-
1
-
-
0033690430
-
Probabilistic monitoring of project performance using SS-curves
-
Barraza, G. A., Back, W. E. & Mata, F. (2000), Probabilistic monitoring of project performance using SS-curves, Journal of Construction Engineering and Management, ASCE, 126 (2), 142-48.
-
(2000)
Journal of Construction Engineering and Management, ASCE
, vol.126
, Issue.2
, pp. 142-148
-
-
Barraza, G.A.1
Back, W.E.2
Mata, F.3
-
2
-
-
13944254406
-
Probabilistic forecasting of project performance using stochastic S curves
-
Barraza, G. A., Back, W. E. & Mata, F. (2004), Probabilistic forecasting of project performance using stochastic S curves, Journal of Construction Engineering and Management, ASCE, 130 (1), 25-32.
-
(2004)
Journal of Construction Engineering and Management, ASCE
, vol.130
, Issue.1
, pp. 25-32
-
-
Barraza, G.A.1
Back, W.E.2
Mata, F.3
-
3
-
-
0000133998
-
An analysis of transformations (with discussion)
-
Box, G. E. P. & Cox, D. R. (1964), An analysis of transformations (with discussion), Journal of the Royal Statistical Society, Series B, 26, 211-52.
-
(1964)
Journal of the Royal Statistical Society, Series B
, vol.26
, pp. 211-252
-
-
Box, G.E.P.1
Cox, D.R.2
-
4
-
-
0003532687
-
-
Addison-Wesley, Reading, MA
-
Box, G. E. P. & Tiao, G. C. (1992), Bayesian Inference in Statistical Analysis, Addison-Wesley, Reading, MA.
-
(1992)
Bayesian Inference in Statistical Analysis
-
-
Box, G.E.P.1
Tiao, G.C.2
-
5
-
-
33846792338
-
Virtual buildings (VB) and tools to manage construction process operations
-
in Aarhus, Denmark, June 12-14
-
Christiansson, P., Dawood, N. N. & Svidt, K. (2002), Virtual buildings (VB) and tools to manage construction process operations, in CIB W78 Conference on Distributing Knowledge in Building, Aarhus, Denmark, June 12-14.
-
(2002)
CIB W78 Conference on Distributing Knowledge in Building
-
-
Christiansson, P.1
Dawood, N.N.2
Svidt, K.3
-
6
-
-
15844413358
-
A tool for managing projects: An analytic parameterization of the S-curve
-
Cioffi, D. F. (2005), A tool for managing projects: An analytic parameterization of the S-curve, International Journal of Project Management, 23, 215-22.
-
(2005)
International Journal of Project Management
, vol.23
, pp. 215-222
-
-
Cioffi, D.F.1
-
7
-
-
0001975372
-
The $2,000 hour: How managers influence project performance through the rework cycle
-
Cooper, K. G. (1994), The $2,000 hour: How managers influence project performance through the rework cycle, Project Management Journal, 25 (1), 11-24.
-
(1994)
Project Management Journal
, vol.25
, Issue.1
, pp. 11-24
-
-
Cooper, K.G.1
-
8
-
-
0020141185
-
Schedule development under stochastic scheduling
-
Crandall, K. C. & Woolery, J. C. (1982), Schedule development under stochastic scheduling, Journal of Construction Division, ASCE, 108 (2), 321-29.
-
(1982)
Journal of Construction Division, ASCE
, vol.108
, Issue.2
, pp. 321-329
-
-
Crandall, K.C.1
Woolery, J.C.2
-
9
-
-
0004065097
-
-
J. Wiley, New York, New York
-
Ditlevsen, O. & Madsen, H. O. (1996), Structural Reliability Methods, J. Wiley, New York, New York.
-
(1996)
Structural Reliability Methods
-
-
Ditlevsen, O.1
Madsen, H.O.2
-
11
-
-
0036793104
-
Probabilistic capacity models and fragility estimates for RC columns based on experimental observations
-
Gardoni, P., Der Kiureghian, A. & Mosalam, K. M. (2002), Probabilistic capacity models and fragility estimates for RC columns based on experimental observations, Journal of Engineering Mechanics, ASCE, 128 (10), 1024-38.
-
(2002)
Journal of Engineering Mechanics, ASCE
, vol.128
, Issue.10
, pp. 1024-1038
-
-
Gardoni, P.1
Der Kiureghian, A.2
Mosalam, K.M.3
-
12
-
-
0010848668
-
Probabilistic Models and Fragility Estimates for Structural Components and Systems
-
Ph.D. dissertation, University of California, Berkeley, CA
-
Gardoni, P. (2002), Probabilistic Models and Fragility Estimates for Structural Components and Systems, Ph.D. dissertation, University of California, Berkeley, CA.
-
(2002)
-
-
Gardoni, P.1
-
13
-
-
0013382199
-
-
(June), Structural Engineering, Mechanics and Materials, Department of Civil Engineering. University of California, Berkeley, CA
-
Geyskens, P., Der Kiureghian, A. & Monteiro, P. (June 1993), BUMP: Bayesian Updating of Model Parameters, Report UCB/SEMM-93/06, Structural Engineering, Mechanics and Materials, Department of Civil Engineering. University of California, Berkeley, CA.
-
(1993)
BUMP: Bayesian Updating of Model Parameters, Report UCB/SEMM-93/06
-
-
Geyskens, P.1
Der Kiureghian, A.2
Monteiro, P.3
-
14
-
-
0003414592
-
-
3rd edn., Clarendon Press, Oxford, UK
-
Jeffreys, H. (1961), Theory of Probability, 3rd edn., Clarendon Press, Oxford, UK.
-
(1961)
Theory of Probability
-
-
Jeffreys, H.1
-
15
-
-
33846825308
-
-
Texas A&M University, College Station, TX
-
Kim, B.-C., Cohen, R., Ertem, E. & Taylor, T. (2005), Forecasting United States Nuclear Power Plant Construction Completion, Texas A&M University, College Station, TX.
-
(2005)
Forecasting United States Nuclear Power Plant Construction Completion
-
-
Kim, B.-C.1
Cohen, R.2
Ertem, E.3
Taylor, T.4
-
16
-
-
0001228444
-
Multi-variate distribution models with prescribed marginals and covariances
-
Liu, P.-L. & Der Kiureghian, A. (1986), Multi-variate distribution models with prescribed marginals and covariances, Probabilistic Engineering Mechanics, 1 (2), 105-12.
-
(1986)
Probabilistic Engineering Mechanics
, vol.1
, Issue.2
, pp. 105-112
-
-
Liu, P.-L.1
Der Kiureghian, A.2
-
18
-
-
0032670945
-
Risk assessment in construction schedules
-
Mulholland, B. & Christian, J., (1999), Risk assessment in construction schedules, Journal of Construction Engineering and Management, ASCE, 125 (1), 8-15.
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.1
, pp. 8-15
-
-
Mulholland, B.1
Christian, J.2
-
19
-
-
0029239251
-
Integrated analyses of cost risk and schedule risk
-
in New York
-
Rao, G. & Grobler, F. (1995), Integrated analyses of cost risk and schedule risk, in Proceedings of the 2nd Congress in Computers in Civil Engineering, ASCE, New York, 1404-11.
-
(1995)
Proceedings of the 2nd Congress in Computers in Civil Engineering, ASCE
, pp. 1404-1411
-
-
Rao, G.1
Grobler, F.2
-
20
-
-
0004186061
-
-
Springer, New York, New York
-
Rao, C. R. & Toutenburg, H. (1997), Linear Models, Least Squares and Alternatives, Springer, New York, New York.
-
(1997)
Linear Models, Least Squares and Alternatives
-
-
Rao, C.R.1
Toutenburg, H.2
-
21
-
-
33846791149
-
-
Texas A&M University, College Station, TX
-
Reinschmidt, K. F. (2004), Project Risk Management, Class Notes. Zachry Department of Civil Engineering, Texas A&M University, College Station, TX.
-
(2004)
Project Risk Management, Class Notes. Zachry Department of Civil Engineering
-
-
Reinschmidt, K.F.1
-
24
-
-
0027675776
-
Forecasting final cost and budget of construction projects
-
Teicholz, P. (1993), Forecasting final cost and budget of construction projects, Journal of Computation in Civil Engineering, 7 (4), 511-29.
-
(1993)
Journal of Computation in Civil Engineering
, vol.7
, Issue.4
, pp. 511-529
-
-
Teicholz, P.1
-
25
-
-
0027560002
-
Probabilistic cost estimating with subjective correlations
-
Touran, A. (1993), Probabilistic cost estimating with subjective correlations, Journal of Construction Engineering Management, 119 (1), 58-71.
-
(1993)
Journal of Construction Engineering Management
, vol.119
, Issue.1
, pp. 58-71
-
-
Touran, A.1
-
26
-
-
84939018356
-
-
U. S. Nuclear Regulatory Commission (NRC) Washington DC, various dates from 1977 to 1982
-
U. S. Nuclear Regulatory Commission (NRC), Nuclear Power Plant Construction Status Reports, Washington DC, various dates from 1977 to 1982.
-
Nuclear Power Plant Construction Status Reports
-
-
-
27
-
-
0016354376
-
Probabilistic approach to estimating and cost control
-
Vergara, A. & Boyer, L. (1974), Probabilistic approach to estimating and cost control, Journal of Construction Division, ASCE, 100 (4), 543-52.
-
(1974)
Journal of Construction Division, ASCE
, vol.100
, Issue.4
, pp. 543-552
-
-
Vergara, A.1
Boyer, L.2
|