메뉴 건너뛰기




Volumn 3, Issue 4, 2011, Pages 395-413

An integrated cost model for production scheduling and perfect maintenance

Author keywords

Deteriorating production process; Integrated models; Maintenance; Production scheduling; Unreliable machine

Indexed keywords


EID: 84858750763     PISSN: 17575850     EISSN: 17575869     Source Type: Journal    
DOI: 10.1504/IJMOR.2011.040875     Document Type: Article
Times cited : (27)

References (12)
  • 1
    • 72049133413 scopus 로고    scopus 로고
    • Simulated annealing approach in scheduling of virtual cellular manufacturing in the automotive industry
    • Aksoy, A. and Ozturk, N. (2010) 'Simulated annealing approach in scheduling of virtual cellular manufacturing in the automotive industry', International Journal of Vehicle Design, Vol. 52, Nos. 1-4, pp.82-95.
    • (2010) International Journal of Vehicle Design , vol.52 , Issue.1-4 , pp. 82-95
    • Aksoy, A.1    Ozturk, N.2
  • 2
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • Cassady, C. and Kutanoglu, E. (2003) 'Minimizing job tardiness using integrated preventive maintenance planning and production scheduling', IIE Transactions, Vol. 35, No. 2, pp.503-513.
    • (2003) IIE Transactions , vol.35 , Issue.2 , pp. 503-513
    • Cassady, C.1    Kutanoglu, E.2
  • 3
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • DOI 10.1109/TR.2005.845967
    • Cassady, C. and Kutanoglu, E. (2005) 'Integrating preventive maintenance planning and production scheduling for a single machine', IEEE Transactions on Reliability, Vol. 54, No. 2, pp.304-309. (Pubitemid 41005032)
    • (2005) IEEE Transactions on Reliability , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 4
    • 77954550654 scopus 로고    scopus 로고
    • Linear programming formulation of the set partitioning problem
    • Diaby, M. (2010a) 'Linear programming formulation of the set partitioning problem', International Journal of Operational Research, Vol. 8, No. 4, pp.399-427.
    • (2010) International Journal of Operational Research , vol.8 , Issue.4 , pp. 399-427
    • Diaby, M.1
  • 5
    • 84861349713 scopus 로고    scopus 로고
    • Linear programming formulation of the vertex colouring problem
    • Diaby, M. (2010b) 'Linear programming formulation of the vertex colouring problem', International Journal of Mathematics in Operational Research, Vol. 2, No. 3, pp.259-289.
    • (2010) International Journal of Mathematics in Operational Research , vol.2 , Issue.3 , pp. 259-289
    • Diaby, M.1
  • 6
    • 79960689839 scopus 로고    scopus 로고
    • Optimal retailer replenishment decisions in the EPQ model for deteriorating items with two level of trade credit financing
    • Goswami, A., Mahata, G. and Prakash, O. (2010) 'Optimal retailer replenishment decisions in the EPQ model for deteriorating items with two level of trade credit financing', International Journal of Mathematics in Operational Research, Vol. 2, No. 1, pp.17-39.
    • (2010) International Journal of Mathematics in Operational Research , vol.2 , Issue.1 , pp. 17-39
    • Goswami, A.1    Mahata, G.2    Prakash, O.3
  • 7
    • 77952548983 scopus 로고    scopus 로고
    • Batching for work and rework processes on dedicated facilities to minimize the makespan
    • Gribkovskaia, I., Kovalev, S. and Werner, F. (2010) 'Batching for work and rework processes on dedicated facilities to minimize the makespan', Omega, Vol. 38, No. 6, pp.522-527.
    • (2010) Omega , vol.38 , Issue.6 , pp. 522-527
    • Gribkovskaia, I.1    Kovalev, S.2    Werner, F.3
  • 8
    • 77953869584 scopus 로고    scopus 로고
    • Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer
    • Karamatsoukis, C. and Kyriakidis, E. (2010) 'Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer', European Journal of Operational Research, Vol. 207, No. 1, pp.297-308.
    • (2010) European Journal of Operational Research , vol.207 , Issue.1 , pp. 297-308
    • Karamatsoukis, C.1    Kyriakidis, E.2
  • 10
    • 34548580996 scopus 로고    scopus 로고
    • Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
    • DOI 10.1002/nav.20232
    • Kuo, Y. and Chang, Z-A. (2007) 'Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process', Naval Research Logistics, Vol. 54, No. 6, pp.602-614. (Pubitemid 47395706)
    • (2007) Naval Research Logistics , vol.54 , Issue.6 , pp. 602-614
    • Kuo, Y.1    Chang, Z.-A.2
  • 11
    • 77952549238 scopus 로고    scopus 로고
    • Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs
    • Sun-Lee, I. and Yoon, S. (2010) 'Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs', Omega, Vol. 38, No. 6, pp.509-521.
    • (2010) Omega , vol.38 , Issue.6 , pp. 509-521
    • Sun-Lee, I.1    Yoon, S.2
  • 12
    • 55649106405 scopus 로고    scopus 로고
    • Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    • Yulan, J., Zuhua, J. and Wenrui, H. (2008) 'Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine', International Journal Advanced Manufacturing Technology, Vol. 39, Nos. 9-10, pp.954-964.
    • (2008) International Journal Advanced Manufacturing Technology , vol.39 , Issue.9-10 , pp. 954-964
    • Yulan, J.1    Zuhua, J.2    Wenrui, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.