-
1
-
-
0348189084
-
A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem
-
TU Graz, Austria
-
Schuurman P, Woeginger GJ. A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem. Report Woe-01, March 1997, Combinatorial Approximation Algorithms, TU Graz, Austria, 1997.
-
(1997)
Report Woe-01, March 1997, Combinatorial Approximation Algorithms
-
-
Schuurman, P.1
Woeginger, G.J.2
-
2
-
-
0003075019
-
Optimal two and three-stage production schedules with set-up times included
-
Johnson SM. Optimal two and three-stage production schedules with set-up times included. Naval Research Logistics Quarterly 1954; 1:61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
6
-
-
0023170393
-
Using dual approximation algorithms for scheduling problems: Theoretical and practical results
-
Hochbaum DS, Shmoys DB. Using dual approximation algorithms for scheduling problems: theoretical and practical results. Journal of the Association for Computing Machinery 1987; 34:144-162.
-
(1987)
Journal of the Association for Computing Machinery
, vol.34
, pp. 144-162
-
-
Hochbaum, D.S.1
Shmoys, D.B.2
-
8
-
-
0005081133
-
On a compact vector summation
-
in Russian
-
Sevastianov SV. On a compact vector summation. Diskretnaya Matematika 1991; 3(3):66-72 (in Russian).
-
(1991)
Diskretnaya Matematika
, vol.3
, Issue.3
, pp. 66-72
-
-
Sevastianov, S.V.1
-
9
-
-
0041555170
-
Nonstrict vector summation in the plane and its application to scheduling problems
-
Korshunov AD (ed.), Kluwer: Dordrecht
-
Sevastianov SV. Nonstrict vector summation in the plane and its application to scheduling problems. In Operations Research and Discrete Analysis, Korshunov AD (ed.), Kluwer: Dordrecht, 1997; 241-272.
-
(1997)
Operations Research and Discrete Analysis
, pp. 241-272
-
-
Sevastianov, S.V.1
-
10
-
-
0003901991
-
Scheduling multiprocessor flow shops
-
Du D-Z, Sun J (eds), Kluwer: Dordrecht
-
Chen B. Scheduling multiprocessor flow shops. In New Advances in Optimization and Approximation, Du D-Z, Sun J (eds), Kluwer: Dordrecht, 1994; 1-8.
-
(1994)
New Advances in Optimization and Approximation
, pp. 1-8
-
-
Chen, B.1
-
12
-
-
0029241717
-
Vector summation in Banach space and polynomial algorithms for flow shops and open shops
-
Sevastianov SV. Vector summation in Banach space and polynomial algorithms for flow shops and open shops. Mathematics of Operations Research 1995; 20:90-103.
-
(1995)
Mathematics of Operations Research
, vol.20
, pp. 90-103
-
-
Sevastianov, S.V.1
-
13
-
-
0347559476
-
Construction of an approximate schedule for a flow-type system
-
in Russian
-
Sevastianov SV. Construction of an approximate schedule for a flow-type system. Upravlyaemye Sistemy 1993; 31:66-71 (in Russian).
-
(1993)
Upravlyaemye Sistemy
, vol.31
, pp. 66-71
-
-
Sevastianov, S.V.1
-
14
-
-
0346302274
-
Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flowshops
-
Kyparisis GJ, Koulamas C. Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flowshops. Naval Research Logistics 2000; 47(3):259-268.
-
(2000)
Naval Research Logistics
, vol.47
, Issue.3
, pp. 259-268
-
-
Kyparisis, G.J.1
Koulamas, C.2
|