-
1
-
-
33645957411
-
Earned value project management method and extensions
-
Anbari F.T. Earned value project management method and extensions. Proj. Manag. J. 2003, 34:12-23.
-
(2003)
Proj. Manag. J.
, vol.34
, pp. 12-23
-
-
Anbari, F.T.1
-
3
-
-
0032595622
-
Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
-
Atkinson R. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. Int. J. Proj. Manag. 1999, 17:337-342.
-
(1999)
Int. J. Proj. Manag.
, vol.17
, pp. 337-342
-
-
Atkinson, R.1
-
4
-
-
78649315598
-
A framework for an automated and integrated project monitoring and control system for steel fabrication projects
-
Azimi R., Lee S., AbouRizk S.M., Alvanchi A. A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 2011, 20:88-97.
-
(2011)
Autom. Constr.
, vol.20
, pp. 88-97
-
-
Azimi, R.1
Lee, S.2
AbouRizk, S.M.3
Alvanchi, A.4
-
5
-
-
0029772743
-
Project management with time, cost, and quality considerations
-
Babu A., Suresh N. Project management with time, cost, and quality considerations. Eur. J. Oper. Res. 1996, 88:320-327.
-
(1996)
Eur. J. Oper. Res.
, vol.88
, pp. 320-327
-
-
Babu, A.1
Suresh, N.2
-
6
-
-
36249000519
-
Probabilistic control of project performance using control limit curves
-
Barraza G.A., Bueno R.A. Probabilistic control of project performance using control limit curves. J. Constr. Eng. Manag. 2007, 133:957-965.
-
(2007)
J. Constr. Eng. Manag.
, vol.133
, pp. 957-965
-
-
Barraza, G.A.1
Bueno, R.A.2
-
7
-
-
84887214178
-
Managing quality in projects: an empirical study
-
Basu R. Managing quality in projects: an empirical study. Int. J. Proj. Manag. 2014, 32:178-187.
-
(2014)
Int. J. Proj. Manag.
, vol.32
, pp. 178-187
-
-
Basu, R.1
-
8
-
-
84940437483
-
Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management.
-
Batselier J., Vanhoucke M. Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management. Int. J. Proj. Manag. 2015, 10.1016/j.ijproman.2015.04.003.
-
(2015)
Int. J. Proj. Manag.
-
-
Batselier, J.1
Vanhoucke, M.2
-
9
-
-
0001185873
-
An essay towards solving a problem in the doctrine of chances
-
Bayes, Price An essay towards solving a problem in the doctrine of chances. Philos. Trans. 1763, 53:370-418.
-
(1763)
Philos. Trans.
, vol.53
, pp. 370-418
-
-
Bayes1
Price2
-
10
-
-
30644462480
-
A novel multiple linear regression model for forecasting S-curves
-
Blyth K., Kaka A. A novel multiple linear regression model for forecasting S-curves. Eng. Constr. Archit. Manag. 2006, 13:82-95.
-
(2006)
Eng. Constr. Archit. Manag.
, vol.13
, pp. 82-95
-
-
Blyth, K.1
Kaka, A.2
-
13
-
-
33644634373
-
Completing projects according to plans: an earned-value improvement index
-
Cioffi D. Completing projects according to plans: an earned-value improvement index. J. Oper. Res. Soc. 2006, 57:290-295.
-
(2006)
J. Oper. Res. Soc.
, vol.57
, pp. 290-295
-
-
Cioffi, D.1
-
15
-
-
84930757791
-
Developing a framework for statistical process control approaches in project management.
-
Colin J., Vanhoucke M. Developing a framework for statistical process control approaches in project management. Int. J. Proj. Manag. 2015, 33:1289-1300.
-
(2015)
Int. J. Proj. Manag.
, vol.33
, pp. 1289-1300
-
-
Colin, J.1
Vanhoucke, M.2
-
16
-
-
0037521910
-
-
Project Management Institute, Newton Square, Pennsylvania
-
Fleming Q., Koppelman J. Earned Value Project Management 2005, Project Management Institute, Newton Square, Pennsylvania, (URL: http://books.google.be/books?id=ZMRVngEACAAJ). 3rd edition.
-
(2005)
Earned Value Project Management
-
-
Fleming, Q.1
Koppelman, J.2
-
17
-
-
0033876271
-
Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure
-
Gardiner P.D., Stewart K. Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure. Int. J. Proj. Manag. 2000, 18:251-256.
-
(2000)
Int. J. Proj. Manag.
, vol.18
, pp. 251-256
-
-
Gardiner, P.D.1
Stewart, K.2
-
19
-
-
70350060197
-
Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
-
Golparvar-Fard M., Peña-Mora F., Arboleda C.A., Lee S. Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs. J. Comput. Civ. Eng. 2009, 23:391-404.
-
(2009)
J. Comput. Civ. Eng.
, vol.23
, pp. 391-404
-
-
Golparvar-Fard, M.1
Peña-Mora, F.2
Arboleda, C.A.3
Lee, S.4
-
20
-
-
77956005672
-
-
Available from, (Retrieved June, 2015)
-
Harzing A.W. Publish or Perish Available from, (Retrieved June, 2015). http://www.harzing.com/pop.htm.
-
Publish or Perish
-
-
Harzing, A.W.1
-
21
-
-
0141536772
-
National goods versus public goods: defense, disarmament, and free riders
-
Hummel J.R. National goods versus public goods: defense, disarmament, and free riders. Rev. Austrian Econ. 1990, 4:88-122.
-
(1990)
Rev. Austrian Econ.
, vol.4
, pp. 88-122
-
-
Hummel, J.R.1
-
22
-
-
85024429815
-
A new approach to linear filtering and prediction problems
-
Kalman R.E. A new approach to linear filtering and prediction problems. J. Basic Eng. 1960, 82:35-45.
-
(1960)
J. Basic Eng.
, vol.82
, pp. 35-45
-
-
Kalman, R.E.1
-
23
-
-
0006767477
-
A construction project cash flow model - an idiographic approach
-
Kenley R., Wilson O.D. A construction project cash flow model - an idiographic approach. Constr. Manag. Econ. 1986, 4:213-232.
-
(1986)
Constr. Manag. Econ.
, vol.4
, pp. 213-232
-
-
Kenley, R.1
Wilson, O.D.2
-
25
-
-
84901619040
-
EDM: earned duration management, a new approach to schedule performance management and measurement
-
Khamooshi H., Golafshani H. EDM: earned duration management, a new approach to schedule performance management and measurement. Int. J. Proj. Manag. 2014, 32:1019-1041.
-
(2014)
Int. J. Proj. Manag.
, vol.32
, pp. 1019-1041
-
-
Khamooshi, H.1
Golafshani, H.2
-
26
-
-
0033177842
-
Time, cost and quality trade-off in project management: a case study
-
Khang D.B., Myint Y.M. Time, cost and quality trade-off in project management: a case study. Int. J. Proj. Manag. 1999, 17:249-256.
-
(1999)
Int. J. Proj. Manag.
, vol.17
, pp. 249-256
-
-
Khang, D.B.1
Myint, Y.M.2
-
27
-
-
84655169583
-
A practical approach to project scheduling: considering the potential quality loss cost in the time-cost tradeoff problem
-
Kim J., Kang C., Hwang I. A practical approach to project scheduling: considering the potential quality loss cost in the time-cost tradeoff problem. Int. J. Proj. Manag. 2012, 30:264-272.
-
(2012)
Int. J. Proj. Manag.
, vol.30
, pp. 264-272
-
-
Kim, J.1
Kang, C.2
Hwang, I.3
-
28
-
-
84929364556
-
2, cost, and schedule management system for building construction projects using the earned value management theory
-
2, cost, and schedule management system for building construction projects using the earned value management theory. J. Clean. Prod. 2014, 103:275-285.
-
(2014)
J. Clean. Prod.
, vol.103
, pp. 275-285
-
-
Kim, J.1
Koo, C.2
Kim, C.J.3
Hong, T.4
Park, H.S.5
-
29
-
-
22744437020
-
Schedule is different
-
Lipke W. Schedule is different. Measurable News 2003, 31:31-34.
-
(2003)
Measurable News
, vol.31
, pp. 31-34
-
-
Lipke, W.1
-
31
-
-
79952441224
-
Evaluating fuzzy earned value indices and estimates by applying alpha cuts
-
Moslemi Naeni L., Salehipour A. Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert Syst. Appl. 2011, 38:8193-8198.
-
(2011)
Expert Syst. Appl.
, vol.38
, pp. 8193-8198
-
-
Moslemi Naeni, L.1
Salehipour, A.2
-
32
-
-
14544298805
-
Automated project performance control of construction projects
-
Navon R. Automated project performance control of construction projects. Autom. Constr. 2005, 14:467-476.
-
(2005)
Autom. Constr.
, vol.14
, pp. 467-476
-
-
Navon, R.1
-
33
-
-
79955974818
-
An extension of the EVM analysis for project monitoring: the cost control index and the schedule control index
-
Pajares J., López-Paredes A. An extension of the EVM analysis for project monitoring: the cost control index and the schedule control index. Int. J. Proj. Manag. 2011, 29:615-621.
-
(2011)
Int. J. Proj. Manag.
, vol.29
, pp. 615-621
-
-
Pajares, J.1
López-Paredes, A.2
-
34
-
-
24744470252
-
Assessing and controlling the quality of a project end product: the earned quality method
-
Paquin J.P., Couillard J., Ferrand D.J. Assessing and controlling the quality of a project end product: the earned quality method. IEEE Trans. Eng. Manag. 2000, 47:88-97.
-
(2000)
IEEE Trans. Eng. Manag.
, vol.47
, pp. 88-97
-
-
Paquin, J.P.1
Couillard, J.2
Ferrand, D.J.3
-
36
-
-
84940444274
-
-
(Retrieved September 30, 2014, from
-
SCImago SCImago J. Country Rank 2007, (Retrieved September 30, 2014, from http://www.scimagojr.com).
-
(2007)
SCImago J. Country Rank
-
-
-
38
-
-
0002988210
-
Computing machinery and intelligence
-
Turing
-
Turing Computing machinery and intelligence. Mind 1950, 59:433-460.
-
(1950)
Mind
, vol.59
, pp. 433-460
-
-
-
39
-
-
84875026723
-
Toward automated earned value tracking using 3D imaging tools
-
Turkan Y., Bosché F., Haas C.T., Haas R. Toward automated earned value tracking using 3D imaging tools. J. Constr. Eng. Manag. 2013, 139:423-433.
-
(2013)
J. Constr. Eng. Manag.
, vol.139
, pp. 423-433
-
-
Turkan, Y.1
Bosché, F.2
Haas, C.T.3
Haas, R.4
-
40
-
-
70450215472
-
Evolution of project management research as evidenced by papers published in the International Journal of Project Management
-
Turner J.R. Evolution of project management research as evidenced by papers published in the International Journal of Project Management. Int. J. Proj. Manag. 2010, 28:1-6.
-
(2010)
Int. J. Proj. Manag.
, vol.28
, pp. 1-6
-
-
Turner, J.R.1
-
41
-
-
33645967441
-
A comparison of different project duration forecasting methods using earned value metrics
-
Vandevoorde S., Vanhoucke M. A comparison of different project duration forecasting methods using earned value metrics. Int. J. Proj. Manag. 2006, 24:289-302.
-
(2006)
Int. J. Proj. Manag.
, vol.24
, pp. 289-302
-
-
Vandevoorde, S.1
Vanhoucke, M.2
-
42
-
-
77953177108
-
Using activity sensitivity and network topology information to monitor project time performance
-
Vanhoucke M. Using activity sensitivity and network topology information to monitor project time performance. OMEGA Int. J. Manag. Sci. 2010, 38:359-370.
-
(2010)
OMEGA Int. J. Manag. Sci.
, vol.38
, pp. 359-370
-
-
Vanhoucke, M.1
-
43
-
-
78649854792
-
On the dynamic use of project performance and schedule risk information during project tracking
-
Vanhoucke M. On the dynamic use of project performance and schedule risk information during project tracking. OMEGA Int. J. Manag. Sci. 2011, 39:416-426.
-
(2011)
OMEGA Int. J. Manag. Sci.
, vol.39
, pp. 416-426
-
-
Vanhoucke, M.1
-
44
-
-
85162216422
-
Integrated Project Management and Control: first come the theory, then the practice
-
Springer
-
Vanhoucke M. Integrated Project Management and Control: first come the theory, then the practice. Management for Professionals 2014, Springer.
-
(2014)
Management for Professionals
-
-
Vanhoucke, M.1
-
45
-
-
34248666540
-
Fuzzy sets
-
Zadeh L.A. Fuzzy sets. Inf. Control. 1965, 8:338-353.
-
(1965)
Inf. Control.
, vol.8
, pp. 338-353
-
-
Zadeh, L.A.1
-
46
-
-
9444236531
-
Evaluation of models for forecasting the final cost of a project
-
Zwikael O., Globerson S., Raz T. Evaluation of models for forecasting the final cost of a project. Proj. Manag. J. 2000, 31:53-57.
-
(2000)
Proj. Manag. J.
, vol.31
, pp. 53-57
-
-
Zwikael, O.1
Globerson, S.2
Raz, T.3
|