Multi-objective optimization of time-cost-quality using multi-colony ant algorithm
-
A. Afshar, A. Kaveh, and, O. Shoghli., Multi-objective optimization of time-cost-quality using multi-colony ant algorithm, Asian J. Civil Eng. (Build. Housing) 8 (2007), pp. 113-124.
-
(2007)
Asian J. Civil Eng. (Build. Housing
, vol.8
, pp. 113-124
-
-
Afshar, A.1
Kaveh, A.2
Shoghli, O.3
-
2
-
-
84874159754
-
Solving a generalised precedence multi-objective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm
-
M. Amiri, A.R. Abtahi, and, K. Khalili-Damghani., Solving a generalised precedence multi-objective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm, Int. J. Serv. Oper. Manage. 14 (2013), pp. 355-372.
-
(2013)
Int. J. Serv. Oper. Manage
, vol.14
, pp. 355-372
-
-
Amiri, M.1
Abtahi, A.R.2
Khalili-Damghani, K.3
-
3
-
-
0029772743
-
Project management with time, cost and quality considerations
-
A.J. Babu, and, N. Suresh., Project management with time, cost and quality considerations, Eur. J. Oper. Res. 88 (1996), pp. 320-327. doi: 10.1016/0377-2217(94)00202-9
-
(1996)
Eur. J. Oper. Res
, vol.88
, pp. 320-327
-
-
Babu, A.J.1
Suresh, N.2
-
4
-
-
77956063014
-
A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
-
L. Bianco, and, M. Caramia., A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations, Comput. Oper. Res. 38 (2011), pp. 14-20. doi: 10.1016/j.cor.2009.07.003
-
(2011)
Comput. Oper. Res
, vol.38
, pp. 14-20
-
-
Bianco, L.1
Caramia, M.2
-
5
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
P. Brucker, A. Drexl, R. Möhring, K. Neumann, and, E. Pesch., Resource-constrained project scheduling: Notation, classification, models, and methods, Eur. J. Oper. Res. 112 (1999), pp. 3-41. doi: 10.1016/S0377-2217(98)00204-5
-
(1999)
Eur. J. Oper. Res
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
6
-
-
0038183863
-
Lower bounds for resource-constrained project scheduling problems
-
P. Brucker, and, S. Knust., Lower bounds for resource-constrained project scheduling problems, Eur. J. Oper. Res. 149 (2003), pp. 302-313. doi: 10.1016/S0377-2217(02)00762-2
-
(2003)
Eur. J. Oper. Res
, vol.149
, pp. 302-313
-
-
Brucker, P.1
Knust, S.2
-
7
-
-
0029632618
-
The discrete time-cost tradeoff problem revisited
-
P. De, E.J. Dunne, J.B. Ghosh, and, C.E. Wells., The discrete time-cost tradeoff problem revisited, Eur. J. Oper. Res. 81 (1995), pp. 225-238. doi: 10.1016/0377-2217(94)00187-H
-
(1995)
Eur. J. Oper. Res
, vol.81
, pp. 225-238
-
-
De, P.1
Dunne, E.J.2
Ghosh, J.B.3
Wells, C.E.4
-
8
-
-
0031102411
-
Complexity of the discrete time/cost trade-off problem for project networks
-
P. De, E.J. Dunne, J.B. Ghosh, and, C.E. Wells., Complexity of the discrete time/cost trade-off problem for project networks, Oper. Res. 45 (1997), pp. 302-306. doi: 10.1287/opre.45.2.302
-
(1997)
Oper. Res
, vol.45
, pp. 302-306
-
-
De, P.1
Dunne, E.J.2
Ghosh, J.B.3
Wells, C.E.4
-
9
-
-
0036530772
-
A fast an elitist multi-objective genetic algorithm: NSGA-II
-
K. Deb, A. Pratap, S. Agarwal, and, T. Meyarivan., A fast an elitist multi-objective genetic algorithm: NSGA-II, IEEE Trans. Evolut. Comput. 6 (2002), pp. 182-197. doi: 10.1109/4235.996017
-
(2002)
IEEE Trans. Evolut. Comput
, vol.6
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
10
-
-
0032205606
-
New computational results on the discrete time/cost trade-off problem in project networks
-
E. Demeulemeester, B. De Reyck, B. Foubert, W. Herroelen, and, M. Vanhoucke., New computational results on the discrete time/cost trade-off problem in project networks, J. Oper. Res. Soc. 73 (1998), pp. 1153-1163. doi: 10.1057/palgrave.jors.2600634
-
(1998)
J. Oper. Res. Soc
, vol.73
, pp. 1153-1163
-
-
Demeulemeester, E.1
De Reyck, B.2
Foubert, B.3
Herroelen, W.4
Vanhoucke, M.5
-
11
-
-
33644636298
-
-
Kluwer Academic Publishers, Dordrecht
-
E. Demeulemeester, and, W. Herroelen., Project Scheduling, Kluwer Academic Publishers, Dordrecht, 2002, pp. 70-95.
-
(2002)
Project Scheduling
, pp. 70-95
-
-
Demeulemeester, E.1
Herroelen, W.2
-
12
-
-
3543055794
-
RanGen: A random network generator for activity-on-the-node networks
-
E. Demeulemeester, M. Vanhoucke, and, W. Herroelen., RanGen: A random network generator for activity-on-the-node networks, J. Sched. 6 (2003), pp. 17-38. doi: 10.1023/A:1022283403119
-
(2003)
J. Sched
, vol.6
, pp. 17-38
-
-
Demeulemeester, E.1
Vanhoucke, M.2
Herroelen, W.3
-
13
-
-
0032210246
-
A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
-
B. De Reyck, and, W. Herroelen., A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations, Eur. J. Oper. Res. 111 (1998), pp. 152-174. doi: 10.1016/S0377-2217(97)00305-6
-
(1998)
Eur. J. Oper. Res
, vol.111
, pp. 152-174
-
-
De Reyck, B.1
Herroelen, W.2
-
14
-
-
0031624059
-
An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
-
B. De Reyck, and, W. Herroelen., An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations, Comput. Oper. Res. 25 (1998), pp. 1-17. doi: 10.1016/S0305-0548(97)00043-9
-
(1998)
Comput. Oper. Res
, vol.25
, pp. 1-17
-
-
De Reyck, B.1
Herroelen, W.2
-
15
-
-
0033311742
-
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
-
B. De Reyck, and, W. Herroelen., The multi-mode resource-constrained project scheduling problem with generalized precedence relations, Eur. J. Oper. Res. 119 (1999), pp. 538-556. doi: 10.1016/S0377-2217(99)00151-4
-
(1999)
Eur. J. Oper. Res
, vol.119
, pp. 538-556
-
-
De Reyck, B.1
Herroelen, W.2
-
16
-
-
15944361924
-
Time-cost-quality trade-off analysis for highway construction
-
K. El-Rayes, and, A. Kandil., Time-cost-quality trade-off analysis for highway construction, J. Constr. Eng. Manage. 131 (2005), pp. 477-486. doi: 10.1061/(ASCE)0733-9364(2005)131:4(477)
-
(2005)
J. Constr. Eng. Manage
, vol.131
, pp. 477-486
-
-
El-Rayes, K.1
Kandil, A.2
-
17
-
-
0003510115
-
-
MKS Umetrics AB, Umea
-
L. Eriksson, E. Johansson, C. Kettaneh-Wold, and, S.W. Wold., Design of Experiments, Principles and Applications, MKS Umetrics AB, Umea, 2008.
-
(2008)
Design of Experiments, Principles and Applications
-
-
Eriksson, L.1
Johansson, E.2
Kettaneh-Wold, C.3
Wold, S.W.4
-
18
-
-
77953872383
-
A survey of variants and extensions of the resource-constrained project scheduling problem
-
S. Hartmann, and, D. Briskorn., A survey of variants and extensions of the resource-constrained project scheduling problem, Eur. J. Oper. Res. 207 (2010), pp. 1-14. doi: 10.1016/j.ejor.2009.11.005
-
(2010)
Eur. J. Oper. Res
, vol.207
, pp. 1-14
-
-
Hartmann, S.1
Briskorn, D.2
-
19
-
-
0032042933
-
Resource-constrained project scheduling: A survey of recent developments
-
W. Herroelen, B. De Reyck, and, E. Demeulemeester., Resource-constrained project scheduling: A survey of recent developments, Comput. Oper. Res. 25 (1998), pp. 279-302. doi: 10.1016/S0305-0548(97)00055-5
-
(1998)
Comput. Oper. Res
, vol.25
, pp. 279-302
-
-
Herroelen, W.1
De Reyck, B.2
Demeulemeester, E.3
-
20
-
-
13444269168
-
Project scheduling under uncertainty: Survey and research potentials
-
W. Herroelen, and, R. Leus., Project scheduling under uncertainty: Survey and research potentials, Eur. J. Oper. Res. 165 (2005), pp. 289-306. doi: 10.1016/j.ejor.2004.04.002
-
(2005)
Eur. J. Oper. Res
, vol.165
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
21
-
-
84874180357
-
Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling
-
H. Iranmanesh, M. Skandari, and, M. Allahverdiloo., Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling, World Acad. Sci., Eng. Technology 38 (2008), pp. 512-516.
-
(2008)
World Acad. Sci., Eng. Technology
, vol.38
, pp. 512-516
-
-
Iranmanesh, H.1
Skandari, M.2
Allahverdiloo, M.3
-
22
-
-
0003457608
-
-
John Wiley & Sons, Hoboken, NJ
-
H. Kerzner., Project Management: A Systems Approach to Planning, Scheduling and Control, John Wiley & Sons, Hoboken, NJ, 2009.
-
(2009)
Project Management: A Systems Approach to Planning, Scheduling and Control
-
-
Kerzner, H.1
-
23
-
-
84870192596
-
A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems
-
K. Khalili-Damghani, A.R. Abtahi, and, M. Tavana., A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems, Reliab. Eng. Syst. Safety 111 (2013), pp. 58-75. doi: 10.1016/j.ress.2012.10.009
-
(2013)
Reliab. Eng. Syst. Safety
, vol.111
, pp. 58-75
-
-
Khalili-Damghani, K.1
Abtahi, A.R.2
Tavana, M.3
-
24
-
-
84912011007
-
A decision support system for solving multi-objective redundancy allocation problems
-
K. Khalili-Damghani, A.R. Abtahi, and, M. Tavana., A decision support system for solving multi-objective redundancy allocation problems, Qual. Reliab. Eng. Int. 30 (2014), pp. 1249-1262. doi: 10.1002/qre.1545
-
(2014)
Qual. Reliab. Eng. Int
, vol.30
, pp. 1249-1262
-
-
Khalili-Damghani, K.1
Abtahi, A.R.2
Tavana, M.3
-
25
-
-
84859517787
-
Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using efficient epsilon-constraint, multi-start partial bound enumeration algorithm, and DEA
-
K. Khalili-Damghani, and, M. Amiri., Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using efficient epsilon-constraint, multi-start partial bound enumeration algorithm, and DEA, Reliab. Eng. Syst. Safety 103 (2012), pp. 35-44. doi: 10.1016/j.ress.2012.03.006
-
(2012)
Reliab. Eng. Syst. Safety
, vol.103
, pp. 35-44
-
-
Khalili-Damghani, K.1
Amiri, M.2
-
26
-
-
84873619127
-
Solving fuzzy multidimensional multiple-choice Knapsack problems: The multi-start partial bound enumeration method versus the efficient epsilon-constraint method
-
K. Khalili-Damghani, M. Nojavan, and, M. Tavana., Solving fuzzy multidimensional multiple-choice Knapsack problems: The multi-start partial bound enumeration method versus the efficient epsilon-constraint method, Appl. Soft Comput. 13 (2013), pp. 1627-1638. doi: 10.1016/j.asoc.2013.01.014
-
(2013)
Appl. Soft Comput
, vol.13
, pp. 1627-1638
-
-
Khalili-Damghani, K.1
Nojavan, M.2
Tavana, M.3
-
27
-
-
84868468248
-
An integrated multi-objective framework for solving multi-period project selection problems
-
K. Khalili-Damghani, M. Tavana, and, S. Sadi-Nezhad., An integrated multi-objective framework for solving multi-period project selection problems, Appl. Math. Comput. 219 (2012), pp. 3122-3138. doi: 10.1016/j.amc.2012.09.043
-
(2012)
Appl. Math. Comput
, vol.219
, pp. 3122-3138
-
-
Khalili-Damghani, K.1
Tavana, M.2
Sadi-Nezhad, S.3
-
28
-
-
0033177842
-
Time, cost and quality trade-off in project management: A case study
-
D. Khang, and, Y. Myint., Time, cost and quality trade-off in project management: A case study, Int. J. Project Manag. 17 (1999), pp. 249-256. doi: 10.1016/S0263-7863(98)00043-X
-
(1999)
Int. J. Project Manag
, vol.17
, pp. 249-256
-
-
Khang, D.1
Myint, Y.2
-
29
-
-
84655169583
-
A practical approach to project scheduling: Considering the potential quality loss cost in the time-cost tradeoff problem
-
J.Y., Kim, C.W. Kang, and, I.K. Hwang., A practical approach to project scheduling: Considering the potential quality loss cost in the time-cost tradeoff problem, Int. J. Project Manag. 30 (2012), pp. 264-272. doi: 10.1016/j.ijproman.2011.05.004
-
(2012)
Int. J. Project Manag
, vol.30
, pp. 264-272
-
-
Kim, J.Y.1
Kang, C.W.2
Hwang, I.K.3
-
30
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
R. Kolisch, and, R. Padman., An integrated survey of deterministic project scheduling, OMEGA: Int. J. Manag. Sci. 29 (2001), pp. 249-272. doi: 10.1016/S0305-0483(00)00046-3
-
(2001)
OMEGA: Int. J. Manag. Sci
, vol.29
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
31
-
-
34548095696
-
An experimental analysis of evolution strategies and particle swarm optimisers using design of experiments
-
O. Kramer, B. Gloger, and, A. Goebels.,. An experimental analysis of evolution strategies and particle swarm optimisers using design of experiments, Proceedings of the 9th annual conference on Genetic and evolutionary computation, ACM Press, New York, 2007, pp. 674-681.
-
(2007)
Proceedings of the 9th Annual Conference on Genetic and Evolutionary Computation, ACM Press, New York
, pp. 674-681
-
-
Kramer, O.1
Gloger, B.2
Goebels, A.3
-
32
-
-
84855969310
-
MILP formulations for single-and multi-mode resource-constrained project scheduling problems
-
T.S. Kyriakidis, G.M. Kopanos, and, M.C. Georgiadis., MILP formulations for single-and multi-mode resource-constrained project scheduling problems, Comput. Chem. Eng. 36 (2012), pp. 369-385. doi: 10.1016/j.compchemeng.2011.06.007
-
(2012)
Comput. Chem. Eng
, vol.36
, pp. 369-385
-
-
Kyriakidis, T.S.1
Kopanos, G.M.2
Georgiadis, M.C.3
-
33
-
-
67349211166
-
Effective implementation of the epsilon-constraint method in multi-objective mathematical programming problems
-
G. Mavrotas., Effective implementation of the epsilon-constraint method in multi-objective mathematical programming problems, Appl. Math. Comput. 213 (2009), pp. 455-465. doi: 10.1016/j.amc.2009.03.037
-
(2009)
Appl. Math. Comput
, vol.213
, pp. 455-465
-
-
Mavrotas, G.1
-
34
-
-
64549097572
-
A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
-
A.A. Najafi, S.T. Akhavan Niaki, and, M. Shahsavar., A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations, Comput. Oper. Res. 36 (2009), pp. 2994-3001. doi: 10.1016/j.cor.2009.01.016
-
(2009)
Comput. Oper. Res
, vol.36
, pp. 2994-3001
-
-
Najafi, A.A.1
Akhavan Niaki, S.T.2
Shahsavar, M.3
-
35
-
-
0012361022
-
-
2nd ed. Springer, Berlin
-
K. Neumann, C. Schwindt, and, J. Zimmermann., Project Scheduling with Time Windows and Scarce Resources, 2nd ed., Springer, Berlin, 2003.
-
(2003)
Project Scheduling with Time Windows and Scarce Resources
-
-
Neumann, K.1
Schwindt, C.2
Zimmermann, J.3
-
36
-
-
33750585495
-
Incorporating quality considerations into project time/cost tradeoff analysis and decision making
-
B. Pollack-Johnson, and, M. Liberatore., Incorporating quality considerations into project time/cost tradeoff analysis and decision making, IEEE Trans. Eng. Manag. 53 (2006), pp. 534-542. doi: 10.1109/TEM.2006.883705
-
(2006)
IEEE Trans. Eng. Manag
, vol.53
, pp. 534-542
-
-
Pollack-Johnson, B.1
Liberatore, M.2
-
37
-
-
84856520172
-
Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of service centres
-
S. Quintanilla, Á. Pérez, P. Lino, and, V. Valls., Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of service centres, Eur. J. Oper. Res. 219 (2012), pp. 59-72. doi: 10.1016/j.ejor.2011.12.018
-
(2012)
Eur. J. Oper. Res
, vol.219
, pp. 59-72
-
-
Quintanilla, S.1
Pérez, Á.2
Lino, P.3
Valls, V.4
-
38
-
-
70449446451
-
Multi objective particle swarm optimization for a discrete time, c ost and q uality t rade-off p roblem
-
M. Rahimi, and, H. Iranmanesh., Multi objective particle swarm optimization for a discrete time, c ost and q uality t rade-off p roblem, World Appl. Sci. J. 4 (2008), pp. 270-276.
-
(2008)
World Appl. Sci. J
, vol.4
, pp. 270-276
-
-
Rahimi, M.1
Iranmanesh, H.2
-
39
-
-
82755177956
-
An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem
-
M. Ranjbar, M. Khalilzadeh, F. Kianfar, and, K. Etminani., An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem, Comput. Ind. Eng. 62 (2012), pp. 264-270. doi: 10.1016/j.cie.2011.09.013
-
(2012)
Comput. Ind. Eng
, vol.62
, pp. 264-270
-
-
Ranjbar, M.1
Khalilzadeh, M.2
Kianfar, F.3
Etminani, K.4
-
42
-
-
77957009077
-
The discrete time-cost-quality trade-off problem using a novel hybrid genetic algorithm
-
N. Shahsavari Pour, M. Modarres, M. Aryanejad, and, R. Tavakolli-Moghaddam., The discrete time-cost-quality trade-off problem using a novel hybrid genetic algorithm, Appl. Math. Sci. 4 (2010), pp. 2091-2094.
-
(2010)
Appl. Math. Sci
, vol.4
, pp. 2091-2094
-
-
Shahsavari Pour, N.1
Modarres, M.2
Aryanejad, M.3
Tavakolli-Moghaddam, R.4
-
43
-
-
84896721435
-
Empirical study of particle swarm optimization
-
IEEE Press, Piscataway, NJ
-
Y. Shi, and, R. Eberhart., Empirical study of particle swarm optimization, in Congress on Evolutionary Computation (CEC'1999), IEEE Press, Piscataway, NJ, 1999, pp. 1945-1950.
-
(1999)
Congress on Evolutionary Computation (CEC'1999)
, pp. 1945-1950
-
-
Shi, Y.1
Eberhart, R.2
-
44
-
-
0004753965
-
Fundamentals of multicriteria optimization
-
W. Stadler ed. Plenum Press, New York
-
W. Stadler., Fundamentals of multicriteria optimization, in Multicriteria Optimization in Engineering and in the Sciences, W. Stadler ed., Plenum Press, New York, 1988, pp. 1-25.
-
(1988)
Multicriteria Optimization in Engineering and in the Sciences
, pp. 1-25
-
-
Stadler, W.1
-
45
-
-
33750488440
-
On the discrete time, cost and quality trade-off problem
-
H. Tareghian, and, S. Taheri., On the discrete time, cost and quality trade-off problem, Appl. Math. Comput. 181 (2006), pp. 1305-1312. doi: 10.1016/j.amc.2006.02.029
-
(2006)
Appl. Math. Comput
, vol.181
, pp. 1305-1312
-
-
Tareghian, H.1
Taheri, S.2
-
46
-
-
34250621376
-
A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
-
H. Tareghian, and, S. Taheri., A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search, Appl. Math. Comput. 190 (2007), pp. 1136-1145. doi: 10.1016/j.amc.2007.01.100
-
(2007)
Appl. Math. Comput
, vol.190
, pp. 1136-1145
-
-
Tareghian, H.1
Taheri, S.2
-
47
-
-
84888326307
-
A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems
-
M. Tavana, A.R. Abtahi, and, K. Khalili-Damghani., A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems, Expert Syst. Appl. 41 (2014), pp. 1830-1846. doi: 10.1016/j.eswa.2013.08.081
-
(2014)
Expert Syst. Appl
, vol.41
, pp. 1830-1846
-
-
Tavana, M.1
Abtahi, A.R.2
Khalili-Damghani, K.3
-
48
-
-
84879421309
-
A new variant of fuzzy multi-choice Knapsack for project selection problem
-
M. Tavana, K. Khalili-Damghani, and, A.R. Abtahi., A new variant of fuzzy multi-choice Knapsack for project selection problem, Ann. Oper. Res. 206 (2013), pp. 449-483. doi: 10.1007/s10479-013-1387-3
-
(2013)
Ann. Oper. Res
, vol.206
, pp. 449-483
-
-
Tavana, M.1
Khalili-Damghani, K.2
Abtahi, A.R.3
-
49
-
-
34548269905
-
Multi-objective particle swarm optimization with time variant inertia and acceleration coefficients
-
P.K. Tripathi, S. Bandyopadhyay, and, S. Kumar Pal., Multi-objective particle swarm optimization with time variant inertia and acceleration coefficients, Inf. Sci. 177 (2007), pp. 5033-5049. doi: 10.1016/j.ins.2007.06.018
-
(2007)
Inf. Sci
, vol.177
, pp. 5033-5049
-
-
Tripathi, P.K.1
Bandyopadhyay, S.2
Kumar Pal, S.3
-
50
-
-
77955559839
-
Project scheduling with finite or infinite number of activity processing modes a survey
-
J. Weglarz, J. Jozefowska, M. Mika, and, G. Waligora., Project scheduling with finite or infinite number of activity processing modes a survey, Eur. J. Oper. Res. 208 (2010), pp. 177-205. doi: 10.1016/j.ejor.2010.03.037
-
(2010)
Eur. J. Oper. Res
, vol.208
, pp. 177-205
-
-
Weglarz, J.1
Jozefowska, J.2
Mika, M.3
Waligora, G.4
-
52
-
-
78149282590
-
Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradoff in construction
-
H. Zhang, and, F. Xing., Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradoff in construction, Autom. Constr. 19 (2010), pp. 1067-1075. doi: 10.1016/j.autcon.2010.07.014
-
(2010)
Autom. Constr
, vol.19
, pp. 1067-1075
-
-
Zhang, H.1
Xing, F.2
-
53
-
-
79960530761
-
Multiobjective evolutionary algorithms: A survey of the state of the art
-
A. Zhou, B. Qu, H.Z. Li, P. Suganthan, and, Q. Zhang., Multiobjective evolutionary algorithms: A survey of the state of the art, Swarm Evol. Comput. 1 (2011), pp. 32-49. doi: 10.1016/j.swevo.2011.03.001
-
(2011)
Swarm Evol. Comput
, vol.1
, pp. 32-49
-
-
Zhou, A.1
Qu, B.2
Li, H.Z.3
Suganthan, P.4
Zhang, Q.5
|