A genetic algorithm approach for the time-cost trade-off in PERT networks
-
DOI 10.1016/j.amc.2004.10.021, PII S0096300304007040
-
A. Azaron, C. Perkgoz, and M. Sakawa A genetic algorithm approach for the time-cost trade-off in PERT networks Applied Mathematics and Computation 168 2 2005 1317 1339 (Pubitemid 41405681)
-
(2005)
Applied Mathematics and Computation
, vol.168
, Issue.2
, pp. 1317-1339
-
-
Azaron, A.1
Perkgoz, C.2
Sakawa, M.3
-
3
-
-
0029772743
-
Project management with time, cost, and quality considerations
-
DOI 10.1016/0377-2217(94)00202-9
-
A.J. Babu, and N. Suresh Project management with time, cost and quality considerations European Journal of Operational Research 88 1996 320 327 (Pubitemid 126378090)
-
(1996)
European Journal of Operational Research
, vol.88
, Issue.2
, pp. 320-327
-
-
Babu, A.J.G.1
Suresh, N.2
-
6
-
-
15344348592
-
Tight LP bounds for resource constrained project scheduling
-
DOI 10.1007/s00291-003-0155-1
-
P. Baptiste, and S. Demassey Tight LP bounds for resource constrained project scheduling OR Spectrum 26 2 2004 251 262 (Pubitemid 40549771)
-
(2004)
OR Spectrum
, vol.26
, Issue.2
, pp. 251-262
-
-
Baptiste, P.1
Demassey, S.2
-
7
-
-
84856537184
-
An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
-
L. Bianco, and M. Caramia An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations European Journal of Operational Research 219 2012 73 85
-
(2012)
European Journal of Operational Research
, vol.219
, pp. 73-85
-
-
Bianco, L.1
Caramia, M.2
-
9
-
-
4544318435
-
The LP/IP hybrid method for construction time-cost trade-off analysis
-
S. Burns, L. Liu, and C. Feng The LP/IP hybrid method for construction time-cost trade-off analysis Construction Management and Economics 14 3 1996 265 276 (Pubitemid 126662979)
-
(1996)
Construction Management and Economics
, vol.14
, Issue.3
, pp. 265-276
-
-
Burns, S.A.1
Liu, L.2
Feng, C.-W.3
-
11
-
-
67650218851
-
Research on the fully fuzzy time-cost trade-off based on genetic algorithms
-
J. Chao-guang, J. Shang, L. Yan, Z. Yuan-min, and H. Zhen-dong Research on the fully fuzzy time-cost trade-off based on genetic algorithms Journal of Marine Science and Application 4 3 2005 18 23
-
(2005)
Journal of Marine Science and Application
, vol.4
, Issue.3
, pp. 18-23
-
-
Chao-Guang, J.1
Shang, J.2
Yan, L.3
Yuan-Min, Z.4
Zhen-Dong, H.5
-
12
-
-
79951581770
-
Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
-
R.M. Chen Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem Expert Systems with Applications 38 6 2011 7102 7111
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.6
, pp. 7102-7111
-
-
Chen, R.M.1
-
13
-
-
70449527542
-
Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
-
R.M. Chen, C.L. Wu, C.M. Wang, and S.T. Lo Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB Expert Systems with Applications 37 3 2010 1899 1910
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.3
, pp. 1899-1910
-
-
Chen, R.M.1
Wu, C.L.2
Wang, C.M.3
Lo, S.T.4
-
15
-
-
84862706043
-
Project scheduling with flexible resources: Formulation and inequalities
-
I. Correia, L.L. Lourenço, and F. Saldanha-da-Gama Project scheduling with flexible resources: Formulation and inequalities OR Spectrum 34 3 2012 635 663
-
(2012)
OR Spectrum
, vol.34
, Issue.3
, pp. 635-663
-
-
Correia, I.1
Lourenço, L.L.2
Saldanha-Da-Gama, F.3
-
16
-
-
0043114427
-
Project planning with precedence lead/lag factors
-
K.C. Crandall Project planning with precedence lead/lag factors Project Management Quarterly 4 3 1973 18 27
-
(1973)
Project Management Quarterly
, vol.4
, Issue.3
, pp. 18-27
-
-
Crandall, K.C.1
-
17
-
-
0031102411
-
Complexity of the discrete time-cost tradeoff problem for project networks
-
P. De, E. Dunne, J. Ghosh, and C. Wells Complexity of the discrete time/cost trade-off problem for project networks Operations Research 45 1997 302 306 (Pubitemid 127684708)
-
(1997)
Operations Research
, vol.45
, Issue.2
, pp. 302-306
-
-
De, P.1
Dunne, E.J.2
Ghosh, J.B.3
Wells, C.E.4
-
18
-
-
0036530772
-
A fast and elitist multiobjective genetic algorithm: NSGA-II
-
DOI 10.1109/4235.996017, PII S1089778X02041012
-
K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan A fast an elitist multi-objective genetic algorithm: NSGA-II IEEE Transactions on Evolutionary Computation 6 2 2002 182 197 (Pubitemid 34555372)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
19
-
-
0034311599
-
The discrete time/resource trade-off problem in project networks: A branch-and-bound approach
-
E. Demeulemeester, B. De Reyck, and W. Herroelen The discrete time/resource trade-off problem in project networks: A branch-and-bound approach IIE Transactions 32 11 2000 1059 1069
-
(2000)
IIE Transactions
, vol.32
, Issue.11
, pp. 1059-1069
-
-
Demeulemeester, E.1
De Reyck, B.2
Herroelen, W.3
-
20
-
-
0030122629
-
An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
-
E. Demeulemeester, and W. Herroelen An efficient optimal procedure for the preemptive resource-constrained project scheduling problem European Journal of Operational Research 90 1996 334 348 (Pubitemid 126652218)
-
(1996)
European Journal of Operational Research
, vol.90
, Issue.2
, pp. 334-348
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
23
-
-
15944361924
-
Time-cost-quality trade-off analysis for highway construction
-
DOI 10.1061/(ASCE)0733-9364(2005)131:4(477)
-
K. El-Rayes, and A. Kandil Time-cost-quality trade-off analysis for highway construction Journal of Construction Engineering and Management 131 4 2005 477 486 (Pubitemid 40430144)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.4
, pp. 477-486
-
-
El-Rayes, K.1
Kandil, A.2
-
24
-
-
0035281212
-
Resource constrained project scheduling problem with multiple crashable modes: An exact solution method
-
DOI 10.1002/1520-6750(200103)48:2<107::AID-NAV1>3.0.CO;2-9
-
S.S. Erenguc, T. Ahn, and D.G. Conway The resource constrained project scheduling problem with multiple crashable modes: An exact solution method Naval Research Logistics 48 2 2001 107 127 (Pubitemid 32252182)
-
(2001)
Naval Research Logistics
, vol.48
, Issue.2
, pp. 107-127
-
-
Erenguc, S.S.1
Ahn, T.2
Conway, D.G.3
-
25
-
-
80255123850
-
Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO
-
E. Fallah-Mehdipour, O. Bozorg Haddad, M.R. Tabari, and M.A. Mariño Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO Expert Systems with Applications 39 3 2012 2794 2803
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.3
, pp. 2794-2803
-
-
Fallah-Mehdipour, E.1
Bozorg Haddad, O.2
Tabari, M.R.3
Mariño, M.A.4
-
26
-
-
0036684673
-
A self-adapting genetic algorithm for project scheduling under resource constraints
-
DOI 10.1002/nav.10029
-
S. Hartmann A self-adapting genetic algorithm for project scheduling under resource constraints Naval Research Logistics 49 5 2002 433 448 (Pubitemid 34878877)
-
(2002)
Naval Research Logistics
, vol.49
, Issue.5
, pp. 433-448
-
-
Hartmann, S.1
-
28
-
-
84874180357
-
Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling
-
H. Iranmanesh, M. Skandari, and M. Allahverdiloo Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling World Academy of Science, Engineering and Technology 38 2008 512 516
-
(2008)
World Academy of Science, Engineering and Technology
, vol.38
, pp. 512-516
-
-
Iranmanesh, H.1
Skandari, M.2
Allahverdiloo, M.3
-
30
-
-
84870192596
-
A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems
-
K. Khalili-Damghani, A.-R. Abtahi, and M. Tavana A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems Reliability Engineering and System Safety 111 2013 58 75
-
(2013)
Reliability Engineering and System Safety
, vol.111
, pp. 58-75
-
-
Khalili-Damghani, K.1
Abtahi, A.-R.2
Tavana, M.3
-
31
-
-
84859517787
-
Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using a hybrid efficient epsilon-constraint constraint, multi-start partial bound enumeration algorithm, and DEA
-
K. Khalili-Damghani, and M. Amiri Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using a hybrid efficient epsilon-constraint constraint, multi-start partial bound enumeration algorithm, and DEA Reliability Engineering and System Safety 103 2012 35 44
-
(2012)
Reliability Engineering and System Safety
, vol.103
, pp. 35-44
-
-
Khalili-Damghani, K.1
Amiri, M.2
-
32
-
-
84868468248
-
An integrated multi-objective framework for solving multi-period project selection problems
-
K. Khalili-Damghani, M. Tavana, and S. Sadi-Nezhad An integrated multi-objective framework for solving multi-period project selection problems Applied Mathematics and Computations 219 2012 3122 3138
-
(2012)
Applied Mathematics and Computations
, vol.219
, pp. 3122-3138
-
-
Khalili-Damghani, K.1
Tavana, M.2
Sadi-Nezhad, S.3
-
33
-
-
0033177842
-
Time, cost and quality trade-off in project management: A case study
-
D. Khang, and Y. Myint Time, cost and quality trade-off in project management: A case study International Journal of Project Management 17 1999 249 256
-
(1999)
International Journal of Project Management
, vol.17
, pp. 249-256
-
-
Khang, D.1
Myint, Y.2
-
34
-
-
84655169583
-
A practical approach to project scheduling: Considering the potential quality loss cost in the time-cost tradeoff problem
-
J. Kim, C. Kang, and I. Hwang A practical approach to project scheduling: Considering the potential quality loss cost in the time-cost tradeoff problem International Journal of Project Management 30 2 2012 264 272
-
(2012)
International Journal of Project Management
, vol.30
, Issue.2
, pp. 264-272
-
-
Kim, J.1
Kang, C.2
Hwang, I.3
-
36
-
-
67349211166
-
Effective implementation of the epsilon-constraint method in multi-objective mathematical programming problems
-
G. Mavrotas Effective implementation of the epsilon-constraint method in multi-objective mathematical programming problems Applied Mathematics and Computations 213 2009 455 465
-
(2009)
Applied Mathematics and Computations
, vol.213
, pp. 455-465
-
-
Mavrotas, G.1
-
37
-
-
0037871958
-
Solving project scheduling problems by minimum cut computations
-
R.H. Möhring, A.S. Schulz, F. Stork, and M. Uetz Solving project scheduling problems by minimum cut computations Management Science 49 2003 330 350
-
(2003)
Management Science
, vol.49
, pp. 330-350
-
-
Möhring, R.H.1
Schulz, A.S.2
Stork, F.3
Uetz, M.4
-
38
-
-
33750585495
-
Incorporating quality considerations into project time/cost tradeoff analysis and decision making
-
DOI 10.1109/TEM.2006.883705
-
B. Pollack-Johnson, and M. Liberatore Incorporating quality considerations into project time/cost tradeoff analysis and decision making IEEE Transactions on Engineering Management 53 2006 534 542 (Pubitemid 44680691)
-
(2006)
IEEE Transactions on Engineering Management
, vol.53
, Issue.4
, pp. 534-542
-
-
Pollack-Johnson, B.1
Liberatore, M.J.2
-
40
-
-
70449446451
-
Multi objective particle swarm optimization for a discrete time, cost and quality trade-off problem
-
M. Rahimi, and H. Iranmanesh Multi objective particle swarm optimization for a discrete time, cost and quality trade-off problem World Applied Sciences Journal 4 2 2008 270 276
-
(2008)
World Applied Sciences Journal
, vol.4
, Issue.2
, pp. 270-276
-
-
Rahimi, M.1
Iranmanesh, H.2
-
41
-
-
80052569757
-
Resource constraint scheduling with a fractional shared resource
-
G. Singh, and A.T. Ernst Resource constraint scheduling with a fractional shared resource Operations Research Letters 39 2011 363 368
-
(2011)
Operations Research Letters
, vol.39
, pp. 363-368
-
-
Singh, G.1
Ernst, A.T.2
-
42
-
-
0032208139
-
Approximation algorithms for the discrete Time-Cost Tradeoff Problem
-
M. Skutella Approximation algorithms for the discrete time-cost tradeoff problem Mathematics of Operations Research 23 4 1998 909 929 (Pubitemid 128508563)
-
(1998)
Mathematics of Operations Research
, vol.23
, Issue.4
, pp. 909-929
-
-
Skutella, M.1
-
43
-
-
84861348428
-
A hybrid genetic algorithm for the discrete time-cost trade-off problem
-
R. Sonmez, and Ö.H. Bettemir A hybrid genetic algorithm for the discrete time-cost trade-off problem Expert Systems with Applications 39 13 2012 11428 11434
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.13
, pp. 11428-11434
-
-
Sonmez, R.1
Bettemir, Ö.H.2
-
45
-
-
81555204455
-
An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs
-
G.J. Szmerekovsky, and P. Venkateshanb An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs Computers and Operations Research 39 7 2012 1402 1410
-
(2012)
Computers and Operations Research
, vol.39
, Issue.7
, pp. 1402-1410
-
-
Szmerekovsky, G.J.1
Venkateshanb, P.2
-
46
-
-
33750488440
-
On the discrete time, cost and quality trade-off problem
-
DOI 10.1016/j.amc.2006.02.029, PII S0096300306002499
-
H.R. Tareghian, and S.H. Taheri On the discrete time, cost and quality trade-off problem Applied Mathematics and Computation 181 2006 1305 1312 (Pubitemid 44646603)
-
(2006)
Applied Mathematics and Computation
, vol.181
, Issue.2
, pp. 1305-1312
-
-
Tareghian, H.R.1
Taheri, S.H.2
-
47
-
-
34250621376
-
A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
-
DOI 10.1016/j.amc.2007.01.100, PII S0096300307001336
-
H.R. Tareghian, and S.H. Taheri A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search Applied Mathematics and Computation 190 2007 1136 1145 (Pubitemid 46935855)
-
(2007)
Applied Mathematics and Computation
, vol.190
, Issue.2
, pp. 1136-1145
-
-
Tareghian, H.R.1
Taheri, S.H.2
-
48
-
-
70349276753
-
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
-
V. Van Peteghem, and M. Vanhoucke A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem European Journal of Operational Research 201 2 2010 409 418
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.2
, pp. 409-418
-
-
Van Peteghem, V.1
Vanhoucke, M.2
-
49
-
-
13444280108
-
New computational results for the discrete time/cost trade-off problem with time-switch constraints
-
DOI 10.1016/j.ejor.2004.04.007, PII S0377221704002450, Project Management and Scheduling
-
M. Vanhoucke New computational results for the discrete time/cost trade-off problem with time-switch constraints European Journal of Operational Research 165 2 2005 359 374 (Pubitemid 40206367)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 359-374
-
-
Vanhoucke, M.1
-
50
-
-
34848917527
-
The discrete time/cost trade-off problem: Extensions and heuristic procedures
-
DOI 10.1007/s10951-007-0031-y
-
M. Vanhoucke, D. Debels, and J. Sched The discrete time/cost trade-off problem: Extensions and heuristic procedures Journal of Scheduling 10 4-5 2007 311 326 (Pubitemid 47501053)
-
(2007)
Journal of Scheduling
, vol.10
, Issue.4-5
, pp. 311-326
-
-
Vanhoucke, M.1
Debels, D.2
-
52
-
-
67349195453
-
A multi-mode resource-constrained discrete time-cost trade-off problem and its genetic algorithm based solution
-
P. Wuliang, and W. Chengen A multi-mode resource-constrained discrete time-cost trade-off problem and its genetic algorithm based solution International Journal of Project Management 27 6 2009 600 609
-
(2009)
International Journal of Project Management
, vol.27
, Issue.6
, pp. 600-609
-
-
Wuliang, P.1
Chengen, W.2
-
53
-
-
84866400598
-
Discrete time-cost-environment trade-off problem for large-scale construction systems with s under fuzzy uncertainty and its application to Jinping-II hydroelectric project
-
J. Xu, H. Zheng, Z. Zeng, S. Wu, and M. Shen Discrete time-cost-environment trade-off problem for large-scale construction systems with s under fuzzy uncertainty and its application to Jinping-II hydroelectric project International Journal of Project Management 30 8 2012 950 966
-
(2012)
International Journal of Project Management
, vol.30
, Issue.8
, pp. 950-966
-
-
Xu, J.1
Zheng, H.2
Zeng, Z.3
Wu, S.4
Shen, M.5
-
54
-
-
84888334946
-
Stochastic time-cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance
-
T. Yang Stochastic time-cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance Automation in Construction 43 2011 1 11
-
(2011)
Automation in Construction
, vol.43
, pp. 1-11
-
-
Yang, T.1
-
55
-
-
0033897639
-
Finding the critical path in an activity network with time-switch constraints
-
DOI 10.1016/S0377-2217(98)00390-7
-
H. Yang, and Y. Chen Finding the critical path in an activity network with time-switch constraints European Journal of Operational Research 120 3 2000 603 613 (Pubitemid 30516820)
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.3
, pp. 603-613
-
-
Yang, H.-H.1
Chen, Y.-L.2
-
57
-
-
78149282590
-
Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction
-
H. Zhang, and F. Xing Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction Automation in Construction 19 8 2010 1067 1075
-
(2010)
Automation in Construction
, vol.19
, Issue.8
, pp. 1067-1075
-
-
Zhang, H.1
Xing, F.2
|