메뉴 건너뛰기




Volumn 24, Issue 3, 2008, Pages 435-449

Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study

Author keywords

Dynamic job shop scheduling; Regression metamodel; Scheduling rules; Sequence dependent setup; Simulation

Indexed keywords

COMPUTER SIMULATION; PRODUCTION; REGRESSION ANALYSIS; SCHEDULING;

EID: 39749143379     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rcim.2007.05.001     Document Type: Article
Times cited : (75)

References (27)
  • 3
    • 0032668814 scopus 로고    scopus 로고
    • Scheduling in job shops with machine breakdowns: an experimental study
    • Holthaus O. Scheduling in job shops with machine breakdowns: an experimental study. Issue Series Title: Comput Ind Eng 36 (1999) 137-162
    • (1999) Issue Series Title: Comput Ind Eng , vol.36 , pp. 137-162
    • Holthaus, O.1
  • 4
    • 0020013653 scopus 로고
    • A state of the art survey of dispatching rules for manufacturing job shop operations
    • Blackstone J.H., Philips D.T., and Hogg G.L. A state of the art survey of dispatching rules for manufacturing job shop operations. Int J Prod Res 20 (1982) 27-45
    • (1982) Int J Prod Res , vol.20 , pp. 27-45
    • Blackstone, J.H.1    Philips, D.T.2    Hogg, G.L.3
  • 5
    • 0033078946 scopus 로고    scopus 로고
    • W.-H. Yang. Survey of scheduling research involving setup times. Int J Syst Sci 1999;30.
    • W.-H. Yang. Survey of scheduling research involving setup times. Int J Syst Sci 1999;30.
  • 6
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi A., Gupta J.N.D., and Aldowaisan T. A review of scheduling research involving setup considerations. Omega 27 (1999) 219-239
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 7
    • 0024899145 scopus 로고
    • Scheduling in a manufacturing shop with sequence-dependent setups
    • Zhou C., and Egbelu P.J. Scheduling in a manufacturing shop with sequence-dependent setups. Robotics Comput Integrated Manuf 5 (1989) 73-81
    • (1989) Robotics Comput Integrated Manuf , vol.5 , pp. 73-81
    • Zhou, C.1    Egbelu, P.J.2
  • 8
    • 0001343733 scopus 로고    scopus 로고
    • A branch and bound method for general shop problem with sequence dependent setup times
    • Brucker P., and Thiele O. A branch and bound method for general shop problem with sequence dependent setup times. OR Spectrum 18 (1996) 145-161
    • (1996) OR Spectrum , vol.18 , pp. 145-161
    • Brucker, P.1    Thiele, O.2
  • 9
    • 0031514082 scopus 로고    scopus 로고
    • Job shop scheduling with separable sequence-dependent setups
    • Choi I.-C., and Korkmaz O. Job shop scheduling with separable sequence-dependent setups. Ann Oper Res 70 (1997) 155-170
    • (1997) Ann Oper Res , vol.70 , pp. 155-170
    • Choi, I.-C.1    Korkmaz, O.2
  • 10
    • 39049123101 scopus 로고    scopus 로고
    • List scheduling in a parallel machine environment with precedence constraints and setup times
    • Hurink J., and Knust S. List scheduling in a parallel machine environment with precedence constraints and setup times. OR Spectrum 18 (2001) 145-161
    • (2001) OR Spectrum , vol.18 , pp. 145-161
    • Hurink, J.1    Knust, S.2
  • 11
    • 15944395695 scopus 로고    scopus 로고
    • Genetic algorithms applied in BOPP film scheduling problems: minimizing total absolute deviation and setup times
    • Changa P.-C., Hsieh J.-C., and Wang Y.-W. Genetic algorithms applied in BOPP film scheduling problems: minimizing total absolute deviation and setup times. Appl Soft Comput 3 (2003) 139-148
    • (2003) Appl Soft Comput , vol.3 , pp. 139-148
    • Changa, P.-C.1    Hsieh, J.-C.2    Wang, Y.-W.3
  • 12
    • 24144468136 scopus 로고    scopus 로고
    • Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis
    • Artigues C., Lopez P., and Ayache P.-D. Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis. Ann Oper Res 138 (2005) 21-52
    • (2005) Ann Oper Res , vol.138 , pp. 21-52
    • Artigues, C.1    Lopez, P.2    Ayache, P.-D.3
  • 13
    • 27644553525 scopus 로고    scopus 로고
    • A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
    • Tahar D.N., Yalaoui F., Chu C., and Amodeo L. A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times. Int J Prod Econ 99 (2006) 63-73
    • (2006) Int J Prod Econ , vol.99 , pp. 63-73
    • Tahar, D.N.1    Yalaoui, F.2    Chu, C.3    Amodeo, L.4
  • 14
    • 27744463120 scopus 로고    scopus 로고
    • A genetic algorithm-based approach to machine assignment problem
    • Chan F.T.S., Wong T.C., and Chan L.Y. A genetic algorithm-based approach to machine assignment problem. Int J Prod Res 43 12 (2005) 2451-2472
    • (2005) Int J Prod Res , vol.43 , Issue.12 , pp. 2451-2472
    • Chan, F.T.S.1    Wong, T.C.2    Chan, L.Y.3
  • 15
    • 33646400835 scopus 로고    scopus 로고
    • Flexible job-shop scheduling problem under resource constraints
    • Chan F.T.S., Wong T.C., and Chan L.Y. Flexible job-shop scheduling problem under resource constraints. Int J Prod Res 44 11 (2006) 2071-2089
    • (2006) Int J Prod Res , vol.44 , Issue.11 , pp. 2071-2089
    • Chan, F.T.S.1    Wong, T.C.2    Chan, L.Y.3
  • 16
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: a survey of simulation research
    • Ramasesh R. Dynamic job shop scheduling: a survey of simulation research. Int J Manage Sci 18 (1990) 43-57
    • (1990) Int J Manage Sci , vol.18 , pp. 43-57
    • Ramasesh, R.1
  • 17
    • 0036069575 scopus 로고    scopus 로고
    • The state of the art in simulation study on FMS scheduling: a comprehensive survey
    • Chan F.T.S., Chan H.K., and Lau H.C.W. The state of the art in simulation study on FMS scheduling: a comprehensive survey. Int J Adv Manuf Technol 19 (2002) 830-849
    • (2002) Int J Adv Manuf Technol , vol.19 , pp. 830-849
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3
  • 18
    • 0034802653 scopus 로고    scopus 로고
    • Dynamic scheduling for a flexible manufacturing system-the preemptive approach
    • Chan F.T.S., and Chan H.K. Dynamic scheduling for a flexible manufacturing system-the preemptive approach. Int J Adv Manuf Technol 17 10 (2001) 760-10768
    • (2001) Int J Adv Manuf Technol , vol.17 , Issue.10 , pp. 760-10768
    • Chan, F.T.S.1    Chan, H.K.2
  • 19
    • 3242671403 scopus 로고    scopus 로고
    • Analysis of dynamic control strategies of an FMS under different scenarios
    • Chan F.T.S., and Chan H.K. Analysis of dynamic control strategies of an FMS under different scenarios. Int J Robotics Comput Integrated Manuf 20 5 (2004) 423-5437
    • (2004) Int J Robotics Comput Integrated Manuf , vol.20 , Issue.5 , pp. 423-5437
    • Chan, F.T.S.1    Chan, H.K.2
  • 20
    • 0038481221 scopus 로고    scopus 로고
    • Analysis of dynamic dispatching rules for a flexible manufacturing system
    • Chan F.T.S., Chan H.K., Lau H.C.W., and Ip R.W.L. Analysis of dynamic dispatching rules for a flexible manufacturing system. J Mater Process Technol 138 1-3 (2003) 325-331
    • (2003) J Mater Process Technol , vol.138 , Issue.1-3 , pp. 325-331
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3    Ip, R.W.L.4
  • 21
    • 0028462998 scopus 로고
    • Bowbrowski impact of sequence dependent setup time on job shop scheduling performance
    • Kim S.C. Bowbrowski impact of sequence dependent setup time on job shop scheduling performance. Int J Prod Res 32 (1994) 1503-1520
    • (1994) Int J Prod Res , vol.32 , pp. 1503-1520
    • Kim, S.C.1
  • 22
    • 1442285828 scopus 로고    scopus 로고
    • Dynamic rescheduling that simultaneously considers efficiency and stability
    • Rangsaritratsamee R., Ferrel Jr. W.G., and Kurtz M.B. Dynamic rescheduling that simultaneously considers efficiency and stability. Comput Ind Eng 46 (2004) 1-15
    • (2004) Comput Ind Eng , vol.46 , pp. 1-15
    • Rangsaritratsamee, R.1    Ferrel Jr., W.G.2    Kurtz, M.B.3
  • 23
    • 0021496929 scopus 로고
    • Sequencing rules and due date assignments in a job shop
    • Baker K.R. Sequencing rules and due date assignments in a job shop. Manage Sci 30 (1984) 1093-1104
    • (1984) Manage Sci , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 25
    • 0028406902 scopus 로고
    • Metamodels in manufacturing: a review
    • Yu B., and Popplewell K. Metamodels in manufacturing: a review. Int J Prod Res 32 (1994) 787-796
    • (1994) Int J Prod Res , vol.32 , pp. 787-796
    • Yu, B.1    Popplewell, K.2
  • 26
    • 0023960890 scopus 로고
    • Experimental design and regression analysis in simulation: an FMS case study
    • Kleijnen J.P.C., and Standridge C.R. Experimental design and regression analysis in simulation: an FMS case study. Int J Prod Res 33 (1988) 257-261
    • (1988) Int J Prod Res , vol.33 , pp. 257-261
    • Kleijnen, J.P.C.1    Standridge, C.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.