메뉴 건너뛰기




Volumn 19, Issue 3, 2000, Pages 186-201

Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms

Author keywords

Dual resources; Flexible manufacturing systems; Genetic algorithms; Scheduling

Indexed keywords


EID: 0041083148     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0278-6125(00)80011-4     Document Type: Article
Times cited : (98)

References (29)
  • 1
    • 0030212185 scopus 로고    scopus 로고
    • Scheduling research in multiple resource constrained job shop: A review and critique
    • V.B. Gargeya and R.H. Deane, "Scheduling Research in Multiple Resource Constrained Job Shop: A Review and Critique," Int'l Journal of Production Research (v34, n8, 1996), pp2077-2097.
    • (1996) Int'l Journal of Production Research , vol.34 , Issue.8 , pp. 2077-2097
    • Gargeya, V.B.1    Deane, R.H.2
  • 2
    • 0016070630 scopus 로고
    • Heuristic methods for assignment of men to machines: An experimental analysis
    • J.G. Miller and W.L. Berry, "Heuristic Methods for Assignment of Men to Machines: An Experimental Analysis," AIIE Trans. (v6, 1974), pp97-104.
    • (1974) AIIE Trans. , vol.6 , pp. 97-104
    • Miller, J.G.1    Berry, W.L.2
  • 3
    • 0024731874 scopus 로고
    • A review of the dual resource constrained system research
    • M. D. Treleven, "A Review of the Dual Resource Constrained System Research," IIE Trans. (v21, 1989), pp279-287.
    • (1989) IIE Trans. , vol.21 , pp. 279-287
    • Treleven, M.D.1
  • 4
    • 0014855493 scopus 로고
    • A simulation of labor efficiency and centralized assignment in a production model
    • R.T. Nelson, "A Simulation of Labor Efficiency and Centralized Assignment in a Production Model," Mgmt. Science (v17, n2, 1970), ppB97-B106.
    • (1970) Mgmt. Science , vol.17 , Issue.2
    • Nelson, R.T.1
  • 5
    • 0002352858 scopus 로고
    • An investigation of labor assignment rules m a dual resource constrained job-shop
    • M.D. Treleven and D.A. Elvers, "An Investigation of Labor Assignment Rules m a Dual Resource Constrained Job-Shop," Journal of Operations Mgmt. (v6, n1, 1985), pp51-68.
    • (1985) Journal of Operations Mgmt. , vol.6 , Issue.1 , pp. 51-68
    • Treleven, M.D.1    Elvers, D.A.2
  • 6
    • 0028439164 scopus 로고
    • An evaluation of worker assignment policies in dual resource constrained job shops with heterogeneous resources and worker transfers delays
    • M.K. Malhotra and H.V. Kher, "An Evaluation of Worker Assignment Policies in Dual Resource Constrained Job Shops with Heterogeneous Resources and Worker Transfers Delays," Int'l Journal of Production Research (v32, n5, 1994), pp1087-1103.
    • (1994) Int'l Journal of Production Research , vol.32 , Issue.5 , pp. 1087-1103
    • Malhotra, M.K.1    Kher, H.V.2
  • 7
    • 0018661544 scopus 로고
    • Server transfer delays in a dual resource constrained paralleled queuing system
    • R.E. Gunther, "Server Transfer Delays in a Dual Resource Constrained Paralleled Queuing System," Mgmt. Science (v25, n12, 1979), pp1245-1257.
    • (1979) Mgmt. Science , vol.25 , Issue.12 , pp. 1245-1257
    • Gunther, R.E.1
  • 8
    • 84911666135 scopus 로고
    • The timing of labor transfer in dual resource constrained system: 'Push' v/s 'Pull' rules
    • M.D. Treleven, "The Timing of Labor Transfer in Dual Resource Constrained System: 'Push' v/s 'Pull' Rules," Decision Sciences (v18, n1, 1987), pp73-88.
    • (1987) Decision Sciences , vol.18 , Issue.1 , pp. 73-88
    • Treleven, M.D.1
  • 9
    • 0010773239 scopus 로고
    • Labor and machine limited production systems
    • R.T. Nelson, "Labor and Machine Limited Production Systems," Mgmt. Science (v13, n9, 1967), pp648-671.
    • (1967) Mgmt. Science , vol.13 , Issue.9 , pp. 648-671
    • Nelson, R.T.1
  • 10
    • 0001311183 scopus 로고
    • Dual-resource constrained series service systems
    • R.T. Nelson, "Dual-Resource Constrained Series Service Systems," Operations Research (v16, n2, 1968), pp324-341.
    • (1968) Operations Research , vol.16 , Issue.2 , pp. 324-341
    • Nelson, R.T.1
  • 11
    • 0016035095 scopus 로고
    • Labour flexibility in multiechelon dual constrained job shop
    • J.S. Fryer, "Labour Flexibility in Multiechelon Dual Constrained Job Shop," Mgmt. Science (v20, n7, 1974), pp1073-1080.
    • (1974) Mgmt. Science , vol.20 , Issue.7 , pp. 1073-1080
    • Fryer, J.S.1
  • 15
    • 0001844324 scopus 로고
    • Overview of genetic algorithms: Part 1, fundamentals
    • D. Beasley, D.R. Bull, and R.R. Martin, "Overview of Genetic Algorithms: Part 1, Fundamentals," University Computing (v15, n2, 1993), pp58-69.
    • (1993) University Computing , vol.15 , Issue.2 , pp. 58-69
    • Beasley, D.1    Bull, D.R.2    Martin, R.R.3
  • 18
    • 0025682531 scopus 로고
    • Genetic algorithms and job shop scheduling
    • J. Biegal and J. Davern, "Genetic Algorithms and Job Shop Scheduling," Computers and Industrial Engg. (v19, 1990), pp81-91.
    • (1990) Computers and Industrial Engg. , vol.19 , pp. 81-91
    • Biegal, J.1    Davern, J.2
  • 20
    • 0027906589 scopus 로고
    • Minimizing flow time variance in a single machine system using genetic algorithms
    • M.C. Gupta, Y.P. Gupta, and A. Kumar, "Minimizing Flow Time Variance in a Single Machine System Using Genetic Algorithms," European Journal of Operational Research (v70, 1993), pp289-303.
    • (1993) European Journal of Operational Research , vol.70 , pp. 289-303
    • Gupta, M.C.1    Gupta, Y.P.2    Kumar, A.3
  • 23
    • 0030241820 scopus 로고    scopus 로고
    • Multi-objective genetic algorithms and its application to flow shop scheduling
    • T. Murata, H. Ishibuchi, and H. Tanaka, "Multi-Objective Genetic Algorithms and Its Application to Flow Shop Scheduling," Computers and Industrial Engg. (v30, n4, 1996), pp1061-1071.
    • (1996) Computers and Industrial Engg. , vol.30 , Issue.4 , pp. 1061-1071
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 24
  • 25
    • 0027675828 scopus 로고
    • Labour flexibility and staffing levels in a dual resource constrained job shop
    • J.T. Felan III, T.D. Fry, and P.R. Philipoom, "Labour Flexibility and Staffing Levels in a Dual Resource Constrained Job Shop," Int'l Journal of Production Research (v31, n10, 1993), pp2487-2506.
    • (1993) Int'l Journal of Production Research , vol.31 , Issue.10 , pp. 2487-2506
    • Felan J.T. III1    Fry, T.D.2    Philipoom, P.R.3
  • 26
    • 0025482435 scopus 로고
    • Job shop scheduling with alternative machines
    • N. Nasr and E.A. Elsayed, "Job Shop Scheduling with Alternative Machines," Int'l Journal of Production Research (v28, n9, 1990), pp1595-1609.
    • (1990) Int'l Journal of Production Research , vol.28 , Issue.9 , pp. 1595-1609
    • Nasr, N.1    Elsayed, E.A.2
  • 27
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • A.K. Jain and H.A. ElMaraghy, "Production Scheduling/Rescheduling in Flexible Manufacturing," Int'l Journal of Production Research (v35, n1, 1997a), pp281-309.
    • (1997) Int'l Journal of Production Research , vol.35 , Issue.1 , pp. 281-309
    • Jain, A.K.1    Elmaraghy, H.A.2
  • 29
    • 0002346490 scopus 로고
    • A study of control parameters affecting online performance of genetic algorithms for function optimization
    • J.D. Schaffer, ed. Palo Alto, CA: Morgan-Kaufmann
    • J.D. Schaffer, R.A. Caruana, L.J. Eshelman, and R. Das, "A Study of Control Parameters Affecting Online Performance of Genetic Algorithms for Function Optimization," Proc. of 3rd Int'l Conf. on Genetic Algorithms, J.D. Schaffer, ed. (Palo Alto, CA: Morgan-Kaufmann, 1989), pp51-60.
    • (1989) Proc. of 3rd Int'l Conf. on Genetic Algorithms , pp. 51-60
    • Schaffer, J.D.1    Caruana, R.A.2    Eshelman, L.J.3    Das, R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.