-
1
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
R.L. Graham, J. Lawler, and K.A. Rinnooy Optimization and approximation in deterministic sequencing and scheduling: a survey Ann Discrete Math 5 1979 287 326
-
(1979)
Ann Discrete Math
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, J.2
Rinnooy, K.A.3
-
2
-
-
0032096682
-
A note on scheduling alternative operations in two-machine flow shops
-
T. Cheng, and G. Wang A note on scheduling alternative operations in two-machine flow shops J Oper Res Soc 49 1998 670 673
-
(1998)
J Oper Res Soc
, vol.49
, pp. 670-673
-
-
Cheng, T.1
Wang, G.2
-
3
-
-
0002844386
-
Scheduling the production of components at a common facility
-
K. Baker Scheduling the production of components at a common facility IIE Trans 20 1988 32 35
-
(1988)
IIE Trans
, vol.20
, pp. 32-35
-
-
Baker, K.1
-
4
-
-
0027569358
-
Batching and sequencing of components at a single facility
-
R. Vickson, M. Magazine, and C. Santos Batching and sequencing of components at a single facility IIE Trans 25 1993 65 70
-
(1993)
IIE Trans
, vol.25
, pp. 65-70
-
-
Vickson, R.1
Magazine, M.2
Santos, C.3
-
5
-
-
0033906317
-
Scheduling the production of two-component jobs on a single machine
-
A.E. Gerodimos, C.A. Glass, and C.N. Potts Scheduling the production of two-component jobs on a single machine Eur J Oper Res 120 2 2000 250 259
-
(2000)
Eur J Oper Res
, vol.120
, Issue.2
, pp. 250-259
-
-
Gerodimos, A.E.1
Glass, C.A.2
Potts, C.N.3
-
6
-
-
0025489361
-
Scheduling production of common components at a single facility
-
Y. Aneja, and N. Singh Scheduling production of common components at a single facility IIE Trans 22 3 1990 234 237
-
(1990)
IIE Trans
, vol.22
, Issue.3
, pp. 234-237
-
-
Aneja, Y.1
Singh, N.2
-
8
-
-
1842671669
-
One-operator, two-machine open shop and flow shop scheduling with setup times for machines and maximum lateness objective
-
F. Baki, and R.G. Vickson One-operator, two-machine open shop and flow shop scheduling with setup times for machines and maximum lateness objective INFOR 41 4 2003 301 319
-
(2003)
INFOR
, vol.41
, Issue.4
, pp. 301-319
-
-
Baki, F.1
Vickson, R.G.2
-
9
-
-
1842764955
-
One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective
-
F. Baki, and R.G. Vickson One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective Optim Methods Software 19 2004 165 178
-
(2004)
Optim Methods Software
, vol.19
, pp. 165-178
-
-
Baki, F.1
Vickson, R.G.2
-
10
-
-
0033895628
-
Scheduling with batching: A review
-
C.N. Potts, and M.Y. Kovalyov Scheduling with batching: a review Eur J Oper Res 120 2 2000 228 249
-
(2000)
Eur J Oper Res
, vol.120
, Issue.2
, pp. 228-249
-
-
Potts, C.N.1
Kovalyov, M.Y.2
-
11
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
A. Allahverdi, C.T. Ng, T.C.E. Cheng, and M.Y. Kovalyov A survey of scheduling problems with setup times or costs Eur J Oper Res 187 3 2008 985 1032
-
(2008)
Eur J Oper Res
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
12
-
-
0012694908
-
Approximation algorithms for two-machine flow shop scheduling with batch setup times
-
B. Chen, C.N. Potts, and V.A. Strusevich Approximation algorithms for two-machine flow shop scheduling with batch setup times Math Programming 82 12 1998 255 271
-
(1998)
Math Programming
, vol.82
, Issue.12
, pp. 255-271
-
-
Chen, B.1
Potts, C.N.2
Strusevich, V.A.3
-
13
-
-
84989723711
-
A simulated annealing approach to scheduling a manufaturing cell
-
A.J. Vakharia A simulated annealing approach to scheduling a manufaturing cell Nav Res Log 37 1990 559 577
-
(1990)
Nav Res Log
, vol.37
, pp. 559-577
-
-
Vakharia, A.J.1
-
14
-
-
0027626538
-
Scheduling a flow-line manufacturing cell: A tabu search approach
-
J. Skorin-Kapov, and A.J. Vakharia Scheduling a flow-line manufacturing cell: a tabu search approach Int J Prod Res 31 7 1993 1721 1734
-
(1993)
Int J Prod Res
, vol.31
, Issue.7
, pp. 1721-1734
-
-
Skorin-Kapov, J.1
Vakharia, A.J.2
-
15
-
-
0041841602
-
Scheduling a single server in a two-machine flow shop
-
T.C.E. Cheng, and M.Y. Kovalyov Scheduling a single server in a two-machine flow shop Computing 70 2 2003 167 180
-
(2003)
Computing
, vol.70
, Issue.2
, pp. 167-180
-
-
Cheng, T.C.E.1
Kovalyov, M.Y.2
-
16
-
-
14844314792
-
Asymptotically optimal schedules for single-server flow shop problems with setup costs and times
-
S. Iravani, and C. Teo Asymptotically optimal schedules for single-server flow shop problems with setup costs and times Oper Res Lett 33 4 2005 421 430
-
(2005)
Oper Res Lett
, vol.33
, Issue.4
, pp. 421-430
-
-
Iravani, S.1
Teo, C.2
-
17
-
-
0031469437
-
Parallel machine scheduling problems with a single server
-
S.A. Kravchenko, and F. Werner Parallel machine scheduling problems with a single server Math Comput Model 26 12 1997 1 11
-
(1997)
Math Comput Model
, vol.26
, Issue.12
, pp. 1-11
-
-
Kravchenko, S.A.1
Werner, F.2
-
18
-
-
0032789050
-
One-operator-two-machine flowshop scheduling with setup and dismounting times
-
T.C.E. Cheng, G. Wang, and C. Sriskandarajah One-operator-two-machine flowshop scheduling with setup and dismounting times Comput Oper Res 26 7 1999 715 730
-
(1999)
Comput Oper Res
, vol.26
, Issue.7
, pp. 715-730
-
-
Cheng, T.C.E.1
Wang, G.2
Sriskandarajah, C.3
-
19
-
-
0013239064
-
Scheduling for parallel dedicated machines with a single server
-
C.A. Glass, Y.M. Shafransky, and V.A. Strusevich Scheduling for parallel dedicated machines with a single server Nav Res Log 47 4 2000 304 328
-
(2000)
Nav Res Log
, vol.47
, Issue.4
, pp. 304-328
-
-
Glass, C.A.1
Shafransky, Y.M.2
Strusevich, V.A.3
-
21
-
-
0347018721
-
Complexity results for parallel machine problems with a single server
-
P. Brucker, C. Dhaenens-Flipo, S. Knust, S.A. Kravchenko, and F. Werner Complexity results for parallel machine problems with a single server J Scheduling 5 6 2002 429 457
-
(2002)
J Scheduling
, vol.5
, Issue.6
, pp. 429-457
-
-
Brucker, P.1
Dhaenens-Flipo, C.2
Knust, S.3
Kravchenko, S.A.4
Werner, F.5
-
22
-
-
13444302444
-
Complexity results for flow-shop problems with a single server
-
P. Brucker, S. Knust, and G. Wang Complexity results for flow-shop problems with a single server Eur J Oper Res 165 2 2005 398 407
-
(2005)
Eur J Oper Res
, vol.165
, Issue.2
, pp. 398-407
-
-
Brucker, P.1
Knust, S.2
Wang, G.3
-
26
-
-
1842483279
-
The hyper-cube framework for ant colony optimization
-
C. Blum, and M. Dorigo The hyper-cube framework for ant colony optimization IEEE Trans Syst Man CybernPart B 34 2 2004 1161 1172
-
(2004)
IEEE Trans Syst Man CybernPart B
, vol.34
, Issue.2
, pp. 1161-1172
-
-
Blum, C.1
Dorigo, M.2
|