-
1
-
-
74549184136
-
A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems
-
Araz, O.U. and Salum, L. (2008) 'A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems', International Journal of Production Research, Vol. 48, No. 1, pp. 251-270.
-
(2008)
International Journal of Production Research
, vol.48
, Issue.1
, pp. 251-270
-
-
Araz, O.U.1
Salum, L.2
-
2
-
-
84867037593
-
Mixed model assembly system with multiple secondary feeder lines: Layout design and balancing procedure for ATO environment
-
Azzi, A., Battini, D., Faccio, M. and Persona, A. (2012a) 'Mixed model assembly system with multiple secondary feeder lines: layout design and balancing procedure for ATO environment', International Journal of Production Research, Vol. 50, No. 18, pp. 5132-5151.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.18
, pp. 5132-5151
-
-
Azzi, A.1
Battini, D.2
Faccio, M.3
Persona, A.4
-
3
-
-
84868225520
-
Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines
-
Azzi, A., Battini, D., Faccio, M. and Persona, A. (2012b) 'Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines', International Journal of Production Research, Vol. 50, No. 21, pp. 6081-6098.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.21
, pp. 6081-6098
-
-
Azzi, A.1
Battini, D.2
Faccio, M.3
Persona, A.4
-
4
-
-
84867572076
-
Lot splitting scheduling procedure for make span reduction and machines capacity increase in a hybrid flow shop with batch production
-
Azzi, A., Faccio, M., Persona, A. and Sgarbossa, F. (2012c) 'Lot splitting scheduling procedure for make span reduction and machines capacity increase in a hybrid flow shop with batch production', International Journal of Advanced Manufacturing Technology, Vol. 59, Nos. 5-8, pp. 775-786.
-
(2012)
International Journal of Advanced Manufacturing Technology
, vol.59
, Issue.5-8
, pp. 775-786
-
-
Azzi, A.1
Faccio, M.2
Persona, A.3
Sgarbossa, F.4
-
5
-
-
84877144344
-
Non-identical parallel machine scheduling with fuzzy processing times using genetic algorithm and simulation
-
Balin, S. (2012) 'Non-identical parallel machine scheduling with fuzzy processing times using genetic algorithm and simulation', International Journal of Advanced Manufacturing Technology, Vol. 61, Nos. 9-12, pp. 1115-1127.
-
(2012)
International Journal of Advanced Manufacturing Technology
, vol.61
, Issue.9-12
, pp. 1115-1127
-
-
Balin, S.1
-
6
-
-
0041083148
-
Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms
-
ElMaraghy, H. (2000) 'Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms', Journal of Manufacturing Systems, Vol. 19, No. 3, pp. 186-198.
-
(2000)
Journal of Manufacturing Systems
, vol.19
, Issue.3
, pp. 186-198
-
-
ElMaraghy, H.1
-
7
-
-
84896729862
-
Sequencing optimization for an automated single station fully flexible assembly system (F-FAS)
-
Finetto, C., Faccio, M., Rosati, G. and Rossi, A. (2013) 'Sequencing optimization for an automated single station fully flexible assembly system (F-FAS)', International Journal of Advanced Manufacturing Technology, Vol. 70, Nos. 5-8, pp. 797-812.
-
(2013)
International Journal of Advanced Manufacturing Technology
, vol.70
, Issue.5-8
, pp. 797-812
-
-
Finetto, C.1
Faccio, M.2
Rosati, G.3
Rossi, A.4
-
8
-
-
0030269708
-
Information and scheduling in a dual resource constrained job shop
-
Fredendall, L.D., Melnyk, S.A. and Ragatz, G. (1996) 'Information and scheduling in a dual resource constrained job shop', International Journal of Production Research, Vol. 34, No. 10, pp. 2783-2802.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.10
, pp. 2783-2802
-
-
Fredendall, L.D.1
Melnyk, S.A.2
Ragatz, G.3
-
9
-
-
84989480716
-
Dual response parallel queues with server transfer and information access delays
-
Gunther, R.E. (1981) 'Dual response parallel queues with server transfer and information access delays', Decision Sciences, Vol. 12, No. 1, pp. 197-211.
-
(1981)
Decision Sciences
, vol.12
, Issue.1
, pp. 197-211
-
-
Gunther, R.E.1
-
10
-
-
84858750763
-
An integrated cost model for production scheduling and perfect maintenance
-
Hadidi, L.A., Al-Turki, U.M. and Rahim, M.A. (2011) 'An integrated cost model for production scheduling and perfect maintenance', International Journal of Mathematics in Operational Research, Vol. 3, No. 4, pp. 395-413.
-
(2011)
International Journal of Mathematics in Operational Research
, vol.3
, Issue.4
, pp. 395-413
-
-
Hadidi, L.A.1
Al-Turki, U.M.2
Rahim, M.A.3
-
11
-
-
0007145385
-
Cross-training and worker flexibility: A review of DRC system research
-
Hottenstein, M.P. and Bowman, S.A. (1998) 'Cross-training and worker flexibility: a review of DRC system research', The Journal of High Technology Management Research, Vol. 9, No. 2, pp. 157-174.
-
(1998)
The Journal of High Technology Management Research
, vol.9
, Issue.2
, pp. 157-174
-
-
Hottenstein, M.P.1
Bowman, S.A.2
-
12
-
-
0003075019
-
Optimal two-and three-stage production schedules with set up times included
-
Johnson, S.M. (1954) 'Optimal two-and three-stage production schedules with set up times included', Naval Research Logistics Quarterly, Vol. 1, No. 1, pp. 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
13
-
-
0033999129
-
Examination of worker assignment and dispatching rules for managing vital customers priorities in dual resource constrained job shop environments
-
Kher, H.V. (2000) 'Examination of worker assignment and dispatching rules for managing vital customers priorities in dual resource constrained job shop environments', Computers and Operations Research, Vol. 27, No. 6, pp. 525-537.
-
(2000)
Computers and Operations Research
, vol.27
, Issue.6
, pp. 525-537
-
-
Kher, H.V.1
-
14
-
-
0035920332
-
Labour flexibility and assignment policies in a job shop having incommensurable objectives
-
Kher, H.V. and Fry, T.D. (2001) 'Labour flexibility and assignment policies in a job shop having incommensurable objectives', International Journal of Production Research, Vol. 39, No. 11, pp. 2295-2311.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.11
, pp. 2295-2311
-
-
Kher, H.V.1
Fry, T.D.2
-
15
-
-
77956062164
-
Flow shop scheduling to minimize the total completing time with permanently present operator: Models and ant colony optimization metaheuristic
-
Li, X., Baki, M.F. and Aneja, Y.P. (2011) 'Flow shop scheduling to minimize the total completing time with permanently present operator: models and ant colony optimization metaheuristic', Computers & Operations Research, Vol. 38, No. 1, pp. 152-164.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.1
, pp. 152-164
-
-
Li, X.1
Baki, M.F.2
Aneja, Y.P.3
-
16
-
-
3843121898
-
A case study in a dual resource constrained job shop
-
Liao, C.J. and Lin, H.T. (1998) 'A case study in a dual resource constrained job shop', International Journal of Production Research, Vol. 36, No. 11, pp. 3095-3111.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.11
, pp. 3095-3111
-
-
Liao, C.J.1
Lin, H.T.2
-
17
-
-
0028439164
-
An evaluation of worker assignment policies in dual resource constrained job shops with heterogenous resources and worker transfer delays
-
Malhotra, M.K. and Kher, H.V. (1994) 'An evaluation of worker assignment policies in dual resource constrained job shops with heterogenous resources and worker transfer delays', International Journal of Production Research, Vol. 32, No. 5, pp. 1087-1103.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.5
, pp. 1087-1103
-
-
Malhotra, M.K.1
Kher, H.V.2
-
18
-
-
84861355931
-
An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility
-
Najid, N.M. and Arroub, M. (2010) 'An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility', International Journal of Mathematics in Operational Research, Vol. 2, No. 6, pp. 748-761.
-
(2010)
International Journal of Mathematics in Operational Research
, vol.2
, Issue.6
, pp. 748-761
-
-
Najid, N.M.1
Arroub, M.2
-
19
-
-
0010773239
-
Labor and machine limited production systems
-
Nelson, R.T. (1967) 'Labor and machine limited production systems', Management Science, Vol. 13, No. 9, pp. 648-671.
-
(1967)
Management Science
, vol.13
, Issue.9
, pp. 648-671
-
-
Nelson, R.T.1
-
20
-
-
84855668675
-
Instance-specific multi-objective parameter tuning based on fuzzy logic
-
Ries, J., Beullens, P. and Salt, D. (2012) 'Instance-specific multi-objective parameter tuning based on fuzzy logic', European Journal of Operational Research, Vol. 218, No. 2, pp. 305-315.
-
(2012)
European Journal of Operational Research
, vol.218
, Issue.2
, pp. 305-315
-
-
Ries, J.1
Beullens, P.2
Salt, D.3
-
21
-
-
34548634818
-
Minimizing the number of late jobs for the permutation flowshop problem with secondary resources
-
Ruiz-Torres, A.J. and Centeno, G. (2008) 'Minimizing the number of late jobs for the permutation flowshop problem with secondary resources', Computers and Operations Research, Vol. 35, No. 4, pp. 1227-1249.
-
(2008)
Computers and Operations Research
, vol.35
, Issue.4
, pp. 1227-1249
-
-
Ruiz-Torres, A.J.1
Centeno, G.2
-
22
-
-
57049101493
-
Using the when/where rules in dual resource constrained systems for a hybrid push-pull control
-
Salum, L. and Araz, O.U. (2009) 'Using the when/where rules in dual resource constrained systems for a hybrid push-pull control', International Journal of Production Research, Vol. 47, No. 6, pp. 1661-1677.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.6
, pp. 1661-1677
-
-
Salum, L.1
Araz, O.U.2
-
23
-
-
84893638448
-
Agent-based modelling of movement rules in DRC systems for volume flexibility: Human factors and technical performance
-
Sammarco, M., Fruggiero, F., Lambiase, A. and Neumann, W.P. (2013) 'Agent-based modelling of movement rules in DRC systems for volume flexibility: human factors and technical performance', International Journal of Production Research, Vol. 52, No. 3, pp. 633-650.
-
(2013)
International Journal of Production Research
, vol.52
, Issue.3
, pp. 633-650
-
-
Sammarco, M.1
Fruggiero, F.2
Lambiase, A.3
Neumann, W.P.4
-
24
-
-
84879559513
-
Bicriteria scheduling on parallel machines: Total tardiness and weighted flowtime in fuzzy environment
-
Sharma, S., Gupta, D. and Sharma, S. (2013) 'Bicriteria scheduling on parallel machines: total tardiness and weighted flowtime in fuzzy environment', International Journal of Mathematics in Operational Research, Vol. 5, No. 4, pp. 492-507.
-
(2013)
International Journal of Mathematics in Operational Research
, vol.5
, Issue.4
, pp. 492-507
-
-
Sharma, S.1
Gupta, D.2
Sharma, S.3
-
26
-
-
0024731874
-
A review of the dual resource constrained system research
-
(Institute of Industrial Engineers)
-
Treleven, M. (1989) 'A review of the dual resource constrained system research', IIE Transactions (Institute of Industrial Engineers), Vol. 21, No. 3, pp. 279-287.
-
(1989)
IIE Transactions
, vol.21
, Issue.3
, pp. 279-287
-
-
Treleven, M.1
-
27
-
-
84855451111
-
Ant colony-based algorithms for scheduling parallel batch processors with incompatible job families
-
Venkataramana, M. and Srinivasa Raghavan, N.R. (2010) 'Ant colony-based algorithms for scheduling parallel batch processors with incompatible job families', International Journal of Mathematics in Operational Research, Vol. 2, No. 1, pp. 73-98.
-
(2010)
International Journal of Mathematics in Operational Research
, vol.2
, Issue.1
, pp. 73-98
-
-
Venkataramana, M.1
Srinivasa Raghavan, N.R.2
-
28
-
-
39749143379
-
Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study
-
Vinod, V. and Sridharan, R. (2008) 'Scheduling a dynamic job shop production system with sequence-dependent setups: an experimental study', Robotics and Computer-Integrated Manufacturing, Vol. 24, No. 3, pp. 435-449.
-
(2008)
Robotics and Computer-Integrated Manufacturing
, vol.24
, Issue.3
, pp. 435-449
-
-
Vinod, V.1
Sridharan, R.2
-
29
-
-
80051792786
-
Recent developments in dual resource constrained (DRC) system research
-
Xu, J., Xu, X. and Xie, S.Q. (2011) 'Recent developments in dual resource constrained (DRC) system research', European Journal of Operational Research, Vol. 215, No. 2, pp. 309-318.
-
(2011)
European Journal of Operational Research
, vol.215
, Issue.2
, pp. 309-318
-
-
Xu, J.1
Xu, X.2
Xie, S.Q.3
|