Volumn 33, Issue 7, 2015, Pages 1610-1634

Classification of articles and journals on project control and earned value management

Author keywords

Classification; Earned value management; Project control; Project management

Indexed keywords

BUDGET CONTROL; CLASSIFICATION (OF INFORMATION); PROJECT MANAGEMENT; STOCHASTIC MODELS; STOCHASTIC SYSTEMS; VALUE ENGINEERING;

EID: 84940435378     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2015.06.003     Document Type: Article
Times cited : (82)

References (46)
  • 1
    • 33645957411 scopus 로고    scopus 로고
    • Earned value project management method and extensions
    • Anbari F.T. Earned value project management method and extensions. Proj. Manag. J. 2003, 34:12-23.
    • (2003) Proj. Manag. J. , vol.34 , pp. 12-23
    • Anbari, F.T.1
  • 3
    • 0032595622 scopus 로고    scopus 로고
    • Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
    • Atkinson R. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. Int. J. Proj. Manag. 1999, 17:337-342.
    • (1999) Int. J. Proj. Manag. , vol.17 , pp. 337-342
    • Atkinson, R.1
  • 4
    • 78649315598 scopus 로고    scopus 로고
    • A framework for an automated and integrated project monitoring and control system for steel fabrication projects
    • Azimi R., Lee S., AbouRizk S.M., Alvanchi A. A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 2011, 20:88-97.
    • (2011) Autom. Constr. , vol.20 , pp. 88-97
    • Azimi, R.1    Lee, S.2    AbouRizk, S.M.3    Alvanchi, A.4
  • 5
    • 0029772743 scopus 로고    scopus 로고
    • Project management with time, cost, and quality considerations
    • Babu A., Suresh N. Project management with time, cost, and quality considerations. Eur. J. Oper. Res. 1996, 88:320-327.
    • (1996) Eur. J. Oper. Res. , vol.88 , pp. 320-327
    • Babu, A.1    Suresh, N.2
  • 6
    • 36249000519 scopus 로고    scopus 로고
    • Probabilistic control of project performance using control limit curves
    • Barraza G.A., Bueno R.A. Probabilistic control of project performance using control limit curves. J. Constr. Eng. Manag. 2007, 133:957-965.
    • (2007) J. Constr. Eng. Manag. , vol.133 , pp. 957-965
    • Barraza, G.A.1    Bueno, R.A.2
  • 7
    • 84887214178 scopus 로고    scopus 로고
    • Managing quality in projects: an empirical study
    • Basu R. Managing quality in projects: an empirical study. Int. J. Proj. Manag. 2014, 32:178-187.
    • (2014) Int. J. Proj. Manag. , vol.32 , pp. 178-187
    • Basu, R.1
  • 8
    • 84940437483 scopus 로고    scopus 로고
    • Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management.
    • Batselier J., Vanhoucke M. Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management. Int. J. Proj. Manag. 2015, 10.1016/j.ijproman.2015.04.003.
    • (2015) Int. J. Proj. Manag.
    • Batselier, J.1    Vanhoucke, M.2
  • 9
    • 0001185873 scopus 로고
    • An essay towards solving a problem in the doctrine of chances
    • Bayes, Price An essay towards solving a problem in the doctrine of chances. Philos. Trans. 1763, 53:370-418.
    • (1763) Philos. Trans. , vol.53 , pp. 370-418
    • Bayes1    Price2
  • 10
    • 30644462480 scopus 로고    scopus 로고
    • A novel multiple linear regression model for forecasting S-curves
    • Blyth K., Kaka A. A novel multiple linear regression model for forecasting S-curves. Eng. Constr. Archit. Manag. 2006, 13:82-95.
    • (2006) Eng. Constr. Archit. Manag. , vol.13 , pp. 82-95
    • Blyth, K.1    Kaka, A.2
  • 13
    • 33644634373 scopus 로고    scopus 로고
    • Completing projects according to plans: an earned-value improvement index
    • Cioffi D. Completing projects according to plans: an earned-value improvement index. J. Oper. Res. Soc. 2006, 57:290-295.
    • (2006) J. Oper. Res. Soc. , vol.57 , pp. 290-295
    • Cioffi, D.1
  • 15
    • 84930757791 scopus 로고    scopus 로고
    • Developing a framework for statistical process control approaches in project management.
    • Colin J., Vanhoucke M. Developing a framework for statistical process control approaches in project management. Int. J. Proj. Manag. 2015, 33:1289-1300.
    • (2015) Int. J. Proj. Manag. , vol.33 , pp. 1289-1300
    • Colin, J.1    Vanhoucke, M.2
  • 16
    • 0037521910 scopus 로고    scopus 로고
    • Project Management Institute, Newton Square, Pennsylvania
    • Fleming Q., Koppelman J. Earned Value Project Management 2005, Project Management Institute, Newton Square, Pennsylvania, (URL: http://books.google.be/books?id=ZMRVngEACAAJ). 3rd edition.
    • (2005) Earned Value Project Management
    • Fleming, Q.1    Koppelman, J.2
  • 17
    • 0033876271 scopus 로고    scopus 로고
    • Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure
    • Gardiner P.D., Stewart K. Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure. Int. J. Proj. Manag. 2000, 18:251-256.
    • (2000) Int. J. Proj. Manag. , vol.18 , pp. 251-256
    • Gardiner, P.D.1    Stewart, K.2
  • 18
    • 33846799194 scopus 로고    scopus 로고
    • A probabilistic framework for Bayesian adaptive forecasting of project progress
    • Gardoni P., Reinschmidt K.F., Kumar R. A probabilistic framework for Bayesian adaptive forecasting of project progress. Comput. Aided Civ. Infrastruct. Eng. 2007, 22:182-196.
    • (2007) Comput. Aided Civ. Infrastruct. Eng. , vol.22 , pp. 182-196
    • Gardoni, P.1    Reinschmidt, K.F.2    Kumar, R.3
  • 19
    • 70350060197 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • Golparvar-Fard M., Peña-Mora F., Arboleda C.A., Lee S. Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs. J. Comput. Civ. Eng. 2009, 23:391-404.
    • (2009) J. Comput. Civ. Eng. , vol.23 , pp. 391-404
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Arboleda, C.A.3    Lee, S.4
  • 20
    • 77956005672 scopus 로고    scopus 로고
    • Available from, (Retrieved June, 2015)
    • Harzing A.W. Publish or Perish Available from, (Retrieved June, 2015). http://www.harzing.com/pop.htm.
    • Publish or Perish
    • Harzing, A.W.1
  • 21
    • 0141536772 scopus 로고
    • National goods versus public goods: defense, disarmament, and free riders
    • Hummel J.R. National goods versus public goods: defense, disarmament, and free riders. Rev. Austrian Econ. 1990, 4:88-122.
    • (1990) Rev. Austrian Econ. , vol.4 , pp. 88-122
    • Hummel, J.R.1
  • 22
    • 85024429815 scopus 로고
    • A new approach to linear filtering and prediction problems
    • Kalman R.E. A new approach to linear filtering and prediction problems. J. Basic Eng. 1960, 82:35-45.
    • (1960) J. Basic Eng. , vol.82 , pp. 35-45
    • Kalman, R.E.1
  • 23
    • 0006767477 scopus 로고
    • A construction project cash flow model - an idiographic approach
    • Kenley R., Wilson O.D. A construction project cash flow model - an idiographic approach. Constr. Manag. Econ. 1986, 4:213-232.
    • (1986) Constr. Manag. Econ. , vol.4 , pp. 213-232
    • Kenley, R.1    Wilson, O.D.2
  • 25
    • 84901619040 scopus 로고    scopus 로고
    • EDM: earned duration management, a new approach to schedule performance management and measurement
    • Khamooshi H., Golafshani H. EDM: earned duration management, a new approach to schedule performance management and measurement. Int. J. Proj. Manag. 2014, 32:1019-1041.
    • (2014) Int. J. Proj. Manag. , vol.32 , pp. 1019-1041
    • Khamooshi, H.1    Golafshani, H.2
  • 26
    • 0033177842 scopus 로고    scopus 로고
    • Time, cost and quality trade-off in project management: a case study
    • Khang D.B., Myint Y.M. Time, cost and quality trade-off in project management: a case study. Int. J. Proj. Manag. 1999, 17:249-256.
    • (1999) Int. J. Proj. Manag. , vol.17 , pp. 249-256
    • Khang, D.B.1    Myint, Y.M.2
  • 27
    • 84655169583 scopus 로고    scopus 로고
    • A practical approach to project scheduling: considering the potential quality loss cost in the time-cost tradeoff problem
    • Kim J., Kang C., Hwang I. A practical approach to project scheduling: considering the potential quality loss cost in the time-cost tradeoff problem. Int. J. Proj. Manag. 2012, 30:264-272.
    • (2012) Int. J. Proj. Manag. , vol.30 , pp. 264-272
    • Kim, J.1    Kang, C.2    Hwang, I.3
  • 28
    • 84929364556 scopus 로고    scopus 로고
    • 2, cost, and schedule management system for building construction projects using the earned value management theory
    • 2, cost, and schedule management system for building construction projects using the earned value management theory. J. Clean. Prod. 2014, 103:275-285.
    • (2014) J. Clean. Prod. , vol.103 , pp. 275-285
    • Kim, J.1    Koo, C.2    Kim, C.J.3    Hong, T.4    Park, H.S.5
  • 29
    • 22744437020 scopus 로고    scopus 로고
    • Schedule is different
    • Lipke W. Schedule is different. Measurable News 2003, 31:31-34.
    • (2003) Measurable News , vol.31 , pp. 31-34
    • Lipke, W.1
  • 31
    • 79952441224 scopus 로고    scopus 로고
    • Evaluating fuzzy earned value indices and estimates by applying alpha cuts
    • Moslemi Naeni L., Salehipour A. Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert Syst. Appl. 2011, 38:8193-8198.
    • (2011) Expert Syst. Appl. , vol.38 , pp. 8193-8198
    • Moslemi Naeni, L.1    Salehipour, A.2
  • 32
    • 14544298805 scopus 로고    scopus 로고
    • Automated project performance control of construction projects
    • Navon R. Automated project performance control of construction projects. Autom. Constr. 2005, 14:467-476.
    • (2005) Autom. Constr. , vol.14 , pp. 467-476
    • Navon, R.1
  • 33
    • 79955974818 scopus 로고    scopus 로고
    • An extension of the EVM analysis for project monitoring: the cost control index and the schedule control index
    • Pajares J., López-Paredes A. An extension of the EVM analysis for project monitoring: the cost control index and the schedule control index. Int. J. Proj. Manag. 2011, 29:615-621.
    • (2011) Int. J. Proj. Manag. , vol.29 , pp. 615-621
    • Pajares, J.1    López-Paredes, A.2
  • 34
    • 24744470252 scopus 로고    scopus 로고
    • Assessing and controlling the quality of a project end product: the earned quality method
    • Paquin J.P., Couillard J., Ferrand D.J. Assessing and controlling the quality of a project end product: the earned quality method. IEEE Trans. Eng. Manag. 2000, 47:88-97.
    • (2000) IEEE Trans. Eng. Manag. , vol.47 , pp. 88-97
    • Paquin, J.P.1    Couillard, J.2    Ferrand, D.J.3
  • 36
    • 84940444274 scopus 로고    scopus 로고
    • (Retrieved September 30, 2014, from
    • SCImago SCImago J. Country Rank 2007, (Retrieved September 30, 2014, from http://www.scimagojr.com).
    • (2007) SCImago J. Country Rank
  • 38
    • 0002988210 scopus 로고
    • Computing machinery and intelligence
    • Turing
    • Turing Computing machinery and intelligence. Mind 1950, 59:433-460.
    • (1950) Mind , vol.59 , pp. 433-460
  • 39
    • 84875026723 scopus 로고    scopus 로고
    • Toward automated earned value tracking using 3D imaging tools
    • Turkan Y., Bosché F., Haas C.T., Haas R. Toward automated earned value tracking using 3D imaging tools. J. Constr. Eng. Manag. 2013, 139:423-433.
    • (2013) J. Constr. Eng. Manag. , vol.139 , pp. 423-433
    • Turkan, Y.1    Bosché, F.2    Haas, C.T.3    Haas, R.4
  • 40
    • 70450215472 scopus 로고    scopus 로고
    • Evolution of project management research as evidenced by papers published in the International Journal of Project Management
    • Turner J.R. Evolution of project management research as evidenced by papers published in the International Journal of Project Management. Int. J. Proj. Manag. 2010, 28:1-6.
    • (2010) Int. J. Proj. Manag. , vol.28 , pp. 1-6
    • Turner, J.R.1
  • 41
    • 33645967441 scopus 로고    scopus 로고
    • A comparison of different project duration forecasting methods using earned value metrics
    • Vandevoorde S., Vanhoucke M. A comparison of different project duration forecasting methods using earned value metrics. Int. J. Proj. Manag. 2006, 24:289-302.
    • (2006) Int. J. Proj. Manag. , vol.24 , pp. 289-302
    • Vandevoorde, S.1    Vanhoucke, M.2
  • 42
    • 77953177108 scopus 로고    scopus 로고
    • Using activity sensitivity and network topology information to monitor project time performance
    • Vanhoucke M. Using activity sensitivity and network topology information to monitor project time performance. OMEGA Int. J. Manag. Sci. 2010, 38:359-370.
    • (2010) OMEGA Int. J. Manag. Sci. , vol.38 , pp. 359-370
    • Vanhoucke, M.1
  • 43
    • 78649854792 scopus 로고    scopus 로고
    • On the dynamic use of project performance and schedule risk information during project tracking
    • Vanhoucke M. On the dynamic use of project performance and schedule risk information during project tracking. OMEGA Int. J. Manag. Sci. 2011, 39:416-426.
    • (2011) OMEGA Int. J. Manag. Sci. , vol.39 , pp. 416-426
    • Vanhoucke, M.1
  • 44
    • 85162216422 scopus 로고    scopus 로고
    • Integrated Project Management and Control: first come the theory, then the practice
    • Springer
    • Vanhoucke M. Integrated Project Management and Control: first come the theory, then the practice. Management for Professionals 2014, Springer.
    • (2014) Management for Professionals
    • Vanhoucke, M.1
  • 45
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh L.A. Fuzzy sets. Inf. Control. 1965, 8:338-353.
    • (1965) Inf. Control. , vol.8 , pp. 338-353
    • Zadeh, L.A.1
  • 46
    • 9444236531 scopus 로고    scopus 로고
    • Evaluation of models for forecasting the final cost of a project
    • Zwikael O., Globerson S., Raz T. Evaluation of models for forecasting the final cost of a project. Proj. Manag. J. 2000, 31:53-57.
    • (2000) Proj. Manag. J. , vol.31 , pp. 53-57
    • Zwikael, O.1    Globerson, S.2    Raz, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.