Volumn 26, Issue 4, 2015, Pages 731-744

No-wait flexible flowshop with uniform parallel machines and sequence-dependent setup time: a hybrid meta-heuristic approach

Author keywords

Flexible flowshop; Meta heuristic; No wait scheduling; Sequence dependent setup time; Taguchi experimental design; Uniform parallel machine

Indexed keywords

HEURISTIC ALGORITHMS; MACHINE SHOP PRACTICE; OPTIMIZATION; SCHEDULING; SCHEDULING ALGORITHMS; SIMULATED ANNEALING; TAGUCHI METHODS;

EID: 84937976613     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-013-0830-2     Document Type: Article
Times cited : (40)

References (55)
  • 1
    • 84888642008 scopus 로고    scopus 로고
    • Artificial bee colony algorithm for CONWIP production control system in a multi-product multi-machine manufacturing environment, Journal of Intelligent Manufacturing
    • Ajorlou, S., & Shams, I. (2012). Artificial bee colony algorithm for CONWIP production control system in a multi-product multi-machine manufacturing environment. Journal of Intelligent Manufacturing. doi:10.1007/s10845-012-0646-5.
    • (2012) & Shams, I
    • Ajorlou, S.1
  • 2
    • 0035324669 scopus 로고    scopus 로고
    • A new heuristic and dominance relations for no-wait flowshops with setup times
    • Aldowaisan, T. A. (2001). A new heuristic and dominance relations for no-wait flowshops with setup times. Computers and Operations Research, 28(6), 563–584.
    • (2001) Computers and Operations Research , vol.28 , Issue.6 , pp. 563-584
    • Aldowaisan, T.A.1
  • 3
    • 0031258858 scopus 로고    scopus 로고
    • Scheduling in stochastic flowshops with independent setup, processing and removal times
    • Allahverdi, A. (1997). Scheduling in stochastic flowshops with independent setup, processing and removal times. Computers and Operations Research, 24(11), 995–960.
    • (1997) Computers and Operations Research , vol.24 , Issue.11 , pp. 960-995
    • Allahverdi, A.1
  • 4
    • 0035312088 scopus 로고    scopus 로고
    • Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
    • Allahverdi, A., & Aldowaisan, T. (2001). Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times. Journal of the Operational Research Society, 52, 449–462.
    • (2001) Journal of the Operational Research Society , vol.52 , pp. 449-462
    • Allahverdi, A.1    Aldowaisan, T.2
  • 7
    • 84880257861 scopus 로고    scopus 로고
    • Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of intelligent manufacturing
    • Belmecheri, F., Prins, C., Yalaoui, F., & Amodeo, L. (2012). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of intelligent manufacturing. doi:10.1007/s10845-012-0627-8.
    • (2012) doi:10.1007/s10845-012-0627-8
    • Belmecheri, F.1    Prins, C.2    Yalaoui, F.3    Amodeo, L.4
  • 8
    • 3342903540 scopus 로고    scopus 로고
    • A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
    • Bertel, S., & Billaut, J. (2004). A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation. European Journal of Operational Research, 159(3), 651–62.
    • (2004) European Journal of Operational Research , vol.159 , Issue.3 , pp. 651-662
    • Bertel, S.1    Billaut, J.2
  • 9
    • 79956127340 scopus 로고    scopus 로고
    • Hybrid metaheuristics in combinatorial optimization: A survey
    • Blum, C., Puchinger, J., Raidl, G. R., & Roli, A. (2011). Hybrid metaheuristics in combinatorial optimization: A survey. Applied Soft Computing, 11, 4135–4151.
    • (2011) Applied Soft Computing , vol.11 , pp. 4135-4151
    • Blum, C.1    Puchinger, J.2    Raidl, G.R.3    Roli, A.4
  • 13
    • 33747373886 scopus 로고    scopus 로고
    • A bicriteria scheduling with sequence-dependent setup times
    • Eren, T., & Güner, T. E. (2006). A bicriteria scheduling with sequence-dependent setup times. Applied Mathematics and Computation, 179, 378–385.
    • (2006) Applied Mathematics and Computation , vol.179 , pp. 378-385
    • Eren, T.1    Güner, T.E.2
  • 14
    • 0031281269 scopus 로고    scopus 로고
    • Two-stage no-wait scheduling models with setup and removal times
    • Gupta, J. N. D., Strusevich, V. A., & Zwaneveld, C. (1997). Two-stage no-wait scheduling models with setup and removal times. Computers and Operations Research, 24(11), 1025–1031.
    • (1997) Computers and Operations Research , vol.24 , Issue.11 , pp. 1025-1031
    • Gupta, J.N.D.1    Strusevich, V.A.2    Zwaneveld, C.3
  • 16
    • 0031955940 scopus 로고    scopus 로고
    • A two-stage hybrid flowshop with uniform machines and setup times
    • Huang, W., & Li, S. (1998). A two-stage hybrid flowshop with uniform machines and setup times. Mathematical and Computer Modelling, 27(2), 27–45.
    • (1998) Mathematical and Computer Modelling , vol.27 , Issue.2 , pp. 27-45
    • Huang, W.1    Li, S.2
  • 19
    • 77950824561 scopus 로고    scopus 로고
    • Invasive weed optimization and its features in electromagnetics
    • Karimkashi, S., & Kishk, A. (2010). Invasive weed optimization and its features in electromagnetics. IEEE Transactions on Antennas and Propagation, 58(4), 1269–1278.
    • (2010) IEEE Transactions on Antennas and Propagation , vol.58 , Issue.4 , pp. 1269-1278
    • Karimkashi, S.1    Kishk, A.2
  • 20
    • 33748432308 scopus 로고    scopus 로고
    • A note on makespan minimization in two-stage flexible flow shops with uniform machines
    • Kyparisis, G. J., & Koulamas, C. (2006a). A note on makespan minimization in two-stage flexible flow shops with uniform machines. European Journal of Operational Research, 175(2), 1321–1327.
    • (2006) European Journal of Operational Research , vol.175 , Issue.2 , pp. 1321-1327
    • Kyparisis, G.J.1    Koulamas, C.2
  • 21
    • 25144444242 scopus 로고    scopus 로고
    • Flexible flow shop scheduling with uniform parallel machines
    • Kyparisis, G. J., & Koulamas, C. (2006b). Flexible flow shop scheduling with uniform parallel machines. European Journal of Operational Research, 168(3), 985–997.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 985-997
    • Kyparisis, G.J.1    Koulamas, C.2
  • 22
    • 84865243299 scopus 로고    scopus 로고
    • Metaheuristics and exact methods to solve a multiobjective parallel machines scheduling problem
    • Li, X., Yalaoui, F., Amodeo, L., & Chehade, H. (2012). Metaheuristics and exact methods to solve a multiobjective parallel machines scheduling problem. Journal of Intelligent Manufacturing, 23(4), 1179–1194.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.4 , pp. 1179-1194
    • Li, X.1    Yalaoui, F.2    Amodeo, L.3    Chehade, H.4
  • 23
    • 70349275461 scopus 로고    scopus 로고
    • Hybrid metaheuristics with evolutionary algorithms specializing in intensification and diversification: Overview and progress report
    • Lozanoa, M., & García-Martínez, C. (2010). Hybrid metaheuristics with evolutionary algorithms specializing in intensification and diversification: Overview and progress report. Computers & Operations Research, 37, 481–497.
    • (2010) Computers & Operations Research , vol.37 , pp. 481-497
    • Lozanoa, M.1    García-Martínez, C.2
  • 24
    • 33751530288 scopus 로고    scopus 로고
    • A novel numerical optimization algorithm inspired from weed colonization
    • Mehrabian, A. R., & Lucas, C. (2006). A novel numerical optimization algorithm inspired from weed colonization. Ecological Informatics, 1, 355–366.
    • (2006) Ecological Informatics , vol.1 , pp. 355-366
    • Mehrabian, A.R.1    Lucas, C.2
  • 26
    • 84872397382 scopus 로고    scopus 로고
    • A two-stage hybrid flowshop scheduling problem in machine breakdown condition
    • Mirabi, M., Ghomi, S. F., & Jolai, F. (2013). A two-stage hybrid flowshop scheduling problem in machine breakdown condition. Journal of Intelligent Manufacturing, 24(1), 193–199.
    • (2013) Journal of Intelligent Manufacturing , vol.24 , Issue.1 , pp. 193-199
    • Mirabi, M.1    Ghomi, S.F.2    Jolai, F.3
  • 27
    • 84855493366 scopus 로고    scopus 로고
    • A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
    • Mirsanei, H. S., Zandieh, M., Moayed, M. J., & Khabbazi, M. R. (2011). A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22(6), 965–978.
    • (2011) Journal of Intelligent Manufacturing , vol.22 , Issue.6 , pp. 965-978
    • Mirsanei, H.S.1    Zandieh, M.2    Moayed, M.J.3    Khabbazi, M.R.4
  • 29
    • 84937981197 scopus 로고
    • Sequencing research and the industrial scheduling problem. In Elmaghra, S. E. (Ed.) Symposium on the theory of scheduling and its applications. New York: Springer, p. 29. International Journal of Advanced Manufacturing Technology, 49
    • Panwalkar, S. S., Dudek, R. A., & Smith, M. L. (1973). Sequencing research and the industrial scheduling problem. In Elmaghra, S. E. (Ed.) Symposium on the theory of scheduling and its applications. New York: Springer, p. 29. International Journal of Advanced Manufacturing Technology, 49, 263–279 (2010).
    • (1973) 263–279 (2010)
    • Panwalkar, S.S.1    Dudek, R.A.2    Smith, M.L.3
  • 30
    • 84865270625 scopus 로고    scopus 로고
    • Earliness-tardiness minimization on a single machine to schedule preventive maintenance tasks: Metaheuristic and exact methods
    • Rebai, M., Kacem, I., & Adjallah, K. H. (2012). Earliness-tardiness minimization on a single machine to schedule preventive maintenance tasks: Metaheuristic and exact methods. Journal of Intelligent Manufacturing, 23(4), 1207–1224.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.4 , pp. 1207-1224
    • Rebai, M.1    Kacem, I.2    Adjallah, K.H.3
  • 32
    • 84874655297 scopus 로고    scopus 로고
    • Heuristics for scheduling a two-stage hybrid flow shop with parallel batching machines: Application at a hospital sterilisation plant. International Journal of Production Research
    • Rossi, A., Puppato, A., & Lanzetta, M. (2012). Heuristics for scheduling a two-stage hybrid flow shop with parallel batching machines: Application at a hospital sterilisation plant. International Journal of Production Research. doi:10.1080/00207543.2012.737942.
    • (2012) doi:10.1080/00207543.2012.737942
    • Rossi, A.1    Puppato, A.2    Lanzetta, M.3
  • 33
    • 78651322130 scopus 로고    scopus 로고
    • Design of non-uniform circular antenna arrays using a modified invasive weed optimization algorithm
    • Roy, G. G., Das, S., Chakraborty, P., & Suganthan, P. N. (2011). Design of non-uniform circular antenna arrays using a modified invasive weed optimization algorithm. IEEE Transactions on Antennas and Propagation, 59(1), 110–118.
    • (2011) IEEE Transactions on Antennas and Propagation , vol.59 , Issue.1 , pp. 110-118
    • Roy, G.G.1    Das, S.2    Chakraborty, P.3    Suganthan, P.N.4
  • 34
    • 27144540137 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
    • Ruiz, R., & Maroto, C. (2006). A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. European Journal of Operational Research, 169(3), 781–800.
    • (2006) European Journal of Operational Research , vol.169 , Issue.3 , pp. 781-800
    • Ruiz, R.1    Maroto, C.2
  • 35
    • 84937981199 scopus 로고    scopus 로고
    • Salvador, M. S. (1973). A solution to a special case of flow shop scheduling problems. In Symposium of the theory of scheduling and applications (pp. 83–91). NewYork: Springer.
    • Salvador, M. S. (1973). A solution to a special case of flow shop scheduling problems. In Symposium of the theory of scheduling and applications (pp. 83–91). NewYork: Springer.
  • 36
    • 0346388714 scopus 로고    scopus 로고
    • Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage
    • Sevastianov, S. V. (2002). Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage. Journal of Scheduling, 5(3), 205–25.
    • (2002) Journal of Scheduling , vol.5 , Issue.3 , pp. 205-225
    • Sevastianov, S.V.1
  • 37
    • 0038370166 scopus 로고    scopus 로고
    • Sequencing on two-stage hybrid flowshops with uniform machines to minimize makespan
    • Soewandi, H., & Elmaghraby, S. E. (2003). Sequencing on two-stage hybrid flowshops with uniform machines to minimize makespan. IIE Transactions, 35(5), 467–477.
    • (2003) IIE Transactions , vol.35 , Issue.5 , pp. 467-477
    • Soewandi, H.1    Elmaghraby, S.E.2
  • 39
    • 21144442004 scopus 로고    scopus 로고
    • A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment
    • Tang, L., Liu, W., & Liu, J. (2005). A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment. Journal of Intelligent Manufacturing, 16(3), 361–370.
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.3 , pp. 361-370
    • Tang, L.1    Liu, W.2    Liu, J.3
  • 40
    • 84865257527 scopus 로고    scopus 로고
    • A cell formation problem considering machine utilization and alternative process routes by scatter search
    • Tavakkoli-Moghaddam, R., Ranjbar-Bourani, M., Amin, G. R., & Siadat, A. (2012). A cell formation problem considering machine utilization and alternative process routes by scatter search. Journal of Intelligent Manufacturing, 23(4), 1127–1139.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.4 , pp. 1127-1139
    • Tavakkoli-Moghaddam, R.1    Ranjbar-Bourani, M.2    Amin, G.R.3    Siadat, A.4
  • 41
    • 36049016444 scopus 로고    scopus 로고
    • Improved immune algorithm for global numerical optimization and job-shop scheduling problems
    • Tsai, J. T., Ho, W. H., Liu, T. K., & Chou, J. H. (2007). Improved immune algorithm for global numerical optimization and job-shop scheduling problems. Applied Mathematics and Computation, 194(2), 406–24.
    • (2007) Applied Mathematics and Computation , vol.194 , Issue.2 , pp. 406-424
    • Tsai, J.T.1    Ho, W.H.2    Liu, T.K.3    Chou, J.H.4
  • 42
    • 48249084195 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for hybrid flowshop scheduling with multiprocessor tasks
    • Tseng, C. T., & Liao, C. J. (2008). A particle swarm optimization algorithm for hybrid flowshop scheduling with multiprocessor tasks. International Journal of Production Research, 46(17), 4655–4670.
    • (2008) International Journal of Production Research , vol.46 , Issue.17 , pp. 4655-4670
    • Tseng, C.T.1    Liao, C.J.2
  • 43
    • 77957784429 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for no-wait flow shop scheduling problem
    • Tseng, L. Y., & Lin, Y. T. (2010). A hybrid genetic algorithm for no-wait flow shop scheduling problem. International Journal of Production Economics, 128, 144–152.
    • (2010) International Journal of Production Economics , vol.128 , pp. 144-152
    • Tseng, L.Y.1    Lin, Y.T.2
  • 44
    • 77955556348 scopus 로고    scopus 로고
    • Shifting representation search for hybrid flexible flowline problems
    • Urlings, T., Ruiz, R., & Stützle, T. (2010). Shifting representation search for hybrid flexible flowline problems. European Journal of Operational Research, 207, 1086–1095.
    • (2010) European Journal of Operational Research , vol.207 , pp. 1086-1095
    • Urlings, T.1    Ruiz, R.2    Stützle, T.3
  • 46
    • 0345979857 scopus 로고    scopus 로고
    • Multistage hybrid flowshop scheduling with identical jobs and uniform parallel machines
    • Verma, S. K., & Dessouky, M. M. (1999). Multistage hybrid flowshop scheduling with identical jobs and uniform parallel machines. Journal of scheduling, 2, 135–50.
    • (1999) Journal of scheduling , vol.2 , pp. 135-150
    • Verma, S.K.1    Dessouky, M.M.2
  • 47
    • 79955911845 scopus 로고    scopus 로고
    • A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem
    • Wang, L., Pan, Q. K., & Tasgetiren, M. F. (2011). A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem. Computers & Industrial Engineering, 61, 76–83.
    • (2011) Computers & Industrial Engineering , vol.61 , pp. 76-83
    • Wang, L.1    Pan, Q.K.2    Tasgetiren, M.F.3
  • 48
    • 84870869927 scopus 로고    scopus 로고
    • Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints
    • Wang, I. L., Yang, T., & Chang, Y. B. (2012). Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints. Journal of Intelligent Manufacturing, 23(6), 2271–2280.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.6 , pp. 2271-2280
    • Wang, I.L.1    Yang, T.2    Chang, Y.B.3
  • 49
    • 24144484641 scopus 로고    scopus 로고
    • No-wait flexible flow shop scheduling with no-idle machines
    • Wang, Z., Xing, W., & Bai, F. (2005). No-wait flexible flow shop scheduling with no-idle machines. Operation Research Letter, 33, 609–614.
    • (2005) Operation Research Letter , vol.33 , pp. 609-614
    • Wang, Z.1    Xing, W.2    Bai, F.3
  • 50
    • 28844491706 scopus 로고    scopus 로고
    • Complexity and algorithms for two-stage flexible flow shop scheduling with availability constraints
    • Xie, J., & Wang, X. (2005). Complexity and algorithms for two-stage flexible flow shop scheduling with availability constraints. Computer and Mathematics with Application, 50, 1629–1638.
    • (2005) Computer and Mathematics with Application , vol.50 , pp. 1629-1638
    • Xie, J.1    Wang, X.2
  • 51
    • 9644283072 scopus 로고    scopus 로고
    • Minimum deviation algorithm for two-stageno-wait flowshops with parallel machines
    • Xie, J., Xing, W., Liu, Z., & Dong, J. (2004). Minimum deviation algorithm for two-stageno-wait flowshops with parallel machines. Computers & Mathematics with Applications, 47(12), 1857–63.
    • (2004) Computers & Mathematics with Applications , vol.47 , Issue.12 , pp. 1857-1863
    • Xie, J.1    Xing, W.2    Liu, Z.3    Dong, J.4
  • 52
    • 67349131899 scopus 로고    scopus 로고
    • Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers
    • Yaurima, V., Burtseva, L., & Tchernykh, A. (2009). Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers. Computers & Industrial Engineering, 56, 1452–1463.
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 1452-1463
    • Yaurima, V.1    Burtseva, L.2    Tchernykh, A.3
  • 53
    • 33745125063 scopus 로고    scopus 로고
    • Multiprocessor task scheduling in multistage hybrid flowshops: an ant colony system approach
    • Ying, K. C., & Lin, S. W. (2006). Multiprocessor task scheduling in multistage hybrid flowshops: an ant colony system approach. International Journal of Production Research, 44(16), 3161–3177.
    • (2006) International Journal of Production Research , vol.44 , Issue.16 , pp. 3161-3177
    • Ying, K.C.1    Lin, S.W.2
  • 54
    • 84855508353 scopus 로고    scopus 로고
    • An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times
    • Zandieh, M., & Karimi, N. (2011). An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22(6), 979–989.
    • (2011) Journal of Intelligent Manufacturing , vol.22 , Issue.6 , pp. 979-989
    • Zandieh, M.1    Karimi, N.2
  • 55
    • 79952618751 scopus 로고    scopus 로고
    • Estimation of distribution algorithm for permutation flow shops with total flow time minimization
    • Zhang, Y., & Li, X. (2011). Estimation of distribution algorithm for permutation flow shops with total flow time minimization. Computers & Industrial Engineering, 60, 706–718.
    • (2011) Computers & Industrial Engineering , vol.60 , pp. 706-718
    • Zhang, Y.1    Li, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.