메뉴 건너뛰기




Volumn 5, Issue 3, 2002, Pages 205-225

Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage

Author keywords

Approximation; Multiprocessor flowshop scheduling; Uniform parallel machines; Worst case analysis

Indexed keywords

ALGORITHMS; APPROXIMATION THEORY; GEOMETRY; HEURISTIC METHODS; MACHINERY; POLYNOMIALS;

EID: 0346388714     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1002/jos.98     Document Type: Article
Times cited : (8)

References (14)
  • 2
    • 0003075019 scopus 로고
    • Optimal two and three-stage production schedules with set-up times included
    • Johnson SM. Optimal two and three-stage production schedules with set-up times included. Naval Research Logistics Quarterly 1954; 1:61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 6
    • 0023170393 scopus 로고
    • Using dual approximation algorithms for scheduling problems: Theoretical and practical results
    • Hochbaum DS, Shmoys DB. Using dual approximation algorithms for scheduling problems: theoretical and practical results. Journal of the Association for Computing Machinery 1987; 34:144-162.
    • (1987) Journal of the Association for Computing Machinery , vol.34 , pp. 144-162
    • Hochbaum, D.S.1    Shmoys, D.B.2
  • 8
    • 0005081133 scopus 로고
    • On a compact vector summation
    • in Russian
    • Sevastianov SV. On a compact vector summation. Diskretnaya Matematika 1991; 3(3):66-72 (in Russian).
    • (1991) Diskretnaya Matematika , vol.3 , Issue.3 , pp. 66-72
    • Sevastianov, S.V.1
  • 9
    • 0041555170 scopus 로고    scopus 로고
    • Nonstrict vector summation in the plane and its application to scheduling problems
    • Korshunov AD (ed.), Kluwer: Dordrecht
    • Sevastianov SV. Nonstrict vector summation in the plane and its application to scheduling problems. In Operations Research and Discrete Analysis, Korshunov AD (ed.), Kluwer: Dordrecht, 1997; 241-272.
    • (1997) Operations Research and Discrete Analysis , pp. 241-272
    • Sevastianov, S.V.1
  • 10
    • 0003901991 scopus 로고
    • Scheduling multiprocessor flow shops
    • Du D-Z, Sun J (eds), Kluwer: Dordrecht
    • Chen B. Scheduling multiprocessor flow shops. In New Advances in Optimization and Approximation, Du D-Z, Sun J (eds), Kluwer: Dordrecht, 1994; 1-8.
    • (1994) New Advances in Optimization and Approximation , pp. 1-8
    • Chen, B.1
  • 12
    • 0029241717 scopus 로고
    • Vector summation in Banach space and polynomial algorithms for flow shops and open shops
    • Sevastianov SV. Vector summation in Banach space and polynomial algorithms for flow shops and open shops. Mathematics of Operations Research 1995; 20:90-103.
    • (1995) Mathematics of Operations Research , vol.20 , pp. 90-103
    • Sevastianov, S.V.1
  • 13
    • 0347559476 scopus 로고
    • Construction of an approximate schedule for a flow-type system
    • in Russian
    • Sevastianov SV. Construction of an approximate schedule for a flow-type system. Upravlyaemye Sistemy 1993; 31:66-71 (in Russian).
    • (1993) Upravlyaemye Sistemy , vol.31 , pp. 66-71
    • Sevastianov, S.V.1
  • 14
    • 0346302274 scopus 로고    scopus 로고
    • Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flowshops
    • Kyparisis GJ, Koulamas C. Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flowshops. Naval Research Logistics 2000; 47(3):259-268.
    • (2000) Naval Research Logistics , vol.47 , Issue.3 , pp. 259-268
    • Kyparisis, G.J.1    Koulamas, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.