
0020139948
-
Construction risk: Multi-attribute approach
-
Ibbs, C. W., and, Crandall, K. C. (1982). " Construction risk: Multi-attribute approach." J. Constr. Div., 108 (2), 187-200. JCCEAZ 0569-7948
-
(1982)
J. Constr. Div.
, vol.108
, Issue.2
, pp. 187-200
-
-
Ibbs, C.W.1
Crandall, K.C.2
-
48
-
-
79955368636
-
Association of risk attitude with market diversification in the construction business
-
Kim, H. J., and, Reinschmidt, K. F. (2011 a). " Association of risk attitude with market diversification in the construction business." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000045, 66-74. JMENEA 0742-597X
-
(2011)
J. Manage. Eng.
, pp. 66-74
-
-
Kim, H.J.1
Reinschmidt, K.F.2
-
49
-
-
79955389359
-
Effects of contractors' risk attitude on competition in construction
-
Kim, H. J., and, Reinschmidt, K. F. (2011 b). " Effects of contractors' risk attitude on competition in construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000284, 275-283. JCEMD4 0733-9364
-
(2011)
J. Constr. Eng. Manage.
, pp. 275-283
-
-
Kim, H.J.1
Reinschmidt, K.F.2
-
50
-
-
85014299450
-
-
Academic Press/Elsevier, Burlington, MA, (Nov. 2013)
-
Krishna, V. (2010). Auction theory, Academic Press/Elsevier, Burlington, MA, (http://public.eblib.com/EBLPublic/PublicView.do?ptiID=453046) (Nov. 2013).
-
(2010)
Auction Theory
-
-
Krishna, V.1
-
51
-
-
79955433610
-
Risk and price in the bidding process of contractors
-
Larea, S., and, Hughes, W. (2011). " Risk and price in the bidding process of contractors." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000293, 248-258. JCEMD4 0733-9364
-
(2011)
J. Constr. Eng. Manage.
, pp. 248-258
-
-
Larea, S.1
Hughes, W.2
-
52
-
-
84991380457
-
Combining rule-based expert systems and artificial neural networks for mark-up estimation
-
Li, H., and, Love, P. E. D. (1999). " Combining rule-based expert systems and artificial neural networks for mark-up estimation." Constr. Manage. Econ., 17 (2), 169-176. 10.1080/014461999371664
-
(1999)
Constr. Manage. Econ.
, vol.17
, Issue.2
, pp. 169-176
-
-
Li, H.1
Love, P.E.D.2
-
53
-
-
0032673239
-
ANN-based mark-up estimation system with self-explanatory capacities
-
Li, H., Shen, L., and, Love, P. (1999). " ANN-based mark-up estimation system with self-explanatory capacities." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:3(185), 185-189. JCEMD4 0733-9364
-
(1999)
J. Constr. Eng. Manage.
, pp. 185-189
-
-
Li, H.1
Shen, L.2
Love, P.3
-
54
-
-
0043065381
-
Using fuzzy neural network approach to estimate contractors' markup
-
Liu, M., and, Ling, Y. (2003). " Using fuzzy neural network approach to estimate contractors' markup." Build. Environ., 38 (11), 1303-1308. 10.1016/S0360-1323(03)00135-5 BUSCBC 0360-1323
-
(2003)
Build. Environ.
, vol.38
, Issue.11
, pp. 1303-1308
-
-
Liu, M.1
Ling, Y.2
-
55
-
-
15944390626
-
Modeling a contractor's markup estimation
-
Liu, M., and, Ling, Y. (2005). " Modeling a contractor's markup estimation." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:4(391), 391-399. JCEMD4 0733-9364
-
(2005)
J. Constr. Eng. Manage.
, pp. 391-399
-
-
Liu, M.1
Ling, Y.2
-
56
-
-
79953756063
-
An economic agent-based model of coupled housing and land markets (CHALMS)
-
Magliocca, N., Safirova, E., McConnell, V., and, Walls, M. (2011). " An economic agent-based model of coupled housing and land markets (CHALMS)." Comput. Environ. Urban Syst., 35 (3), 183-191. 10.1016/j.compenvurbsys.2011.01.002 CEUSD5
-
(2011)
Comput. Environ. Urban Syst.
, vol.35
, Issue.3
, pp. 183-191
-
-
Magliocca, N.1
Safirova, E.2
McConnell, V.3
Walls, M.4
-
57
-
-
0001812752
-
Exploration and exploitation in organizational learning
-
March, J. G. (1991). " Exploration and exploitation in organizational learning." Organ. Sci., 2 (1), 71-87. 10.1287/orsc.2.1.71 ORSCEZ 1047-7039
-
(1991)
Organ. Sci.
, vol.2
, Issue.1
, pp. 71-87
-
-
March, J.G.1
-
58
-
-
84993012246
-
A decision support tool for construction bidding
-
Marzouk, M., and, Moselhi, O. (2003). " A decision support tool for construction bidding." Constr. Innov. Infor. Process Manage., 3 (2), 111-124.
-
(2003)
Constr. Innov. Infor. Process Manage.
, vol.3
, Issue.2
, pp. 111-124
-
-
Marzouk, M.1
Moselhi, O.2
-
60
-
-
0034428043
-
Agent-based simulation of dynamic online auctions
-
New York
-
Mizuta, H., and, Steiglitz, K. (2000). " Agent-based simulation of dynamic online auctions." Proc., 2000 Winter Simulation Conf., IEEE, New York, 2, 1772-1777.
-
(2000)
Proc. 2000 Winter Simulation Conf. IEEE
, vol.2
, pp. 1772-1777
-
-
Mizuta, H.1
Steiglitz, K.2
-
61
-
-
84906217264
-
Ex-ante policy analysis in civil infrastructure systems
-
Mostafavi, A., Abraham, D., and, DeLaurentis, D. (2014). " Ex-ante policy analysis in civil infrastructure systems." J. Comput. Civ. Eng., 10.1061/(ASCE)CP.1943-5487.0000350, 1-14. JCCEE5 0887-3801
-
(2014)
J. Comput. Civ. Eng.
, pp. 1-14
-
-
Mostafavi, A.1
Abraham, D.2
DeLaurentis, D.3
-
63
-
-
0036744541
-
A theoretical framework for determining the minimum number of bidders in construction bidding competitions
-
Ngai, S. C., Drew, D. S., Lo, H. P., and, Skitmore, M. (2002). " A theoretical framework for determining the minimum number of bidders in construction bidding competitions." Constr. Manage. Econ., 20 (6), 473-482. 10.1080/01446190210151041
-
(2002)
Constr. Manage. Econ.
, vol.20
, Issue.6
, pp. 473-482
-
-
Ngai, S.C.1
Drew, D.S.2
Lo, H.P.3
Skitmore, M.4
-
64
-
-
14944374049
-
E-laboratories: Agent-based modeling of electricity markets
-
North, M., Conzelmann, G., Koritarov, V., Macal, C., Thimmapuram, P., and, Veselka, T. (2002). " E-laboratories: Agent-based modeling of electricity markets." American Power Conf., Chicago.
-
(2002)
American Power Conf. Chicago
-
-
North, M.1
Conzelmann, G.2
Koritarov, V.3
Macal, C.4
Thimmapuram, P.5
Veselka, T.6
-
65
-
-
77953600574
-
Modeling the heterogeneity in contractors' mark-up behavior
-
Oo, B., Drew, D., and, Lo, H. (2010). " Modeling the heterogeneity in contractors' mark-up behavior." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000186, 720-729. JCEMD4 0733-9364
-
(2010)
J. Constr. Eng. Manage.
, pp. 720-729
-
-
Oo, B.1
Drew, D.2
Lo, H.3
-
66
-
-
44049108418
-
A comparison of contractors' decision to bid behaviour according to different market environments
-
Oo, B. L., Drew, D. S., and, Lo, H. P. (2008). " A comparison of contractors' decision to bid behaviour according to different market environments." Int. J. Project Manage., 26 (4), 439-447. 10.1016/j.ijproman.2007.06.001 IPMAEL
-
(2008)
Int. J. Project Manage.
, vol.26
, Issue.4
, pp. 439-447
-
-
Oo, B.L.1
Drew, D.S.2
Lo, H.P.3
-
67
-
-
84855688740
-
The effect of bidding success in construction bidding
-
Oo, B. L., Lo, H. P., and, Lim, B. T. H. (2012). " The effect of bidding success in construction bidding." Eng. Constr. Archit. Manage., 19 (1), 25-39. 10.1108/09699981211192553
-
(2012)
Eng. Constr. Archit. Manage.
, vol.19
, Issue.1
, pp. 25-39
-
-
Oo, B.L.1
Lo, H.P.2
Lim, B.T.H.3
-
68
-
-
0000964327
-
Tendering theory revisited
-
Runeson, G., and, Skitmore, M. (1999). " Tendering theory revisited." Constr. Manage. Econ., 17 (3), 285-296. 10.1080/014461999371493
-
(1999)
Constr. Manage. Econ.
, vol.17
, Issue.3
, pp. 285-296
-
-
Runeson, G.1
Skitmore, M.2
-
69
-
-
84901054592
-
Modeling of the sustainability goal and objective setting process in the predesign phase of green institutional building projects
-
Said, H., et al. (2013). " Modeling of the sustainability goal and objective setting process in the predesign phase of green institutional building projects." J. Archit. Eng., 10.1061/(ASCE)AE.1943-5568.0000138, 1-11. JAEIED 1076-0431
-
(2013)
J. Archit. Eng.
, pp. 1-11
-
-
Said, H.1
-
70
-
-
50149091763
-
Agent-based modeling: Approach for improving infrastructure management
-
Sanford Bernhardt, K. L., and, McNeil, S. (2008). " Agent-based modeling: Approach for improving infrastructure management." J. Infrastruct. Syst., 10.1061/(ASCE)1076-0342(2008)14:3(253), 253-261. JITSE4 1076-0342
-
(2008)
J. Infrastruct. Syst.
, pp. 253-261
-
-
Sanford Bernhardt, K.L.1
McNeil, S.2
-
71
-
-
0025694105
-
Bids considering multiple criteria
-
Seydel, J., and, Olson, D. (1990). " Bids considering multiple criteria." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1990)116:4(609), 609-623. JCEMD4 0733-9364
-
(1990)
J. Constr. Eng. Manage.
, pp. 609-623
-
-
Seydel, J.1
Olson, D.2
-
72
-
-
0000643379
-
Factors considered in tendering decisions by top U.K. Contractors
-
Shash, A. A. (1993). " Factors considered in tendering decisions by top U.K. contractors." Constr. Manage. Econ., 11 (2), 111-118. 10.1080/01446199300000004
-
(1993)
Constr. Manage. Econ.
, vol.11
, Issue.2
, pp. 111-118
-
-
Shash, A.A.1
-
73
-
-
0032659895
-
Optimal bid model for price-time biparameter construction contracts
-
Shen, L., Drew, D., and, Zhang, Z. (1999). " Optimal bid model for price-time biparameter construction contracts." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:3(204), 204-209. JCEMD4 0733-9364
-
(1999)
J. Constr. Eng. Manage.
, pp. 204-209
-
-
Shen, L.1
Drew, D.2
Zhang, Z.3
-
74
-
-
0000885441
-
The construction contract bidder homogeneity assumption: An empirical test
-
Skitmore, M. (1991). " The construction contract bidder homogeneity assumption: An empirical test." Constr. Manage. Econ., 9 (5), 403-429. 10.1080/01446199100000032
-
(1991)
Constr. Manage. Econ.
, vol.9
, Issue.5
, pp. 403-429
-
-
Skitmore, M.1
-
75
-
-
0028549898
-
A multivariate approach to construction contract bidding mark-up strategies
-
Skitmore, M., and, Pemberton, J. (1994). " A multivariate approach to construction contract bidding mark-up strategies." J. Oper. Res. Soc., 45 (11), 1263-1272. 10.1057/jors.1994.199 JORSDZ
-
(1994)
J. Oper. Res. Soc.
, vol.45
, Issue.11
, pp. 1263-1272
-
-
Skitmore, M.1
Pemberton, J.2
-
76
-
-
33746850199
-
Construction price formation: Full cost pricing or neoclassical microeconomic theory?
-
Skitmore, M., Runeson, G., and, Chang, X. (2006). " Construction price formation: Full cost pricing or neoclassical microeconomic theory? " Constr. Manage. Econ., 24 (7), 773-783. 10.1080/01446190500434849
-
(2006)
Constr. Manage. Econ.
, vol.24
, Issue.7
, pp. 773-783
-
-
Skitmore, M.1
Runeson, G.2
Chang, X.3
-
77
-
-
79955442959
-
Modeling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks
-
Unsal, H., Taylor, J. (2011 a). " Modeling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000286, 284-293. JCEMD4 0733-9364
-
(2011)
J. Constr. Eng. Manage.
, pp. 284-293
-
-
Unsal, H.1
Taylor, J.2
-
78
-
-
84894411230
-
An empirical investigation of opportunistic behaviour in project networks and its impact on market efficiency
-
Unsal, H. I., and, Taylor, J. E. (2011 b). " An empirical investigation of opportunistic behaviour in project networks and its impact on market efficiency." Eng. Project Organ. J., 1 (2), 95-106. 10.1080/21573727.2011.569931
-
(2011)
Eng. Project Organ. J.
, vol.1
, Issue.2
, pp. 95-106
-
-
Unsal, H.I.1
Taylor, J.E.2
-
79
-
-
71049115473
-
Reinforcement learning in supply chains
-
Valluri, A., North, M. J., and, Macal, C. M. (2009). " Reinforcement learning in supply chains." Int. J. Neural Syst., 19 (05), 331-344. 10.1142/S0129065709002063 IJSZEG 0129-0657
-
(2009)
Int. J. Neural Syst.
, vol.19
, Issue.5
, pp. 331-344
-
-
Valluri, A.1
North, M.J.2
Macal, C.M.3
-
80
-
-
84980096808
-
Counterspeculation, auctions, and competitive sealed tenders
-
Vickrey, W. (1961). " Counterspeculation, auctions, and competitive sealed tenders." J. Finance, 16 (1), 8-37. 10.1111/j.1540-6261.1961.tb02789.x 0022-1082
-
(1961)
J. Finance
, vol.16
, Issue.1
, pp. 8-37
-
-
Vickrey, W.1
-
81
-
-
79960740091
-
The ACEGES laboratory for energy policy: Exploring the production of crude oil
-
Voudouris, V., Stasinopoulos, D., Rigby, R., and, Di Maio, C. (2011). " The ACEGES laboratory for energy policy: Exploring the production of crude oil." Energy Policy, 39 (9), 5480-5489. 10.1016/j.enpol.2011.05.014 ENPYAC
-
(2011)
Energy Policy
, vol.39
, Issue.9
, pp. 5480-5489
-
-
Voudouris, V.1
Stasinopoulos, D.2
Rigby, R.3
Di Maio, C.4
-
82
-
-
33846818747
-
Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions
-
Wang, W. C., Dzeng, R. J., and, Lu, Y. H. (2007). " Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions." Comput. Aided Civ. Infrastruct. Eng., 22 (3), 223-235. 10.1111/mice.2007.22.issue-3
-
(2007)
Comput. Aided Civ. Infrastruct. Eng.
, vol.22
, Issue.3
, pp. 223-235
-
-
Wang, W.C.1
Dzeng, R.J.2
Lu, Y.H.3
-
83
-
-
43549105150
-
A critical survey of agent-based wholesale electricity market models
-
Weidlich, A., and, Veit, D. (2008). " A critical survey of agent-based wholesale electricity market models." Energy Econ., 30 (4), 1728-1759. 10.1016/j.eneco.2008.01.003 EECODR 1873-6181
-
(2008)
Energy Econ.
, vol.30
, Issue.4
, pp. 1728-1759
-
-
Weidlich, A.1
Veit, D.2
-
84
-
-
0015646550
-
Utility function determination for bidding models
-
Willenbrock, J. H. (1973). " Utility function determination for bidding models." J. Constr. Div., 99 (1), 133-153. JCCEAZ 0569-7948
-
(1973)
J. Constr. Div.
, vol.99
, Issue.1
, pp. 133-153
-
-
Willenbrock, J.H.1
-
85
-
-
84945159897
-
XJ Technologies
-
(Dec. 20, 2014)
-
XJ Technologies. (2011). " Anylogic overview." http://www.anylogic.com/overview/ (Dec. 20, 2014).
-
(2011)
Anylogic Overview
-
-
-
86
-
-
84878857234
-
Key factors considered in compiling tender prices for China's public works projects
-
Ye, K., Li, B., and, Shen, L. (2013). " Key factors considered in compiling tender prices for China's public works projects." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000153, 206-215. JMENEA 0742-597X
-
(2013)
J. Manage. Eng.
, pp. 206-215
-
-
Ye, K.1
Li, B.2
Shen, L.3
-
87
-
-
84894252986
-
Key attributes underpinning different markup decision between public and private projects: A China study
-
Ye, K., Shen, L., Xia, B., and, Li, B. (2014). " Key attributes underpinning different markup decision between public and private projects: A China study." Int. J. Project Manage., 32 (3), 461-472. 10.1016/j.ijproman.2013.06.001 IPMAEL
-
(2014)
Int. J. Project Manage.
, vol.32
, Issue.3
, pp. 461-472
-
-
Ye, K.1
Shen, L.2
Xia, B.3
Li, B.4
|